12363N26Q4161 RFQ--.pdf
PDF 11 MB Posted
- Attached to
- Mark Twain NF Beaver Lake Dam Rehabilitation
- Solicitation number
- 12363N26Q4161
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Request for Quotation (RFQ) and Combined Synopsis/Solicitation for construction services issued by the USDA Forest Service, Procurement and Property Services, National Stewardship Contracting Branch. The solicitation seeks quotations for the Mark Twain National Forest Beaver Lake Dam Rehabilitation project in Butler County, Missouri (Poplar Bluff Ranger District). The work is designated as a small business set-aside with a NAICS code 237310 (Highway, Street, and Bridge Construction) and a $45 million size standard. Quotations are due by June 30, 2026, at 11:00 AM CDT, with a proposed performance period of July 15, 2026, through December 31, 2026. The contract will be awarded on a Firm Fixed Price basis to the responsible offeror offering the best value based on evaluation criteria including relevant past performance, technical approach, experience/qualifications, acceptability, and cost/price reasonableness.
The base bid work includes mobilization/demobilization, surveying, quality control, erosion control, clearing and grubbing, removal of existing structures, and placement of 400 cubic yards of Class 3 riprap to repair spillway damage caused by an existing 15-inch corrugated metal pipe and 24-inch vault undermining. Two optional bid items are included: OBI-1 for installation of a 30-inch reinforced concrete pressure pipe (RCPP) level control structure within the spillway, and OBI-2 for a more comprehensive 30-inch RCPP level control system with an 18-inch RCPP and sluice gate drawdown structure through the dam embankment. Offerors must submit separate technical and price proposals, with technical proposals addressing relevant past performance (minimum three references), technical approach including work description and scheduling, and experience/qualifications. Questions are due June 2, 2026, and the contracting officer is Thomas Tran (thomas.tran2@usda.gov). A mandatory site visit is scheduled for May 28, 2026, at 11:00 AM CST at Beaver Lake coordinates 36.800194N, -90.623668W, with contact Rachel Uetrecht (573-308-5798).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Updated Questions and Answers for Solicitation 12363N26Q4161.docx | DOCX document | |
| Addendum to 12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation.docx | DOCX document | |
| 12363N26Q4161 RFQ Amendment 2.pdf | ||
| Questions and Answers for Solicitation 12363N26Q4161.docx | DOCX document | |
| 12363N26Q4161 RFQ Amendment.pdf | ||
| FP-14.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. GENERAL INFORMATION
Document Type: Combined Synopsis/Solicitation Solicitation Number: 12363N26Q4161 Posted Date: 5/22/2026 Original Response Date: 6/30/2026 Current Response Date: N/A Product or Service Code: Z1LB Set Aside: Small Business NAICS Code: 237310 Highway, Street, and Bridge Construction – $45 Million
Contracting Office Address
USDA Forest Service Procurement and Property Services National Stewardship Contracting Branch 1400 Independence Ave. SW, MS-1138 Washington DC 20250-1138
This is a combined synopsis/solicitation for commercial services prepared in accordance with FAR 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued.
Solicitation number 12363N26Q4161 has been issued as a Request for Quotes (RFQ) for the Mark Twain NF Beaver Lake Dam Rehabilitation.
This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
The associated North American Industrial Classification System (NAICS) code for this procurement is 237310 – Highway, Street, and Bridge Construction, with a small business size standard of $45 Million. The product service code is Z1LB. The government intends to award a Firm Fixed Price contract resulting from this combined synopsis/solicitation to the responsible offeror whose offer, conforming to the synopsis/solicitation, will be most advantageous to the government (as determined by the solicitation evaluation criteria). All responsible sources may submit a quotation which will be considered by the agency, and proposals shall be valid for 60 days after the date of receipt for the solicitation.
Points of Contact
Thomas Tran, Contracting Officer, thomas.tran2@usda.gov Site Visit: Please contact Rachel if you plan on attending the site visit.
