This solicitation is for a construction project to renovate two existing facilities for the Salt Lake Ranger District Office. The project includes base bid items to remodel the North Building, followed by the South Building, as well as optional site work and landscaping items. Offerors must submit pricing for all base items, which cover work such as general requirements, concrete, masonry, metals, woods, thermal and moisture protection, doors and windows, finishes, equipment, plumbing, HVAC, electrical systems, and earthwork. Optional items include additional remodeling, demolition, site preparation, paving, fencing, landscaping, and irrigation. The solicitation identifies technical specifications and drawings that are incorporated. Proposals are due on May 17 by 16:30 MT and must include forms such as the SF-1442 cover sheet signed and completed, representations and certifications, pricing schedule, insurance verification, and a bid guarantee of 20% of the price. Award will be made from this solicitation to the responsible offeror submitting a responsive offer with the lowest price.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROCUREMENT & PROPERTY SERVICES INSTRUCTIONAL COVER SHEET

ISSUING OFFICE:

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

INTERMOUNTAIN REGION PPS/CSA #8

1249 S VINNELL WAY, SUITE 200 BOISE,

ID 83709

SOLICITATION NO. 1240LT23R0024

OFFERS ARE SOLICITED FOR: Salt Lake District Office Renovation – Phase II

IMPORTANT – NOTICE TO OFFEROR:

1. This is a complete copy. Information and instructions for submission of proposals as well as contract provisions and specifications are contained in this OFFEROR REFERENCE COPY. This copy should be retained by offerors.

2. Note: An offer guarantee (Bid Bond) IS REQUIRED. Performance and Payment Bonds will be required of the successful offeror. (See Section I, FAR Clause 52.228-15.)

3. All questions regarding this solicitation must be in writing and addressed to the Contracting Officer email Tanya Spanfellner, tanya.spanfellner@usda.gov.

4. SITE VISIT, TUESDAY MAY 2, 2023 AT 10:00am, Salt Lake District Office Parking Lot, 6914 S. 3000 E., Salt Lake City, UT 84121.

All questions must be received no later than MAY 5, 2023, by 1630 MT to be considered prior to solicitation close date

AT A MINIMUM, OFFEROR SHALL SUBMIT THE FOLLOWING DOCUMENTS BACK WITH THEIR

RESPONSE TO THIS SOLICITATION:

1. SF-1442, Complete, date, and sign.

Provide SAM UNIQUE ENTITY IDENTIFER and email address. Block 14

2. Representations and Certifications Section K 52.204-8. You must complete Representations and

Certifications via SAM, please only submit a response to Paragraph (b)(1) Pg. 30.

3. Provide information required Section L Addenda to FAR clause 52.215-1, paragraph c Pg. 39-41

4. Fill out the pricing schedule for all items Section B-Schedule, Page 5-9

5. Provide Liability insurance verification

6. Complete Determination of responsibility, Attach J.6

7. Submit Bid Guarantee 52.228-1-20% of your price

PROPOSALS ARE DUE MAY 17 BY 1630 MT

Return to:

NAME: TANYA SPANFELLNER

Email: tanya.spanfellner@usda.gov Solicitation No. 1240LT23R0024

ONLY EMAIL PROPOSALS ARE BEING ACCPETED

Please keep a copy of your proposal for your records.

NO PAPER SOLICITATIONS SHALL BE ISSUED.

IT IS THE OFFERORS RESPONSIBILITY TO WATCH FOR ANY AND ALL AMENDMENTS TO THE

SOLICITATION

mailto:tanya.spanfellner@usda.gov

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

1091877

USDA-FS CSA INTERMOUNTAIN 8

1249 S VINNELL WAY

SUITE 200

BOISE ID 83709

40LT

TANYA SPANFELLNER

tanya.spanfellner@usda.gov

TANYA SPANFELLNER 208-258-1041

1x 04/17/2023

1240LT23R0024

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Salt Lake District Office Renovation-Phase II

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 360 calendar days and complete it within ________________ ________________ calendar days after receiving

Section F 52.211-10

05/17/2023

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USDA-FS CSA INTERMOUNTAIN 8

1249 S VINNELL WAY

SUITE 200

BOISE ID 83709

40LT

TANYA I. SPANFELLNER

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

SAM UNIQUE ENTITY ID:_____________________

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 45

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

1240LT23R0024

Delivery Location Code: 8491

USDA FOREST SERVICE

SALT LAKE RANGER DISTRICT

6944 SOUTH 30TH EAST

SALT LAKE CITY UT 84121 US

Period of Performance: 08/01/2023 to 01/31/2025

0001 Base Items

Delivery: 360 Days After Notice to Proceed

0002 Optional Items

(Option Line Item)

