C05 A0001 1240LP27Q0008.pdf
PDF 159 KB Posted
- Attached to
- Janitorial services- Pagsoa Ranger District
- Solicitation number
- 1240LP27Q0008
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is Amendment 1 to Solicitation 1240LP27Q0008, issued by the USDA Forest Service (Intermountain Region) on November 5, 2026, with an effective date of November 16, 2026. The amendment addresses questions and answers for a janitorial services contract at the Pagosa Ranger District facility (180 Pagosa Street, Pagosa Springs, Colorado) with a period of performance from January 1, 2027 to December 31, 2027.
The solicitation is for a requirements contract for janitorial services involving daily cleaning (Monday-Friday, 5:00 PM to 6:30 AM), weekly services (52 visits per year on weekends), and annual specialized services (carpet cleaning, vent cleaning, power washing, window screen cleaning, and restroom grout/tile cleaning). The Schedule of Items specifies 260 daily visits, 52 weekly visits, and one annual cleaning, all set as obligated, unit-priced requirements rather than estimates. Key requirements include: submission by email to stephen.holly@usda.gov by the solicitation deadline; subcontracting permitted to similarly situated small businesses; primary janitor with minimum six months janitorial experience; Contract Manager or alternate available within one hour after government working hours; site tour available through Brandon Caley; and responses limited to 10 pages for technical submissions. The Government provides toilet paper, paper towels, hand soap, trash liners, and toilet seat covers; the contractor furnishes all cleaning equipment, chemicals, and tools. The dumpster is government-furnished and on-site. The facility is approximately 5,437 square feet including main floor, second floor, and lower-level areas. Background investigations (up to three per 12-month contract period at government expense) will be required, with crew members requiring HSPD-12 clearance needing escort during the investigation process. Quality metrics include 95% Acceptable Quality Level for bathrooms/kitchen and 90% for other standards, with 1% monthly invoice deductions for non-compliance. No insurance limits or bonding are required. Invoice payment is processed through the IPP system without additional documentation requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240LP27Q0008
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40LP
OGDEN UT 84401-2310
324 25TH ST
USDA-FS CSA INTERMOUNTAIN 4
11/16/20260001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/05/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This Amendment 1 addresses questions and answers. Acknowledgement of this amendment must be included with any solicitation response to be considered responsive.
Period of Performance: 01/01/2027 to 12/31/2027
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STEPHEN D. HOLLY
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Q1. Submission method: Could you please confirm how and where the quotation should be submitted (email address), and which documents must accompany it beyond the SF- 1449, Schedule of Items, and Experience Questionnaire?
A1. Solicitation responses are to be received by email only, to the listed point of contact, stephen.holly@usda.gov, no later than the listed response due date. It is the responsibility of the quoter to ensure that their response was received by that time. As listed on page 11 of the solicitation, Quoters shall submit all required technical information, pricing, and past performance information by the solicitation closing date and time identified in the SF- 1449. Technical acceptability of the quote will be evaluated according to the requirements starting on page 8 of the solicitation.
Q2. Subcontracting: FAR 52.219-14 Limitations on Subcontracting does not appear in the clause list for this solicitation. Could you confirm whether subcontracting is permitted, and whether the limitations on subcontracting apply to this requirement?
A2. Subcontracting is permitted to a similarly situated Small Business.
Q3. Site visit: The solicitation states there is no scheduled site visit and that a tour may be arranged through Brandon Caley. May a subcontractor representative attend an arranged tour on the prime contractor's behalf?
A3. Yes
Q4. Previous award: Is this a new requirement or a re-compete? If there was a prior contract for these services, could you share the previous award amount, the awardee, and the period of performance?
A4. The previous contract for these services was 1240LN22P0010. All available information for that contract is available on FPDS.gov.
Q5. Background checks: The PWS states no more than three background investigations will be conducted at Government expense within a 12-month period, with additional investigations at the contractor's expense. What is the typical timeline for HSPD-12 adjudication ahead of the January 1, 2027 start, and how are additional investigations handled if a subcontractor's crew changes during performance?