Time – May 28, 2026 at 11am CST Location – Beaver Lake (lat: 36.800194°, long: -90.623668°) COR – Rachel Uetrecht, 573-308-5798
Offerors shall quote in accordance with the SOW. Please provide your price and technical proposal separately.
Technical proposals that fail to adequately address all evaluation factors and criteria may receive a reduced score or may not be considered.
Quotes shall be valid for a minimum of 60 calendar days after submission.
Please label file name by format below:
Company name, price or technical proposal or both and name of project Ex. USDA Price/Technical Proposal Solicitation #
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 1 of 100 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-12 http://www.acquisition.gov/ mailto:thomas.tran2@usda.gov
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
5. REQUISITION/PURCHASE REQUEST NO.
1156438
USDA-FS STEWARDSHIP CONTRACTING BR
1400 INDEPENDENCE AVE SW
MS-1138
WASHINGTON DC 20250-1138
363N
THOMAS TRAN
b. EMAIL thomas.tran2@usda.gov
5/22/2026
1. SOLICITATION NO.
12363N26Q4161
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
11. The Contractor shall begin performance upon receipt of notice to proceed and shall be completed no later than December 31, 2026.
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
negotiable. (See FAR Clause 52.211-10)
13. ADDITIONAL SOLICITATION REQUIREMENTS
a. Offers to perform the work specified in Item 10 shall be submitted by 11:00 am CDT, June 30, 2026. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing bid bonds shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.) 10
NSN 7540-01-155-3212
mandatory
30 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
USDA-FS STEWARDSHIP CONTRACTING BR
1400 INDEPENDENCE AVE SW
MS-1138
WASHINGTON DC 20250-1138
SOLICITATION FOR PRICING AND TECHNICAL PROPOSALS
1156438 R8 MO Mark Twain NF Beaver Lake Dam Rehab
See Schedule of Items, specific work description, supplemental specifications/terms and conditions, and attachments that apply to the work. These terms supplement the base IDIQ terms and conditions.
**ALL DOCUMENTS, INCLUDING A SCANNED COPY OF THE FULLY EXECUTED BID BOND IF REQUIRED, SHALL BE SUBMITTED ELECTRONICALLY TO THOMAS TRAN AT thomas.tran2@usda.gov AND
RECEIVED BY THE DEADLINE IN BLOCK 13.
xThis performance period is x x (If total price exceeds $150,000 - see page 5) x
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 2 of 100
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
See schedule
USDA-FS STEWARDSHIP CONTRACTING BR
1400 INDEPENDENCE AVE SW
MS-1138
WASHINGTON DC 20250-1138
363N
INVOICE PROCESSING PLATFORM IPP
ALL INVOICES MUST BE SUBMITTED
ELECTRONICALLY THROUGH THE
INVOICE PROCESSING PLATFORM IPP
VIA WWW IPP GOV
THOMAS T. TRAN
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 3304(a)x x
STANDARD FORM 1442 (REV. 8/2014) BACK
Continued...