Delivery: 180 Days After Notice to Proceed

FOB: Destination

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Table of Contents

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCHEDULE OF ITEMS

B.3 PAYMENT FOR BOND PREMIUMS

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

C.2 PROJECT LOCATION

C.3 MAGNITUDE OF CONSTRUCTION PROJECT

C.4 TECHNICAL SPECIFICATIONS

SECTION D--PACKAGING AND MARKING

D.1 PACKING AND MARKING

D.2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE

SECTION E--INSPECTION AND ACCEPTANCE

E.1 CLAUSES

SECTION F--DELIVERIES OR PERFORMANCE

F.1 CLAUSES

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 CLAUSES

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 CLAUSES

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 CLAUSES

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

J.1 Wage Rate Decision No. See separate attached UT20230085 dated 04/14/2023

PART IV--REPRESENTATIONS AND INSTRUCTIONS

SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND

OTHER STATEMENTS OF OFFERORS OR RESPONDENTS

K.1 PROVISIONS

SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS

L.1 PROVISIONS

SECTION M--EVALUATION FACTORS FOR AWARD

M.1 PROVISIONS

M.2 PROPOSAL EVALUATION

M.3 TECHNICAL EVALUATION FACTORS

Solicitation No: 1240LT23R0024 Project Name: Salt Lake District Office Renovation – Phase II

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

This solicitation and any resulting contract is a firm-fixed price type of contract, which under the definition in FAR 16.202-1, “this type of contract provides for a price that is not subject to any adjustment on the basis of the contractor’s cost experience in performing the contract. This contract type places upon the contractor maximum risk and full responsibility for all costs and resulting profit or loss.”

Offerors shall submit pricing on all base and optional items listed on the Schedule of Items. Failure to comply with the instructions may render your offer nonresponsive and ineligible for contract award.

Prices on the Schedule shall reflect Contractor’s full cost for labor, supervision, overhead costs, and incidental items.

B.1 SCHEDULE OF ITEMS

BASE BID ITEMS: SEE SECTION C OF SPECIFICATIONS FOR DESCRIPTIONS

Item Supplies/Services Qty Unit of Issue

Method of Measure

Unit Price Total Price

011900-1 Mobilization 1 LS LSQ $ $ 010250-1 Construction Staking for Base

Items

1 LS LSQ $ $

023701-1 Sedimentation & Erosion Control for Base Items

1 LS LSQ $ $

000501 Division

Remodel North Building:

Division 01 Work: General Requirements

1 LS LSQ $ $

000501 Division

Remodel North Building:

Division 02 Work: Existing Conditions

1 LS LSQ $ $

000501 Division

Remodel North Building:

Division 03 Work: Concrete

1 LS LSQ $ $

000501 Division

Remodel North Building:

Division 04 Work: Masonry

1 LS LSQ $ $

000501 Division

Remodel North Building:

Division 05 Work: Metals

1 LS LSQ $ $

000501 Division

Remodel North Building:

Division 06 Work: Woods and Plastics

1 LS LSQ $ $

000501 Division

Remodel North Building:

Division 07 Work: Thermal and Moisture Protection

1 LS LSQ $ $

Solicitation No: 1240LT23R0024

000501 Division

Remodel North Building:

Division 08 Work: Doors and Openings

1 LS LSQ $ $

000501 Division

Remodel North Building:

Division 09 Work: Finishes

1 LS LSQ $ $

000501 Division 10, 11 and 12

Remodel North Building:

Division 10, 11 and 12 Work:

Specialties, Equipment and Furnishing

1 LS LSQ $ $

000501 Division

Remodel North Building:

Division 14 Work: Conveying Equipment: Elevator

1 LS LSQ $ $

000501 Division

Remodel North Building:

Division 22 Work: Plumbing

1 LS LSQ $ $

000501 Division

Remodel North Building:

Division 23 Work: Heating and Air Conditioning

1 LS LSQ $ $

000501 Division 26, 27 and 28

Remodel North Building:

Division 26-28 Work:

Electrical, Communications, Electronic Safety and Security

1 LS LSQ $ $

000501 Division 31, 32

Remodel North Building:

Division 31 , 32 Work:

Earthwork and exterior improvements for construction of the addition only

1 LS LSQ $ $

TOTAL BASE ITEMS $

OPTIONAL BID ITEMS:

SEE SECTION C OF SPECIFICATIONS FOR DESCRIPTIONS

Item Supplies/Services Qty Unit of Issue

Method of Measure

Unit Price Total Price

011900-2 Mobilization for Optional Bid Items

1 LS LSQ $ $

010250-2 Construction Staking for Optional Bid Items

1 LS LSQ $ $

023701-2 Sedimentation & Erosion Control for Optional Bid Items

1 LS LSQ $ $

017320-1 Site Demolition 1 LS LSQ $ $ 024102-1 Landscape Demolition 1 LS LSQ $ $ 024102-2 Landscape Demolition (South

Building Bid Option #1)

1 LS LSQ $ $

260500-1 Site Electrical - Lighting and Electrical Distribution System

1 LS LSQ $ $

Solicitation No: 1240LT23R0024

033545-2 4" Concrete - Sidewalks, Slabs; Includes Aggregate Base Material

152 SF DQ $ $

033545-3 "A" Type Curbing 42 LF DQ $ $ 101400 Exterior Signs (Aluminum on

Galv. Steel Tube Posts)

4 EA AQ $ $

312100-1 Project Site Preparation and Grading for north. (Exclude 5' from roofline of building addition)

1 LS LSQ $ $

321200-1 Hot Mix Asphalt Pavement, north areas

250 Ton AQ $ $

321204-1 Crushed Aggregate Base Course - Grading "C" (For Under Roadways) for north areas

230 CY DQ $ $

321713 Bollards 2 EA AQ $ $ 322622-1 Wheelstops - 6-Foot Concrete 29 EA AQ $ $ 322640-1 Pavement Markings - Parking

Stall Lines 4" Solid Yellow Non Reflective

1500 LF DQ $ $

322640-2 Pavement Markings - ADA Symbol

3 AQ EA $ $

322706-1 Pulverize Asphalt Pavement and Reuse - North areas shown on civil drawings

1338 SY DQ $ $

323113-1 Chain Link Fence 110 LF DQ $ $ 323113-2 Automatic Slide Gate - 24

Foot Wide Opening

1 EA AQ $ $

323113-3 Pedestrian Gate - 5 Foot Wide Opening

1 EA AQ $ $

026460-1 Dumpster Pad without Screen Enclosure

1 EA AQ $ $

026460-2 Dumpster Pad Screen Enclosure

1 EA AQ $ $

000502 Division

Remodel South Building:

Division 01 Work: General Requirements

1 LS LSQ $ $

000502 Division

Remodel South Building:

Division 02 Work: Existing Conditions

1 LS LSQ $ $

000502 Division

Remodel South Building:

Division 03 Work: Concrete

1 LS LSQ $ $

000502 Division

Remodel South Building:

Division 04 Work: Masonry

1 LS LSQ $ $

000502 Division

Remodel South Building:

Division 05 Work: Metals

1 LS LSQ $ $

Solicitation No: 1240LT23R0024

000502 Division

Remodel South Building:

Division 06 Work: Woods and Plastics

1 LS LSQ $ $

000502 Division

Remodel South Building:

Division 07 Work: Thermal and Moisture Protection

1 LS LSQ $ $

000502 Division

Remodel South Building:

Division 08 Work: Doors and Opening

1 LS LSQ $ $

000502 Division

Remodel South Building:

Division 09 Work: Finishes

1 LS LSQ $ $

000502 Division

Remodel South Building:

Division 10 Work:

Specialties

1 LS LSQ $ $

000502 Division

Remodel South Building:

Division 22 Work Plumbing

1 LS LSQ $ $

000502 Division

Remodel South Building:

Division 23 Work: Heating and Air Conditioning

1 LS LSQ $ $

000502 Division 26, 27 and

Remodel South Building:

Division 26-28 Work:

Electrical, Communications, Electronic Safety

1 LS LSQ $ $

000502 Division 31, 32

Remodel South Building:

Division 31 and 32 Work:

Earthwork and exterior improvements for construction of the addition only

1 LS LSQ $ $

024102-3 Existing Perimeter Fence Removal

396 LF DQ $ $

033545-1 8" Concrete - Driveway, Sidewalk, Drive Approach;

