1240LT24Q0028.0003 - Bloomington Lake Midland Trail (2 Pages).pdf
PDF 97 KB Posted
- Attached to
- Bloomington Lake - Midland Trail
- Solicitation number
- 1240LT24Q0028
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is an amendment to a solicitation for the Bloomington Lake - Midland Trail project. The purpose of the amendment is to clarify the units for the gravel quantities, which are thousands of gallons, not millions as originally stated. The statement of work had different gravel quantities than the schedule of items, so the schedule of items should be used as the correct quantities. The period of performance is also being changed to September 1st through September 30th for base items and October 1st through October 15th for option items. There are no other changes, and the offer due date is not extended.
The federal contract opportunity is for a construction project to haul and place 700 cubic yards of gravel for a trailhead, as well as temporary traffic control. Option items include hauling and placing 467 cubic yards of gravel on Road #30457. The project is located on the Bloomington Canyon access road off US Highway 89 in Bear Lake County, Idaho. The magnitude of construction is between $25,000 and $100,000. A pre-proposal site visit is scheduled, and proposals should be submitted via email to the specified USDA Forest Service contracting officials.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240LT24Q0028
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40LT
OGDEN UT 84401-2310
324 25TH ST
USDA-FS CSA INTERMOUNTAIN 8
05/15/20240003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/12/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 0003 - The purpose of this amendment is to clarify the quantities listed on the
Schedule of Items regarding the Unit MG, which is actually thousands of gallons, not millions.
The stated quantities for the gravel are correctly listed on the schedule of items, but the statement of work has different quantities listed. Please utilize the Schedule of Items as these numbers are correct.
The Period of Performance is also being changed to September 1st through the 30th for base items and October 1st through the 15th for option items as there is earthwork that takes place in August that must be done before this project can begin.
The offer due date is not extended. There are no other changes.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
WESTLEY M. BISSON
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240LT24Q0028/0003
PROJECT NAME: BLOOMINGTON LAKE - MIDLAND TRAIL
PROJECT DESCRIPTION: Proposed work hauling and placing 700 CY of gravel for the trail head, as well as temporary traffic control. Option items include hauling, placing, 467 CY of gravel on
Road #30457 from the junction to the trail head.
Local traffic shall be closed during construction with temporary traffic control measures in place.
This project shall follow related FP-14 requirements and the Forest Service Supplemental
Specifications for construction.
PROJECT LOCATION: The project is located on the
Bloomington Canyon access road #30409 off US
Highway 89 (42°10'35" N, 111°33'00" W) in Bear
Lake County, Idaho.
PRE-PROPOSAL SITE VISIT SCHEDULED? YES, SEE
SECTION L.
SUBMIT PROPOSALS TO WESTLEY.BISSON@USDA.GOV AND
NINI.ANDERSON@USDA.GOV. DO NOT MAIL PROPOSALS.
FOB: Destination
Period of Performance: 09/01/2024 to 10/18/2024