This document is a Questions and Answers (Q&A) addendum for the Lolo National Forest T-150 Building Reconstruction project (solicitation #1240LU25R0018), scheduled for bid on 08/08/2025 at 11:00 am. The document provides clarifications on various technical aspects of the project, including lighting fixtures, fencing, building materials, and optional construction elements. Key details include: no liquidated damages will be applied, the project requires bonding but not Builder's Risk insurance, and it is a small business set-aside. The project involves reconstructing a building with optional elements such as fitness and restroom areas, and specific technical clarifications were made about lighting fixtures, downspout colors, and material specifications. Notable substitutions were approved for Drexel Metals roofing, Arcadia products, and C.H.I. coiling doors. The project will follow the Buy American Act requirements under FAR Clause 52.225-11, and no local building permits are required as the U.S. Forest Service will conduct their own inspections.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lolo National Forest T-150 Building Reconstruction, 1240LU25R0018

08/08/2025 11:00 am

Additional submitted questions:

1. Is there any liquidated damages? No liquidated damages in this contract.

2. A403/ detail 1 grid 9 shows mop sink, grid 8 shows drinking fountain. Are these part of Option 2? If option 2 is not accepted, where do they go? Fitness and Restroom Areas shall be installed only if “Option Item 2 – Fitness and Restroom Areas” is selected. All infrastructure for option 2 is base bid. The mop sink and drinking fountain fixtures are associated with Option 2. Note: Option item numbering will be clarified in a future amendment.

3. A701 finish schedule calls out full size FRP. A403/ details 2-13 calls for 5’ FRP. Which is correct? Full size FRP is not required. See interior elevations on sheet A403 for layout and dimensions of FRP panels.

4. C101 calls for fence to remain / reuse. Correct

5. C106A calls for new fence and gates. Correct

6. C106 calls for new fence and Asphalt Correct

7. C108 has new fence details Correct

8. A011 Protect existing / Remove and relocate Correct see civil drawings

9. A101 / 1 Is new fence part of Option 1 or is it base bid? See dash line, and Civil drawings - Base bid

10. US Forestry T150 #1240LU25R0018, will this project need local building permits or will Forestry perform their on inspections? No local building permits required.

11. I am a local (Butte MT) manufacturer representative for several commercial building product lines. One of these is Drexel Metals a division of Carlisle Construction Materials. Drexel is a premier manufacturer of metal roofing and wall panels. I have had several qualified contractors reach out to me about this project expressing interest in using Drexel. I would like to formally request Drexel be added as an approved equal per addendum. Confirmed acceptable. The proposed metal roof panel product substitution will be added as a note into the applicable specifications section and then included in a future amendment.

12. Is there a Builders Risk required for Forestry T150 #1240LU25R0018? Builders Risk is not a requirement, bonding is required.

13. What the series of RLM Lighting is specified on fixtures E1E and E3 by TMS Lighting?

This is on E004. See responses below, 18 and 19.

14. Also, can you please verify if this project needs to meet BAA requirements? FAR Clause 52.225-11 Buy American Act-Construction Materials under Trade Agreements (NOV 2023) is included in this solicitation and impending contract.

15. I am looking at the ICT portion of this bid and have an RFI:

The legend and specs include security cameras, but I don't see any on the plans on the exchange. Is there another set of plans that includes cameras?

There are no cameras in this scope, just the infrastructure shown for future installation. Spec section 28 2300 is removed.

Installation of camera pathways shall be considered under option 1.

Bid items 27/28 will be added to SOI in a future amendment.

16. Who is responsible for the ACM panel in detail 4 of sheet A510? Is there an ACM panel spec that I am missing? ACM Panel not required - 1/8" alum plate with bend ends acceptable for infill panels. Color to match storefront.

17. Detail 1 on Sheet A510 shows SF3. I noticed that the jambs are drawn continuously.

I believe those jambs should not continue on past the head of each storefront bay.

We will provide pricing for three separate storefront openings per, with detail 4.

Correct, sections of storefront are not continuous at elevations see updated transition detail at jambs. These will be shown in a future the amendment.