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 3 of 100
Payment will be made via EFT. Invoice using IPP.Gov Set Aside For: Large Small
Woman- Owned SDVOSB Hubzone 8(a)
(Please check all that apply) x
**MUST HAVE ALL INFO BELOW**
Company Name:
Vendor Rep:
Phone:
Email:
Mailing Address:
UEI SAM #
Estimated Period of Performance 07/15/2026 – 12/31/2026
Contractor Signature: ______________________________________
Contractor Parent BPA/IDIQ #: ______________________________________
**QUOTES ARE DUE BY: 06/30/2026 by 11:00AM CST** Questions are due 06/02/2026 by COB
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 4 of 100
BEAVER LAKE DAM REHABILITATION Section B
Pg. 1
SECTION B SCHEDULE OF ITEMS
BEAVER LAKE DAM REHABILITATION
POPLAR BLUFF RANGER DISTRICT
MARK TWAIN NATIONAL FOREST
STATE OF MISSOURI
BASE BID ESTIMATE
FP-14
Section
Pay Item Description Estimated
Qty Unit Total Price
151 Mobilization and Demobilization 1 LS $___________
152 Construction Surveying & Staking 1 LS $___________
153 Contractor Quality Control 1 LS $___________
Sec 204 Sampling & Testing - Excavation & Embankment (Per FP-14 Table 204-1)
1 LS $___________
Sec 209 Sampling & Testing - Structure Excavation & Backfill (Per FP-14 Table 209-1)
1 LS $___________
155 Schedules for Construction Contracts 1 LS $___________
Soil Erosion and Sediment Control, Lake Drawdown and/or Cofferdam
1 LS $___________
201 Clearing and Grubbing 1 LS $___________
203 Removal of Structures & Obstructions (Removal and Remediation of Existing Drain Structure and Undermining)
1 LS $___________
251 Class 3 Riprap (Spillway Channel) 400 CY $___________
624/625 Topsoil and Turf Establishment 1 LS $___________
TOTAL BASE BID ESTIMATE $___________
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 5 of 100
Pg. 2
OPTIONAL BID ITEM 1 – 30” RCPP LEVEL CONTROL PIPE
Pay Item Description Estimated
Qty Unit Total Price
152 Construction Surveying & Staking 1 LS $__________
Sec 601 & 614 Sampling & Testing - Cast-in-place Concrete (Per FP-14 Table 552-9; Only Compressive Strength on 3 Test Cylinders: 1 @ 7 & 2@ 28 days)
1 LS $__________
201 Clearing and Grubbing 1 LS $__________
252 Rockery (Outfall Pipe Plunge Pool)
10 CY $___________
601 Minor Concrete Structures (30” FES AND Outfall Headwall)
1 LS $___________
602 Culverts & Drains (30” Low Pressure Concrete Pipe) With Lean Concrete Bedding/Cradle.
150 LF $___________
717 Structural Metal (30” Rodent Protection and Trash Rack)
1 LS $___________
TOTAL OBI 1 ESTIMATE $___________
OPTIONAL BID ITEM 2 – 30” RCPP LEVEL CONTROL PIPE WITH 18” RCPP
AND SLUICE GATE DRAWDOWN STRUCTURE
Pay Item Description Estimated
Qty Unit Total Price
152 Construction Surveying & Staking 1 LS $___________
Sec 204 Sampling & Testing - Excavation & Embankment (Per FP-14 Table 204-1)
1 LS $___________
Sec 209 Sampling & Testing - Structure Excavation & Backfill (Per FP-14 Table 209-1)
1 LS $___________
Sec 601 & 614 Sampling & Testing - Cast-in-place Concrete (Per FP-14 Table 552-9; Only Compressive Strength on 3 Test Cylinders: 1 @ 7 & 2@ 28 days)
1 LS $___________
209 Structure Excavation & Backfill 40 CY $___________
252 Rockery (Outfall Pipe Plunge Pool)
10 CY $___________
601 Minor Concrete Structures (30” FES AND Outfall Headwall)
1 LS $___________
602 Culverts & Drains (18” Low Pressure Concrete Pipe) With
50 LF $___________
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 6 of 100
Pg. 3
FP-14
Section
Pay Item Description Estimated
Qty Unit Total Price
Lean Concrete Bedding/Cradle.
