This document is a Request for Proposal (RFP) for the Saguache Park Phase III Tank Install project on the Rio Grande National Forest. The project consists of replacing two existing livestock watering tanks on the Continental Divide Pipeline with tire tanks and redeveloping the Horse Canyon Pipeline, which includes two spring redevelopments, approximately 7,000 feet of buried pipe, two tire tank installations, and a 16,000-gallon storage tank installation. The Period of Performance is from June 1, 2024, to October 1, 2024, and the Competitive Range is between $10,000 and $50,000. The solicitation is open to all businesses, and a pre-bid site visit meeting is scheduled for April 16, 2024. The technical point of contact is Margaret (Meg) Shelley, Rangeland Management Specialist with the USDA Forest Service.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

40LT

OGDEN UT 84401-2310

324 25TH ST

USDA-FS CSA INTERMOUNTAIN 8

82AS CODE 16. ADMINISTERED BYCODE

X

X

236220

SIZE STANDARD:

% FOR:SET ASIDE:UNRESTRICTED OR40LT

REQUEST FOR

PROPOSAL

(RFP)

INVITATION

FOR BID (IFB)

10. THIS ACQUISITION ISCODE

REQUEST FOR

QUOTE (RFQ)

14. METHOD OF SOLICITATION

13b. RATING

NORTH AMERICAN INDUSTRY

CLASSIFICATION STANDARD

(NAICS):

SMALL BUSINESS

05/06/2024 1700 MT

04/03/2024

(970) 945-3225LONNIE ROOT

(No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

1240LT24R0033

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 3 1114917OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

SAGUACHE CO 81149

46525 STATE HWY 114

SAGUACHE RANGER DISTRICT

15. DELIVER TO

OGDEN UT 84401-2310

324 25TH ST

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$45

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

11.

SEE SCHEDULEX

12. DISCOUNT TERMS THIS CONTRACT IS A RATED

ORDER UNDER THE DEFENSE

PRIORITIES AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

8(A)

USDA-FS CSA INTERMOUNTAIN 8

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

Delivery: 10/01/2024 Period of Performance: 06/01/2024 to 10/01/2024

0001 This contract is the replacement of two water tanks on the Continental Divide Pipeline and redeveloping Horse Canyon Pipeline.

Continental Divide Tank Replacement replace two old galvanized tanks with tire tanks on the Continental Divide Pipeline. Tanks need to be picked up at the Forest Service Monte Vista Ad

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

DATED . YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Government Use Only)

OFFER

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT: REFERENCE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 11/2021) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

Site 347 CR 26 Monte Vista CO 81144 and hauled to site location. Machinery will be available to load tanks with prior coordination. Contractor must provide trailer and truck to haul tanks.

Tank location must be leveled and plumbed into existing line per NRCS standards (see attachment.

Floats will be plumbed to NRCS standards.

Wildlife escape ramps will be installed to NRCS standards. Tanks will be sealed with dirt and then filled with 6" concrete. Fences shall be constructed around inflow pipe using metal pipe per NRCS standards. Contractor must provide protective fencing material. Old tanks and material need to be hauled off site and disposed of.

Horse Canyon Redevelopment involves installing two spring Boxes redeveloped per technical drawing. Excavate springs approximately 4 feet or until level with existing spring box. Install corrugated culvert with perforations in the lowest 2 feet. Plumb a valved outlet pipe. Fill surrounding excavated area with native rock to approximately 2 feet and cover with native compacted soil. Cap culvert with tight durable lid 2x Tire Tank Installation. Tanks need to be picked up at the Forest Service Monte Vista Ad

Site 347 CR 26 Monte Vista CO 81144 and hauled to site location. Tank location must be leveled and

Continued ...

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

3 2 of

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240LT24R0033

plumbed into existing line per NRCS standards

(see attachment). Float will be plumbed to NRCS standards. . Wildlife escape ramp will be installed to NRCS standards. Tank will be sealed with dirt and then filled with 6" concrete. Fence shall be constructed around inflow pipe using metal pipe per NRCS standards. Contractor must provide protective fencing material.

Storage tank to be picked up at 30755 State

Highway 114 Saguache, CO 81149. Machinery will be provided to load. Install a 16,000 gallon storage tank. Float will be plumbed to NRCS standards.

Plumb into new Horse Canyon line Plumb into existing Continental Divide Pipeline Bury approximately 7000ft 1 ½ HDPE pipe. Bury pipeline approximately 2 feet deep Pipe will be laid above ground in groundwater dependent ecosystem (see map for reference)