A5. The typical timeline for HSPD-12 adjudication varies. Janitor crews will need to be escorted in the facility by Forest Service personnel until the investigation process is complete. additional investigations will be handled in this same manner.
Q6. Experience Questionnaire: The questionnaire asks for projects completed within the last three years. For a new firm with no prior contracts, is a response stating no prior projects acceptable, with past performance rated neutral?
A6. Yes- a response stating no prior projects acceptable.
Q7. Hours of performance: Daily services are to be performed Monday through Friday between 5:00 PM and 6:30 AM, with weekly services on Saturday or Sunday. Could you confirm that daily services may be performed at any time within that overnight window, and that weekly services must fall on the weekend?
A7. Yes. Daily services may be performed at any time between 5:00 PM and 6:30 AM, Monday through Friday. Weekly services shall be performed on either Saturday or Sunday.
Annual services shall also be performed on a weekend but not on the same day as weekly services.
Q8. Section 2.8.2 of the Performance Work Statement states that weekly services are "performed twice during each 12-month period of the contract." However, Attachment 2 (Schedule of Items) lists the weekly services line item with a quantity of 52 per year, and the service hours provisions state that weekly services shall be performed on Saturday or Sunday. Could you confirm that weekly services are intended to be performed once per week (approximately 52 times per 12-month period), consistent with the Schedule of Items?
A8. Yes. Weekly services are intended to be performed once per week (52 times per year).
Section 2.8.2 has been corrected.
Q9. Could the Government provide the approximate square footage breakdown for the following areas?
Carpeted areas, Tile and vinyl flooring areas, Restrooms, Hallways and lobby, Offices and cubicles, Conference and collaborative rooms A9. The Government and its engineering staff do not have measurements or quantities for carpeted areas, exterior surfaces, screens, grout areas, vents, or other related cleaning elements. Interested prospective contractors are expected to determine all applicable quantities through review of the provided floor plans and by conducting a site tour.
Contractors should request a site tour and inspect the physical work location prior to submitting a quote to ensure they have sufficient information to accurately price and perform the required work.
Q10. The RFQ describes a requirements contract, while the schedule prices 260 daily visits, 52 weekly visits and one annual cleaning. Are any quantities or base-year payments guaranteed? Are these estimated unit-priced quantities or fixed annual obligations?
A10. The quantities listed in the Schedule of Items will be set, obligated, unit-priced requirements. They are not estimates.
Q11. PWS section 2.8.2 defines weekly work as twice per 12 months, while the tasks and schedule indicate weekly work. Please confirm 52 weekend visits, the separate annual visit, holiday scheduling, and whether trash removal and the other general cleaning descriptions apply daily or weekly.?
A11. The Government confirms 52 weekly weekend service visits per 12-month period.
Annual services are separate contract requirements, and shall be performed once during each 12-month period. Annual services shall not be performed concurrently with weekly services unless otherwise authorized by the Contracting Officer. All work shall be performed at the frequencies specified in the Performance Work Statement (PWS). Daily tasks shall be performed at the daily frequency identified in the PWS, and weekly tasks shall be performed at the weekly frequency identified in the PWS. Requirements containing condition-based language, such as "empty all trash cans into designated outside receptacles whenever trash is present," shall be performed whenever the specified condition exists in order to meet the applicable PWS performance standards. When a designated legal holiday falls on a Sunday, the following Monday will be observed as the legal holiday. When a designated legal holiday falls on a Saturday, the preceding Friday will be observed as the legal holiday. If a holiday falls on a scheduled Contractor workday, the work shall be performed on the following or preceding workday, as applicable, to accomplish the required service. Such schedule adjustments do not alter the required frequencies established by the PWS.
Q12. Does the primary janitor's name, resume demonstrating at least six months of janitorial or directly related experience, and references must be included with the initial quotation?
