3.2 SOI_GAOA South Zone Fence Replacement Update 02.pdf

PDF 73 KB Posted

Attached to
GAOA SOUTH ZONE FENCE REPLACEMENT Federal contract opportunity
Solicitation number
1240LT26Q0016
Issued by
Department of Agriculture Forest Service

About this file

This is a Schedule of Items for the GAOA South Zone Fence Replacement fixed-price construction contract dated April 15, 2026. The project involves removing and constructing barbed wire fences and wooden post-and-rail fences across multiple sites in the South Zone geographic area.

The contract includes 12 base items and 6 option items, all measured in linear feet using the Comparative Quote (CQ) method. Base items total approximately 53,609 linear feet of fence work across sites including Oowah Lake (8,000 ft barbed wire), Buckeyee (8,498 ft wood), Warner Wood (5,528 ft wood), Devils Canyon Barb (9,392 ft barbed wire), Monticello Lake (7,853 ft barbed wire), and other locations, plus a lump-sum mobilization requirement. Option items total approximately 29,632 linear feet across six additional sites (Pack Creek, Gooseberry, Indian Creek, Orange Olsen, Potters Pond, and Mammoth) and will be awarded simultaneously with the base contract if selected. The contract start date is May 18, 2026, with a 344 calendar-day performance period ending April 26, 2027. A bid guarantee is required per FAR 52.228-1, and bond premium payments must be included in the mobilization line item. The Great Wall of Buckeye site has been removed from base items due to funding limitations.

View the file

Other files for this federal contract opportunity

Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site Description Unit of Measure Method of Measure QTY Unit Price Total Price

Schedule Notes:

1. Any award of Option Items will be done with initial award.

2. Payment for bond premiums will be required in accordance with FAR 52.228-15. In accordance with FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, shallnot be in addition to the contract price. Include bond payments under Base Item – Mobilization.

3. A bid guarantee is required for this solicitation. See FAR 52.228-1 Bid Guarantee (SEP 1996) on page 18 of Attachment 1. Solicitation Terms and Conditions

4. Due to funding limitations, the Great Wall of Buckeye site is removed from the base items on the SOI. Any reference to this site throughout any attachments is hereby deemed not a part of any resulting contract.

5. SOW paragraph 1.7 START DATE is changed to May 18, 2026.

6. SOW paragraph 1.8 CONTRACT TIME is changed to 344 Calendar Days; the POP end date remains 4/26/2027.

Warner Barbed Wire Convert 3516 ft of Barbed Wire to Lay Down Linear Foot

CQ 3516

Linear Foot CQ

Nizhoni Barb Remove and Construct 200 ft of Barbed Wire Fence. Linear Foot CQ 200

Devils Canyon Wood Remove and Construct 710 ft Wood Post and Rail Fence 710

Mammoth

3168CQLinear FootRemove and Construct Barbed Wire FenceOrange Olsen

Potters Pond Remove and Install Wooden Post and Rail Fence Linear Foot CQ 2290

Indian Creek

OPTION QUOTE PRICE

TOTAL PRICE

2946CQLinear Foot

BASE QUOTE PRICE

Remove and Install Wooden Post and Rail Fence

Remove and Install Wooden Post and Rail Fence Linear Foot CQ 5808

8213CQLinear FootRemove and Construct Barbed Wire Fence

OPTION ITEMS

7705CQ

3740CQ

CQ

CQ

CQ

Gooseberry

Pack Creek Remove and Construct Barbed Wire Fence Linear Foot

Porcupine Rim Remove and Construct Barbed wire fence

Remove and Construct Barbed Wire Fence

Linear Foot

Linear Foot CQ 5528

Linear Foot CQ 3465

Linear Foot CQ

Linear Foot

Linear Foot

Linear Foot

Linear Foot

Monticello Lake

Nizhoni Wood

Buckboard

Devils Canyon Barb Remove and Construct 9392 ft of Barbed Wire Fence.

Remove and Construct Barb wire fence

Remove and Consturct 2735 ft Wood Post and Rail Fence

Remove and Construct Barbed Wire Fence

Mason Draw

Schedule of Items 4/15/2026 GAOA South Zone Fence Replacment

Oowah Lake

Buckeye

Warner Wood

CQ 8498

Remove and Construct Barbed Wire Fence Linear Foot CQ 8000

Remove and Install Wood post and rail fence

Remove and Construct 5528 ft Wood Post and Rail Fence.

Mobilization Mobilization for entire project LS LS LS

BASE ITEMS

File details come from the government source that posted it. Updated .