602 Culverts & Drains (30” Low Pressure Concrete Pipe) With Lean Concrete Bedding/Cradle.
86 LF $___________
604 Manholes, Inlets & Catch Basins (Lake Drawdown Structure With Sluice Gate)
1 EA $___________
605 Underdrains, Sheet Drains, and Pavement Edge Drains (Granular Filter Drain)
25 LF $___________
624/625 Topsoil and Turf Establishment 1 LS $___________
717 Structural Metal (18” Rodent Protection and Trash Rack) 1 LS $___________
717 Structural Metal (30” Rodent Protection and Trash Rack) 1 LS $___________
TOTAL OBI 2 ESTIMATE $___________
Total Contract Award (Base + Option 1 and Option 2) =_______________________________
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 7 of 100
EVALUATION CRITERIA:
TECHNICAL PROPOSAL INSTRUCTIONS
General Proposals shall be submitted in two parts: a technical proposal and a price proposal. Each part shall be separate and complete in itself so that evaluation of one may be accomplished independently of the other. The price proposal shall be submitted with the solicitation forms.
Offerors are cautioned that sufficient and detailed information must be presented in their proposals to enable the Government to evaluate their proposals fully in accordance with the evaluation and award criteria contained herein. The Government is not obligated to ask for additional information and in the absence of appropriate information, the proposal will be rated deficient.
Price Proposal A completed schedule of items with pricing information completes this requirement.
Technical Proposal Offerors shall submit technical information for their firm and any proposed major subcontractors. Please submit your past performance with the technical information. Also, the offeror shall submit information that illustrates a technical understanding of the work to be performed.
1) Relevant Past Performance:
Relevant Past Performance shall be obtained from previous work with the Federal Government and utilized for evaluation on this contract. Please provide at least 3 past performances with references.
2) Technical Approach:
All offerors should show a high level of understanding of the work to be performed. This can be accomplished by submitting with the proposal the following information:
1. Description of how the work will be performed
2. Schedule (accomplishing work while meeting weather conditions)
3. Key Personnel
4. List of equipment to be used
3) Experience/Qualification:
The Offeror will be evaluated on the experience and qualifications of their company and personnel.
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 8 of 100
Technical Evaluation Criteria Technical proposals will be evaluated and rated by a Technical Evaluation Panel. Proposals shall be prepared in accordance with the proposal preparation instructions. The Government intends to evaluate quotations using a comparative evaluation methodology. This means quotations will be compared against one another to determine which provides the best value to the Government, based on the evaluation factors outlined in this solicitation.
The Government may consider quotations that exceed minimum requirements and offer additional value or benefits, even if they are not the lowest priced.
1) Relevant Past Performance:
a) Relevant Past Performance shall be provided and utilized for evaluation on this contract.
2) Technical Approach:
b) Understanding of Proposed Work: Offeror demonstrates a technical understanding of the proposed work including but not limited to preliminary scheduling, equipment requirements, site conditions and location, project challenges, and material requirements.
3) Experience/Qualification:
Evaluates the company’s history, background, and ability to perform work of similar size, scope, and complexity. Specialized work and accomplishments relative to the scope of work.
4) Acceptability:
An offeror’s documented response to the solicitation will not be deemed acceptable, if not received by the specified closing date and time, and the submitted proposal not clearly demonstrate the offerors understanding the needed work. In such cases the offeror will be viewed as having “failed” this criterion and will not be considered for award.
5) Cost or Price:
Each acceptable offer will be evaluated for reasonableness of proposal price. This criterion will include consideration of cost information provided. It is the Government's intent to assess the unit prices to determine reasonableness and offeror's understanding of the work and ability to perform the contract. The importance of price may become greater as the differences between technical proposals decrease. Where technical proposals are determined to be substantially equal, price may control award.
