This document is a Pricing Template and Schedule of Items for a siding replacement project at Tatanka Hot Shot Base located within the Black Hills National Forest.
The solicitation encompasses six base bid items and one option bid item. Base items include: General Requirements/Mobilization (1 LS); Demolition (1 LS); Provision and Installation of New Metal Siding, Soffit, and Facia (1 LS); Soffit Lights (5 EA); Exterior Wall Lights (2 EA); and Painting Existing Exterior Doors (1 LS). The single option item consists of an Increase/Decrease in Quantity to Replace Damaged ½" Sheathing (1 EA). Bidders are required to provide unit prices and extended prices for all line items, with totals calculated for base items, option items, and a grand total combining base and all options. The template provides columns for Number, Description, Quantity, Unit of Measure, Unit Price, and Price, with all pricing fields left blank for contractor completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1240LT26Q0034 A0002.pdf | ||
| Tatanka Siding 2nd Site Visit SignIn.pdf | ||
| Q and A.pdf | ||
| Tatanka Siding Site Visit SignIn.pdf | ||
| 1240LT26Q0034 A0001.pdf | ||
| 1240LT26Q0034.pdf | ||
| Attachment 2 SOW.pdf | ||
| Attachment 3 Specs.pdf | ||
| Attachment 4 Drawings.pdf | ||
| Attachment 6 Wage Determination.pdf | ||
| Attachment 5 Map.pdf | ||
| Attachment 1 SOI.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Number Description Quantity Unit of Measure Unit Price PRICE
BI-1 General Requirements/Mobilization 1 LS $ $
BI-2 Demolition 1 LS $ $
BI-3 Provide and Install New Metal Siding, Soffit, and Facia 1 LS $ $
BI-4 Soffit Lights 5 EA $ $
BI-5 Exterior Wall Lights 2 EA $ $
BI-6 Painting Existing Exterior Doors 1 LS $ $
Number Description Quantity Unit of Measure Unit Price PRICE
OI-1 Increase/Decrease in Quantity to Replace Damaged ½” Sheathing 1 EA $ $
GRAND TOTAL, BASE + ALL OPTIONS $
SIDING REPLACEMENT
BLACK HILLS NATIONAL FOREST
TATANKA HOT SHOT BASE
BASE BID ITEMS
TOTAL BASE ITEMS
OPTION BID ITEMS
TOTAL OPTION ITEMS
SCHEDULE OF ITEMS
SOI
File details come from the government source that posted it. Updated .