This is Amendment 0004 to a solicitation for fence replacement services on the Manti-La Sal National Forest, issued by the USDA Forest Service CSA Intermountain Region. The amendment was issued on February 20, 2026, and is effective as of March 24, 2026. The solicitation number is 1240LT26Q0016, and the project is titled "GAOA South Zone Fence Replacement."
The amendment addresses identified discrepancies within the original solicitation and updates the response date to April 3, 2026, at 12:00 PM MT. The contract specialist is Tony Taylor (tony.taylor@usda.gov), and the Contracting Officer Representative (COR) is Jared McCourt. The period of performance is May 1, 2026, through April 26, 2027. The amendment includes seven questions and answers that clarify specifications, including: quoting based on the Statement of Objectives (SOI) rather than maps for fence quantities; confirmation that there is no Bull Canyon in the project and fence construction order is flexible; wooden posts should be installed every 6th post with 5 steel posts creating 4 sections; Great Wall of Buckeye posts are 6.5'-7' with 40-44" exposed; wood stays will be required (not optional); and 14-gauge tie wire is acceptable for tying wood stays. Staging areas and material storage will be coordinated after contract award, with offerors advised to estimate freight using Moab or Monticello as reference points.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240LT26Q0016
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40LT
OGDEN UT 84401-2310
324 25TH ST
USDA-FS CSA INTERMOUNTAIN 8
GAOA03/24/20260004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/20/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Manti-La Sal National Forest
GAOA South Zone Fence Replacement
Amendment 0004 - This amendment makes the following clarifications:
- There are some discrepancies that have been identified within the solicitation. The attached questions and answers address those discrepancies with instruction as to what information takes precedence. These answers will be made a part of any resulting contract.
The supporting documents will be adjusted as identified within this amendment.
- The response date is changed to April 3, 2026. The time remains 12:00 PM MT.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
BRIAN J. WHARTON
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240LT26Q0016/0004
No, other changes are made.
Period of Performance: 05/01/2026 to 04/26/2027
COR - Jared McCourt
Contract Specialist - Tony Taylor -tony.taylor@usda.gov
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Questions and Answers 3/24/2026
1. There are differences in totals when the maps are compared to the SOI.
Ex: Oowah Lake map says 8047’/ SOI says 8000’
Devils Canyon wood map says 703’ / SOI says 710
Nizhoni barbed map says 1406’ / SOI says 200’
Answer: Quote based on SOI. Maps were given to provide visual representation, not exact quantities and there are reasons given in section C for the variation of quantities.
2. Amendment 1 states the order in which the fences are to be built, it says Bull Canyon which I believe is a mistake? There’s no Bull Canyon map and it’s not on
SOI?
Answer: This was a mistake. There is no Bull Canyon in this project. **Note that the order in which in fences are to be done is only preference and can be varied if needed.
3. SOW says wood posts on barbed wire every 6th post but amendment 1 says every 4th section. From what I am readying the SOW supersedes everything else so it’s every 6th post?
Answer: A wooden post should be installed every 6th post. 5 Steel posts should create 4 sections, and the next post should be a wooden post.
4. I am assuming the lengths of the posts on the Great Wall of Buckeye are the same as other specs 6.5’-7’?
Answer: That is correct. Roughly 40-44” of post is exposed on the great wall of buckeye.
5. Once awarded are we able to collaborate with the local FS office near the projects and use their yard as a possible storage for big loads of materials? If so what are the addresses to some of the yards for estimating freight?
Answer: We will be able to work out staging areas after award, but I am not sure exactly where that will be yet. I would use Moab or Monticello for estimating freight.
6. I have a concern, the SOW states that wood posts are preferred (but that means not required) according to the specs purchasing the wood stays, staples and tie wire is a significantly greater cost than metal stays. The solicitation states lowest bids will be considered first, for the sake of being fair for bidders, there should be a decision of either wood or metals stays.
Answer: Wood stays will be required. This will be updated in the SOW.
Questions and Answers 3/24/2026
7. 12.5 g tire wire to tie wood stays is almost impossible to wrap around the stays, I believe they won’t be as secure. Can we quote 14g tie wire for tying stays? We are already stapling them and tying them, they will be very secure with 14g, its lighter and will more easily wrap around the stays.
Answer: 14g tie wire will be acceptable. We will update the spec (6.2 B) to reflect that.