This document appears to be a detailed painting specification for multiple buildings located in the Stevensville and Darby areas, dated December 15, 2025. The specifications cover 9 different structures including a bunkhouse, offices, ranger stations, a visitor center, shops, warehouses, and a residence, with precise painting instructions for each building. Common requirements across most sites include painting cement fiberboard siding, metal handrails, and painted concrete surfaces, while explicitly excluding work on gutters, downspouts, and certain structural elements.
Unique specifications vary by site, with some notable details including: the Darby Visitor Center is a historic building requiring brush application and lead-based product considerations; the West Fork Residence requires sanding of silicone caulk and oil-based priming; and the Darby Ranger Station Barn involves extensive preparation with over 50 woodpecker holes to be filled, no pressure washing, and careful sanding to maintain the wood's profile. Most buildings feature vinyl windows, and many had previous painting or trim work completed in 2010. The specifications provide comprehensive, site-specific guidance for a systematic repainting project across multiple government-owned facilities.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
December15, 2025
Stevensville RD Bunkhouse
Footprint: 58’ x 30’, Cement Fiberboard siding, installed/painted 2010, paint handrails, and concrete that is painted. No work on unpainted, treated 6x6 carport posts and gutters and downspouts. Vinyl windows. New trim will be installed to finish out egress window wells and shall be painted.
Stevensville Office
Basic Footprint: 90’ x 42’, Cement Fiberboard siding, and new trim installed/painted 2010, paint metal handrails and posts, and concrete that is painted. Vinyl windows. No work on stained front and rear entrance brown wood finish. Paint metal door frames. No work on gutters and downspouts.
Darby Ranger Station Office
Footprint: 80’ x 34’, Cement fiberboard siding, and new trim installed/painted 2010, paint metal handrails and posts, and concrete that is painted. No work on wood and plastic ADA ramp. Paint metal door frames. No work on gutters and downspouts. Vinyl windows.
Darby Visitor Center
Footprint: 40’ x 30’, Wood siding and trim last painted in 2010. Historic building, application must include brush application on final application. Lead-based products present in window glazing.
Top of concrete entrance steps painted white. Paint storm windows. Paint metal handrails., otherwise no work on ADA ramp. Shutter to be removed, painted both sides, re-installed. Siding to be painted behind shutters. Wood framed windows to be painted, glazing replaced as needed.
West Fork Residence #3
Footprint: 36’ x 24’, Wood siding and wood or fiberboard trim. Painted in last 20 years. Window trim needs to be primed on surfaces near window and painted. Windows are vinyl. Siding knots and joints were originally sealed with a silicone caulk. Siding knots and joints shall be sanded to remove all silicone caulk, primed with oil-based primer before painting. Not work on deck. Paint exterior doors.
Stevensville RD Shop
Footprint: 94’ x 30’, Cement fiberboard siding, and new trim installed/painted 2010. Paint concrete that is painted. No work on gutters and downspouts or vehicle garage doors. Wood framed windows to be painted, and glazing replaced as needed.
Darby Ranger Station Shop
Footprint: 104’ x 30’, Cement fiberboard siding, and new trim installed/painted 2010. Paint concrete that is painted. No work on gutters and downspouts or vehicle garage doors. Gutters will be removed. Wood facia shall be completely stripped/sanded and reprimed with oil-based primer prior to painting. West side of building has oil splashed on siding and will take extra effort to clean and prime prior to painting. Vinyl windows.
Darby Fire Warehouse
Footprint: 70’ x 30’, Cement fiberboard siding, and new trim installed/painted 2010. Paint concrete that is painted. No work on gutters and downspouts or vehicle garage doors. Vinyl windows.
Darby Tree Cooler
Footprint: 41’ x 26’, Cement fiberboard siding, and new trim installed/painted 2010. Paint concrete that is painted. No work on gutters and downspouts or vehicle garage doors. Vinyl windows.
Darby Ranger Station Barn
Footprint: 30’ x 18’, Wood siding and trim. Historic structure that hasn’t been painted for decades.
All paint has failed. Existing paint is lead-based. All painting/primer system to be removed by certified individuals. Do not use pressure washer to remove coating systems as will make wood grainier. Sanding with appropriate filters to maintain flat wood profile. Several boards will have been recently replaced and have an oil-based primer applied. There are numerous (50+/-) woodpecker holes approximately 1” in diameter to be filled prior to priming/painting. Existing tin cans used to cover holes to be left. Reglaze wood framed windows as needed. No work on wooden stoops.