Please see below regarding the lighting fixtures specified on this project:

18. Type E1E – Specified as TMS Lighting 0-19W-30K-120-W/M-XX. Fixture schedule description is 16” diameter RLM light ceiling mount at soffit but mounting is specified as surface wall mount. The attached specification sheet indicates that this is a wall mount fixture. I must confirm whether the mounting is ceiling mount rather than wall mount as that would require a custom mounting. If the attached spec sheet is the correct series, the catalog number should be prefaced with “4W.”

E1E fixtures are to be wall mounted, see elevations and plan drawings. Please use a wall type fixture for mounting (no custom mounting required). Updated cut sheet https://tmslighting.com/farm-light.html#wdetails for bidding 10W-O-15LED-30K-

120-WM-XX-

19. Types E3/E3E – Specified as TMS Lighting 0-16-19LED-C01-30K-120-XX. Fixture schedule description is 16” diameter RLM light surface mount at soffit. The attached specification sheet indicates that this is a ceiling pendant mount fixture. I must confirm whether the mounting is ceiling surface mount at the soffit or ceiling pendant mount as a ceiling mount would require a custom mounting. It is entirely possible that the specified 1” stem mount is interpreted as surface mount. If that is the case, no further clarification is need other than prefacing the catalog number with “NAU” per the attached spec sheet. Please see drawings for additional https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Ftmslighting.com%2Ffarm-light.html%23wdetails&data=05%7C02%7Ctanner.grimstad%40usda.gov%7Cb01429c826ab45ebaf8b08ddd0693963%7Ced5b36e701ee4ebc867ee03cfa0d4697%7C1%7C0%7C638895872719461777%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=0sI2NFmg7mR5lq3U2EhgG8n%2Bf%2FulFhbKr%2FpxLwkjyT0%3D&reserved=0 references of the required mounting. These fixtures in those locations are intended with stem mount at soffit.

20. Types H1/H1E – Specified as Lithonia XIB-L24-30000LM-AVCL-MVOLT-GZ10-40K- 90CRI-UPL. The XIB high bay is a wet location high bay which seems unusual for mezzanine mounting. I would like to confirm whether this fixture really needs to be wet location listed. The exits mounted in the same area are not wet location, so that is another reason for my question. Wet location type is not required. Please use fixture IBE Non-Wet location High Bay.

21. Bid Option #2 vs. Bid Option #3 – Section 01 2300 lists Option Item No. 2 as Fitness and Restroom Areas (Rooms 104 – 108. Option Item No. 3 is Interior Fence Partitions. Note #8 on Sheet E103 states “shaded area is to be bid as Option Item

3. For Base Bid, simply continue the pattern of Type F1 luminaires from Storage Area 103 throughout this area.” From this description, I believe this is Option 2 rather than Option 3. Please clarify this for bidding purposes. Restrooms are option 2 so electrical notes are correct in designation of #2. The revised option numbering will be shown in a future amendment.

22. I'm reaching out to see if you know the color for the downspout adapter? Final finish colors are selected once physical samples of options are provided during submittal process. Design intent is to attempt to closely match the downspout and roof material color – METAL SALES - Old Zinc Grey (W29) is the reference. Note...but until final roofing color is selected a final color can not be selected to match.

23. Specification Section 105123 Lockers is included in the specifications. No lockers appear to be indicated in the plans. Is this specification required for the project?

No lockers in the project.

24. Specification Section 113013 Residential Appliances is included in the specifications. Sheet A110 indicates that these are to be provided and installed by Owner. Is the specification strictly for reference? Correct, this specification is only for reference.

25. Specification Section 133419 Metal Building Systems is included in the specifications. This appears to be a structural steel building and specification for all components of the building are included elsewhere. Should this Specification 133419 be deleted? Yes, division 13 should be deleted. In the near future a drawing amendment will be issued showing the updated option numbers on drawings and specifications.

26. Sheet A003; Ceiling Assemblies C1; States ‘(SSD) See Structural Drawings for sizes and spacing.’ Assembly also indicates 600S162-54 @ 16” OC. Structural plans do not contain these elements. Should we follow the 600S152-54 @ 16” OC? Yes, the 16” O.C. is a MINIMUM requirement.

27. Sheet A120; Reflected Ceiling Plan; Level 1 RCP; Lower right hand side: Calls for “Caged Ceiling 12’ AFF. See Structural Drawings (SSD).” Structural plans do indicate any of these elements. Please clarify for bidding purposes. Correct, this is not a structural condition. The intent is to use the same wire cage partition manufacturers system for the ceiling as the walls. Verify with cage partition manufacturer the shown span and area. Utilize their approved system for caging the ceiling secure.