(b) Award. A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 9 of 100
FROM POPLAR BLUFF TAKE US-60W TO C.R. 411/HWY PP (8.8 MI). TURN LEFT ON 411/PP
AND PROCEED 1.6 MILES. TURN RIGHT ON C.R. 435 THEN IMMEDIATELY RIGHT AGAIN
ON C.R. 426 FOR 1.2 MILES. AT TEE, STAY STRAIGHT ON C.R.428 FOR 2.4 MILES. AT
TEE, TURN LET ON C.R. 436 FOR 0.8 MILES.TURN RIGHT ONTO FSR 3899 AND PROCEED
0.3 MILES TO BEAVER LAKE.
36.801777 N, 90.622492 W.
FOREST LOCATION MAP
PROJECT LOCATION MAP
TRAVEL DIRECTIONS:
SHEET OF
United States Department of Agriculture Forest Service
BEAVER LAKE
DAM REHABILITATION
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER
DISTRICT RANGER DATE
DATE
DIRECTOR OF ENGINEERING DATE
FOREST SUPERVISOR DATE
RO DAM PROGRAM MANAGER DATE
5/ 1/
0:
R O
B
ER
TC
O
N A
W A
Y C
PR
O
JE
C
TS
\P O
PL
A
R B
LU
FF
\B
EA
VE
R
L A
K E\
D R
A W
IN
G
S\ B
EA
VE
R L
A K
E M
O D
1-
.D W
G
STATE OF MISSOURI
BUTLER COUNTY
EASTERN REGION
MARK TWAIN NATIONAL FOREST
POPLAR BLUFF RANGER DISTRICT
INDEX OF SHEETS
SHEET SHEET TITLE DATE
G-01 COVERSHEET 05/01/26
C-01 OVERALL PLAN 05/01/26
C-02 EXISTING CONDITIONS & BASE BID 05/01/26
C-03 OBI-1 30" LC PIPE 05/01/26
C-04 OBI-2 30" LC PIPE & 18" GATE 05/01/26
C-05 DETAILS 05/01/26
C-06 DETAILS 05/01/26
C-07 DETAILS 05/01/26
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 10 of 100
CP 100
X: 783962.49 Y: 352036.70
Z: 564.13
CP 101
X: 783831.15 Y: 352271.67 Z: 563.15
0+00
0+50
1+00
1+50
1+86
BASE BID:
REPAIR DAM BREACH BY;
1. EXCAVATE AND REMOVE EX. 15" CMP AND 24" VAULT AND VALVES
2. EXCAVATE EACH END, REMOVE 24" VAULT AND VALVES AND GROUT
PIPE AND UNDERMINED AREA.
3. HAUL AND PLACE 510 TONS OF CLASS II RIPRAP TO REPAIR SPILLWAY.
OPTIONAL BID ITEMS:
OBI 1 - INSTALL 30" RCPP LEVEL CONTROL PIPE IN SPILLWAY.
OBI 2 - INSTALL 30" RCPP LEVEL CONTROL AND DRAWDOWN STRUCTURE
THROUGH DAM EMBANKMENT.
12" Oak
20" Pine
24" PINE
24" PINE
24" PINE
18" PINE
18" PINE
CP 1000
X: 784114.06 Y: 351845.29
Z: 564.46
545550
560555550
EXISTING BOAT ACCESS
SPILLWAY REPAIR.
0+00
0+50
1+00
1+50
2+00
2+32
OBI 1.
OBI 2.
GENERAL NOTES:
1. USFS SHALL PROVIDE SITE CONTROL POINTS (CP).
CONTRACTOR SHALL VERIFY CP INFO AND EXISTING
CONDITIONS PRIOR TO START OF CONSTRUCTION.
2. CONTRACTOR SHALL SUBMIT PROPOSED STAGING AND
LAYDOWN AREAS TO THE CO/COR. ANY CLEARING SHALL
BE THE CONTRACTOR'S RESPONSIBILITY TO RETURN TO
LIKE OR BETTER CONDITION UPON COMPLETION (LESS
TREE REPLACEMENT).
3. ANY TREES REMOVED DURING CLEARING SHALL INCLUDE
THE ROOT WAD. TREES LARGER THAN 12" SHALL BE
TOPPED AND LOGS/STUMPS (WITH ROOT WAD) MAY BE
RANDOMLY PLACED INSIDE THE LAKE JUST BELOW THE
PROPOSED WSE. ALL OTHER CLEARING WASTE MAY BE
DISPOSED OF/PLACED BELOW THE DAM AND UTILIZED TO
ASSIST WITH EROSION CONTROL.
