This is a Request for Quotation (RFQ) for janitorial services issued by the U.S. Forest Service's International Institute of Tropical Forestry (IITF) in San Juan, Puerto Rico. The solicitation number is 1240BE26Q0088, and this is a Women-owned Small Business Set-Aside with a NAICS code of 561720 (Janitorial Services) and a small business size standard of $22 million. The Government seeks quotations for janitorial services covering five buildings at the IITF complex: Headquarters, Library, Conference Center, Remote Sensing laboratory (GIS building), and the multi-purpose building. Award will be made as a Firm Fixed Price Purchase Order. The base performance period runs from August 16, 2026, through April 15, 2027, with four optional one-year extension periods through April 15, 2031. Quotations must be submitted electronically by August 6, 2026, at 2:00 PM PST to Paula Winningham (paula.winningham@usda.gov), with offers remaining firm through September 25, 2026. A pre-quote site visit is available by contacting Maysaa Ittayem at maysaa.ittayem@usda.gov or 787-766-5335.

Evaluation will be conducted using three primary factors: Technical Capability (including Service Work Plan, Quality Control Program, Equipment/Materials List, and Use of Biobased Products), Past Performance (reviewed for relevance and recency within three years), and Price (primary evaluation factor). Quoters must provide complete pricing with no rounding, and the Government will evaluate offers by adding total option prices to the base requirement price. All work must comply with applicable codes and standards per the Performance Work Statement (Attachment 3). Quoters must submit three documents: Attachment 2 (Schedule of Items with pricing), written responses to evaluation factors, and Attachment 15 (SF-1449 with signed blocks). A mandatory post-award conference must be held virtually within 10 days of contract award. Invoices will be processed monthly through the Invoice Processing Platform (IPP) at www.ipp.gov for work satisfactorily performed and inspected by the Government.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.

Solicitation number: 1240BE26Q0088 is issued as a Request for Quotation (RFQ)

Project: US Forest Service, International Institute of Tropical Forestry (IITF) Janitorial Services

This acquisition is a Women-owned Small Business Set-Aside. The applicable North American Industry Classification Standard Code is 561720 Janitorial Services The small business size standard is $ 22 million.

All responsible sources may submit a quotation to be considered by the agency.

Award Type: It is anticipated that a Firm Fixed Price Purchase Order will be awarded as a result of this synopsis/solicitation.

Statement of Requirement: Provide janitorial services for five (5) buildings on the IITF complex:

Headquarters, Library, Conference Center, Remote Sensing laboratory (known as the GIS building) and the multi-purpose building.

All work shall be performed in accordance with all applicable codes, and standards. See Attachment 3, Performance Work Statements (PWS) for further information.

Schedule of Items See Attachment 2 - Schedule of Items. Complete the Schedule of Items with quoter’s business information and pricing.

Unit of Issue: Month = MO

Location: All work shall be performed at the International Institute of Tropical Forestry Headquarters Complex, located at Botanical Gardens South, 1201 Calle Ceiba, San Juan, Puerto Rico, 00926 County: San Juan

Estimated Start Work Date: August 16, 2026 Period of Performance: Base Year: August 16, 2026, through August 15, 2027, plus four (4) Option Years.

Period POP Start Date POP End Date Base Period August 16, 2026 April 15, 2027 Option Period 1 August 16, 2027 April 15, 2028 Option Period 2 August 16, 2028 April 15, 2029 Option Period 3 August 16, 2029 April 15, 2030 Option Period 4 August 16, 2030 April 15, 2031

PRE-QUOTE SITE VISIT:

To request a Pre-quote Site Visit, contact: with Maysaa Ittayem, at email address: maysaa.ittayem@usda.gov or phone 787-766-5335. When you RSVP, provide: your company name, identify if Prime or Sub-contractor, attendee’s full name, and email address.

