This document is a Schedule of Items (SOI) for the GAOA Sula Housing Water System Improvements project in Ravalli County, Montana, issued by the Department of Agriculture Forest Service. The solicitation (1240LU25R0016) covers comprehensive water system infrastructure upgrades at the Sula Ranger Station, including construction surveying, site preparation, demolition of an existing pump house, and installation of new water system components.

The project scope involves multiple key construction elements: building a new wood-framed pump house, installing 1,100 linear feet of 2" HDPE water line, rehabilitating an existing water supply well, implementing electrical controls, and performing site restoration. The solicitation includes 21 distinct pay items with estimated quantities and unit pricing, ranging from excavation and embankment to valve installations and surface restoration. A site visit is scheduled for July 9th at the Sula Ranger Station, with questions due by July 15th, 2025. The project appears to be funded under the Great American Outdoors Act (GAOA) and focuses on critical infrastructure improvements for the Bitterroot National Forest housing and district water system.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART 1 – THE SCHEDULE

SECTION B – SUPPLIES OR SERVICES AND PRICES

Sula Ranger Station Water System Improvements Ravalli County, Montana

B-1 Schedule of Items

Pay Item
Description
Meth of

Meas.

Unit

Estimated Qty

Unit Price Total

BASE PROPOSAL

010250
Construction Surveying and Staking
LSQ
LS
1
$________
$________
012910
Mobilization
LSQ
LS
1
$________
$________
015100
Erosion Control
LSQ
LS
1
$________
$________
024100
Demolition (Existing Pump House)
LSQ
LS
1
$________
$________
133422
Pump House Foundation & Utility Preparation
AQ
EA
1
$________
$________
133423
Wood Framed Pump House
AQ
EA
1
$________
$________
221000.1
2” Galvanized Water Line
AQ
LF
10
$________
$________
221000.2
Plumbing Appurtenances Inside Pump House
LSQ
LS
1
$________
$________
260500
Electrical Controls – Transducer, Conduit, Etc.
LSQ
LS
1
$________
$________
310000.1
Excavation
AQ
CY
5
$________
$________
310000.2
Embankment
AQ
CY
5
$________
$________
311000.1
Site Clearing
LSQ
LS
1
$________
$________
311000.2
Remove, Salvage, And Replace Gravel Surface
AQ
CY
4
$________
$________
321123
¾” Minus Aggregate Base Course, Gravel (6” Thick)
AQ
CY
2
$________
$________
321216
Asphalt Concrete Pavement (3” Thick)
AQ
SY
7
$________
$________
329000
Surface Restoration
LSQ
LS
1
$________
$________
330110.91
Rehabilitation of Existing Water Supply Well
LSQ
LS
1
$________
$________
331000.1
2” HDPE DR11 Water Line
AQ
LF
1100
$________
$________
331000.2
2” Ball Valve – Storage tank Drain Line
AQ
EA
1
$________
$________
331000.3
6” Gate Valve -Storage Tank Distribution Line
AQ
EA
1
$________
$________
331000.4
2” Fittings (Bends)
AQ
EA
10
$________
$________
331000.5
Connect 2” HDPE to Proposed Pump House
AQ
LF
1
$________
$________
331000.6
Connect to Existing Storage Tank
LSQ
LS
1
$________
$________

TOTAL BASE PROPOSAL

* Designated Method of Measurement DQ – Designed Quantities; AQ – Actual Quantities, LSQ – Lump Sum Quantities;

B-1 Notes

1. Bidder must bid on all items. Round to nearest cent.

2. Item 133423 was changed from a precast concrete pump house to a wood framed pump house. Requirements of the wood framed pump house are outlined in Section C Statement of Work.

3. In the event of an error in extending bid prices, unit prices will govern unless otherwise determined by the Contracting Officer in accordance with applicable regulations.

4. Offers for quantities less than those listed in the numbered items may be rejected.

5. Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include payment bond under Item 01 Mobilization.

6. The Government reserves the right to request additional information as required to fully understand the Contractor’s pricing structure and determine its reasonableness.

7. Contingency costs are not permissible in accordance with FAR 31.205-7. Unforeseen conditions are addressed under the following FAR clauses: 52.236-2 and 52.243-4 (see Section I).

File details come from the government source that posted it. Updated .