28. Can you confirm this is a small business set-aside project? Yes

29. Can we get a copy of the site visit sign in sheet? This sign-in sheet was posted

8/4/25 on the solicitation link on SAM.gov.

30. Can you provide the existing building plans as .pdf files? SEE EXISTING T150

INSPECTION REPORT.

31. Can you clarify the Option Item numbering? There seems to be various plan sheets showing different numberings. For instance, Sheet A110 shows the Fitness / Restroom area as Option 3. Sheet A120 shows the ceiling clouds as Option 6.

Revised option numbering will be addressed in a future amendment.

32. Civil plans do not call for repair of existing lawn areas north of the building. Is this to be part of our scope? Is this area irrigated? Any sod removed for trenching will need to be replaced as well as irrigation lines and sprinkler heads prior to substantial completion. Any sod that is damaged for construction and is not included in the trench limits will need to be replaced prior to substantial completion.

33. 1/A101 calls out “landscaping gravel” north and east of the building, and “landscaping area” west of the building. Is all of this meant to be landscaping gravel as shown in 2/C107? Yes

34. Demolition note 1 on C101 calls out exploratory excavation for a potential water line. Are we to include only the exploratory excavation in our pricing? Or are we to assume there is a water line and include pricing for removing it? SEE DEMOLITION

NOTE 1 ON C101 FOR CLARIFICATION.

35. C102 has a 1”=30’ scale. Should this be 1” = 20’? Yes, the overall view on sheet C102 is at a 1”=20’ scale, the scale bar in the upper right hand corner of the page is incorrect.

36. Can you confirm if abatement is part of our scope? Specification 024100, 1.01A notes “excluding of hazardous materials”. Abatement is the responsibility of the contractor.

37. Can you clarify what work is being covered under specification 133419? It looks like the structure steel and framing are all under Division 5 specs. Division 13 is being removed in a future amendment.

38. There is a specification for lockers (105123), but I haven’t located any on the plans. Can you clarify where these occur? No lockers in project, locker specifications will be removed in future amended drawings.

39. Can you clarify the height of the Option 4 caged partition? Will be option 3 in future amended drawings, but height = 12’-0”

40. A601 includes a Type W wire cage door. I don’t see this occurring on the plan or in the schedule. Does this exist? CLARIFICATION: TYPE W DOOR NOT

REQUIRED. NO DOORS IN DOOR SCHEDULE ARE TYPE W.

41. A120 refers to structural plans for the caged ceiling. Can you clarify where this is on structural plans? CLARIFICATION, this is not a structural condition. The intent is to use the same wire cage partition manufacturers system for the ceiling as the walls. Verify with cage partition manufacturer the shown span and area. Utilize their approved system for caging the ceiling secure.

42. Can you provide a size for door 102? THIS SIZE WILL DEPEND ON MFR

CAPABILITIES. OUR REQUESTED SIZE IS 6’-0” W X 7’-0” H. PLEASE PLAN FOR

CAGED PARTITION TO ALLOW SLIDING DOOR TO MOVE FREELY PAST T150

COLUMN @ INTERSECTION OF GRIDS 10 & D.

43. The Accessories Legend on A403 show Baby Changing Stations but it is not called out in the spec. Are these owner furnished or do you have a basis of design? No changing stations required see sheet A403.

44. There are Shower Benches shown on the plans but it is not included in the spec. Is this included in the Shower Enclosure or do you have a basis of design? No accessories spec, these are built-ins.

45. Are the Shower Grab Bars included in the Shower Enclosure Bid or should these be included in the Toilet Accessories Bid? Grab bars required for showers.

46. I am not seeing Lockers on the plans. Can you please advise? No lockers required, locker specifications will be removed in future amended drawings.

47. I've noticed on the exterior elevations that there are two different shaded areas stating "insulated wall panels" (specifically elevation #1 & #4) , which contradicts the materials legend. May I please get clarification on this? The elevations had shading turned on and that made it hard to tell what the material was in shadow.

The shading was turned off and a revised sheet A201 will be issued in future amended drawings.

