Attach 1_ Schedule of Items_ 11-15-19.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- 1243ZP20Q0008
- Issued by
-
Department of Agriculture Forest Service
About this file
This document outlines a federal contract solicitation for design services. The USDA Forest Service El Yunque National Forest is seeking proposals to design and develop contract documents for the reconstruction of the Big Tree Trail and La Mina Trail and associated trail bridges in Puerto Rico. The selected contractor will provide drawings, specifications, schedules, and cost estimates ready for advertisement. All final design documents must be stamped by a Professional Engineer licensed in Puerto Rico. The estimated construction cost is between $900,000 and $1,300,000. The period of performance for design services is 110 days. The North American Industry Classification System code for this requirement is 541330 for Engineering Services. The solicitation is anticipated to be issued on or around January 6, 2020 and will be set aside 100% for small businesses. Non-mandatory site showings will be held on January 8 and 9, 2020 for up to 40 people per date, with reservations required.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor's Estimate
| CONTRACT # ******** | |||||
| ATTACHMENT 1 - SCHEDULE OF ITEMS | |||||
| LA MINA AND BIG TREE TRAIL ASSESSMENT, TRAIL BRIDGES ASSESSMENT AND A-E REPAIR AND RE-CONSTRUCTION DESIGN PROJECT | |||||
| PAY ITEM | DESCRIPTION | PAY UNIT | EST. # OF PAY UNITS | TOTAL PRICE | |
| 001 | La Mina and Big Tree Trail Assessment, Trail Bridges and Trail Assessment, La Mina and Big Trail and Trail Bridges A-E Repair and Re-Construction Design (30%) | ||||
| Per Attachment 2 - Statement of Work | Lump Sum | 1 | $ - 0 | ||
| 002 | La Mina and Big Tree Trail Assessment, Trail Bridges and Trail Assessment, La Mina and Big Trail and Trail Bridges A-E Repair and Re-Construction Design (60%) | ||||
| Per Attachment 2 - Statement of Work | Lump Sum | 1 | $ - 0 | ||
| 003 | La Mina and Big Tree Trail Assessment, Trail Bridges and Trail Assessment, La Mina and Big Trail and Trail Bridges A-E Repair and Re-Construction Design (90%) | ||||
| Per Attachment 2 - Statement of Work | Lump Sum | 1 | $ - 0 | ||
| 004 | La Mina and Big Tree Trail Assessment, Trail Bridges and Trail Assessment, La Mina and Big Trail and Trail Bridges A-E Repair and Re-Construction Design (100%) | ||||
| Per Attachment 2 - Statement of Work | Lump Sum | 1 | $ - 0 | ||
| 005 | Geotech Report --- Required For Trail Bridge(s) For Replacement and As Applicable for All Complex and Minor Trail Bridges For Repair | Lump Sum | 1 | $ - 0 | |
| 006 | Hydrologic and Hydraulic (H&H) Analysis --- Required For Trail Bridge(s) For Replacement and As Applicable for All Complex and Minor Trail Bridges For Repair | Lump Sum | 1 | $ - 0 |
TOTAL CONTRACT AMOUNT: $ - 0
Brooks act
| LA MINA AND BIG TREE TRAIL AND TRAIL BRIDGES ASSESSMENT AND DESIGN PROJECT | ||
| LABOR | Labor Rate | Task 001 |
30% Conceptual Design Task 002
60% Task 003
| 90% Pre-Final | Task 004 | ||||||||||||
| 100% Final | Subtotal Hours | Subtotal Revenue | |||||||||||
| Personnel Level | Site Visit & | ||||||||||||
| Pre-Design Mtg. | Evaluate Electrical Service | Demolition Design | Concept | ||||||||||
| Design | Design Development | Permit Documents | Pre-Final | ||||||||||
| Permit Documents | Final | ||||||||||||
| Project Management-QAQC | 0 | $ - 0 | |||||||||||
| Sr Civil Engineer | 0 | $ - 0 | |||||||||||
| Civil Engineer | 0 | $ - 0 | |||||||||||
| Sr Structural Engineer | 0 | $ - 0 | |||||||||||
| Structural Engineer | 0 | $ - 0 | |||||||||||
| Sr. Architect | 0 | $ - 0 | |||||||||||
| Architect | 0 | $ - 0 | |||||||||||
| Sr. Mechanical Engineer | 0 | $ - 0 | |||||||||||
| Mechanical Engineer | 0 | $ - 0 | |||||||||||
| Sr Electrical Engineer | 0 | $ - 0 | |||||||||||
| Electrical Engineer | 0 | $ - 0 | |||||||||||
| Specification Writer | 0 | $ - 0 | |||||||||||
| LEED AP/ Interior Designer | 0 | $ - 0 | |||||||||||
| Adm Support/Clerical | 0 | $ - 0 | |||||||||||
| Labor Subtotals: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Labor Subtotal: | $ - 0 |
| ECC | 900000 |
| 6% | 54000 |