1240BK27R0001 Amendment 2 - Q and As.pdf
PDF 158 KB Posted
- Attached to
- Pomeroy Ranger District NZ Blowdown Cleanup
- Solicitation number
- 1240BK27R0001
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is Amendment 2 to Solicitation 1240BK27R0001, issued by the USDA Forest Service (FS) CSA Northwest 1 on November 18, 2026, with an effective date of November 18, 2026. The amendment incorporates Questions and Answers dated November 18, 2026 and establishes a period of performance from December 9, 2026 through October 30, 2027. The contracting office is located at 1220 SW 3rd Ave, Suite 310, Portland, OR 97204-2829. Offerors must acknowledge receipt of this amendment prior to the specified solicitation closing date through submission of offer copies, written acknowledgment, or electronic communication referencing the solicitation and amendment numbers.
The underlying solicitation addresses the NZ Blowdown Cleanup project, which involves processing and decking of green and dead blowdown material created from a December 2025 winter storm on National Forest land. Work includes cutting, processing, and moving material to landing sites where trees will be processed and piled into small log decks and slash piles, with the primary end state being small decks for personal firewood use. The project is priced on a daily rate basis (8-10 hours per work day) rather than by acreage or tonnage. All material remains government property; the contractor has no responsibility for hauling or removal. Work must be completed by October 30, 2027, with roads seasonally closed December 1 through March 31, though dates are negotiable based on weather conditions. The project involves roadside operations with processor or excavator-type equipment; handwork is not required. Daily inspections by the Contracting Officer's Representative (COR) will occur to ensure contract specifications are met. Partial payments can be negotiated during pre-work meetings. Tree sizes range from approximately 12 inches average diameter at breast height (dbh) to 30 inches maximum dbh.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240BK27R0001
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40BK
PORTLAND OR 97204-2829
STE 310
1220 SW 3RD AVE
USDA-FS CSA NORTHWEST 1
11/18/20260002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/05/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of amendment 2 is to:
(a) Incorporate Questions and Answers, dated 18 November 2026.
Period of Performance: 12/09/2026 to 10/30/2027
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
JASON N. TANAMOR
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
NZ Blowdown Cleanup Questions and Answers
18 November 2026
1. The Schedule of Items prices the work by the day. How many working hours does the Government consider one day (for example 8, 10, or 12 hours)? Is a day measured as on-site operating hours for the full equipment task force?
Generally, consider 8-10 hrs of operation a full day.
2. Do we need to skid anything? How far off the road way are we going?
Yes, in the traditional sense there will be a skid or movement of material to landing sights where trees will be processed in piled into small ‘log’ decks and slash piles. We are open to contractors ideas, tools and experience of how to best complete this task. The primary end state will be to leave small decks available for personal use firewood after this project is complete and preferably not ‘large’ decks usually associated with traditional logging.
3. Is this purely just a cut, process and deck job?
Yes. This will be processing and decking of green and dead blowdown created from the winter storm of Dec 2025. There is no intent of felling standing trees unless operating hazard is identified.
4. Is this feller buncher cutting, hand cutting or can a processor handle it?
I would think a processor could handle most of the work from my experience. However, this is very much an owner or operators call here as opinions of how to use each piece of equipment varies greatly from operator to operator or owner to owner in my experience.
5. Any road work needed?
No, unless significant damage occurs in an activity that was not approved by govt rep on site.
6. When could this job be done?
Needs to be completed by 10/30/27. Refer to SOW.
7. Please confirm that decked logs remain Government property and that the contractor is not responsible for hauling or removal.
Contractor is not responsible for removing any material from federal land, it will remain government property.
8. Are there insurance minimums, Industrial Fire Precaution Level or fire season restrictions, or equipment limits in sensitive areas?
IFPL will be followed if operating during fire season like every other activity on National Forest owned land, waivers could be possible due to being a priority roads. Sensitive areas will be flagged out and/or identified on the ground or maps by government officials on site.
9. if winter conditions close FSR 40-240, 4027, or 40-360, may work pause and resume when the roads reopen, within the 12/09/2026 – 10/30/2027 period of performance?
Yes
10. How many acres and roughly how many loads?
This is based on a daily rate, not acres.
11. Is the material chipped on site, decked for removal, or hauled off?
Logs will be decked after processed, and processed material will be piled.
12. Is there road access to the units, and are the roads passable in winter?
This is a roadside project. Roads may be passable in winter, depends on precipitation amounts. Most winters roads are not passable during winter months. Roads are closed December 1st through Mar 31st. But depending on snow levels could be possible to move in early or stay late.
13. Daily COR inspection is required. Does that mean a government person is on site every day?
COR will not be on site for the entire day but will be available for questions and will make daily checks to ensure contract specifications are being met.
14. When does the work have to be finished by?
10/30/2027
15. Can we invoice for accepted partial deliveries, or by monthly or milestone line items, under this order, rather than one invoice at final completion?
Partial payments can be made as negotiated by COR/CO and as decided upon during pre-work meeting.
16. Is there a site visit or pre-offer tour available for the blowdown areas, and if so, how do I schedule it?
Site visit can be made available. Email request to Contracting Office.
17. What is the estimated volume / acreage of windthrown material, and how is it priced — by acre, by ton, by deck/pile unit, or lump sum?
This project is based on a daily rate, approximately 8 to 10 hours per work day.
18. What are the specs for processing, decking and piling — piece size, pile size/location, and what material must be retained vs. removed?
All material stays on Forest. Refer to Statement of Work.
19. What equipment access is there to the sites (road access, seasonal restrictions, snow/winter work Dec–winter), and are there areas that are hand-work only?
Handwork is not required. All roads are accessible to processor/excavator type equipment. Roads are typically not accessible during winter months and roads are seasonal closed from December 1 through March 31st but this can be negotiated depended on weather conditions and access.
20. How many miles or acres are there concerning this project?
This project is based on a daily rate, with approximately 8 to 10 works hours a day.
21. What is the average dbh of the fallen trees and what are approximately the dbh of the largest trees?
Approximately 12” ave largest up to 30” dbh.
File details come from the government source that posted it. Updated .