Address: International Institute of Tropical Forestry Headquarters Complex, located at Botanical Gardens South, 1201 Calle Ceiba, San Juan, Puerto Rico, 00926

1240BE26Q0088

mailto:maysaa.ittayem@usda.gov

Solicitation Attachments:

Attachment 1 Solicitation 25 pages Attachment 2 Schedule of Items 2 pages Attachment 3 Performance Work Statement 20 pages Attachment 4 Facilities Summary 5 pages Attachment 5 Janitorial Work Schedule 5 pages Attachment 6 Key Deliveries-Inspection Checklist 5 pages Attachment 7 Wage Determination 2015-5707 Rev 29, Dated 5/13/2026 15 pages Attachment 8 SF-1449 4 pages

EVALUATION AND BASIS FOR AWARD

The Provision at Federal Acquisition Regulations (FAR) 52.212-2, Evaluation—Commercial Products and Commercial Services is not applicable to this solicitation. In lieu of this Provision, quotes will be evaluated in accordance with FAR 12.203 based on the criteria listed below.

ADDENDUM to FAR 52.212-2:

(a) BASIS FOR CONTRACT AWARD: The source selection will be conducted in accordance with Federal

Acquisition Regulation (FAR) Part 12, Acquisition of Commercial Products and Commercial Services.

Award will be made to the offeror who is deemed responsible in accordance with the FAR, whose offer conforms to the solicitation requirements, and whose offer, judged by an overall assessment of the evaluation criteria and other considerations specified in this solicitation, will be best value to the Government.

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(d) The government reserves the right to conduct a price realism analysis at any point during the evaluation process. The Government will evaluate prices for reasonableness using adequate competition and price analysis techniques.

1240BE26Q0088

The following factors shall be used to evaluate Quotes:

Factors described:

FACTOR I – TECHNICAL CAPABILITY

• Sub-Factor 1 – Service Work Plan

• Sub-Factor 2 – Quality Control Program (QCP)

• Sub-Factor 3 – Equipment/Materials List

• Sub-Factor 4 – Use of Biobased Products

FACTOR II – PAST PERFORMANCE

The Past Performance evaluation will be accomplished by reviewing aspects of an Offeror's recent and relevant Past Performance, as it directly relates to the services being procured under this solicitation, and as defined in Addendum to FAR 52.212-2 Evaluation – Commercial Products and Commercial Services.

(A) Past Performance information described herein is required on the offeror and all subcontractors, teaming partners, and/or joint venture partners proposed to perform on the proposed effort.

(B) Relevant Past Performance. The offeror shall include documentation regarding their relevant past performance as it directly relates to the services being procured under this solicitation. The offeror SHALL NOT go back any farther than 3 years for the submitted data. The past performance data shall document a successful history of past contract performance. Past Performance seeks to affirm an Offeror’s ability to conform to contract requirements, timeliness, quality of workmanship, business practices such as cost and schedule control, and customer satisfaction through reference checks.

(C) In conducting the Past Performance evaluation, the Government reserves the right to use both the information provided in the offeror’s Past Performance submission and information obtained from other sources, such as the Past Performance Information Retrieval System (PPIRS) or similar systems, The Contractor Performance Assessment Reporting System (CPARS) at https://www.cpars.gov, and commercial sources.

Offerors are reminded that both independent data and data provided by offerors in their offers may be used by the Government to evaluate offeror past performance. However, the burden of providing thorough, complete, and current past performance information as requested in this paragraph remains with the offerors.

The overall past performance evaluation is a subjective decision based on the whole of all data received. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”

(D) Submission Requirements. The offeror shall provide documentation outlining the offeror’s past performance on contracts, as a prime or subcontractor, of the same or similar in nature, size, and complexity to the services being procured under this solicitation. For each past performance project listed, provide the following: associated contract number, total contract value, period of performance, location, description of services provided, your contract role (indicate prime or subcontractor), and at least one contact (reference) name and phone number, and email address.

FACTOR III – PRICE

EVALUATION FACTORS – FOR QUOTER’S RESPONSE:

EVALUATION CRITERIA. Evaluation criteria consist of factors and sub-factors. The offers will be evaluated under 3 evaluation factors and 4 sub-factors.