Please all see attachments for additional clarifications:

1. Arcadia substitution request (approved). Will be included in the future amended specifications.

2. Drexel substitution request (approved). Will be included in the future amended specifications.

3. C.H.I. coiling door substitution request (approved). Will be included in the future amended specifications.

4. Light fixture clarification (farm light). Attachment included below.

5. E3 cut sheet. Attachment included below.

6. Piedmont Brochure WITH CHIPS. Attachment included below.

FORTETM PENDANT

QUANTITY:

TYPE:

PROJECT:

APPLICATION • PENDANT MOUNT

• INDOOR OR OUTDOOR RATED

APPLICATION • PENDANT MOUNT

• INDOOR OR OUTDOOR RATED

PN: FOR

FINISHES • AVAILABLE IN SEVERAL TMS SPECIALTY, AND

POWDER COATED FINISHES

• CUSTOM RAL FINISHES AVAILABLE

FINISHES • AVAILABLE IN SEVERAL TMS SPECIALTY, AND

POWDER COATED FINISHES

• CUSTOM RAL FINISHES AVAILABLE

DIMMING • 0 - 10V STANDARD DIMMINGDIMMING • 0 - 10V STANDARD DIMMING

WEIGHT • 4.6 LBS MAXIMUM WEIGHT • 4.6 LBS MAXIMUM

ILLUMINATION • DIRECT

• LED 90CRI

• 995 - 1,887 LUMENS

ILLUMINATION • DIRECT

• LED 90CRI

• 995 - 1,887 LUMENS

ELECTRICAL • 120V, 277V AND 347V

• 10kA SURGE SUPRESSION STANDARD

ELECTRICAL • 120V, 277V AND 347V

• 10kA SURGE SUPRESSION STANDARD DIFFUSERS • CLEAR OR FROSTED, TEMPERED GLASS GLOBEDIFFUSERS • CLEAR OR FROSTED, TEMPERED GLASS GLOBE

MOUNTING • 120” (305CM) BLACK OR WHITE DROP CORD

W/ AIRCRAFT CABLE (OPTIONAL)

• 1“ TO 60” (2.5CM TO 152CM) STEM MOUNT

MOUNTING • 120” (305CM) BLACK OR WHITE DROP CORD

W/ AIRCRAFT CABLE (OPTIONAL)

• 1“ TO 60” (2.5CM TO 152CM) STEM MOUNT

CONSTRUCTION • ALUMINUM, BRUSHED COPPER OR STEELCONSTRUCTION • ALUMINUM, BRUSHED COPPER OR STEEL

DIMENSION • 12”, 14” 16“ (31CM, 36CM, 41CM)DIMENSION • 12”, 14” 16“ (31CM, 36CM, 41CM)

DIRECT

100W

100IN

15W

1342 1108

15LED

17W

17LED

19W

19LED

FORTETM PENDANT

QUANTITY:

TYPE:

PROJECT:

FOR

120V

VOLTAGE

277V

347V

100IN

100W 100W15W

995 1109

15LED 100IN

15W

1144 1109

15LED

17W

17LED

19W

19LEDILLUMINATION1

LED (W)

LUMENS

3.

CRD C01 C06 C12 C18 C24 C36 C48 C60

MOUNTING

4.

12”DIA. (31CM)

14”DIA. (36CM)

16”DIA. (41CM)

DIAMETER

2.

1 8765 12 1311109432

OUTDOOR

O

APPLICATION

1.

INDOOR

I

NOTE: SOME OPTIONS MAY NOT BE COMPATIBLE WITH OTHERS. ALL SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE. CONTACT TMS LIGHTING FOR UPDATED SPECIFICATIONS.

NONE

12” (31CM) WIRED GUARD

W12

14” (36CM) WIRED GUARD

W14

16” (41CM) WIRED GUARD

W1613.

LED DIMMING (0 - 10V, CURRENT - SINKING)

DIML

NONE

DIMMING

10.

FROSTED

GLOBE

G2

CLEAR, ELONGATED

GLOBE WITH CAST GUARD

G11

NONE

GLOBE/

LENS

9.

CLEAR, ELONGATED

GLOBE

G1

CEILING SLOPE ADAPTER

FOR STEM MOUNT (30°)

BL

AIRCRAFT CABLE

FOR DROP CORDS

ACC

NONE

MOUNTING5

ACCESSORIES

WIRE GUARD

12.

