Section 055213 SF - PIPE RAILINGS.DOC
DOC document 44 KB Posted
- Attached to
- Critical Housing Maintenance Construction at Crawford Work Center, Boise National Forest, Idaho (GAOA)
- Solicitation number
- 1240LT26Q0017
About this file
This is a specification document for steel pipe railings as part of the USDA Forest Service Critical Housing Deferred Maintenance project at Crawford Work Center in the Boise National Forest, Idaho. The specification outlines requirements for design, materials, fabrication, and installation of steel pipe railings for the barracks and mess hall remodeling effort.
The specification requires steel pipe railings fabricated from ASTM A 53/A 53M Type F or Type S, Grade A, Schedule 40 standard weight pipe, with ASTM A 36/A 36M plates, shapes, and bars. Materials must include welding rods per AWS specifications, universal shop primer complying with MPI #79, epoxy intermediate coat per MPI #77, and polyurethane topcoat per MPI #72. Post-installed anchors must be torque-controlled expansion anchors capable of sustaining loads 6 times imposed loads in unit masonry and 4 times in concrete per ASTM E 488/E 488M testing. Fabrication requirements include cutting, drilling, and punching metals cleanly with burrs removed and edges eased to approximately 1/32 inch radius. All welded connections must provide full fusion without undercut or overlap, with exposed surfaces finished smooth and blended. Installation requires posts set plumb within 1/16 inch in 3 feet tolerance and rails aligned with variations not exceeding 1/4 inch in 12 feet. Posts must be anchored using metal sleeves preset in concrete or via core-drilled holes at least 5 inches deep and 3/4 inch larger than post outside diameter, filled with nonshrink, nonmetallic grout complying with ASTM C 1107/C 1107M. The contract has an estimated magnitude between $250,000 and $500,000 with a quote due date of April 2, 2026, at 5 p.m. MST, and this is a 100% small business set-aside procurement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA FOREST SERVICE, R-4
CRAWFORD CRITICAL HOUSING DEFFERED MAINTENANCE
SECTION 055213 - PIPE RAILINGS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Steel pipe railings.
1.2 PERFORMANCE REQUIREMENTS
A. Delegated Design: Design railings, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.
B. Control of Corrosion: Prevent galvanic action and other forms of corrosion by insulating metals and other materials from direct contact with incompatible materials.
1.3 ACTION SUBMITTALS
A. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.
1.4 MEASUREMENT AND PAYMENT:
A. There will be no separate measurement or payment for work in this section. Payment will be included in the contract unit price for items shown in the schedule of items.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Steel Pipe Railings:
1. Basis-of-Design Product: Subject to compliance with requirements, provide a product as noted in the drawings or comparable product by one of the following:
a. Local manufacturer meeting design criteria.
2.2 STEEL AND IRON
A. Pipe: ASTM A 53/A 53M, Type F or Type S, Grade A, Standard Weight (Schedule 40), unless another grade and weight are required by structural loads.
B. Plates, Shapes, and Bars: ASTM A 36/A 36M.
C. Post-Installed Anchors: Torque-controlled expansion anchors capable of sustaining, without failure, a load equal to 6 times the load imposed when installed in unit masonry and 4 times the load imposed when installed in concrete, as determined by testing according to ASTM E 488/E 488M, conducted by a qualified independent testing agency.
1. Material for Interior Locations: Carbon-steel components zinc-plated to comply with ASTM B 633 or ASTM F 1941, Class Fe/Zn 5, unless otherwise indicated.
2.3 MISCELLANEOUS MATERIALS
A. Welding Rods and Bare Electrodes: Select according to AWS specifications for metal alloy welded.
B. Universal Shop Primer: Fast-curing, lead- and chromate-free, universal modified-alkyd primer complying with MPI#79 and compatible with topcoat.
C. Epoxy Intermediate Coat: Complying with MPI #77 and compatible with primer and topcoat.
D. Polyurethane Topcoat: Complying with MPI #72 and compatible with undercoat.
E. Nonshrink, Nonmetallic Grout: Factory-packaged, non-staining, noncorrosive, nongaseous grout complying with ASTM C 1107/C 1107M. Provide grout specifically recommended by manufacturer for interior and exterior applications.
