Attachment 2_Schedule of Items.pdf
PDF 264 KB Posted
- Attached to
- Pomeroy Ranger District NZ Blowdown Cleanup
- Solicitation number
- 1240BK27R0001
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Task Order for windthrown tree salvage services on the Umatilla National Forest. The project, titled "NZ Blowdown," addresses a December 16-17, 2025 wind event that caused widespread tree damage across Columbia, Garfield, and Asotin counties in the Pomeroy Ranger District. The contractor must process, deck, and pile blown-down material to reduce insect and disease infestations, lower hazardous fuel loads, and preserve wood value. The base item includes 14 days of processing and piling on the East Side, with two optional items for 7 days each of additional East Side work and 7 days of West Side work, all measured in daily units. The period of performance runs from the date of award through December 15, 2026. The task order requires the contractor to commence work within 7 calendar days of receiving the notice to proceed and complete all work by a date to be determined (TBD). Unit pricing is to be determined; the document notes that orders exceeding $2,500 are invalid until signed by the Contracting Officer.
Evaluation will follow a two-step process: Step 1 assesses technical capability on a pass/fail basis, requiring a signed technical capability statement that explains the contractor's time frame, personnel, deliverables, and survey work experience with relevant past performance information; Step 2 awards to the lowest-priced acceptable quote. A post-award conference is mandatory and must be scheduled within 10 days of contract award, to be held at either Mt Adams Ranger District or Cowlitz Valley Ranger District. The contractor must maintain an inspection system acceptable to the Government, conduct concurrent inspections of completed work, and submit legible inspection forms to the Contracting Officer within 24 hours of completing each stand. The Government reserves the right to conduct compliance inspections, typically daily initially, with formal compliance inspections conducted within 5 business days of unit completion. The document includes March 2025 FAR class deviations implementing recent Executive Orders, removing outdated AGAR clauses, and adding new clauses effective April 2026, including FAR 52.222-90 addressing discrimination by federal contractors and AGAR 452.203-72 on unenforceable supplier terms. The solicitation also incorporates a USDA Ombudsman Program notice for filing agency protests and references FAR Overhaul updates posted October 30, 2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TASK ORDER NO.
IF THIS ORDER IS GREATER THAN $2,500.00, IT IS
NOT VALID UNTIL SIGNED BY THE CONTRACTING OFFICER
Project Name: NZ Blowdown County:
Columbia, Garfield & Asotin
Issuing and Billing Office:
Umatilla National Forest 2517 SW Hailey Ave.
Pendleton, OR 97801
Item No.
Description
Quantity Order
Unit
Unit Price
Amount
BASE ITEM
0001 Processing and Piling – East Side
14 Days $ $
Base Item Total:
Optional Items
1001 Processing and Piling Blowdown – East Side
7 Days $ $
1002 Processing and Piling – West Side
7 Days $ $
Option Items Total
Grand Total:
Period of Performance: Date of Award - 15 December 2026
1. DESCRIPTION/STATEMENT OF WORK
On December 16th and 17th, 2025 the local area experienced a wind event with sustained high wind speeds, as high as 100 mph which resulted in isolated pockets and large swaths of blown down trees or trees snapped at the bole.
The purpose of this project is to assist with the salvage of windthrown trees across the Pomeroy Ranger District. Processing, decking and piling blown-down material is necessary to help reduce potential insect and disease infestations, reduce hazardous fuel loading, and retain economic value of the wood material.
2. SPECIFICATIONS:
See attached Statement of Work
2.2 Government Property FAR 52.245-1 GOVERNMENT PROPERTY (SEP 2021)
See attached Statement of Work
3. PROJECT LOCATION AND DESCRIPTION
Pomeroy Ranger District
4. INSPECTION AND ACCEPTANCE:
4.1 FAR 52.246-4: INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)
a. Definition. “Services”, as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.
b. The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
c. The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
d. If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.
e. If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount.
When the defects in services cannot be corrected by reperformance, the Government may—
1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
2) Reduce the contract price to reflect the reduced value of the services performed.
f. If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may—
1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or
2) Terminate the contract for default.
4.2 CONTRACTOR INSPECTION PROCEDURES
(A) General Instructions
1) The Contractor shall conduct inspections of plots and record the results using procedures described herein.
Inspections shall be maintained concurrent with contract work. Completed inspection forms shall be made available to the Government within 24 hours of completion of each stand and will remain part of the permanent contract file.
2) By submission of inspection forms to the Government, the Contractor is considered to be certifying that the unit is satisfactorily completed and that the inspection forms reflect the work accomplished.
3) The Contractor shall submit legible inspection forms. Illegible and incomplete forms shall be returned to the Contractor for correction and re-submission.
4) In the event the Contractor falsifies inspection results, as determined by the Contracting Officer, the Government may declare the Contractor to be in default of the contract. Additionally, the Government may refer such falsifications to the US Attorney’s Office for possible prosecution pursuant to 18 U.S.C. 1001 (Falsification of Government Documents) or 18 U.S.C. 287 (Fraud).
4.3 GOVERNMENT INSPECTION PROCEDURES – COMPLIANCE INSPECTION:
(A) The COR, or a designated inspector, will conduct compliance inspections while work is in progress, usually daily at first, to assure that work is proceeding satisfactorily. Compliance inspections will be accomplished by stand inspection of each exam unit and will be based on adherence to the required specifications.
(B) The Contractor shall notify the COR when units are completed prior to their moving out of the general area.
Compliance inspections will be conducted within five (5) business days of completion of treatment units and the Contractor notified of any part of the unit(s) requiring additional work or rework.
Work will be accepted on the basis of measured inspection for compliance with specifications on areas reported as completed by the Contractor.
5. COMMENCEMENT PROSECUTION, AND COMPLETION OF WORK
The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than TBD.
6. POST AWARD CONFERENCE
A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at the Mt Adams RD or Cowlitz Valley RD.
7. EVALUATION CRITERIA:
Contractor must send a technical capability statement briefly explaining:
How they intend to complete this contract as far as time frame, personnel, and deliverables as well as explaining experience in survey work. Include relevant past performance information.
The Government will consider the relevance of past performance information obtained in relation to the scope of this procurement with respect to both similar efforts, and the length, scope, number, complexity, and diversity of contracts completed by the firm. Past performance, either positive or negative, which is considered by the
Government to be more closely related to the scope of this effort will be given additional weight in the evaluation process.
Government evaluators may avail themselves of various federal, state, and local past performance databases. The Government may research offeror performance on any federal, state, local, and commercial contract performance of the offeror that is known to the Government, but not included on the submitted performance information.
Additionally, the personal experience and evaluator knowledge of offeror performance may be utilized.
Quotes will be evaluated in two steps:
• Step 1: Quotes will be reviewed initially under a Pass/Fail evaluation to determine if the Technical Capability meets requirements of the call order. Quotes must be signed. Those that do not meet the requirements will be marked unresponsive. Acceptable quotes will then be evaluated under Step 2.
• Step 2: Lowest Price with an acceptable quote will receive the award
8. LIST OF ATTACHMENTS
The following attachments are made a part of this solicitation and any resultant contract.
Title Pages Performance Work Statement 3 Map 1 NZ Blowdown 1 Map 2 NZ Blowdown 1 Wage Determination 7 FAR Class Deviations and Updates (at end of this document) 2 Notice for Filing Agency Protests (at end of this document) 2 FAR Overhaul | FAR Companion Guide 1
March 2025 Class Deviation
This Call Order incorporates two FAR class deviations to ensure compliance with Executive Orders 14148, 14173, 14168, and 14208, issued since January 20, 2025. It also removes references to AGAR clauses and provisions that have been rescinded. These updates reflect recent policy changes and remove outdated requirements, as detailed below.
The following FAR provisions and clauses are hereby removed in their entirety from the LMIR BPA:
• 52.222-21 Prohibition of Segregated Facilities
• 52.222-26 Equal Opportunity
• 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026/1
1/This provision was removed to comply with the Executive Order 14236 titled "Additional Rescissions of Harmful Executive Orders and Actions," dated March 14, 2025.
The following FAR clauses now include deviations to align with recent Executive Orders:
• 52.212-3 Offeror Representations and Certifications—Commercial Products and Commercial Services (MAY
2024) (DEVIATION FEB 2025)
• 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders— Commercial Products and Commercial Services (JAN 2025) (DEVIATION FEB 2025)
• 52.223-1 Biobased Product Certification (MAY 2024) (DEVIATION FEB 2025)
• 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (MAY 2024)
(DEVIATION FEB 2025)
Ther following references to AGAR Clauses and provisions are hereby removed to comply with AGAR Rule 2024-22463 (89 FR 81014):
• AGAR 452.211-74 Period of Performance (FEB 1988)/2
• AGAR 452.215-73 Post Award Conference (NOV 1996) /2
• AGAR 452.219-70 Size Standard and NAICS Code Information (SEP 2001) /2
• AGAR 452.236-72 Use of Premises (NOV 1996) /2
• AGAR 452.236-77 Emergency Response (NOV 1996)
• AGAR 452.236-78 Fire Suppression and Liability (MAY 2014)
• AGAR 452.237-74 Key Personnel (FEB 1988) /2
2/AGAR clauses and provisions that were included in full text have been retained, with only the AGAR reference removed.
The following AGAR clauses is hereby included:
• AGAR 452.236-70 Emergency Response, Fire Suppression and Liability (NOV 2024)
The following FAR and AGAR clauses have been added, effective April 2026:
• FAR 52.222-90, Addressing DEI Discrimination by Federal Contractors (APR 2026).
• AGAR Clause 452.203-72 Unenforceable Supplier Terms (APR 2026)
All call orders will incorporate these changes by reference at award.
Disclaimer: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services.
Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
In advancement of Section 2 of Executive Order 14208, the removal of requirements related to Executive Order 14057 eliminates all non-statutory sustainability requirements or preferences in purchases of food service wares, including paper straws. In addition to removing requirements related to Executive Order 14057, the attachment also reflects recent updates to Code of Federal Regulation citations for the U.S.
Department of Agriculture’s BioPreferred® Program, a statutory purchasing preference program.
These class deviations will remain in effect until rescinded or incorporated into the FAR.
As prescribed in AGAR 433.104-4 (a)(5)(ii), the following Notice for Filing Agency Protests shall be included in every solicitation.
NOTICE FOR FILING AGENCY PROTESTS
United States Department of Agriculture (USDA) Ombudsman Program
The USDA is committed to issuing solicitations and awarding contracts in a fair and prompt manner. The Ombudsman Program for Agency Protests (OPAP) was established to address protest issues within the agency, providing an alternative to costly and time-consuming litigation. Operating independently, OPAP offers relief comparable to that granted by the Government Accountability Office (GAO). Interested parties are encouraged to resolve concerns through USDA’s internal Alternative Dispute Resolution (ADR) process before pursuing external forums such as the GAO. Concerns may be addressed informally or through a formal agency protest filed with either the Contracting Officer or the Ombudsman.
Informal Forum with the Ombudsman
1. Initial Point of Contact: Interested parties who believe a specific USDA procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer.
2. Escalation: If the Contracting Officer is unable to address their concerns, interested parties are encouraged to contact the USDA Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Utilization of the informal forum does not suspend any time requirement for filing a formal protest with the agency or other forums.
3. Required Information: To ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).
Formal Agency Protest with the Ombudsman
1. Effort to Resolve: Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions.
2. Independent Review: If the protester’s concerns remain unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest with either the Contracting Officer or, alternatively, with the Ombudsman under the OPAP program. Contract awards or performance will be suspended during the protest period unless justified in writing for urgent and compelling reasons or determined in writing to be in the best interest of the Government.
3. Resolution Timeline: The agency’s goal is to resolve protests within 35 calendar days from the date of filing.
4. Required Information: Protests shall include the information set forth in FAR 33.104(a)(3).
Failure to submit the required information may result in a delay or dismissal of the protest.
5. Timeliness: Protests must be filed within the timeframes specified in FAR 33.104.
6. Submission: Formal protests under the OPAP program should be submitted electronically to SPE.inquiry@usda.gov and the Contracting Officer.
Election of Forum. By initiating a protest with the USDA, the protester agrees not to pursue the same matter with the Government Accountability Office (GAO) or any other external forum while the agency protest is pending. If a protest is filed externally, the agency protest will be dismissed.
Page last modified on October 15, 2025 mailto:SPE.inquiry@usda.gov
FAR Overhaul | FAR Companion Guide
Oct 30, 2025
The Federal Acquisition Regulatory Council has released an update to the FAR Companion as part of the ongoing Revolutionary FAR Overhaul (RFO) Initiative, in accordance with Executive Order 14275 and OMB Memorandum M-25-26.
The following RFO update was posted on October 30, 2025:
• FAR Companion, Version 2.0, includes the initial release of FAR Companion (FC) parts 2, 3, 7, 13, 14, 15, 16, 17, 19, 20, 21, 22, 23, 24, 25, 27, 30, 32, 37, 41, 42, 44, 45, 47, 48, 52, and 53.
• Version 2.0 also includes updates to previously released content: update to FC 8.104 pertaining to “required use” contracts and providing more information and resources on Category Management, including beta version content of the Category Management Buying Guide; update to FC 8.401 pertaining to evaluation factors; updates to FC 8.401(b) and FC 12.301 removing references to debriefings; new annotation under FC 8.401(b) related to sole source justification content for FSS orders; new annotation under FC 12.001 related to contracting methods for commercial construction; update to FC 11.204 to clarify brand name or equal as distinct from brand name justifications under FAR 6.104; updates to thresholds referenced due to the October 1, 2025 inflation adjustment rule; various citation corrections throughout; and changed “Reserved” to “No additional guidance” when the FAR Companion does not provide any practice recommendations for that associated FAR part.
• FAR Companion, Version 2 is posted on www.acquisition.gov/far-overhaul.
To view the FAR Companion, Version 2.0. inclusive of all parts and updates, visit: https://www.acquisition.gov/sites/default/files/page_file_uploads/far-companion.pdf
To view all available rewritten FAR Parts and agency deviations, visit: https://www.acquisition.gov/far-overhaul/far-part-deviation-guide.
Stay informed. View the latest FAR Overhaul news and announcements at: https://www.acquisition.gov/far-overhaul.
https://links-2.govdelivery.com/CL0/https:%2F%2Flinks-2.govdelivery.com%2FCL0%2Fhttps:%252F%252Fwww.whitehouse.gov%252Fpresidential-actions%252F2025%252F04%252Frestoring-common-sense-to-federal-procurement%252F%2F1%2F0101019a2c554a32-f0246afd-e2b4-418c-817b-e6a76b6d073a-000000%2FUX8vjw5CHuC8f77RXf4Fu_Fb-_GNv8DPn3ftoPjCF5w=428/1/0101019a2c60554d-c2540c50-6d63-472c-95dc-38b51df370df-000000/iQRSADqlGWrqB7R_fB5Wg3JNajtZsj28p5OVudC_BNc=428 https://links-2.govdelivery.com/CL0/https:%2F%2Flinks-2.govdelivery.com%2FCL0%2Fhttps:%252F%252Fwww.whitehouse.gov%252Fpresidential-actions%252F2025%252F04%252Frestoring-common-sense-to-federal-procurement%252F%2F1%2F0101019a2c554a32-f0246afd-e2b4-418c-817b-e6a76b6d073a-000000%2FUX8vjw5CHuC8f77RXf4Fu_Fb-_GNv8DPn3ftoPjCF5w=428/1/0101019a2c60554d-c2540c50-6d63-472c-95dc-38b51df370df-000000/iQRSADqlGWrqB7R_fB5Wg3JNajtZsj28p5OVudC_BNc=428 https://links-2.govdelivery.com/CL0/https:%2F%2Flinks-2.govdelivery.com%2FCL0%2Fhttps:%252F%252Fwww.acquisition.gov%252Fsites%252Fdefault%252Ffiles%252Fpage_file_uploads%252FM-25-26-Overhauling-the-Federal-Acquisition-Regulation-002.pdf%2F1%2F0101019a2c554a32-f0246afd-e2b4-418c-817b-e6a76b6d073a-000000%2FV2fElIf9f7QdG6m5Ww5jhArdcb1aIH_aeS4ElUjVmc4=428/1/0101019a2c60554d-c2540c50-6d63-472c-95dc-38b51df370df-000000/xV7YtpptB-6N9VpzH2pxYTGN8LdN8SNn64No6C5amvE=428 http://www.acquisition.gov/far-overhaul https://www.acquisition.gov/sites/default/files/page_file_uploads/far-companion.pdf https://links-2.govdelivery.com/CL0/https:%2F%2Flinks-2.govdelivery.com%2FCL0%2Fhttps:%252F%252Fwww.acquisition.gov%252Ffar-overhaul%252Ffar-part-deviation-guide%2F1%2F0101019a2c554a32-f0246afd-e2b4-418c-817b-e6a76b6d073a-000000%2F5uwlAI9fF6_-jn5dDrAJ48p0ONjbyVaveJ8mw6NFErg=428/1/0101019a2c60554d-c2540c50-6d63-472c-95dc-38b51df370df-000000/hKblUJZVwmanVmACgNxzdtGcTCp_8oeUkYIXHQ6RvZg=428 https://links-2.govdelivery.com/CL0/https:%2F%2Flinks-2.govdelivery.com%2FCL0%2Fhttps:%252F%252Fwww.acquisition.gov%252Ffar-overhaul%252Ffar-part-deviation-guide%2F1%2F0101019a2c554a32-f0246afd-e2b4-418c-817b-e6a76b6d073a-000000%2F5uwlAI9fF6_-jn5dDrAJ48p0ONjbyVaveJ8mw6NFErg=428/1/0101019a2c60554d-c2540c50-6d63-472c-95dc-38b51df370df-000000/hKblUJZVwmanVmACgNxzdtGcTCp_8oeUkYIXHQ6RvZg=428 https://links-2.govdelivery.com/CL0/https:%2F%2Flinks-2.govdelivery.com%2FCL0%2Fhttps:%252F%252Fwww.acquisition.gov%252Ffar-overhaul%2F1%2F0101019a2c554a32-f0246afd-e2b4-418c-817b-e6a76b6d073a-000000%2FukMJUCl7XyhWDI2ryQDSaDkjAdvpP13mSWTjRrsTJgw=428/1/0101019a2c60554d-c2540c50-6d63-472c-95dc-38b51df370df-000000/swhJC4pXT7o0UtFbXNL-dK3Q6ehR3wIq3ZsJ5q7R3-s=428
| IF THIS ORDER IS GREATER THAN $2,500.00, IT IS |
| 1. DESCRIPTION/STATEMENT OF WORK |
| 2.2 Government Property FAR 52.245-1 GOVERNMENT PROPERTY (SEP 2021) |
File details come from the government source that posted it. Updated .