1240LU25R0016 Attachment 1 Schedule of Items GAOA Sula Housing Water System BNF.docx

DOCX document 24 KB Posted

Attached to
GAOA Sula Housing Water System Improvements Bitterroot NF
Solicitation number
1240LU25R0016
Issued by

About this file

This document is a Schedule of Items for the GAOA Sula Housing Water System Improvements project for the Bitterroot National Forest. The solicitation (1240LU25R0016) seeks a contractor to complete water system infrastructure improvements, including constructing a new pump house, rehabilitating an existing water supply well, installing water lines, and performing site preparation and restoration work. The project involves 23 line items covering construction surveying, mobilization, erosion control, demolition, utility preparation, water line installation, electrical controls, excavation, and surface restoration.

Key project details include a site visit scheduled for July 9th at the Sula Ranger Station, with questions due by July 15th, 2025. The contract will be awarded to the most responsive and responsible proposer offering the best value to the Government. Contractors must submit pricing for all items and be registered in the System for Award Management (SAM) database. The total project scope involves approximately 1,100 linear feet of water line installation, construction of a wood-framed pump house, and various site improvement activities for the water system infrastructure.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Items

Sula Ranger Station Water System Improvements

Bitterroot National Forest

Item No.
Item Description
Method
Units
Quantity
Unit Cost
Total Cost
0001
010250
Construction Surveying and Staking
LSQ
LS
1
$
$
0002
012910
Mobilization
LSQ
LS
1
$
$
0003
015100
Erosion Control
LSQ
LS
1
$
$
0004
024100
Demolition (Existing Pump House)
LSQ
LS
1
$
$
0005
133422
Pump House Foundation & Utility Preparation
AQ
EA
1
$
$
0006
133423
Construct Wood Framed Pump House
AQ
EA
1
$
$
0007
221000.1
2" Galvanized Water Line
AQ
LF
10
$
$
0008
221000.2
Plumbing Appurtenances Inside Pump House
LSQ
LS
1
$
$
0009
260500
Electrical Controls - Transducer, Conduit, etc.
LSQ
LS
1
$
$
0010
310000.1
Excavation
AQ
CY
5
$
$
0011
310000.2
Embankment
AQ
CY
5
$
$
0012
311000.1
Site Clearing
LSQ
LS
1
$
$
0013
311000.2
Remove, Salvage, and Replace Gravel Surface
AQ
CY
4
$
$
0014
321123
3/4" Minus Aggregate base Course, Gravel (6" Thick)
AQ
CY
2
$
$
0015
321216
Asphalt Concrete Pavement (3" Thick)
AQ
SY
7
$
$
0016
329000
Surface Restoration
LSQ
LS
1
$
$
0017
330110.91
Rehabilitation of Existing Water Supply Well
LSQ
LS
1
$
$
0018
331000.1
2" HDPE DR11 Water Line
AQ
LF
1100
$
$
0019
331000.2
2" Ball Valve - Storage Tank Drain Line
AQ
EA
1
$
$
0020
331000.3
6" Gate Valve - Storage Tank Distribution Line
AQ
EA
1
$
$
0021
331000.4
2" Fittings (Bends)
AQ
EA
10
$
$
0022
331000.5
Connect 2" HDPE To Proposed Pump House
AQ
LF
1
$
$
0023
331000.6
Connect to Existing Storage Tank
LSQ
LS
1
$
$
Total
$

CY=Cubic Yard EA=Each LS-Lump Sum LF-Linear Foot SY-Square Yard

SCHEDULE NOTES

a) One award will be made from this solicitation; contractors must submit pricing for all items.

b) In the event of an error in extending the item prices, unit prices will govern, unless otherwise determined by the Contracting Officer, in accordance with applicable regulations.

c) Offers for quantities less than those listed in the numbered items may be rejected.

d) Payment for bond premiums in accordance with FAR 52.232-5. Payments under Fixed-Price Construction Contracts shall not be in addition to the contract price but can be included under Mobilization.

e) The pay items in the Schedule of Items may have suffixes that do not appear on the pay items in the specifications. The suffixes pertain only to sizes, classes, and/or types indicated in the item ‘Descriptions,’ and are used by the Government for computer tabulation of price schedules. For the abbreviations in the schedule descriptions, see Special Project Specification, SPS 101 (07/07/1997).

f) One contract will be awarded to the responsive and responsible proposer offering the best value to the Government.

g) The successful Contractor must be registered in the System for Award Management (SAM) data base before an award is issued.

h) This is a Request for Proposal (RFP); no public opening will be held. Results will not be made public prior to the award. Proposals submitted in response to this RFP will not be returned and will be retained by the U.S. Forest Service for official record purposes. This RFP does not commit the Government to pay any costs incurred in the preparation or the submission of a proposal, or to make any award.

i) Proposals received after the stated closing date and time for submission will be deemed late and will not be considered for the award. Contractors are urged to thoroughly read the RFP and to review all attachments prior to preparing and submitting a proposal.

File details come from the government source that posted it. Updated .