4. USFS WILL REMOVE TREES IN SPILLWAY. STUMPS TO
REMAIN AND NOT BE REMOVED BY CONTRACTOR.
5. CONTRACTOR SHALL SUBMIT EROSION, DEWATERING
AND STORM/SURFACE WATER CONTROL PLAN TO COR
FOR REVIEW. SEE SUPPLEMENTAL SPECIFICATIONS
SECTION 157.
Cut/Fill Summary - SPILLWAY RIPRAP Name
SPILL GRADE (1)
Totals
Cut
53.28 Cu. Yd.
53.28 Cu. Yd.
Fill
406.78 Cu. Yd.
406.78 Cu. Yd.
Net
353.49 Cu. Yd.<Fill>
353.49 Cu. Yd.<Fill>
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/ 1/
0:
R O
B
ER
TC
O
N A
W A
Y C
PR
O
JE
C
TS
\P O
PL
A
R B
LU
FF
\B
EA
VE
R
L A
K E\
D R
A W
IN
G
S\ B
EA
VE
R L
A K
E M
O D
1-
.D W
G
R09
EASTERN REGION
BEAVER LAKE
DAM
REHABILITATION
MARK TWAIN NATIONAL
FOREST
POPLAR BLUFF RANGER DISTRICT
OVERALL PLAN
RKC
RKC
AW
Feet
0 40 80
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 11 of 100
CP 100
X: 783962.49 Y: 352036.70
Z: 564.13
CP 101
X: 783831.15 Y: 352271.67 Z: 563.15
EXISTING 15" CMP
TO BE REMOVED
FL=541.8
EXISTING VALVES AND
STRUCTURE TO BE
REMOVED. FL=551.2
FSR 3899
CP 1000
X: 784114.06 Y: 351845.29
Z: 564.46
CURRENT WATER SURFACE
ELEVATION = 551.2'.
PROPOSED WATER SURFACE
ELEVATION = 556.0.
545550
560555550
REPAIR
SPILLWAY.
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CP CONTROL POINT
CO CONTRACTING OFFICER
CONC CONCRETE
COR CO REPRESENTATIVE
DIA DIAMETER
EX EXISTING
FL FLOW LINE
FSR FOREST SERVICE ROAD
LC LEVEL CONTROL
MFR MANUFACTURER
OBI OPTIONAL BID ITEM
RCPP REINFORCED CONCRETE PRESSUR
STA STATION
WSE WATER SURFACE ELEVATION
FLOOD LIGHT
CABLE MARKER
WATER METER
WATER VALVE
FIRE HYDRANT
LIGHT POLE
EX EDGE OF WATER
EX EASEMENT LINE
CLEANOUT
ELECTRICAL MANHOLE
STORM SEWER MANHOLE
CABLE TV PEDESTAL
TRAFFIC CONTROL BOX
TELEPHONE PEDESTAL
ELECTRIC BOX
GAS VALVE
GAS METER
GAS DRIP
WATER SPRINKLER
TRAFFIC STANDARD
BOLLARD
EX 5' CONTOUR
EX UNDERGROUND TELEPHONE
EX PROPERTY LINE (APPROXIMATE)
EX SANITARY SEWER
EX STORM PIPE
EX 1' CONTOUR
EX UNDERGROUND ELECTRIC
EX OVERHEAD ELECTRIC
EX RIGHT-OF-WAY
PROPOSED 5' CONTOUR
PROPOSED 1' CONTOUR
(500)
AREA LIGHT
EX UNDERGROUND CABLE
