This is a Schedule of Items for a federal fixed-price construction contract for the GAOA South Zone Fence Replacement project, dated 3/16/26. The document outlines base items and option items for fence removal, construction, and installation services across multiple sites managed by what appears to be a federal land management agency.
The base items include mobilization for the entire project and twelve fence-related tasks across various named locations: Oowah Lake (8,000 linear feet of barbed wire fence removal and construction), Buckeye (8,498 linear feet of wood post and rail fence installation), Warner Wood (5,528 linear feet of wood post and rail fence construction), Warner Barbed Wire (3,516 linear feet of barbed wire conversion), Mason Draw (3,465 linear feet of barbed wire fence removal and construction), Devils Canyon Barb (9,392 linear feet of barbed wire fence removal and construction), Devils Canyon Wood (710 linear feet of wood post and rail fence removal and construction), Buckboard (5,631 linear feet of barbed wire fence removal and construction), Nizhoni Barb (200 linear feet of barbed wire fence removal and construction), Nizhoni Wood (2,735 linear feet of wood post and rail fence removal and construction), Monticello Lake (7,853 linear feet of barbed wire fence removal and construction), Porcupine Rim (3,740 linear feet of barbed wire fence removal and construction), and Great Wall of Buckeye (3,700 posts for broken and rotten post replacement on existing wood fence). The contract uses unit pricing with "CQ" (Contractor Quote) as the method of measure for all line items. Six option items are available: Pack Creek (7,705 linear feet), Gooseberry (8,213 linear feet), Indian Creek (5,808 linear feet), Orange Olsen (3,168 linear feet), Potters Pond (2,290 linear feet), and Mammoth (2,946 linear feet), all involving barbed wire fence or wood post and rail fence work. All items are priced on a linear foot or per-post basis with unit prices to be provided by bidders. The schedule notes require a bid guarantee, specify that bond premium payments must be included in the mobilization line item rather than added to the contract price, and stipulate that any option item awards will be made with the initial award.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Description Unit of Measure Method of Measure QTY Unit Price Total Price
BASE ITEMS
Warner Barbed Wire Convert 3516 ft of Barbed Wire to Lay Down Linear Foot
CQ 3516
Linear Foot CQ
Nizhoni Barb Remove and Construct 200 ft of Barbed Wire Fence. Linear Foot CQ 200
Devils Canyon Wood Remove and Construct 710 ft Wood Post and Rail Fence 710
Mammoth
3168CQLinear FootRemove and Construct Barbed Wire FenceOrange Olsen
Potters Pond Remove and Install Wooden Post and Rail Fence Linear Foot CQ 2290
Indian Creek
OPTION QUOTE PRICE
TOTAL PRICE
(Base + Options)
2946CQLinear Foot
BASE QUOTE PRICE
Remove and Install Wooden Post and Rail Fence
Remove and Install Wooden Post and Rail Fence Linear Foot CQ 5808
8213CQLinear FootRemove and Construct Barbed Wire Fence
7705CQ
OPTION ITEMS
Nizhoni Wood
Buckboard 5631
Gooseberry
Pack Creek Remove and Construct Barbed Wire Fence Linear Foot
Porcupine Rim
Great Wall of Buckeye
Remove and Construct Barbed wire fence
Replace Broken and Rotten posts for 22423 ft of existing wood fence, apprx 3700 posts
Monticello Lake
Linear Foot
Linear Foot
Linear Foot
Linear Foot
Each 3700CQ (Post)
CQ
CQ
CQ
CQ
Schedule of Items 3/16/26 GAOA South Zone Fence Replacment
Oowah Lake
Buckeye
Warner Wood
CQ 8498
Remove and Construct Barbed Wire Fence Linear Foot CQ 8000
Remove and Install Wood post and rail fence
Remove and Construct 5528 ft Wood Post and Rail Fence.
Mobilization Mobilization for entire project
Linear Foot
Linear Foot CQ 5528
LS LS LS
Schedule Notes:
1. Any award of Option Items will be done with initial award.
2. Payment for bond premiums will be required in accordance with FAR 52.228-15. In accordance with FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Base Item – Mobilization.
3. A bid guarantee is required for this solicitation. See FAR 52.228-1 Bid Guarantee (SEP 1996) on page 18 of Attachment 1. Solicitation Terms and Conditions
Devils Canyon Barb Remove and Construct 9392 ft of Barbed Wire Fence.
Remove and Construct Barb wire fence
Remove and Consturct 2735 ft Wood Post and Rail Fence
Remove and Construct Barbed Wire Fence
Mason Draw Remove and Construct Barbed Wire Fence Linear Foot CQ 3465