Includes Aggregate Base Material

780 Sf Dq $ $

101420 Administrative Identification Sign - AS (HDPE) and base

1 LS LSQ $ $

312100-2 Project Site Preparation and Grading. (Exclude 5' from roofline of building addition) for south)

1 LS LSQ $ $

322706-2 Pulverize Asphalt Pavement and Reuse - south areas

1390 SY DQ $ $

321200-2 Hot Mix Asphalt Pavement, south areas

270 Ton AQ $ $

321204-2 Crushed Aggregate Base Course - Grading "C" (For

230 CY DQ $ $

Solicitation No: 1240LT23R0024

Under Roadways) south areas item

323132 Wood Composite Fencing 396 LF DQ $ $ 328000-1 Landscape Irrigation System 1 LS LSQ $ $ 328000-2 Landscape Irrigation System

(South Building)

1 LS LSQ $ $

329310-1 Landscape Exterior Plants, Landscape Boulders and Topsoil

1 LS LSQ $ $

329310-2 Landscape Exterior Plants, Landscape Boulders and Topsoil, (South Building)

1 LS LSQ $ $

329400-1 Landscape Stone, Wood Mulch, Weed Barrier

1 LS LSQ $ $

329400-2 Landscape Stone, Wood Mulch, Weed Barrier (South Building)

1 LS LSQ $ $

312010 Landscape Berm (Select Borrow)

30 CY DQ $ $

329212-1 Landscape Concrete Landscape Edger

55 LF AQ $ $

329212-2 Landscape Concrete Landscape Edger (South Building)

40 LF AQ $ $

084113-1 Replace windows and window coverings, North Building

1 LS LSQ $ $

074646-1 Replace exterior siding, framing and fascia for North Building

1 LS LSQ $ $

113100-1 Appliances, North Building:

2 refrigerators, 2 microwaves

1 LS LSQ $ $

113100-2 Appliances, South Building, Refrigerator, Washer and Dryer

1 LS LSQ $ $

099113-1 Paint South Building CMU North and West Bay walls

1 LS LSQ $ $

072100-1 Between floor Insulation, North Building

1 LS LSQ $ $

TOTAL OPTIONAL BID ITEMS $

BASE + OPTIONAL TOTAL $

* Designated Method of Measurement:

DQ – Designed/Contract Quantities, AQ - Actual Quantities, LSQ - Lump Sum Quantities, SQ - Staked Quantities

B.2 SCHEDULE NOTES

a) Items labeled as optional are not required to be exercised by the government. If exercised, the contractor will be required to perform the optional work in accordance with the terms and conditions of this contract.

b) One award will be made from this solicitation, contractors must submit pricing for all items.

Solicitation No: 1240LT23R0024

B.3 PAYMENT FOR BOND PREMIUMS

Payment for bond premiums in accordance with FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 – Mobilization.

Solicitation No: 1240LT23R0024

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

This project consists of the remodeling of two existing facilities for the Salt Lake Ranger District Office.

The facilities are owned and operated by the United States Forest Service as a part of the Unita Wasatch Cache National Forest.

The construction work will be arranged in base bid items with multiple optional bid items. The work will be phased to complete the North Building, described in Specification Section 000501, before completing the South Building, described in Specification Section 000502. The site repair work and landscaping for the entire campus are included in the scope of work as optional bid items. The contractor shall carefully review this section and the Schedule of Bid Items while bidding on the work to be done.

See Section C – Description/Specifications/Statement of Work in the project specifications for base and optional item work descriptions.

C.2 PROJECT LOCATION

The “North Building” is located at 6914 S 3000 E, Salt Lake City, UT 84121. The “South Building” is located at 6944 S 3000 E, Salt Lake City, UT 841221. The site is located in Salt Lake County. The site is also located within the area known as “Cottonwood Heights” The Authority having Jurisdiction on the property is USDA Forest Service, a Federal Agency.

C.3 MAGNITUDE OF CONSTRUCTION PROJECT

Between $1,000,000 and $5,000,000.

C.4 TECHNICAL SPECIFICATIONS

The following specifications are attached. Some sections in the schedule of items refer to other sections not listed and are subsidiary to or are included in payment for other pay items in this contract. These items are considered incidental and no additional compensation will be made.