INTEGRAL

EM

NONE

REMOTE

EMR

REMOTE COLD PACK

EMCR

INTEGRAL COLD PACK

EMC

EMERGENCY4

11.

2. GLOBES AND EMERGENCY ARE NOT AVAILABLE WITH THE 17W LED PAR 38 LAMPS

4. 10W AT 90 MINUTES. EMERGENCY OPTION IS ONLY AVAILABLE IN 120 - 277V SYSTEMS

3. A CLEAR COAT IS APPLIED TO COPPER. PATINA WILL FORM OVER TIME

5. MAY REQUIRE TO COMPLY WITH LOCAL SEISMIC/EARTHQUAKE CODE

1. 12” IS ONLY AVAILABLE FOR 100IN AND 15LED

120”(305CM)

DROP CORD

1”(2.5CM)

STEM MOUNT

6”(15CM)

STEM MOUNT

12”(31CM)

STEM MOUNT

18”(46CM)

STEM MOUNT

24”(61CM)

STEM MOUNT

36”(91CM)

STEM MOUNT

48”(122CM)

STEM MOUNT

60”(152CM)

STEM MOUNT

35K

40K

NONE

LED CCT

6.

30K

BLACK DROP CORD

BC

NONE

CORD

5.

WHITE DROP CORD

WC

FINISH3

8.

ADDITIONAL AND PREMIUM FINISHES

AVAILABLE. SEE FINISHES CHART MATTE

WHITE

F04

GLOSS

WHITE

F05

MATTE

BLACK

F15

GLOSS

BLACK

F16

PEWTER

F09

SILVER

METALLIC

F31

SATIN

ALUMINUM

F18

DROP CORD MOUNT STEM MOUNT

FOR - 12”

3.4LB

FOR - 16”

4.6LB

FOR - 14”

4LB

6.25” (15.8CM)

ø12”DIA (30CM) ø14”DIA (35CM) ø16”DIA (40.8CM)

7.18” (18CM) 8” (20CM)

3”(8CM)

REMOTE DRIVER ENCLOSURE REMOTE DRIVER ENCLOSURE

3”(8CM) 3”(8CM)

H

DIADIA

ADJUSTABLE DROP CORD

120”(305CM) MAX.

INCLUDED

H

AIRCRAFT CABLE

120”(305CM)

H

DIA

STEM MOUNT

60”(152CM) MAX.

SPECIFY LENGTH

REMOTE DRIVER ENCLOSURE

DROP CORD MOUNT

W/AIRCRAFT CABLE

POWER CORD

NOTE: THIS FIXTURE CAN BE CUSTOMIZE. DIMENSION, LAMP TYPES, ENCLOSURE, AND COLOR CAN BE MODIFIED TO SUIT YOUR LIGHTING AND ARCHITECTURAL REQUIREMENTS. CONTACT YOUR LOCAL REPRESENTATIVE FOR MORE DETAILS: https://tmslighting.com/sales-agents.html

CUSTOM

PN

FOR

100INC

15LED

FORTETM PENDANT

LUMINAIRE LUMENS 995

TOTAL LUMINAIRE EFFICIENCY 58%

LUMINAIRE EFFICACY RATING 10

TOTAL LUMINAIRE WATTS 100

LUMINAIRE LUMENS 1887

TOTAL LUMINAIRE EFFICIENCY NA

LUMINAIRE EFFICACY RATING 87

TOTAL LUMINAIRE WATTS 22

WATTAGELUMENSSIZE (DIA) ILLUMINATION

100INC

IES INDOOR REPORT

PHOTOMETRIC FILENAME : FOR 16 19LED.IES

POLAR GRAPH

IES INDOOR REPORT

PHOTOMETRIC FILENAME : FOR 12 100IN.IES

POLAR GRAPH

DIRECT

100INC 100

15LED

15LED

19LED

19LED

MAXIMUM CANDELA = 309.726 LOCATED AT HORIZONTAL ANGLE = 90, VERTICAL ANGLE = 5

# 1 - VERTICAL PLANE THROUGH HORIZONTAL ANGLES (90 - 270)

# 2 - VERTICAL PLANE THROUGH HORIZONTAL ANGLES (0 - 180)

MAXIMUM CANDELA = 51353.46 LOCATED AT HORIZONTAL ANGLE = 0, VERTICAL ANGLE = 0

# 1 - VERTICAL PLANE THROUGH HORIZONTAL ANGLES (90 - 270)

# 2 - VERTICAL PLANE THROUGH HORIZONTAL ANGLES (0 - 180)

80 1300

DISPLAYED FINISHES DIFFER BETWEEN SCREENS AS WELL AS PRINTERS AND MAY NOT ACCURATELY DEPICT COLOR.