FACTOR I – TECHNICAL CAPABILITY. The Government will evaluate the degree to which your offer demonstrates capability to perform all the services required in the Performance Work Statement (Attachment 3);

including the following criteria:

Sub-Factor 1 – Service Work Plan and Key Personnel. To be determined acceptable the offeror shall provide a service plan describing the method or combination of methods to be utilized to accomplish all the work required in Attachment 3. The service plan shall include how each task will be accomplished, work rate, starting and ending point, and number of employees to be appointed.

For those performing duties on-site, they shall be clearly identified by first and last name, their skill level and task they’ll perform, and their years of experience. Include the same information (name, skill level, years of experience) for subcontractors if you plan to use a subcontractor for any work under contract. Personnel will be required to go through a background investigation. Do not include personnel Social Security numbers and addresses in response to the solicitation.

Sub-Factor 2 – Quality Control Plan (QCP). To be determined acceptable the offeror shall provide a Quality Control plan adequately addressing the responsibility of carrying out its quality control obligations and contain measurable inspection and acceptance criteria corresponding to the PWS (Attachment 3)

Sub-Factor 3 – Equipment/Materials List. To be determined acceptable the offeror shall provide a full list of the equipment/materials to be utilized to accomplish all the work required in the PWS (Attachment 3).

Assigning Ratings: Each Technical Capability Sub-Factor 1 through 3 will receive one of the adjectival ratings defined below. To receive an acceptable rating for this factor, all sub-factors must be rated acceptable.

Technically Capability Rating Rating Description

Acceptable Offer clearly meets the minimum requirements of the solicitation.

Unacceptable Offer does not clearly meet the minimum requirements of the solicitation.

Sub-Factor 4 – Use of Biobased Products and EPA-designated Items. To be determined acceptable the offeror shall provide a statement demonstrating compliance, provide a list of biobased products and EPA-designated items and describe their use on the contract. Include the percentage of their biobased content or recycled materials content.

Assigning Ratings: Sub-Factor 4 will receive one of the adjectival ratings defined below. To receive an acceptable rating for this factor, this sub-factor must be rated acceptable.

Biobased Products and EPA-designated Items Rating Rating Description Acceptable Proposal clearly states the utilization of biobased products, list of products, certification and biobased or recycled content percentage, and use.

Unacceptable Proposal does not clearly state the utilization of biobased products, does not include a list of products, lacks certification, and is lacking in clear understanding of use and application. Proposal does not clearly state the utilization of biobased products, does not include a list of products, lacks certification, and is lacking in clear understanding of use and application.

FACTOR II – PAST PERFORMANCE. The Past Performance evaluation will assess the relative risks associated with an offeror’s likelihood of success in performing the solicitation’s requirements as indicated by that offeror’s record of past performance. Performance risk is assessed at the factor level after evaluating aspects of the offeror’s recent past performance and focusing on performance that is relevant to the services and/or products being procured under this solicitation. Past performance areas of evaluation include quality, timeliness, business practices, and customer satisfaction.

(A) Recency Assessment. An assessment of the past performance information will be made to determine if it is recent. To be recent, the effort must be ongoing or must have been performed during the past 3 years from the date of issuance of this solicitation. Past performance information that fails this condition will not be evaluated.

(B) Relevancy Assessment. An assessment of the past performance information will be made to determine if it is relevant. To be relevant, the effort must be the same or similar in nature, size, magnitude, complexity, and scope to the services and/or products being procured under this solicitation. Past performance information that fails this condition will not be evaluated.

Assigning Ratings. The Past Performance Factor will be assigned one of the ratings defined below. An award will not be made to any offeror who receives an “Unacceptable” past performance rating.

Offerors without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, will not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”

FACTOR III – PRICE. Price is not formally scored but is the primary evaluation factor for determining award. The government expects competitive offers to be submitted for this procurement and will use these competitive offers to determine price reasonableness. Price Reasonableness, in its nature and amount, does not exceed that which would be incurred by a prudent person in the conduct of competitive business. If competitive offers are not received, the Government reserves the right to utilize other methods identified in the FAR to determine price reasonableness.