Section 000501 - Remodel North Office Buildings Section 000502 - Remodel South Building Section 010250 - Construction Staking Section 011250 - Measurement And Payment With Asphalt Section 011900 - Mobilization Section 012500 - Utility Company Coordination Section 013100 - Project Management And Coordination Section 013300 - Submittal Procedures Section 014130 - Contractor’s Quality Control Section 015000 - Temporary Facilities And Controls Section 017320 - Selective Demolition Section 017700 - Closeout Procedures Section 023701 - Sediment And Erosion Control Measures Section 024100 - Waste Material Disposal Section 024102 - Landscape Waste Material Disposal Section 024113 - Selective Site Demolition Section 024117 - Hazardous Waste Disposal Section 026460 - Concrete Dumpster Pad Section 033000 - Cast-In-Place Concrete Section 033545 - Concrete Sidewalks And Curb & Gutters

Solicitation No: 1240LT23R0024

Section 042200 - Concrete Unit Masonry Section 047000 - Manufactured Masonry For Sign Bases Section 048100 - Unit Masonry Assemblies Section 055000 - Metal Fabrications Section 055213 - Pipe Railings Section 061000 - Rough Carpentry Section 061500 - Wood Tongue And Groove Ceiling Section 061600 - Sheathing Section 061753 - Shop-Fabricated Wood And Steel Trusses Section 061800 - Glued-Laminated Construction Section 062013 - Exterior Finish Carpentry Section 062023 - Interior Finish Carpentry Section 064116 - Plastic-Laminate-Faced Architectural Cabinets Section 064300 - Wood Stairs Section 071113 - Dampproofing Systems Section 072100 - Thermal Insulation Section 074646 - Fiber-Cement Siding Section 075423 - Thermoplastic Polyolefin (Tpo) Roofing Section 076200 - Sheet Metal Flashing And Trim Section 078413 - Penetration Firestopping Section 079200 - Joint Sealants Section 081113 - Hollow Metal Doors And Frames Section 081416 - Flush Wood Doors Section 083113 - Access Doors And Frames Section 083613 - Sectional Overhead Doors Section 084113 - Aluminum-Framed Entrances And Windows Section 087100 - Door Hardware Section 088000 - Glazing Section 092900 - Gypsum Board Section 092910 - Structural Concrete Panels Section 093000 - Tiling Section 095113 - Acoustical Panel Ceilings Section 096500 - Rubber Sports Flooring Section 096513 - Resilient Base And Accessories Section 096519 - Resilient Tile Flooring Section 096613 - Concrete Floor Coating Section 096813 - Tile Carpeting Section 097700 - Special Wall Finishes Section 099113 - Exterior Painting Section 099114 - Exterior Powder Coatings Section 099123 - Interior Painting Section 099300 - Staining And Transparent Finishing Section 099600 - High-Performance Coatings Section 101400 - Exterior Signs Section 101419 - Dimensional Letter Signage Section 101420 - Administrative Identification Sign – As (Hdpe) Section 101423 - Panel Signage Section 102800 - Toilet And Bath Accessories Section 105201 - Fire-Protection Specialties Section 112130 - Slatwall Panel Systems Section 113100 - Residential Appliances Section 115213 - Projection Screens Section 122413 - Roller Window Shades Section 123661.16 - Solid Surfacing Countertops

