This is Amendment No. 0001 to Solicitation 1240BH26Q0024 issued by USDA Forest Service, CSA Northwest 6 (Portland, Oregon) on July 13, 2026. The amendment provides clarification to questions received from interested contractors regarding a fence construction project. All inquiries must be submitted by July 16, 2026, and the solicitation due date remains unchanged. The period of performance runs from August 1, 2026 to October 1, 2027, with FOB Destination. The contracting officer is Darcy J. Rapoza.
The consolidated Q&A addresses eight topic areas: (1) Motorized Access & Equipment Restrictions—UTVs and ATVs may be used along rights-of-way for clearing and construction but require written CO/COR approval for off-road or fence-line use; (2) Pack Stock Usage/Camping & Field Staging—camping and pack stock use are allowed with written permission; pack stock may be grazed with approval; (3) Progress Payments—may be issued as each priority area is completed, inspected, and approved; (4) Site Location Information—project locations are in Attachments 3, 8, and 9; no additional coordinates or elevation ranges will be provided; contractors must conduct independent site visits; (5) Site Access, Roads, and Restrictions—no formal pre-bid site visit is planned; contractors may independently visit sites and should verify road conditions through the appropriate Ranger District; Forest Service Road Entry Permits are required for closed roads; standard commercial weight restrictions apply; (6) Period of Performance, Seasonal Restrictions & Wildlife—no specific wildlife, seasonal, or fire restrictions currently apply; work completion this year is preferred; (7) Layout and Flagging—fence alignments and flagging will occur after award; contractors should rely on attachments for planning; (8) Construction Materials & Alternatives—all existing fence components must be completely removed and hauled off-site; untreated wood may remain on-site; all materials must be contractor-furnished; bark-on or peeled poles are acceptable per Attachment 11.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240BH26Q0024
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40BH
PORTLAND OR 97204-2829
STE 310
1220 SW 3RD AVE
USDA-FS CSA NORTHWEST 6
07/13/20260001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/29/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment provides clarification to questions received from interested contractors. To allow sufficient time for Government responses, all inquiries must be submitted by 16 July 2026. The solicitation due date remains unchanged.
FOB: Destination
Period of Performance: 08/01/2026 to 10/01/2027
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
DARCY J. RAPOZA
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Consolidated Q&A – Vendor Clarifications
Motorized Access & Equipment Restrictions
Questions:
− Are there any other motorized restrictions besides no heavy equipment on this project?
− Can UTVs have along fence line travel approved? (For example, scattering new material down the fenceline pre installation).
Answer:
UTVs and ATVs may be used along the ROW for clearing and construction activities. UTVs and ATVs may not operate off roads or cross-country without written approval from the CO/COR. Approval is on a case-by-case based on location, resource concerns, and access needs. Contractors must request approval in advance for any fence-line motorized use.
Pack Stock Usage / Camping & Field Staging
Questions:
− If pack stock is utilized, can they be grazed?
− Is camping onsite or nearby allowed?
− Will the grazing permittee have livestock present during construction?
Answer:
Camping and pack stock use are allowed, but establishing any camp or storage area requires written CO/COR permission. Pack stock may be grazed with written approval. Livestock may be present depending on season; no grazing schedule changes are planned.
Progress Payments
Questions:
Are partial payments an option and if so, what are the terms (per fence, per priority group, etc.)
Answer:
Progress payments are an option and may be issued as each priority area is completed, inspected, and approved.
Site Location Information (Coordinates, Elevation, Mapping)
Questions:
− Is it possible to get site coordinates?
− Is it possible to get an elevation range on each project?
− Is it possible to get these projects in a KMZ file on Google Earth or ONX?
Answer:
Project locations are provided in Attachments 3, 8, and 9. No additional coordinates, elevation ranges, or KMZ files will be issued. Contractors should conduct site visits and may use any preferred mapping tools—such as Google Earth, KMZ files, or ONX—for planning purposes. Site visits are strongly encouraged to ensure a full understanding of existing conditions and access needs.
Site Access, Roads, and Restrictions
Questions:
− Are there any private ground, road closures, etc. blocking access to the locations if we go look at them in person?
− Will the Forest Service be conducting a pre-bid site visit, or is a site visit available upon request?
− If no formal site visit is planned, may prospective contractors independently visit the project areas?
If so, are there any access restrictions, locked gates, or required points of contact for site access?
− Are there any road weight limits or access limitations contractors should consider when transporting equipment and materials to the project sites?
− Will all project locations be accessible by vehicle, or should contractors anticipate transporting materials and equipment by hand or with specialized equipment in certain areas?
− On a heavy snow year, on average when do you have access to the sites in the spring?
Answer:
No formal site visit is planned; contractors may independently visit project locations. Access is obtained via Forest Service roads and rights-of-way, and conditions may vary due to closures, slides, washouts, or other road impacts. Contractors should verify current road conditions through the appropriate Ranger District prior to traveling to the sites. Spring access will depend on factors such as elevation, aspect, and annual snowpack, and may vary from year to year.
Contractors may submit applications for entry through cooperative road closures or other restricted roads using the USDA Forest Service Road Entry Permit process. These permits are available from the appropriate Ranger District office and must be completed prior to entering on closed roads. Approval for use of closed roads within the project area is determined on a case-by-case basis by the District Ranger. Permit applications will be provided to the awarded contractor.
Standard commercial vehicle weight restrictions would apply. Any overweight or oversized loads would need to be approved.
Period of Performance, Seasonal Restrictions & Wildlife
Questions:
− Is there any award preference for completion this year vs next year?
− Are there any period of performance restrictions such as nesting birds, red flag warnings, etc.?
− Are there any anticipated seasonal restrictions, wildlife restrictions, road closures, or fire restrictions that could impact construction during the performance period?
Answer:
The performance period runs through October 1, 2027, and while there is no specific start-date preference, we would like to see as much work completed this year as feasible. No wildlife, seasonal, or fire restrictions currently apply, though weather and road conditions may affect access. If IFPL levels increase, a waiver may be required.
Layout, Flagging
Questions:
Will the Forest Service identify and flag all fence alignments, gate locations, and project limits prior to construction?
Answer:
Fence alignments, gate locations, and established flagging will occur after award. Contractors should rely on Attachments 3, 8, and 9 for planning purposes.
Construction Materials & Alternatives
Questions:
− Can TimberLoks be used in place of spike nails on the buck and rail sections?
− What materials are the current existing wire fences (barbed wire, woven wire, etc.)?
− If existing buck materials are barkies, can old materials be scattered or chipped for natural decomposition or must they be fully removed?
− Are the new buck and rail to be built with bark on or treated poles/bucks?
− Are any existing materials to be salvaged and returned, such as T posts, or must they all be removed completely?
− Are all fencing materials to be contractor-furnished, or will the Forest Service provide any materials such as buck-and-pole logs or other project materials?
Answer:
Material substitutions or alternatives may be requested for use and approved by CO/COR. Existing fences consist of 3–4 strands of barbed wire with a smooth bottom wire. All existing fence components—including wire, staples, and metal T-posts—must be completely removed and hauled off site by the contractor for disposal. Untreated wood may be left onsite to decompose naturally, while treated wood must be removed unless otherwise directed.
All project materials must be furnished by the contractor. Construction of the buck and rail will require off-site materials, and contractors may use commercially available peeled or bark-on poles as outlined in Attachment 11.
Additional Documents or Amendments
Questions:
Are any additional amendments, drawings, specifications, or other solicitation documents anticipated before the quotation due date?
Answer:
Amendments may occur throughout the duration of the solicitation we cannot anticipate when an amendment may be needed. Contractors should monitor SAM.gov to ensure they have the most recent documents.