2.4 FABRICATION
A. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of approximately 1/32 inch unless otherwise indicated. Remove sharp or rough areas on exposed surfaces.
B. Form work true to line and level with accurate angles and surfaces.
C. Welded Connections: Cope components at connections to provide close fit, or use fittings designed for this purpose. Weld all around at connections, including at fittings.
1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.
2. Obtain fusion without undercut or overlap.
3. Remove flux immediately.
4. At exposed connections, finish exposed surfaces smooth and blended so no roughness shows after finishing and welded surface matches contours of adjoining surfaces.
D. Nonwelded Connections: Connect members with concealed mechanical fasteners and fittings. Fabricate members and fittings to produce flush, smooth, rigid, hairline joints.
E. Form changes in direction by bending.
F. For changes in direction made by bending, use jigs to produce uniform curvature for each repetitive configuration required. Maintain cross section of member throughout entire bend without buckling, twisting, cracking, or otherwise deforming exposed surfaces of components.
G. Close exposed ends of railing members with prefabricated end fittings.
H. Provide wall returns at ends of wall-mounted handrails unless otherwise indicated.
I. Brackets, Flanges, Fittings, and Anchors: Provide wall brackets, flanges, miscellaneous fittings, and anchors to interconnect railing members to other work unless otherwise indicated.
1. At brackets and fittings fastened to plaster or gypsum board partitions, provide crush-resistant fillers or other means to transfer loads through wall finishes to structural supports and prevent bracket or fitting rotation and crushing of substrate.
2.5 STEEL AND IRON FINISHES
A. Preparation for Shop Priming: Prepare uncoated ferrous-metal surfaces to comply with SSPC-SP 6/NACE No. 3, "Commercial Blast Cleaning."
B. Primer Application: Apply shop primer to prepared surfaces of railings unless otherwise indicated. Comply with requirements in SSPC-PA 1, "Shop, Field, and Maintenance Painting of Steel," for shop painting. Primer need not be applied to surfaces to be embedded in concrete or masonry.
C. High-Performance Coating: Apply epoxy intermediate and polyurethane topcoats to prime-coated surfaces. Comply with coating manufacturer's written instructions and with requirements in SSPC-PA 1, "Shop, Field, and Maintenance Painting of Steel," for shop painting. Apply at spreading rates recommended by coating manufacturer.
1. Color: As selected by COR from manufacturer's full range.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Set railings accurately in location, alignment, and elevation; measured from established lines and levels and free of rack.
1. Do not weld, cut, or abrade surfaces of railing components that are coated or finished after fabrication and that are intended for field connection by mechanical or other means without further cutting or fitting.
2. Set posts plumb within a tolerance of 1/16 inch in 3 feet .
3. Align rails so variations from level for horizontal members and variations from parallel with rake of steps and ramps for sloping members do not exceed 1/4 inch in 12 feet.
B. Control of Corrosion: Prevent galvanic action and other forms of corrosion by insulating metals and other materials from direct contact with incompatible materials.
1. Coat, with a heavy coat of bituminous paint, concealed surfaces of aluminum that are in contact with grout, concrete, masonry, wood, or dissimilar metals.
3.2 ANCHORING POSTS
A. Use metal sleeves preset and anchored into concrete for installing posts. After posts are inserted into sleeves, fill annular space between post and sleeve with nonshrink, nonmetallic grout, mixed and placed to comply with anchoring material manufacturer's written instructions.
B. Form or core-drill holes not less than 5 inches deep and 3/4 inch larger than OD of post for installing posts in concrete. Clean holes of loose material, insert posts, and fill annular space between post and concrete with nonshrink, nonmetallic grout, mixed and placed to comply with anchoring material manufacturer's written instructions.
C. Anchor posts to metal surfaces with oval flanges, angle type, or floor type as required by conditions, connected to posts and to metal supporting members.
3.3 ADJUSTING AND CLEANING
A. Touchup Painting: Immediately after erection, clean field welds, bolted connections, and abraded areas of shop paint, and paint exposed areas with the same material as used for shop
END OF SECTION 055213
FEBRUARY 2022
| PIPE RAILINGS |
| 055213 - 6 |