Solicitation No: 1240LT23R0024

Section 124813 - Entrance Floor Grilles And Frames Section 142400 - Machine Room-Less Hydraulic Passenger Elevators Section 220517 - Sleeves And Sleeve Seals For Plumbing Piping Section 220518 - Escutcheons For Plumbing Piping Section 220523 - General-Duty Valves For Plumbing Piping Section 220523.12 - Ball Valves For Plumbing Piping Section 220529 - Hangers And Supports For Plumbing Piping And Equipment Section 220553 - Identification For Plumbing Piping And Equipment Section 220719 - Plumbing Piping Insulation Section 221116 - Domestic Water Piping Section 221316 - Sanitary Waste And Vent Piping Section 221429 - Sump Pumps Section 223400 - Fuel-Fired, Domestic-Water Heaters Section 224100 - Residential Plumbing Fixtures Section 224213.13 - Commercial Water Closets Section 224216.13 - Commercial Lavatories Section 224217 - Commercial Sinks Section 224716 - Pressure Water Coolers Section 230130.51 - Hvac Air-Distribution System Cleaning Section 230513 - Common Motor Requirements For Hvac Equipment Section 230517 - Sleeves And Sleeve Seals For Hvac Piping Section 230529 - Hangers And Supports For Hvac Piping And Equipment Section 230548 - Vibration And Seismic Controls For Hvac Section 230593 - Testing, Adjusting, And Balancing For Hvac Section 230713 - Duct Insulation Section 230923.12 - Control Dampers Section 231123 - Facility Natural-Gas Piping Section 233113 - Metal Ducts Section 233300 - Air Duct Accessories Section 233416 - Centrifugal Hvac Fans Section 233713.13 - Air Diffusers Section 235416.13 - Gas-Fired Furnaces Section 235533.16 - Gas-Fired Unit Heaters Section 236313 - Air-Cooled Refrigerant Condensers Section 238126 - Split-System Air-Conditioners Section 260500 - Common Work Results For Electrical Section 260519 - Low-Voltage Electrical Power Conductors And Cables Section 260533 - Raceways And Boxes For Electrical Systems Section 260553 - Identification For Electrical Systems Section 260923 - Lighting Control Devices Section 262726 - Wiring Devices Section 270500 - Common Work Results For Communications Section 270528 - Pathways For Communications Systems Section 271100 - Communications Equipment Room Fittings Section 271200 - Communications Copper Network Cabling Section 280500 - Common Work Results For Electronic Safety And Security Section 280513 - Conductors And Cables For Electronic Safety And Security Section 281300 - Access Control System Section 282300 - Video Surveillance Section 283111 - Digital, Addressable Fire-Alarm System Section 312000 - Earthwork

Solicitation No: 1240LT23R0024

Section 312010 - Select Borrow For Berm Construction Section 312100 - Project Site Preparation And Grading Section 312225 - Excavation & Embankment Section 312600 - Steel Helical Piers Section 321200 - Hot-Mix Asphalt Paving Section 321204 - Crushed Aggregate Base Or Surface Course Section 321713 - Bollards Section 322622 - Precast Concrete Curb Stops Section 322640 - Pavement Marking Section 322705 - Pavement Sawing Section 322706 - Asphalt Pavement Pulverizing Section 323113 - Chain-Link Fences And Gates Section 323132 - Wood Composite Fences Section 328000 - Irrigation System Section 329212 - Concrete Edger Landscape Curbing Section 329310 - Exterior Plants, Landscape Boulders & Planting Media Section 329400 - Landscape Stone, Wood Mulch And Weed Barrier

452.211-72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION D--PACKAGING AND MARKING

D.1 PACKING AND MARKING

All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.

D.2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE

The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.

SECTION E--INSPECTION AND ACCEPTANCE

E.1 CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

SECTION F--DELIVERIES OR PERFORMANCE

F.1 CLAUSES

52.211-13 Time Extensions (SEP 2000) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.242-14 Suspension of Work (APR 1984)

52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 360 calendar days from the start date identified on the notice to proceed for the North Building. An Additional 180 calendar days for the South Building, Phase 1 and 2.

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 CLAUSES

452.215-73 Post Award Conference (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled and held within TBD days after the date of contract award. The conference will be held at virtually via Teams meeting.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 CLAUSES

452.228-71 Insurance Coverage (NOV 1996) Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:

(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.

(b) General Liability. (1) The Contractor shall have bodily injury liability coverage written on a comprehensive form of policy of at least $500,000 per occurrence. (2) The Contractor shall have property damage liability insurance shall be required in the amount of $500,000 per occurrence.

(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.

(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.

452.237-74 Key Personnel (FEB 1988)

(a) The Contractor shall assign to this contract the following key personnel: project forman.

(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 CLAUSES

52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation (FAR) Clauses: https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Agriculture Acquisition Regulation (AGAR) Clauses: https://www.acquisition.gov/agar (AGAR clauses begin with 452) FAR and AGAR Deviations to clauses may be viewed at: Policies & Regulations | USDA

52.202-1 Definitions (JUN 2020) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (JUN 2020) 52.203-7 Anti-Kickback Procedures (JUN 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) 52.203-17 Contractor Employee Whistleblower Rights & Requirements to Inform Employees of

Whistleblower Rights (JUN 2020) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) 52.204-2 Security Requirements (MAR 2021) Alternate II (APR 1984) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-14 Service Contract Reporting Requirements (OCT 2016) 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by

Kaspersky Lab and Other Covered Entities (NOV 2021) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or