(A) Completeness. Each offeror is required to provide complete pricing for each contract line identified.

Unit price and totals shall be in exact dollars and cents – no rounding.

(B) The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Options for this requirement will be evaluated in accordance with FAR Clause 52.217-5. Evaluation of options shall not obligate the Government to exercise the options(s).

Table A-2. Relevant Past Performance Evaluation Ratings Rating Description

Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.

Unacceptable Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.

FAR 52.212-1 INSTRUCTIONS TO OFFERORS - COMMERCIAL PRODUCTS AND COMMERCIAL

SERVICES (NOV 2025)

For simplified acquisitions, the word quote or quoter is substituted in Provision FAR 52.212-1 for the word offer or offeror and is interchangeable throughout the solicitation.

FAR 52.212-1 is amended as follows:

(a) Submission of Quotes To respond to this quote, email the following documents:

1) Attachment 2 – Schedule of Items – filled in and signed 2)Your written response to the Evaluation Factors. Adobe Acrobat or Word documents accepted. Failure to respond to evaluation factors will result in exclusion from the evaluation.

3) Attachment 15 SF-1449: Sign Blocks 17a and 30 a, b, and c

Date, time, and place of receipt of Quote through email only:

Date Time Method of Submission August 6, 2026 2:00 PM (PST) Quotes shall be submitted electronically via email to the

Government Points of Contact below.

Government Points of Contact:

Title POC Contracting Officer Paula Winningham paula.winningham@usda.gov

(b) Period for acceptance of Quote:

The Offeror agrees to hold its offer firm through September 25, 2026.

(c) Questions Questions shall be submitted via email to paula.winningham@usda.gov are due no later than three days prior to quote due date and time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the email.

mailto:paula.winningham@usda.gov

FAR or Agriculture Acquisition Regulation (AGAR) Provisions by full text:

FAR 52.223-1 BIOBASED PRODUCT CERTIFICATION (NOV 2025)

As required by the Farm Security and Rural Investment Act of 2002 (7 U.S.C. 8101(4)) and the Energy Policy Act of 2005 (7 U.S.C. 8102(a)(2)(F)), the Offeror certifies, by signing this offer, that biobased products (within categories of products listed by the United States Department of Agriculture at https://www.biopreferred.gov/resources/categories.html to be used or delivered in the performance of the contract, other than biobased products that are not purchased by the Offeror as a direct result of this contract, will comply with the applicable specifications or other contractual requirements. (End of provision)

FAR 52.223-4 RECOVERED MATERIAL CERTIFICATION (MAY 2008)

As required by the Resource Conservation and Recovery Act of 1976 (42 U.S.C. 6962(c)(3)(A)(i)), the offeror certifies, by signing this offer, that the percentage of recovered materials content for EPA-designated items to be delivered or used in the performance of the contract will be at least the amount required by the applicable contract specifications or other contractual requirements. (End of provision)

USDA BIOBASED PRODUCTS website:

https://www.biopreferred.gov/BioPreferred/faces/pages/BiobasedProducts.xhtml

EPA-DESIGNATED ITEMS website:

https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program

FAR 52.237-1 SITE VISIT (APR 1984)

Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

(End of Provision)

AGAR 452.203-70 ANTI-DISCRIMINATION AND DIVERSITY, EQUITY, AND INCLUSION (DEI)

CERTIFICATION (DEC 2025)

(a) By submission of its offer, the offeror certifies that:

• It is compliant with all applicable Federal anti-discrimination laws and the Equal Protection principles of the U.S. Constitution.

• Neither it nor any proposed subcontractor or teaming partner operates or funds any program, policy, or initiative that promotes DEI in a manner that violates any applicable Federal anti-discrimination laws, including but not limited to Title VI and VII of the Civil Rights Act of 1964, or the Equal Protection principles of the U.S.

Constitution.

(b) If the offeror participates in, facilitates, or funds programs that implicate Title VI of the Civil Rights Act of 1964 or Title IX of the Education Amendments of 1972, as amended, including but not limited to grants to or for schools, colleges, universities, 4-H programs, non-governmental organization (NGO) programs, sports programs, and education-related grants to prisons or other detention facilities, by submission of its offer, the offeror certifies that it is compliant with those laws, including the requirements set forth in Executive Order 14168, Defending Women

1240BE26Q0088

https://www.biopreferred.gov/resources/categories.html http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6962(c)(3)(A)(i)&num=0&edition=prelim https://www.biopreferred.gov/BioPreferred/faces/pages/BiobasedProducts.xhtml https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program from Gender Ideology Extremism and Restoring Biological Truth to the Federal Government, and Executive Order 14173, Ending Illegal Discrimination and Restoring Merit-Based Opportunity.

(c) The offeror affirms that the above requirements are conditions of payment that go to the essence of the contract and are therefore material terms of the contract. Payments under the contract are predicated on compliance with the above requirements, and therefore the offeror will not be eligible for funding under the contract or to retain any funding under the contract absent compliance with the above requirements.

(d) This certification reflects a change in the Government’s position regarding the materiality of the foregoing requirements and therefore any prior payment of similar claims does not reflect the materiality of the foregoing requirements to this contract.

(e) Submission of a knowing false statement relating to offeror’s compliance with the above requirements and/or eligibility for the contract may subject the offeror to liability under the False Claims Act, 31 U.S.C. § 3729, and/or criminal liability, including under 18 U.S.C. §§ 287 and 1001.

(f) Failure on the part of the offeror or its subcontractors to comply with the terms of this clause may be grounds for the Contracting Officer to terminate the contract for default.

(End of Provision)

FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation Provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed Provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those Provisions, the offeror may identify the Provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation Provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

FAR 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions

(SEP 2024)

FAR 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation (JAN 2017) FAR 52.204-7 System for Award Management—Registration (NOV 2025) FAR 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations - Representation (SEP 2025) FAR 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (SEP 2025) FAR 52.217-5 Evaluation of Options (NOV 2025) FAR 52.233-2 Service of Protest (SEP 2025) FAR 52.240-90 Security Prohibitions and Exclusions Representations and Certifications (NOV 2025) https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

FEDERAL ACQUISITION REGULATION (FAR) AND UNITED STATES DEPARTMENT OF

AGRICULTURE ACQUISITION REGULATION (AGAR) CLAUSES AND PROVISIONS

The clauses and provisions contained herein are applicable to any order awarded as a result of this solicitation.

The terms and conditions set forth herein supersede all other terms and conditions. Acceptance of the order in accordance with (IAW) FAR 12.201-1(b)(2) constitutes acceptance of all terms and conditions contained herein.

As part of the Revolutionary FAR Overhaul (RFO), system updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in this solicitation. Contracting officers will rely on representations from offers based on provisions in the solicitation. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

FAR or AGAR Clauses Incorporated by Full Text:

FAR 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

(a)The Contractor shall comply with agency personal identity verification procedures identified in the contract that implement Homeland Security Presidential Directive-12 (HSPD-12), Office of Management and Budget (OMB) guidance M-05-24 and Federal Information Processing Standards Publication (FIPS PUB) Number 201.

(b)The Contractor shall account for all forms of Government-provided identification issued to the Contractor employees in connection with performance under this contract. The Contractor shall return such identification to the issuing agency at the earliest of any of the following, unless otherwise determined by the Government:

(1)When no longer needed for contract performance.

(2)Upon completion of the Contractor employee’s employment.

(3)Upon contract completion or termination.

(c)The Contracting Officer may delay final payment under a contract if the Contractor fails to comply with these requirements.

(d)The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts when the sub-contractor’s employees are required to have routine physical access to a Federally-controlled facility and/or routine access to a Federally-controlled information system. It shall be the responsibility of the prime Contractor to return such identification to the issuing agency in accordance with the terms set forth in paragraph (b) of this section, unless otherwise approved in writing by the Contracting Officer. (End of clause)

FAR 52.208-9 CONTRACTOR USE OF MANDATORY SOURCES OF SUPPLY OR SERVICES (NOV

2025)

(a) Certain supplies or services to be provided under this contract for use by the Government are required by law to be obtained from nonprofit agencies participating in the program operated by the Committee for Purchase From People Who Are Blind or Severely Disabled (the Committee) under 41 U.S.C. 8504. The Committee operates under the name AbilityOne Commission. Additionally, some of these supplies are available from the Defense Logistics Agency (DLA), the General Services Administration (GSA), or the Department of Veterans Affairs (VA). The Contractor shall obtain mandatory supplies or services to be provided for Government use under this contract from the specific sources indicated in the contract schedule.

(b) The Contractor shall immediately notify the Contracting Officer if a mandatory source is unable to provide the supplies or services by the time required, or if the quality of supplies or services provided by the mandatory source is unsatisfactory. The Contractor shall not purchase the supplies or services from other sources until the Contracting Officer has notified the Contractor that the Committee or an AbilityOne central nonprofit agency has authorized purchase from other sources.

(c) Price and delivery information for the mandatory supplies is available from the Contracting Officer for the supplies obtained through the DLA/GSA/VA distribution facilities. For mandatory supplies or services that are not available from DLA/GSA/VA, price and delivery information is available from the appropriate central nonprofit agency. Payments shall be made directly to the source making delivery. Points of contact for

ABILITY ONE CENTRAL NONPROFIT AGENCIES ARE:

(1) NATIONAL INDUSTRIES FOR THE BLIND website: www.NIB.org 1310 Braddock Place, Alexandria, VA 22314-1691, (703) 310-0500

(2) NISH/SourceAmerica website: www.SourceAmerica.org 8401 Old Courthouse Road, Vienna, VA 22182, (571) 226-4660

FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES. (DEVIATION NOV 2025)

(a) Definitions. The clause at Federal Acquisition Regulation (FAR) 52.202-1, Definitions, is incorporated by reference.

(b) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(c) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

1240BE26Q0088

http://www.nib.org/ http://www.sourceamerica.org/

(d) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(e) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal, or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause FAR 52.233-1, Disputes, which is incorporated in this contract by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence. Examples of occurrences include acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. When an excusable delay occurs, the Contractor shall—

(1) Notify the Contracting Officer in writing as soon as possible;

(2) Remedy the delay as quickly as possible; and

(3) Notify the Contracting Officer when the occurrence is over.

(g) Invoice. The Government will handle invoices according to the Prompt Payment Act (31 U.S.C. 3903) and 5 CFR part 1315. The Contractor shall submit invoices to the address designated in the contract to receive invoices. An invoice must include the information required by 5 CFR part 1315.9(b).

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees, and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark, or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment—

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(3) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(4) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable;

(D) Contractor point of contact; and

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(5) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to

1240BE26Q0088

http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by FAR part 33 if–

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see FAR part 32).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a termination for cause.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures for interest credits prescribed in FAR part 32 in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon—

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance.

The Government will send a cure notice to the Contractor, unless the reason for the termination is late delivery.

In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered under this contract are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C.

1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 40 U.S.C.

chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 49 U.S.C. 40118, Government-financed air transportation; and 41 U.S.C. chapter 21 relating to procurement integrity.

(r) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services;

(2) The Disputes, Payments, Invoice, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;

(3) Other contract clauses incorporated in the solicitation or contract;

(4) Addenda to this solicitation or contract;

(5) Solicitation provisions incorporated in the solicitation;

(6) Other paragraphs of this clause;

(7) Other documents, exhibits, and attachments; and

(8) The specification.

(s) Unauthorized obligations.

(1) Except as stated in paragraph (s)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:

(i) Any such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government-authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.

(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (s)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.

(t) Comptroller General examination of record. This paragraph applies if this contract was awarded using other than sealed bid procedures and is in excess of the simplified acquisition threshold on the date of award of this contract.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices, at all reasonable times, the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR part 4, longer period required by statute, or periods specified in other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This clause does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(u) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

(End of clause)

FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 10 days of contract expiration.

(End of Clause)

FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 45 days;

provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 60 months. (End of clause)

FAR 52.223-2 REPORTING OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION

CONTRACTS (NOV 2025)

(a) Definitions. As used in this clause— Biobased product means a product determined by the U.S. Department of Agriculture (USDA) to be a commercial product or industrial product (other than food or feed) that is composed, in whole or in significant part, of biological products, including renewable domestic agricultural materials and forestry materials, or that is an intermediate ingredient or feedstock. The term includes, with respect to forestry materials, forest products that meet biobased content requirements, notwithstanding the market share the product holds, the age of the product, or whether the market for the product is new or emerging. (7 U.S.C. 8101) (7 CFR 4270.2).

USDA-designated product category a generic grouping of biobased products that are listed by USDA in a procurement guideline (7 CFR part 4270) and for which USDA has provided minimum biobased content standards (see https://www.biopreferred.gov/resources/categories.html).

(b) Requirement. The Contractor shall—

1240BE26Q0088

https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8101&num=0&edition=prelim https://www.biopreferred.gov/resources/categories.html

(1) Report to https://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any biobased products in USDA-designated product categories purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and

(2) Submit this report no later than—

(i) October 31 of each year during contract performance; and

(ii) At the end of contract performance.

FAR 52.246-4 INSPECTION OF SERVICES – FIXED PRICE (AUG 1996)

(a) Definition. “Services," as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may-

(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

(2) Reduce the contract price to reflect the reduced value of the services performed.

(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may-

(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or

(2) Terminate the contract for default. (End of clause)

FAR 52.247-21 CONTRACTOR LIABILITY FOR PERSONAL INJURY AND/OR PROPERTY

DAMAGE (APR 1984)

(1) The Contractor assumes responsibility for all damage or injury to persons or property occasioned through the use, maintenance, and operation of the Contractor’s vehicles or other equipment by, or the action of, the Contractor or the Contractor’s employees and agents.

(2) The Contractor, at the Contractor’s expense, shall maintain adequate public liability and property damage insurance during the continuance of this contract, insuring the Contractor against all claims for injury or damage.

(3) The Contractor shall maintain Workers’ Compensation and other legally required insurance with respect to the Contractor’s own employees and agents.

(4)The Government shall in no event be liable or responsible for damage or injury to any person or property occasioned through the use, maintenance, or operation of any vehicle or other equipment by, or the action of, the Contractor or the Contractor’s employees and agents in performing under this contract, and the Government shall be indemnified and saved harmless against claims for damage or injury in such cases.

https://www.sam.gov/

AGAR 452.203-71 ANTI-DISCRIMINATION AND DIVERSITY, EQUITY, AND INCLUSION (DEI)

COMPLIANCE (MAY 2026)

(a) By entering into this contract, the contractor certifies that:

1. It is compliant with all applicable Federal anti-discrimination laws and the Equal Protection principles of the U.S. Constitution, and it will remain compliant for the duration of the contract.

2. Neither it nor any subcontractor or teaming partner operates or funds any program, policy, or initiative that promotes DEI in a manner that violates any applicable Federal anti-discrimination laws, including but not limited to Title VI and VII of the Civil Rights Act of 1964, or the Equal Protection principles of the U.S. Constitution, and the contractor and any subcontractor or teaming partner will not do so for the duration of the contract.

(b) If the contractor participates in, facilitates, or funds programs that implicate Title VI of the Civil Rights Act of 1964 or Title IX of the Education Amendments of 1972, as amended, including but not limited to grants to or for schools, colleges, universities, 4-H programs, non-governmental organization (NGO) programs, sports programs, and education-related grants to prisons or other detention facilities, the contractor certifies that it will remain compliant with those laws, including the requirements set forth in Executive Order 14168, Defending Women from Gender Ideology Extremism and Restoring Biological Truth to the Federal Government, and Executive Order 14173, Ending Illegal Discrimination and Restoring Merit-Based Opportunity.

(c) The contractor affirms that the above requirements are…