A12. Yes
Q13. Can a detailed staffing and recruitment plan be submitted in lieu of a contingent commitment letter, together with a written explanation of the efforts made to obtain the commitment letter?
A13. Yes
Q14. Onsite response: Please clarify the exact hours and triggering circumstances for the one-hour onsite availability requirement in §8.1, and whether a qualified local subcontractor representative may satisfy it while the prime manages contract administration and oversight.?
A14. The Contract Manager or designated alternate must be available during Government working hours and capable of being on-site within one hour after working hours if needed. A qualified local subcontractor representative may satisfy this requirement if authorized to act on behalf of the contractor.
Q15. Does Section 1.11.2 require regulated blood/body-fluid or other biohazard cleanup/disposal beyond ordinary restroom cleaning? If so, please identify expected tasks, quantities, required qualifications and disposal arrangements. Please also confirm the exterior power-washing area, window/screen count, access height and any wastewater restrictions?
A15. The PWS does not anticipate routine biohazard cleanup beyond normal janitorial services. Any required biohazard cleaning must be performed by qualified personnel. The PWS does not provide quantities, window counts, screen counts, or wastewater restrictions. A site tour is encouraged.
Q16. Are there required insurance limits or bonding?
A16. These do not apply to this solicitation.
Q17. When is an invoice considered accepted, and is payment dependent on any additional documentation or approval?
A17. An invoice is considered accepted when it has been processed as accepted in the IPP system. Payment is not dependent on any additional documentation or approval. If the invoice is not accepted, it will be rejected in the IPP system.
Q18. The QASP lists semi-annual floor stripping and finishing and semi-annual cleaning of outside windows and blinds, which the PWS task list does not name. Are those tasks part of the required work?
A18. No. Floor stripping, floor refinishing, outside window cleaning, and blind cleaning are not identified as required services in the PWS. Required annual services are limited to carpet cleaning, vent cleaning, power washing, window screen cleaning, and restroom grout/tile cleaning. The QASP will be adjusted at the award of the contract.
Q19. PWS uses 180 Pagosa Street, while the SF1449 uses 180 Second & Pagosa St. Please confirm the service address?
A19. The service location is the Pagosa Ranger District, 180 Pagosa Street, Pagosa Springs, Colorado.
Q20. Does the stated 5,437 square feet include the first- and second-floor addition and stairs shown on the layout? Is there a second floor or stairs to clean?
A20. The facility is approximately 5,437 square feet and includes a main floor, a second-floor area accessible by staircase, and a lower-level room accessible by a separate staircase. Contractors should rely on the provided floor plan and conduct a site visit to verify the facility layout and existing conditions before submitting a quote.
Q21. Is trash removal daily or weekly? The PWS lists it in both places.
A21. Although listed under the weekly task schedule, the requirement to "empty all trash cans into designated outside receptacles whenever trash is present" makes trash removal a daily, condition-based task. Because the requirement is triggered by the presence of trash rather than a specific day of the week, the Contractor is expected to remove trash as needed to maintain the required level of cleanliness and sanitation.
Q22. Does paid sick leave clause apply, and which health and welfare rate applies? The A25. These apply in connection with the document “C04d Attachment 4 Wage Determination 2015-5435 r32”, that was attached to the solicitation.
Q22. Please confirm no Town of Pagosa Springs or tribal fee or permit applies to this work.
A26. The Government is not aware of any Town or Tribal permits required specifically for this work. Contractors remain responsible for complying with applicable local requirements.
Q23. Please confirm whether toilet paper, paper towels, soap, and trash liners are Government-furnished, and whether the Contractor is responsible only for cleaning chemicals, equipment, and tools.
A23. The Government confirms that toilet paper, paper towels, hand soap refills, plastic bags/trash liners, and toilet seat covers are Government-furnished supplies under Section
6.1. The Contractor is responsible for notifying the Government when these supplies are running low. The Contractor is responsible for furnishing all cleaning equipment, cleaning supplies/chemicals, and cleaning tools, including items such as vacuums, steam cleaners, brooms, brushes, buckets, and other materials necessary to perform the required services.