EX CONCRETE PAVING
EX ASPHALT PAVING
EX GRANULAR PAVING
EX BUILDING LINE/ / / / / / / / / / / /
TELEPHONE MANHOLE
SANITARY SEWER MANHOLE
POWER POLE & GUY WIRE
EX BARBED WIRE FENCE
PROPOSED SILT FENCE
PROPOSED STORM PIPE
EX WATER LINE
PROPOSED GRANULAR PAVING
PROPOSED CONCRETE PAVING
PROPOSED ASPHALT PAVING
MAILBOX
PROPOSED SANITARY SEWER
EX FORCE MAIN
PROPOSED FORCE MAIN
EX CHAIN LINK FENCE
EX WOOD FENCE
EX GUARD RAIL
EX NATURAL GAS
PROPOSED INLET PROTECTION
WATER WELL
ELECTRIC METER
WATER MANHOLE
PARKING METER
PROPOSED GAS LINE
PROPOSED WATER LINE
IRRIGATION CONTROL VALVE
SIGN
PROPOSED PAD MOUNTED TRANSFORM
PROPOSED STREET LIGHT
PROPOSED FIRE HYDRANT
PROPOSED WATER VALVE
PROPOSED WATER METER
PROPOSED CLEANOUT
PROPOSED SANITARY SEWER MANHOL
STANDARD LEGEND
CONTROL POINT
E L
E V
A T
IO
N
F
E E
T
E L
E V
A T
IO
N
F
E E
T
EXISTING PIPE PROFILE
0+000+501+001+501+86
F L
.7
S
T A
.1
C
M P
V A
U L
T W
IT
H
V A
LV
E
S
F L
.8
S T
A
.5
E N
D O
F
5" C
M P
115 LF 15" CMP
F L
.2
S T
A
.2
IN
L
E T
5"
C M
P
R U
S T
E D
A N
D U
N D
E R
M
IN
E D
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/ 1/
0:
R O
B
ER
TC
O
N A
W A
Y C
PR
O
JE
C
TS
\P O
PL
A
R B
LU
FF
\B
EA
VE
R
L A
K E\
D R
A W
IN
G
S\ B
EA
VE
R L
A K
E M
O D
1-
.D W
G
R09
EASTERN REGION
BEAVER LAKE
DAM
REHABILITATION
MARK TWAIN NATIONAL
FOREST
POPLAR BLUFF RANGER DISTRICT
EXISTING CONDITIONS
& BASE BID
RKC
RKC
AW
Feet
0 100 200
REMOVAL OF STRUCTURES - OPTION B - EXCAVATE AND
REMOVE FROM INLET TO VAULT, AND OUTLET TO
STA 1+30 AND FILL REMAINING PIPE AND UNDERMINED
AREA WITH NON-SHRINK FLOWABLE GROUT.
(ASSUMED OPTION FOR OBI 1)
REMOVAL OF STRUCTURES - OPTION A - EXCAVATE AND REMOVE ALL EXISTING PIPE AND
APPURTENANCES AND REPLACE SOIL IN COMPACTED LIFTS.
(ASSUMED OPTION FOR OBI 2)
EX. WSE = 551.2
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 12 of 100
E L
E V
A T
IO
N
F
E E
T
E L
E V
A T
IO
N
F
E E
T
LC 30 PIPE PROFILE
0+000+501+001+502+002+30
R
IP
R
A P
P L
U N
G E
P O
O L
F L=
3.
S T
A
.6
0"
R C
P P
F E
S A
N D
T O
E W
A L
L
F L=
6.