FINISHES ARE SUBJECT TO AVAILABLILITY AND MAY NOT BE APPLICABLE TO ALL FIXTURES OR FOR QUICKSHIP.

NOTE: ALL FINISHES NOT MARKED WITH NOTATION (1) ARE APPLIED TO THE EXTERIOR ONLY. THE INTERIOR WILL BE F05 GLOSS WHITE.

MATTE FINISHES AVAILABLE. CONSULT FACTORY.

F04

MATTE

WHITE

FINISHES

F09

PEWTER

F05

GLOSS

WHITE

F15

MATTE

BLACK

F16

GLOSS

BLACK

F311

SILVER

METALLIC

F41

ELECTRIC

PURPLE

F18

SATIN

ALUMINUM

F40

BUBBLE

PINK

F10

FIRE

RED

F08

MIDNIGHT

BLUE

F45

COPPER

METALLIC

F39

AQUA

BLUE

F13

FOREST

GREEN

F38

MEADOW

GREEN

F06

CLAY

BROWN

F14

SUNSHINE

YELLOW

F11

CITRUS

ORANGE

F281

DARK

CHAMPAGNE

F221

HARVEST

GOLD

F331

PYRITE

BRONZE

F261

MELTED

COPPER

F07

ZEUS

BROWN

F21

ARCH

BRONZE

F321

BRONZE

METALLIC

F251

MELTED

GOLD

F241

MELTED

PLATINUM

RAL

CUSTOM

(RAL #)

F441

FAUX

COPPER

F431

FAUX

GOLD

F421

FAUX

CHROME

PREMIUM FINISHES

PREMIUM MATERIALS

BR1 2

BRUSHED

ALUMINUM

AN1 2

ANODIZED

SS1 2

STAINLESS

STEEL

CO1 2

SOLID

COPPER

2: MATERIALS ARE CONSISTENT (INTERIOR & EXTERIOR). STEMS AND CANOPIES WILL BE F16 GLOSS BLACK.

1: FINISHES IS APPLIED TO THE INTERIOR AND EXTERIOR OF THE FIXTURE.

FARM LIGHTTM WALL

QUANTITY:

TYPE:

PROJECT:

APPLICATION • WALL MOUNT

• INDOOR OR OUTDOOR RATED

APPLICATION • WALL MOUNT

• INDOOR OR OUTDOOR RATED

PN: 10W

FINISHES • AVAILABLE ANODIZED, BRUSHED, AND IN SEVERAL TMS

POWDER COATED FINISHES

• CUSTOM RAL FINISHES AVAILABLE

FINISHES • AVAILABLE ANODIZED, BRUSHED, AND IN SEVERAL TMS

POWDER COATED FINISHES

• CUSTOM RAL FINISHES AVAILABLE

DIMMING • 0 - 10V STANDARD DIMMINGDIMMING • 0 - 10V STANDARD DIMMING

WEIGHT • 2.5 LBS MAXIMUMWEIGHT • 2.5 LBS MAXIMUM

ELECTRICAL • 120V, 277V AND 347V

• 10kA SURGE SUPRESSION STANDARD

ELECTRICAL • 120V, 277V AND 347V

• 10kA SURGE SUPRESSION STANDARD

DIFFUSERS • HIGH EFFICIENCY ACRYLICDIFFUSERS • HIGH EFFICIENCY ACRYLIC

MOUNTING • WALL, MOUNTED TO A 4”(10CM) J-BOXMOUNTING • WALL, MOUNTED TO A 4”(10CM) J-BOX

CONSTRUCTION • ALUMINUMCONSTRUCTION • ALUMINUM

DIRECT

DIMENSION • 12”DIA (30CM)DIMENSION • 12”DIA (30CM)