Q24. Please confirm whether the annual carpet steam cleaning, exterior power washing, grout cleaning, and vent cleaning may be scheduled across more than one weekend day, provided none falls on the same day as the weekly service.
A24. The Government confirms that the annual services may be scheduled across multiple weekend days, as necessary to complete the work, provided they are coordinated with the
COR and no annual service work is performed on the same day that weekly services are performed, consistent with Section 1.6. Annual services remain a separate annual requirement.
Q25. Does the subcontractor need to be registered in SAM.gov, or is verification of its small-business status under NAICS 561720 sufficient?
A25. Verification of its small-business status under NAICS 561720 is sufficient.
Q26. Would a local subcontractor's designated supervisor satisfy the one-hour on-site response requirement?
A26. Yes.
Q27. Is there an attachment-size limit, required subject line, or preferred file-naming convention?
A27. Attachment size limit is 10 pages for the technical response. Required subject line must identify the solicitation number. The response file-naming convention is Technical Response and separate, Pricing Response.
Q28. Is the evaluated price the sum of the base period and all four option periods only?
A28. Yes.
Q29. Are the three government-paid background investigations per 12-month period counted per contract or per employee?
A29. They are counted per contract.
Q30. Regarding the QASP deduction: is the 1 percent deduction applied per service area that falls below the Acceptable Quality Level or once per month, and is the threshold 90 percent or 95 percent for restrooms and the kitchen?
A31. No. As stated, “1% deduction of monthly invoice”. MAL is 95% for Bathrooms/Kitchen Clean/Sanitized, and 90% of MAL for other standards listed.
Q32 How many windows and screens are in the building? Is stripping and waxing of the restroom and kitchen floors required?
A32. The PWS does not provide a window or screen count. Stripping and waxing of restroom or kitchen floors are not required. Annual restroom floor maintenance consists of grout and tile cleaning.
Q33. Does any exterior window work require ladders, lifts, or elevated access?
A33. Yes. The PWS states that a ladder may be required to access exterior windows. No lifts are necessary to reach the exterior windows.
Q34. Vacuuming: PWS 3.2 says floors shall be vacuumed weekly, and the daily list covers lobby and hallway mats. Please confirm that the carpeted offices and the 28 cubicles are vacuumed weekly, not daily.
A34. The Government confirms that vacuuming of the carpeted offices, work cubicles, conference/shared-use rooms, carpeted stairs (if applicable), and other carpeted areas is a weekly requirement. Daily vacuuming is only required for the lobby and hallway entrance mats as identified in the Daily Requirements section. Therefore, carpeted office areas and the 28 cubicles are to be vacuumed weekly, not daily.
Q35. Can the Government confirm the interpretation from the statement that the contract manager or the alternate contract manager must be "available on site within one hour after the Government's regular working hours". Does the Government require the contract manager or the alternate to be physically able to report to the site within an hour?
A35. Yes. The Contract Manager or designated alternate must be able to physically report to the site within one hour if required after Government working hours.
Q36. The Experience Questionnaire ( Attachment 7) is not named in the minimum submission list. Must it be submitted with the quotation?
A36. No, it is provided as a convenience to assist with the required Technical Response
Q37. Are dumpsters Government-furnished and on site (as implied by the PWS), or must the contractor provide refuse containers?
A37. The dumpster is Government-furnished and on site. The contractor must transport building trash to the Government-provided dumpster but is not required to provide a dumpster or refuse container for final disposal.
Q38. The Key Personnel section asks for a primary janitor resume showing a minimum of six months of janitorial experience, while PWS 8.2 gives one year of experience as the example qualification for the staff list. Which standard applies?
A38. The 6-month minimum experience requirement applies.
File details come from the government source that posted it. Updated .