This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the Lolo National Forest Building T150 Reconstruction project. Amendment 001 makes several key changes, including adding Division 27 Telecom and Division 28 Safety and Security to the Schedule of Items, changing the completion date from 426 days after Notice to Proceed to March 1, 2027, and removing a specific sentence about schedule completion deadlines. The amendment also includes multiple modifications to project specifications and drawings, such as adding and removing manufacturers for metal roof panels, windows, and overhead doors, substituting communication cabling specifications, and revising option item numbering and drawing details. The solicitation is issued by the USDA-FS Intermountain Zone CSA 9, with the amendment dated 07/16/2025 and effective on the same date.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240LU25R0018
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40LU
TOWNSEND MT 59644
415 SOUTH FRONT STREET
ALISHA KNAUB
USDA-FS INTERMOUNTAIN ZONE CSA 9
07/16/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/16/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 001 - LOLO NATIONAL FOREST - Lolo Building T150 Reconstruction
This amendment makes the following changes and is hereby included in this solicitation:
- Adding Division 27 Telecom (Pay Item 14) and Division 28 Safety and Security (Pay Item
15) to the Schedule Of Items. Use the attached Amendment 001 Schedule of Items when submitting business/price proposal.
- Changes the completion date from 426 days after Notice to Proceed is issued to a completion date of March 1, 2027.
- Removes the following sentence from Section L.2(b)(iii) located on page 36 of the solicitation document: The schedule shall indicate completion deadlines for each of the two phases identified in the specifications and identify the critical path and diagram its
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
ALISHA D. KNAUB
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240LU25R0018/0001
progress.
- Makes the following changes to Volume 1 of the project specifications (See attached revised document, dated 8/12/2025):
- Revised option numbering to match plans.
- Added Drexel under metal roof panels manufacturers (07 4113-2, section 2.01, A).
- Removed specification section 10 5123 -lockers.
- Removed Division 13 - Special Construction.
- Added Arcadia under aluminum windows manufacturers (08 5113-2, section 2.01, A).
- Added C.H.I. coiling door substitution under Overhead Coiling Doors (08 3323-2 section
2.01, A)
- Makes the following changes to Volume 2 of the project specifications (See attached revised document, dated 8/12/2025):
- Removed specification Section 28 2300 -
Video Surveillance.
- Added OCC CAT6 substitution request under
Communications Copper Horizontal Cabling (27
1513-2, Section 2.02, A)
- Added OCC fiber substitution request under
Communications Optical Fiber Backbone Cabling (27
1323-2, Section 2.02, B)
- Makes the following changes to the drawings
(See attached revised document, dated 8/12/2025):
- Revised option item numbering throughout the drawings.
- Revised sheet A510 showing non-continuous jambs.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
aknaub Highlight aknaub Highlight aknaub Highlight
File details come from the government source that posted it. Updated .