DRIVER • WALL MOUNT (INTEGRAL)

• REMOTE MOUNT (INDOOR OR OUTDOOR)

DRIVER • WALL MOUNT (INTEGRAL)

• REMOTE MOUNT (INDOOR OR OUTDOOR)

ILLUMINATION • DIRECT

• LED 90CRI

• INCANDESCENT MEDIUM BASE SOCKET

• 753 - 1602 LUMENS

ILLUMINATION • DIRECT

• LED 90CRI

• INCANDESCENT MEDIUM BASE SOCKET

• 753 - 1602 LUMENS

https://tmslighting.com/farm-light.html https://tmslighting.com/farm-light.html https://tmslighting.com/home.html

EMERGENCY2

QUANTITY:

TYPE:

PROJECT:

10W

NOTE: SOME OPTIONS MAY NOT BE COMPATIBLE WITH OTHERS. ALL SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE. CONTACT TMS LIGHTING FOR UPDATED SPECIFICATIONS.

INDOOR

I

OUTDOOR

O

APPLICATION

1.

FINISH1

6.

----8.

NONE INTEGRAL

EM

INTEGRAL

COLD PACK

EMC

REMOTE

EMR

REMOTE

COLD PACK

EMCR

NONE

DIMMING

7.

LED DIMMING (0 - 10V, CURRENT - SINKING)

DIML

120V

VOLTAGE

4.

277V

347V

150W

150IN

ILLUMINATION

LED (W)

2.

15W

2240LUMENS 1090

15LED

NONE

WALL MOUNT

(INTEGRAL)

WM

REMOTE INDOOR MOUNT

(NEMA 1)

N1

REMOTE OUTDOOR MOUNT

(NEMA 4)

N4

DRIVER

5.

1 8 9765432

WIRE

GUARD

----9.

NONE

W12

12”

WIRE GUARD

1. WALL PLATE OR DRIVER ENCLOSURE, CONDUIT, AND TOP CAP ARE ALWAYS IN “F18-SATIN ALUMINUM” FINISH. SEE FINISH CHART FOR REFLECTOR.

2. 10W AT 90 MINUTES. EMERGENCY OPTION IS ONLY AVAILABLE IN 120 - 277V SYSTEMS

4000K

40K

3000K

30K

NONE

LED CCT

3.

3500K

35K

BRUSHED

ALUMINUM

BR

ANODIZED

AN

FAUX

GOLD

F43

FAUX

COPPER

F44

COPPER

METALLIC

F45

CUSTOM

(SPECIFY RAL)

RAL

BUBBLE

PINK

F40

ELECTRIC

PURPLE

F41

FAUX

CHROME

F42

MELTED

GOLD

F25

MELTED

COPPER

F26

PYRITE

BRONZE

F33

DARK

CAMPAGNE

F28

BRONZE

METALLIC

F32

AQUA

BLUE

F39

MEADOW

GREEN

F38

ARCH.

BRONZE

F21

HARVEST

GOLD

F22

MELTED

PLATINUM

F24

CLAY

BROWN

F06

ZEUS

BROWN

F07

CITRUS

ORANGE

F11

MIDNIGHT

BLUE

F08

FIRE

RED

F10

SUNSHINE

YELLOW

F14

FOREST

GREEN

F13

MATTE

WHITE

F04

GLOSS

WHITE

F05

PEWTER

F09

MATTE

BLACK

F15

GLOSS

BLACK

F16

SATIN

ALUMINUM

F18

SILVER

METALLIC

F31 https://tmslighting.com/farm-light.html

10W

5.75”(15CM)

7.5”(19CM)

12”

(30.5CM)

3.36”

(8.5CM)

19.9(50.5CM)

INTEGRAL LED DRIVER

PROFILE

NOTE: THIS FIXTURE CAN BE CUSTOMIZE. DIMENSION, LAMP TYPES, ENCLOSURE, AND COLOR CAN BE MODIFIED TO SUIT YOUR LIGHTING AND ARCHITECTURAL REQUIREMENTS. CONTACT YOUR LOCAL REPRESENTATIVE FOR MORE DETAILS: https://tmslighting.com/sales-agents.html

CUSTOM

PN

10W

FARM LIGHTTM WALL

LUMINAIRE LUMENS 1090

TOTAL LUMINAIRE EFFICIENCY NA

LUMINAIRE EFFICACY RATING 64

TOTAL LUMINAIRE WATTS 17

LUMINAIRE LUMENS 2240

TOTAL LUMINAIRE EFFICIENCY 84%

LUMINAIRE EFFICACY RATING 15

TOTAL LUMINAIRE WATTS 150

WATTAGELUMENSILLUMINATION

15LED

150IN

MAXIMUM CANDELA = 1078.77 LOCATED AT HORIZONTAL ANGLE = 0, VERTICAL ANGLE = 0

# 1 - VERTICAL PLANE THROUGH HORIZONTAL ANGLES (90 - 270)

# 2 - VERTICAL PLANE THROUGH HORIZONTAL ANGLES (0 - 180)

# 3 - HORIZONTAL CONE THROUGH VERTICAL ANGLE (90)

MAXIMUM CANDELA = 613.755 LOCATED AT HORIZONTAL ANGLE = 45, VERTICAL ANGLE = 5

# 1 - VERTICAL PLANE THROUGH HORIZONTAL ANGLES (90 - 270)

# 2 - VERTICAL PLANE THROUGH HORIZONTAL ANGLES (0 - 180)

IES INDOOR REPORT

PHOTOMETRIC FILENAME : 10W 150IN.IES

POLAR GRAPH

IES INDOOR REPORT

PHOTOMETRIC FILENAME : 10W 15LED F05.IES

POLAR GRAPH

DIRECT

AN1 2

ANODIZED

F04

MATTE

WHITE

FINISHES

F09

PEWTER

F05

GLOSS

WHITE

F15

MATTE

BLACK

F16

GLOSS

BLACK

F311

SILVER

METALLIC

F41

ELECTRIC

PURPLE

F18

SATIN

ALUMINUM

F40

BUBBLE

PINK

F10

FIRE

RED

F08

MIDNIGHT

BLUE

F45

COPPER

METALLIC

F39

AQUA

BLUE

F13

FOREST

GREEN

F38

MEADOW

GREEN

F06

CLAY

BROWN

F14

SUNSHINE

YELLOW

F11

CITRUS

ORANGE

F281

DARK

CHAMPAGNE

F221

HARVEST

GOLD

F331

PYRITE

BRONZE

F261

MELTED

COPPER

F07

ZEUS

BROWN

F21

ARCH

BRONZE

F321

BRONZE

METALLIC

F251

MELTED

GOLD

F241

MELTED

PLATINUM

F441

FAUX

COPPER

F431

FAUX

GOLD

F421

FAUX

CHROME

RAL

CUSTOM

(RAL #)

PREMIUM FINISHES

PREMIUM MATERIALS

BR1 2

BRUSHED

ALUMINUM

DISPLAYED FINISHES DIFFER BETWEEN SCREENS AS WELL AS PRINTERS AND MAY NOT ACCURATELY DEPICT COLOR.

FINISHES ARE SUBJECT TO AVAILABLILITY AND MAY NOT BE APPLICABLE TO ALL FIXTURES OR FOR QUICKSHIP.

NOTE: ALL FINISHES NOT MARKED WITH NOTATION (1) ARE APPLIED TO THE EXTERIOR ONLY. THE INTERIOR WILL BE F05 GLOSS WHITE.

MATTE FINISHES AVAILABLE. CONSULT FACTORY.

2: MATERIALS ARE CONSISTENT (INTERIOR & EXTERIOR). STEMS AND CANOPIES WILL BE F16 GLOSS BLACK.

1: FINISHES IS APPLIED TO THE INTERIOR AND EXTERIOR OF THE FIXTURE.

FARM LIGHTTM WALL

Lolo National Forest

NAME:
TYPE:
QUANTITY:
APPLICATION: [ ]
DIAMETER: [ ]
ILLUMINATION: [ ]
MOUNTING: [ ]
CORD: [ ]
LEDCCT: [ ]
VOLTAGE: [ ]
FINISH: [ ]
GLOBE/LENS: [ ]
DIMMING: [ ]
EMERGENCY: [ ]
MOUNTING ACCESSORIES: [ ]
WIREGUARD: [ ]

File details come from the government source that posted it. Updated .