SaguacheParkPhaseIII_ContractMapAUPDATED.pdf
PDF 2 MB Posted
- Attached to
- Saguache Park Tank Install Phase III
- Solicitation number
- 1240LT24R0033
- Issued by
-
Department of Agriculture Forest Service
About this file
This document appears to be a geographic map related to a federal contract opportunity for the Saguache Park Tank Install Phase III project. The contract opportunity, posted by the Department of Agriculture Forest Service, is for the replacement of 2 livestock watering tanks on the Continental Divide Pipeline and the redevelopment of the Horse Canyon Line, which involves two spring redevelopments, approximately 7,000 ft of buried pipe, two tire tank installations, and a storage tank installation. The period of performance is from 06/01/2024 to 10/01/2024, and the competitive range is between $10,000 and $50,000. A pre-bid site visit meeting is scheduled for 04/16/2024. The map provides details on the location and specific details of the work, including the redevelopment of springs, installation of storage tanks, and plumbing for the pipeline. The map shows two pipeline route options, with one to be selected prior to the start of contract work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Statement of Work SaguacheParkPhaseIIIV2.docx | DOCX document | |
| A1 NRCS_PipelinePlumbingSpecs.pdf | ||
| A5 Proposed_Spring_Development_Sketch_USFS_5.2018.pdf | ||
| A3 SaguacheParkPhaseIII_ContractMapA.pdf | ||
| Statement of Work SaguacheParkPhaseIII.docx | DOCX document | |
| A6 Wage Determination CO20240001.txt | TXT text file | |
| A4 SaguacheParkPhaseIII_ContractMapB_Vicinity.pdf | ||
| A2 NRCS_TankInstallationSpecs.pdf | ||
| 1240LT24R0033 RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P P
Bureau of Land Management, Esri, HERE, Garmin, INCREMENT P, USGS, METI/NASA, EPA, USDA
Creede
Saguache
La Garita
The USDA Forest Service makes no warranty, expressed or implied, including the warranties of merchantability and fitness for a particular purpose, nor assumes any legal liability or responsibility for the accuracy, reliability, completeness or utility of these geospatial data, or for the improper or incorrect use of these
Saguache Park Water Development Map Phase III
Legend
Type
Above Ground
Above ground
Option 1
Option 2
ContractPoints
Type
P Spring
" Storage
Tank
¯ 0.95 0 0.950.47 MilesM Shelley RMS Date: 5/6/2024
Redevelop Spring -106.755639 38.071512
Redevelop Spring -106.755866 38.070446
Install Tank -106.754341 38.066417
Install Tank -106.755696 38.063342
Plumb for Storage Tank -106.755678 38.059091
Replace Tank -106.729364 38.043874
Replace Tank -106.722872 38.039187
Install Tank -106.753141 38.067618
Install Tank -106.751787 38.063779
Plumb for Storage Tank -106.751003 38.059132
Note: This map shows two pipeline routes. Option 1 or option 2 will be selected prior to contract work beginning
Plumb and set two storage tanks -106.718806 38.083940
Salthouse
Horse Canyon
Continental Divide
File details come from the government source that posted it. Updated .