Equipment (NOV 2021) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.210-1 Market Research (NOV 2021) 52.215-2 Audit and Records -- Negotiation (JUN 2020) 52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) 52.219-8 Utilization of Small Business Concerns (OCT 2022)(DEVIATION DEC 2022) 52.219-9 Small Business Subcontracting Plan (OCT 2022) 52.219-14 Limitations on Subcontracting (OCT 2022) 52.219-16 Liquidated Damages --Subcontracting Plan (SEP 2021)

Solicitation No: 1240LT23R0024 Project Name: Salt Lake District Office Renovation – Phase II https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar https://www.usda.gov/da/ocp/ppd/policies-regulations https://www.usda.gov/sites/default/files/documents/far-class-deviation-regarding-threshold-small-disadvantaged-business.pdf

52.219-28 Post Award Small Business Program Rerepresentation (MAR 2023) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY 2018) 52.222-6 Construction Wage Rate Requirement (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (JUL 2021) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (APR 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-35 Equal Opportunity for Veterans (JUN 2020) 52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020) 52.222-37 Employment Reports on Veterans (JUN 2020) 52.222-40 Notification of Employee Rights Under National Labor Relations Act (DEC 2010) 52.222-50 Combating Trafficking in Persons (NOV 2021) 52.222-54 Employment Eligibility Verification (MAY 2022) 52.222-55 Minimum Wages for Contractor Workers under Executive Order 14026 (JAN 2022) 52.222-62 Paid Sick Leave under Executive Order 13706 (JAN 2022) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts (SEP

2013) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun

2016) 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners

(JUN 2016)

52.223-15 Energy Efficiency in Energy Consuming Products (MAY 2020) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (AUG

2018) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) 52.223-20 Aerosols (JUN 2016) 52.223-21 Foams. (JUN 2016) 52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021) 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises (JUN 2000) 52.227-1 Authorization and Consent (JUN 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance – Work on a Government Installation (JAN 1997) 52.228-12 Prospective Subcontractor Requests for Bonds (DEC 2022) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014)

Solicitation No: 1240LT23R0024

52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) 52.233-1 Disputes (MAY 2014) Alt 1 (DEC 1991) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR

1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-16 Quantity Surveys (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997)

Alternate I (APR 1984) 52.242-5 Payments to Small Business Subcontractors (JAN 2017) 52.242-13 Bankruptcy (JUL 1995) 52.243-4 Changes (JUN 2007) 52.244-2 Subcontracts (JUN 2020) 52.244-6 Subcontracts for Commercial Products and Commercial Services (MAR 2023) 52.246-21 Warranty of Construction (MAR 1994)

Alternate I (MAR 1994) 52.248-3 Value Engineering – Construction (OCT 2020) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012) Alternate I (SEP

1996) 52.249-10 Default (Fixed-Price Construction) (APR 1984)

Alternate I (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991) 452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) 452.236-70 Additive or Deductive Items (FEB 1988) 452.236-71 Prohibition Against the Use of Lead-Based Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archaeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation, and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)

52.217-7 Option for Increased quantity – Separately Priced Line Item (MAR 1989) The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 180 calendar days after contract award.

52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008)

(a) Definitions. As used in this clause— “Postconsumer material” means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”

“Recovered material” means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.

(b) The Contractor, on completion of this contract, shall—

(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and

(2) Submit this estimate to identified after contract award.

52.225-9 Buy American Act-Construction Materials (OCT 2022)

(a) Definitions. As used in this clause— Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is–

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means—

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

Critical item means a domestic construction material or domestic end product that is deemed critical to U.S.

supply chain resiliency. The list of critical items is at FAR 25.105.

Domestic construction material means—

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if–

(A)The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items

Solicitation No: 1240LT23R0024 Project Name: Salt Lake District Office Renovation – Phase II https://www.acquisition.gov/far/part-2#FAR_2_101 https://www.acquisition.gov/far/part-25#FAR_25_105 delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all component used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:

_______________NONE_________________________________

[Contracting Officer to list applicable excepted materials or indicate "none"]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable.

(A) For domestic construction material that is not a critical item or does not contain critical components.

(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

Solicitation No: 1240LT23R0024 Project Name: Salt Lake District Office Renovation – Phase II http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-12#FAR_12_505

(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.

(3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.

(B) For domestic construction material that is a critical item or contains critical components.

(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.

(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .