1240LT26Q0053_A0003.pdf
PDF 1 MB Posted
- Solicitation number
- 1240LT26Q0053
- Issued by
-
Department of Agriculture Forest Service
About this file
This is Amendment 0003 to solicitation 1240LT26Q0053 for the Northern Hills Ranger District Parking Lot Reconstruction project in Spearfish, South Dakota, issued by the USDA Forest Service on May 18, 2026, with an effective date of May 14, 2026.
The amendment incorporates consolidated contractor questions and answers addressing 29 inquiries regarding project scope, requirements, and logistics. Key clarifications include: the chain-link fence, concrete drain, and lighting will be removed and replaced; the front parking lot will be sealed and restriped rather than fully removed; parking lot lights must be hardwired (with solar as a potential value engineering proposal); contractors should coordinate temporary access through the City of Spearfish; mixed asphalt and concrete surfacing is due to loading conditions on the south portion, though concrete for the entire lot may be considered via value engineering; one individual may serve as Superintendent, QC Manager, and Safety Manager; a revised Geotechnical Report M2215045 and drawing files C050, C100, C200, C202, C300, C302, C303, and C304 are attached; anticipated on-site work begins July 2026; third-party inspections and all state and local permits are required; asbestos is not present; the entire parking area will be available for construction without phasing; bulk water sources include Ellingson Well and Green Acres location; grading and landscape preparation are included with seeding to be completed by others; and no known soil contaminants exist. The amendment also includes a site visit sign-in sheet dated May 6, 2026, with certain attendee information redacted for privacy.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240LT26Q0053
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40LT
OGDEN UT 84401-2310
324 25TH ST
USDA-FS CSA INTERMOUNTAIN 8
05/14/20260003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/21/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
LUCAS J. DAHLMAN
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project Title: Northern Hills Ranger District Parking Lot Reconstruction, Spearfish, South
Dakota
The purpose of the amendment is the following:
1. This amendment incorporates consolidated questions and answers to include the site visit sign-in sheet. Revised Geotechnical Report M2215045 and DWG files C050, C100, C200, C202, C300, C302, C303, and C304 are attached. Please note that certain information on the sign-in sheet has been redacted for privacy.
Point of contact for this amendment is Contract Specialist Holly Hlavac at
Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 7CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240LT26Q0053/0003
Holly.Hlavac@usda.gov.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Date: 5/18/2026 Amendment 0003
SUBJECT: Summary of Changes, 1240LT26Q0053_Northern Hills Ranger District Parking Lot Reconstruction, Spearfish, SD
Contractor Questions:
1. Does the chain-link fence get removed?
U.S. Forest Service Response:
Yes. Removed and replaced with new chain link fence and gate.
See Base Item No. 9 – Demolition, Plan Drawing Sheet C100 – 5 of 33 See Base Item No. 8 – Site Improvements, Plan Drawing Sheets E505-E508, 22-24 of 33
2. Does the concrete drain in parking area get removed.
U.S. Forest Service Response:
Yes. Removed and replaced with new concrete.
See Base Item No. 9 – Demolition, Plan Drawing Sheet C100, 5 of 33
3. Does the lighting get replaced?
U.S. Forest Service Response:
Yes. Removed and replaced with new lighting.
See Base Item No. 9 – Demolition, Plan Drawing Sheet ED100, 30 of 33 See Base Item No. 8 – Site Improvements, Plan Drawing Sheets E100-E600, 31-33 of 33
4. Does the front parking lot get removed?
U.S. Forest Service Response:
No. The front parking area is sealed and restriped.
See Base Item No. 9 – Demolition, Plan Drawing Sheet C100, 5 of 33 See Base Item No. 8 – Site Improvements, Plan Drawing Sheet C300, 9 of 33
5. Are the parking lot lights hardwired or can they be solar?
U.S. Forest Service Response:
Parking lot lights are to be hardwired. The Forest Service will entertain solar lights as a value engineering proposal.
See Base Item No. 9 – Demolition, Plan Drawing Sheet ED100, 30 of 33 See Base Item No. 8 – Site Improvements, Plan Drawing Sheets E100-E600, 31-33 of 33
6. Is temporary access to the city street on the north side of the parking lot a possibility?
U.S. Forest Service Response:
Work with the City of Spearfish on a temporary access permit.
7. Why is there a mix of surfacing types? Asphalt vs Concrete?
U.S. Forest Service Response:
Loading conditions for the south portion of the parking lot required concrete surfacing. The FS will entertain a value engineering proposal for concrete pavement being used for the entire parking lot.
8. Can one-person triple hat as Superintendent, QC Manager and Safety Manager?
U.S. Forest Service Response:
Yes
9. How many projects is the offeror required to provide for Past Performance?
U.S. Forest Service Response:
For instructions regarding Factor 2, Past Performance, refer to page 16 of the solicitation PDF.
10. Can the projects for Experience/ Past Performance be ongoing?
U.S. Forest Service Response:
For instructions regarding Factor 2, Past Performance, refer to page 16 of the solicitation PDF.
11. If a past performance evaluation (CPARS, Customer Reviews, any other relevant recommendations) is not available for a past performance project, can the offeror simply include customer contact information for a reference?
U.S. Forest Service Response:
For instructions regarding Factor 2, Past Performance, refer to page 16 of the solicitation PDF.
12. Can a proposed alternate for the pole and luminaire fixture be proposed?
U.S. Forest Service Response:
Yes
13. Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?
U.S. Forest Service Response:
Yes, This can be one person representing the prime contractor.
14. Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project?
U.S. Forest Service Response:
I am unaware of any material/equipment issues. It is important that the project is completed before the winter season.
15. Please provide the site visit attendee sign in sheet.
U.S. Forest Service Response:
Incorporated into the amendment, some of the site visit information has been redacted to protect information.
16. Please confirm whether asbestos or lead is present on this project, and if so, provide the relevant documentation.
U.S. Forest Service Response:
Asbestos is not present on this site.
17. Does this project require phasing?
U.S. Forest Service Response:
No. The entire parking area will be available for construction.
18. Is this project tax exempt?
U.S. Forest Service Response:
Please consult the South Dakota Department of Revenue for all tax requirements.
19. When do you anticipate on site work starting?
U.S. Forest Service Response:
July 2026
20. Are third party inspections required?
U.S. Forest Service Response:
Yes
21. Is permitting required?
U.S. Forest Service Response:
The contractor is responsible for all state and local permits.
22. Are soil boring reports available? If not, it will be assumed that excavation will be clear of rocks and obstructions.
U.S. Forest Service Response:
See Geotechnical Report – M2215045 – USFA Northern Hills Office Geotechnical revised.
23. Please confirm the manufacturer of the existing roofing system and who carries the current warranty of the roofing system.
U.S. Forest Service Response:
Not applicable
24. Is there a bulk water fill i.e. a hydrant or water source we can pump from for grading operations in close proximity?
U.S. Forest Service Response:
Ellingson Well: Located on the corner Dakota Street and State Street, available 24 hour, 7 days a week, 365 days a year.
• Clearance of 10 feet with an overhead fill.
Green Acres: Located on the south side of the Green Acres shop, 540 S 32nd Street, available 24 hour, 7 days a week, 365 days a year.
• Clearance of 13 feet with an overhead fill.
Hydrant meters can be installed for larger construction projects with the approval of the Water Superintendent.
25. Is any landscaping restoration required for this project? For example; topsoil, seeding, and fertilizer.
U.S. Forest Service Response:
Grading for preparation of lawns and grasses is included in Base Item No. 2 – Earth Moving. Seeding will be completed by others.
26. Please provide staking data points for the project.
U.S. Forest Service Response:
See DWG files C050, C100, C200, C202, C300, C302,C303 and C304.
27. Are red, yellow, and blue tops required?
U.S. Forest Service Response:
Grading tolerances can be found in plan specifications section 312000 Part 3.13.B. Red, yellow, and blue tops are not required.
28. Is there a third-party utility locate necessary, or will calling 811 suffice?
U.S. Forest Service Response:
The contractor is responsible for locating and verify the horizontal and vertical location of all existing utilities. A third-party locater is recommended.
29. Are there any known contaminants in the soils?
U.S. Forest Service Response:
No known contaminants in the soils.