1240LT24Q0028.0005 - Bloomington Lake - Midland Trail (3 Pages).pdf
PDF 277 KB Posted
- Attached to
- Bloomington Lake - Midland Trail
- Solicitation number
- 1240LT24Q0028
- Issued by
-
Department of Agriculture Forest Service
About this file
This document appears to be an amendment to a federal solicitation for the Bloomington Lake - Midland Trail project. The amendment revises the schedule of items, changing the gravel gradation from 'D' to 'T'. The project involves hauling and placing 700 cubic yards of gravel for a trailhead, as well as temporary traffic control. An optional item includes hauling and placing an additional 467 cubic yards of gravel on a road. The project is located in Bear Lake County, Idaho and has an estimated magnitude of construction between $25,000 and $100,000. A pre-proposal site visit is scheduled, and proposals must be submitted via email to the specified USDA Forest Service points of contact by the due date. The period of performance is September 1, 2024 to October 18, 2024.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240LT24Q0028
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40LT
OGDEN UT 84401-2310
324 25TH ST
USDA-FS CSA INTERMOUNTAIN 8
06/21/20240005
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/12/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 0005 - The purpose of this amendment is to revise the schedule of items. The
Gradation has been changed from 'D' to 'T'. There are no other changes.
PROJECT NAME: BLOOMINGTON LAKE - MIDLAND TRAIL
PROJECT DESCRIPTION: Proposed work hauling and placing 700 CY of gravel for the trail head, as well as temporary traffic control. Option items include hauling, placing, 467 CY of gravel on Road #30457 from the junction to the trail head. Local traffic shall be closed during construction with temporary traffic control measures in place. This project shall follow related FP-14 requirements and the Forest Service Supplemental Specifications for construction.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
WESTLEY M. BISSON
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240LT24Q0028/0005
PROJECT LOCATION: The project is located on the
Bloomington Canyon access road #30409 off US
Highway 89 (42°10'35" N, 111°33'00" W) in Bear
Lake County, Idaho.
PRE-PROPOSAL SITE VISIT SCHEDULED? YES, SEE
SECTION L.
SUBMIT PROPOSALS TO WESTLEY.BISSON@USDA.GOV AND
NINI.ANDERSON@USDA.GOV. DO NOT MAIL PROPOSALS.
Period of Performance: 09/01/2024 to 10/18/2024
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SCHEDULE OF ITEMS
BLOOMINGTON LAKE-MIDLAND TRAIL
Item Supplies/Services Qty Unit of
Issue Unit Price Total Price
151.01 Mobilization 1 LS $ $
158.01 Water for Dust Control 20 MG $ $
301.01 Haul & Place Crushed Aggregate
(Gradation T) Compaction Method B
500 CY $ $
635.01 Temporary Traffic Control 1 LS $ $
SUBTOTAL (BASE): $ $
301.02 Haul & Place Crushed Aggregate
(Gradation T) Compaction Method B
200 CY $ $
SUBTOTAL (OPTION): $ $
TOTAL: $ $
LS = LUMP SUM / CY = CUBIC YARDS / MG = THOUSAND GALLONS
B.2 SCHEDULE NOTES
a) Items labeled as optional are not required to be exercised by the government. If exercised, the contractor will be required to perform the optional work in accordance with the terms and conditions of this contract.
b) One award will be made from this solicitation, contractors must submit pricing for all items.
c) Proposals must be submitted to Westley.Bisson@usda.gov and Nini.Anderson@usda.gov.
Make sure to read Section L.2 for proposal submission instructions and do not forget to include your Experience Questionnaire.
d) Project will take place from July 8th to August 7th, 2024 for base work (30 calendar days). Option item 1 is from August 8th to August 15th, 2024 (7 calendar days, if exercised).
mailto:Westley.Bisson@usda.gov mailto:Nini.Anderson@usda.gov
| 1240LT24Q0028 (5).pdf |
| Revised SOI.pdf |
| PART I—THE SCHEDULE |
| SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS |
| B.1 SCHEDULE OF ITEMS |
| B.2 SCHEDULE NOTES |
File details come from the government source that posted it. Updated .