This is a Performance Work Statement (PWS) for windblown trees processing and decking services at the Pomeroy Ranger District. The contractor shall provide all labor, equipment, tools, materials, supervision, and transportation necessary to safely fell and deck designated trees within the project area in accordance with forestry safety standards and environmental regulations. The project was initiated following a severe wind event on December 16-17, 2025, with sustained winds up to 100 mph that resulted in extensive blown-down and snapped trees across the district.
The primary objectives include clearing and processing windblown debris along three mandatory road systems (FSR 40-240, FSR 4027, and FSR 40-360) and two optional systems (FSR 42-140 and FSR 46-300) as funds permit. All downed green material on road prisms and up to 300 feet off prisms in non-sensitive areas on slopes less than 35 percent shall be processed to log lengths and staged along road systems. Log specifications require all downed green logs greater than 8 inches DBH to be processed to 6 inches top DIB in lengths of either 16 feet 6 inches or 33 feet, then stacked neatly in stable decks at designated landings. Brush piles shall not exceed 20 feet by 20 feet and must be free of soil and debris. The contractor must comply with OSHA logging safety standards (29 CFR 1910.266), maintain first-aid kits and fire suppression equipment on site, and minimize environmental disturbance with erosion control measures. The award date is October 30, 2027, with work to commence within 10 calendar days of the Notice to Proceed. Deliverables include daily progress reports and a final completion report with photographic documentation. The Government will furnish maps and provide access to staging areas and landings, with daily COR inspections required to ensure compliance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS) Project Title: Windblown Trees Processing and Decking Services
Location: Pomeroy Ranger District
1. Scope The contractor shall provide all labor, equipment, tools, materials, supervision, and transportation necessary to safely fell and deck designated trees within the project area. Work shall be performed in accordance with applicable forestry safety standards and environmental regulations.
2. Background On December 16th and 17th, 2025 the local area experienced a wind event with sustained high wind speeds, as high as 100 mph which resulted in isolated pockets and large swaths of blown down trees or trees snapped at the bole.
The purpose of this project is to assist with the salvage of windthrown trees across the Pomeroy Ranger District. Processing, decking and piling blown-down material is necessary to help reduce potential insect and disease infestations, reduce hazardous fuel loading, and retain economic value of the wood material.
3. Objectives
• The purpose of the project is to clear and process windblown debris on and along the road prisms identified below and as shown on the Contract Area Map.
o Road Systems: The following road systems, and associated spur roads, are mandatory for debris clearing, processing, and decking. Additional roads may be added, in the vicinity, if there are days remaining days on contract, and in agreeance with CO and Contractor.
FSR 40-240
FSR 4027
FSR 40-360
Following road systems are optional as funds are made available:
FSR 42-140
FSR 46-300
• Minimize environmental disturbance and comply with erosion control measures.
4. Requirements
• Processing:
o All downed green material on the road prims, and up to 300’ off the prisms outside of sensitive areas and on slopes less than 35%, should be processed to log lengths, to the specifications described below, and staged along the road systems within the project boundary.
o Brush generated from the processing the material shall be piled no larger than 20’ by 20’ and free of soil or other large debris.
• Decking:
o Log Length Specifications: All downed green logs greater than 8” DBH (diameter at breast height) shall be processed to a 6” top DIB (diameter inside bark) and into lengths of either 16’6” or 33’.
o Stack logs neatly in stable decks at designated landings.
o Ensure decks are accessible for loading equipment.
o Keep decks free of excessive debris and slash.
• Safety & Compliance:
• Follow OSHA logging safety standards (29 CFR 1910.266).
• Maintain first-aid kits and fire suppression equipment on site.
• Comply with all federal, state, and local environmental regulations.
5. Deliverables
• Completion of processing and decking for all downed trees within the project boundaries.
• Daily progress reports including number of trees felled, decked, and any incidents.
• Final completion report with photographic documentation.
6. Period of Performance
• Date of Award – October 30, 2027
• Work shall start within 10 calendar days from the Notice to Proceed.
7. Government-Furnished Property/Services The Government will provide:
• Maps of areas to process, decked and piled.
• Access to staging areas and landings.
8. Quality Assurance The COR will inspect work daily to ensure compliance with specifications. Non-conforming work must be corrected at no additional cost to the Government.