A5 Proposed_Spring_Development_Sketch_USFS_5.2018.pdf
PDF 289 KB Posted
- Attached to
- Saguache Park Tank Install Phase III
- Solicitation number
- 1240LT24R0033
- Issued by
-
Department of Agriculture Forest Service
About this file
The provided document is a proposed spring development sketch for the U.S. Forest Service's Saguaro Park Tank Install Phase III solicitation. The solicitation (Solicitation Number: 1240LT24R0033) seeks to replace two livestock watering tanks on the Continental Divide Pipeline with tire tanks and redevelop the Horse Canyon Line, which involves two spring redevelopments, approximately 7,000 feet of buried pipe, two tire tank installations, and a storage tank installation. The period of performance is from June 1, 2024, to October 1, 2024, and the competitive range is between $10,000 and $50,000. The technical point of contact is Margaret (Meg) Shelley, Rangeland Management Specialist, and a pre-bid site visit meeting is scheduled for April 16, 2024, at 9:00 AM MST, to be held via Microsoft Teams.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Statement of Work SaguacheParkPhaseIIIV2.docx | DOCX document | |
| SaguacheParkPhaseIII_ContractMapAUPDATED.pdf | ||
| A1 NRCS_PipelinePlumbingSpecs.pdf | ||
| A3 SaguacheParkPhaseIII_ContractMapA.pdf | ||
| Statement of Work SaguacheParkPhaseIII.docx | DOCX document | |
| A6 Wage Determination CO20240001.txt | TXT text file | |
| A4 SaguacheParkPhaseIII_ContractMapB_Vicinity.pdf | ||
| A2 NRCS_TankInstallationSpecs.pdf | ||
| 1240LT24R0033 RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .