Amendment 3 - BCE_BSE_LiftStationCalculations.pdf

PDF 599 KB Posted

Attached to
Bend Seed Extractory Site Improvements
Solicitation number
1240BH22R0018
Issued by

About this file

This document package contains calculations for a sewage pump station and force main design for the Bend Seed Extractory site. The calculations determine parameters for the wet well, pump sizing, surge pressures, and total dynamic head. Based on projected flows from facility employees and processes, the design calls for a 42-inch diameter wet well, two 35 gpm pumps, and a 2-inch diameter force main running 420 feet to discharge. Additional details include specifications for HDPE pipe, maximum cycle times and starts per hour within design parameters, and thrust and pressure surge calculations within acceptable limits. This package provides technical specifications and designs for the wastewater infrastructure required to support operations at the Bend Seed Extractory site.

The related federal contract opportunity is a solicitation from the USDA Forest Service to perform electrical, mechanical and site improvements at multiple buildings at the Bend Seed Extractory in Bend, Oregon. Work will occur on an active site throughout construction. A pre-proposal conference will be held on July 25, 2022 at the project address. The solicitation number is 1240BH22R0018 and involves upgrades by the Department of Agriculture Forest Service Pacific Northwest Region.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

krisd Text Box

USDA FOREST SERVICE

BEND SEED EXTRACTORY

LIFT STATION DESIGN CALCULATIONS

Sewage Pump Station Design Project: BCE_BSE

Prepared By: APM

Date: 01/11/2022

Determine force main parameters

Variable Description Value Units Notes

D Force Main Diameter 2 in

D Force Main Diameter 0.17 ft ν Minimum Force Main Velocity 3 ft/s = City of Bend Design Standards part II

| Section 2-4, item 4.1.9

Qminimum Minimum Flow for Solids

Conveyence

0.07 ft

/s = ν [ft/s] * π/4 * D

[ft]

Qminimum Minimum Flow for Solids

Conveyence

29.37 gpm

= Qminimum [ft /s] * 7.48 gal/ft

60 s/min

L Pipeline Length 420 ft

Vpipeline Volume of Pipeline 9.16 ft

= L * π/4 * D [ft]

Vpipeline Volume of Pipeline 68.54 gal θ Retention Time 0.09 days

Determine average and peak service area flows

EDUemployee EDU equivalent per employee 0.09 EDU/person

= Per City of Bend Design Standards part II | Section 2-4 | table 4.1 - Basis for sanitary sewage flow estimation |

Commercial Use | Industrial, Manufacturing, Beverage, Processor &

Commercial Warehouse

#employees Number of Employees 52

= Per BSE prospectus:

1. Seed Extractory

a. 6-12 people from July-April

b. 3 people from May-June

2. Packing Shed

a. 10-15 people in winter (November-

March)

b. 20-40 people in summer (April-

October)

#EDU

Number of Equivalent Dwelling

Units

4.68 EDU

QEDU

Equivalend Dwelling unit flowrate 130 gal/EDU/day

= Per City of Bend Design Standards part II | Section 2-4 | table 4.1 - Basis for sanitary sewage flow estimation

Qemployee Total Employee Flow (Average

Daily)

608.4 gpd = QEDU * #EDU

QADF Average Daily Flow 608.4 gpd = Qemployee [gpd]

QADF

Average Daily Flow w/

Contingency 740 gpd

= Qemployee [gpd] w/ 20% contingency

QADF Average Daily Flow 0.51 gpm = QADF [gpd] * 1 day/1440 min

PFPHF

Peak Hourly Flow Peaking

Factor 4 unitless Assumed

QPHF Peak Hourly Flow 2,960 gpd = QADF [gpd] * PFPHF

QPHF Peak Hourly Flow 2.06 gpm = QPHF [gpd] * 1 day/1440 min

Page 1 of 2L:\BCE_BSE\Docs\5_Team\5.1_Civil\Sanitary Sewer Calculations\BCE_BSE Lift Station Calculations.xlsx

Sewage Pump Station Design Project: BCE_BSE

Date: 01/11/2022

Determine wet well invert in

INVin Wet Well Inv In 3457.45 Per Mitch Rosa

FB Freeboard 1.90 ft

HWL

High Water Surface Elevation

(high level alarm - 2 pumps on)

3455.55 ft = INVin - FB

Pump On 3455.05 ft

LWL Low Water Level (Pump Off) 3454.55 ft = BOT + S [ft]

S Minimum Submergence 24 in

BOT Wet Well Bottom 3452.55 ft

Determine wet well operating volume φwet well Wet Well Diameter 42 in φwet well Wet Well Diameter 3.5 ft

Awet well Wet Well Area 9.62 ft 2 = 0.25 * PI * φwet well doperating Operating Depth 0.50 ft

Voperating Wet Well Operating Volume 35.98 gal = doperating [ft] * Awet well [ft

] * 7.48 gal/ft

Qpump Pump Flow 35 gpm Assumed, based on Qminimum

#pumps Number of Pumps 2 Per Design Drawings, will have alternating on/off

Determine wet well cycle times tADF Average Daily Flow Cycle Time 1.04 min =Voperating/(Qpump-QADF)

#starts-ADF Number of Starts Per Hour @

ADF

0.86

= Per Crane Co. Company:

Recommended no more than

10 starts per hour tPHF Peak Hourly Flow Cycle Time 1.09 min =Voperating/(Qpump-QPHF)

#starts-PHF Number of Starts Per Hour @

PHF

3.43

= Per Crane Co. Company:

Recommended no more than

10 starts per hour

Determine Wet Well Retention Time θADF Average Daily Flow Retention

Time

70.02 min θPHF Peak Hourly Flow Retention

Time

17.51 min θADF Average Daily Flow Retention

Time

1.17 hr

Detention times greater than

2 hours may require some form of odor prevention/mitigation measures θPHF Peak Hourly Flow Retention

Time

0.29 hr

Page 2 of 2L:\BCE_BSE\Docs\5_Team\5.1_Civil\Sanitary Sewer Calculations\BCE_BSE Lift Station Calculations.xlsx

Thrust Calculations Project: USFWS RMPB

Prepared By: CDB

Date: 1/11/2022

Given Parameters

Variable Description Units Notes g Gravity 32.2 ft/s according to Hwang's Fundamentals of

Hydraulic Engineering γ Specific Weight of Water 62.4 lb/ft according to Hwang's Fundamentals of

Hydraulic Engineering ρ Density of Water 1.94 slug/ft according to Hwang's Fundamentals of

Hydraulic Engineering

Qpump Pump Flow 35 gpm From Previous Sheets

Ptest Test Pressure 200 psi

Determine pipe parameters

HDPE_DR26_DIPS

D Nominal Diameter 2" in

ID Pipe Inner Diameter 2.067 in For ASTM D2241 SDR 17 rated for 250 psi

OD Pipe Outer Diameter 2.375 in

A Pipe Area 4.430136515 in

Determine thrust force using AWWA Manual M23 Equation 4-30

T=2*P*A*sin(Δ)/2

Δ Bend Angle 45 90 º

Δ Bend Angle 0.785398163 1.5708 rad

T Thrust Force 626.52 886.03 lbs

Angle 11.25 22.5 45 90

Rad 0.196349541 0.392699082 0.7854 1.570796327

T 172.8553519 339.0679695 626.52 886.0273031

Page 1 of 1 L:\BCE_BSE\Docs\5_Team\5.1_Civil\Sanitary Sewer Calculations\BCE_BSE Lift Station Calculations.xlsx

Surge Calculations Project: BCE_BSE

Date: 01/11/2022

Given Parameters

Variable Description Units Notes g Gravity 32.2 ft/s according to Hwang's Fundamentals of

Hydraulic Engineering γ Specific Weight of Water 62.4 lb/ft according to Hwang's Fundamentals of

Hydraulic Engineering ρ Density of Water 1.94 slug/ft according to Hwang's Fundamentals of

Hydraulic Engineering

Qpump Pump Flow 35 gpm From Previous Sheets

Determine pipe parameters

HDPE_DR26_DIPS

Ep Modulus of Elasticity for Pipe 145,000 psi from:

http://www.matweb.com/search/DataSheet

.aspx?MatGUID=c305addb2e1c4a58a3de ce14122acfde&ckck=1

D Nominal Diameter 2 in

ID Pipe Inner Diameter 2.067 in

E Pipe Wall Thickness 0.14 in

Eb Bulk Modulus of Water 300,000 psi ε Poisson's Ratio 0.46 from:

https://polymerdatabase.com/polymer%20 physics/Poisson%20Table.html k

Coefficient for pipes anchored at both ends against longitudinal movement 0.79

= 1 - ε , according to Hwang's

Fundamentals of Hydraulic Engineering

1/Ec

Inverse Composite Bulk Modulus of Water 8.10082E-05 = 1/Eb + D/EpE

Ec Composite Bulk Modulus 1.23E+04 psi = 1/Ec

-1

Determine wave celerity C and pressure wave return speed

C Wave 79.77 ft/s = √Ec/ρ

L Pipeline Length 420 ft Per drawings/profile t Wave Return Time 10.53 s = 2 * L [ft] / C [ft/s]

Determine maximum hammer pressure v Pipe Fluid Velocity 3.35 ft/s

ΔP Pressure Surge 517.90 lb/ft

= ρ [slug/ft] * v [ft/s] * C [ft/s]

ΔP Pressure Surge 3.60 psi = ΔP [lb/ft / * 1 ft

/ 144 in from: https://emcoww.com/wp-content/uploads/Sandale_IPS_PE_3408_4

710_Pipe_Chart.pdf

Page 1 of 1 L:\BCE_BSE\Docs\5_Team\5.1_Civil\Sanitary Sewer Calculations\BCE_BSE Lift Station Calculations.xlsx

System Head Calculations Project: BCE_BSE

Date: 01/11/2022

Given Parameters

Variable Description Units Notes g Gravity 32.2 ft/s γ Specific Weight of Water 62.4 lb/ft

HP High Point of Force Main 3458.40 ft From xbas/survey drawings, top of manhole = 61.4. 3ft below, 58.4 ft

LWL Low Water Level 3452.55 ft From xbas/survey drawings: SUMP elevation z Static Head 5.85 ft = HP - LWL

Qpump Pump Flow 35.00 gpm From Sewage Pump Station Design

Qpump Pump Flow 0.0780 ft

/s = Qpump [gpm] / 7.48 gal/ft

/ 60 s/min h<f> Friction Head 10.15 ft = z [ft] + Σhf-pipe + Σhf-ftgs

TDH Total Dynamic Head 16.00 ft

TDH TDH w/ 15% Buffer 17.53 ft

TDH TDH w/ 15% Buffer 6.93 psi

Page 1 of 3 L:\BCE_BSE\Docs\5_Team\5.1_Civil\Sanitary Sewer Calculations\BCE_BSE Lift Station Calculations.xlsx

Date: 01/11/2022

OD (in) Description Pipe Type ID (in) Qty (LF) C Value

Losses

, hf (ft)

Qty

(ea) k

Value

Total K

Value

Velocity

(ft/s)

Losses

, hf (ft)

2" Pipe

HDPE_DR26_

DIPS 2.067 420 150 8.74

2" Ball Valve

HDPE_DR26_

DIPS 2.067 1 0.05 0.05 3.35 0.01

2" Swing Check Valve (Min

V=4.43)

HDPE_DR26_

DIPS 2.067 1 2.5 2.5 3.35 0.43

2" 45º Bend (Standard r/d=1)

HDPE_DR26_

DIPS 2.067 5 0.4 2 3.35 0.35

2" 90º Bend (Flanged, r/d=1)

HDPE_DR26_

DIPS 2.067 1 0.8 0.8 3.35 0.14

2" Y

HDPE_DR26_

DIPS 2.067 1 1.8 1.8 3.35 0.31

Exit

HDPE_DR26_

DIPS 2.067 1 1 1 3.35 0.17

Total Discharge Losses Σ L= 420 Σhf-pipe= 8.74 Σ K= 8.15 Σhf-ftgs= 1.42

Evaluate discharge friction losses - specialty fittings hf = K*v /2g , pipe hf= 0.2083*L/100*((100/C)

1.852 )*(Q

1.852

)/(ID

4.865 ) using Hazen, for sudden contraction, k=1/2*(1+(d1/d2) ) where d1 is smaller, for sudden expansion, k=(1-(d1/d2)

Page 2 of 3 L:\BCE_BSE\Docs\5_Team\5.1_Civil\Sanitary Sewer Calculations\BCE_BSE Lift Station Calculations.xlsx

Date: 01/11/2022

Evaluate Pump Power Requirements

WHP

Water Horsepower

Required 0.16 HP = Q [gpm] * TDH [ft] / 3956 ft-gal/hp-min, according to EERM Example 18.11 ηpump Pump Efficiency 0.25 Assumed

BHP

Brake Pump Power

Horsepower 0.62 HP = WHP / ηpump ηmotor Motor Efficiency 0.95 Assumed

MHP Motor Horsepower 0.65 = BHP / ηmotor η Overall Hydraulic Efficiency 24% = WHP / MHP v (ft/s)

Flow

(gpm) Pipe Friction (c=150) Loss

Fitting Friction

Loss

TDH w/

15% buffer Barnes Series ZSGV

0.0 0 0.000 0.000 5.85 Flow Head

0.5 5 0.238 0.029 6.16 50 0

1.0 10 0.858 0.116 6.97 45 11

1.4 15 1.819 0.260 8.24 40 20

1.9 20 3.099 0.463 9.95 35 27

2.4 25 4.685 0.723 12.07 30 34

2.9 30 6.566 1.041 14.60

3.3 35 8.736 1.417 17.53

3.8 40 11.187 1.851 20.84

4.3 45 13.913 2.343 24.54

4.8 50 16.911 2.893 28.62

5.3 55 20.176 3.500 33.08

5.7 60 23.704 4.165 37.90

6.2 65 27.492 4.889 43.09

6.7 70 31.536 5.670 48.64

7.2 75 35.834 6.508 54.54

Proposed System Curve

Page 3 of 3 L:\BCE_BSE\Docs\5_Team\5.1_Civil\Sanitary Sewer Calculations\BCE_BSE Lift Station Calculations.xlsx

Date: 01/11/2022

<- Table from EPANet manual ball valve = 0.05 http://www.tfd.chalmers.se/~lada/MoF/assignment_2-starccm/Minor-Losses-in-Pipes-Balsiger-Bastos-Behm.pdf ball valve = 0.05 http://fluid.itcmp.pwr.wroc.pl/~znmp/dydaktyka/fundam_FM/Lecture11_12.pdf

Page 1 of 1 L:\BCE_BSE\Docs\5_Team\5.1_Civil\Sanitary Sewer Calculations\BCE_BSE Lift Station Calculations.xlsx anamaher Highlight anamaher Highlight anamaher Highlight anamaher Highlight anamaher Highlight

0.00

10.00

20.00

30.00

40.00

50.00

60.00

0 10 20 30 40 50 60 70 80

T o ta l

D y n a m ic

H e a d fe e t

Flow, gpm

System & Performance Curves

Proposed System Curve

Barnes Series ZSGV