S T
A
.1
0"
I N
L E
T
T R
A S
H G
U A
R D
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/ 1/
0:
R O
B
ER
TC
O
N A
W A
Y C
PR
O
JE
C
TS
\P O
PL
A
R B
LU
FF
\B
EA
VE
R
L A
K E\
D R
A W
IN
G
S\ B
EA
VE
R L
A K
E M
O D
1-
.D W
G
R09
EASTERN REGION
BEAVER LAKE
DAM
REHABILITATION
MARK TWAIN NATIONAL
FOREST
POPLAR BLUFF RANGER DISTRICT
OBI-1
30" LC PIPE
RKC
RKC
AW
Feet 0 20 40
SPILLWAY REPAIR
PROPOSED GRADE
30" RCPP FES WITH
RODENT GUARD PER
DETAIL SHEET C-05
150 LF OF 30" RCPP @ 1.88 %
BASE BID - SPILLWAY
REPAIR/RIPRAP GRADE
30" TRASH GUARD PER
DETAIL SHEET C-06
FL = 556.0
RIPRAP PLUNGE POOL
PER DETAIL SHEET C-05
EXISTING SPILLWAY GRADE
OBI 1 - 30" RCPP LEVEL
CONTROL PIPE WITH TRASH
GUARD AND PLUNGE POOL
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 13 of 100
E L
E V
A T
IO
N
F
E E
T
E L
E V
A T
IO
N
F
E E
T
0+000+501+001+501+86
F L
0"
I N
.6
S T
A
.0 F
L
O
U T
.0
S T
A
.0 L
E V
E L
C O
N T
R O
L
S
LU
IC
E
G A
T E
F L
8"
I N
.4
S T
A
.0
R
IP
R
A P
P L
U N
G E
P O
O L
F L=
0.
S
T A
0"
R C
P P
F E
S A
N D
T O
E W
A L
L
PROPOSED WATER
SURFACE EL = 556.0
F L=
0.
S T
A
.0
8"
I N
L E
T
T R
A S
H G
U A
R D
F L=
6.
S T
A
.0
0"
I N
L E
T
T R
A S
H G
U A
R D
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/ 1/
0:
R O
B
ER
TC
O
N A
W A
Y C
PR
O
JE
C
TS
\P O
PL
A
R B
LU
FF
\B
EA
VE
R
L A
K E\
D R
A W
IN
G
S\ B
EA
VE
R L
A K
E M
O D
1-
.D W
G
R09
EASTERN REGION
BEAVER LAKE
DAM
REHABILITATION
MARK TWAIN NATIONAL
FOREST
POPLAR BLUFF RANGER DISTRICT
OBI-2
30" LC PIPE & 18" GATE
RKC
RKC
AW
Feet 0 20 40
25 LF OF FILTER DRAIN
PER DETAIL SHEET C-05
6' X 4' CONCRETE BOX
WITH 3O" INLET AND OUTLET
AND 18" SLUICE GATE
TOP = 563.0
SEE DETAIL SHEET C-06
50 LF OF 18" RCPP @ 12%
56 LF OF 30" RCPP @ 16%
30 LF OF 30" RCPP @ 1.3%
EXISTING 15" CMP
AND 24" CMP STRUCTURES
30" TRASH GUARD PER
DETAIL SHEET C-06
30" RCPP FES WITH
RODENT GUARD PER
DETAIL SHEET C-05
18" TRASH GUARD PER
DETAIL SHEET C-06
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 14 of 100
1. MINIMUM REINFORCING OF #4 BARS ON
12-INCH CENTERS EACH WAY REQUIRED
IN HEADWALL, TOEWALL, AND
FOUNDATION/FOOTING.
FINE DRAIN FILL
MATERIAL
COARSE DRAIN
FILL MATERIAL
SECTION OF FILTER DRAIN - OUTLET PIPE
STANDARD
SIEVE SIZE
FINE FILL
LIMITS
1" 3/4" 1/2" 3/8" #4 #8
#16 #30 #50 #100 #200
96-100 80-100 50-85 25-60 5-30 0-10 0-3
75-100 40-80 20-50 0-30 0-15
COARSE FILL
LIMITS
DRAIN FILL MATERIAL
9" 9"
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/ 1/
0:
R O
B
ER
TC
O
N A
W A
Y C
PR
O
JE
C
TS
\P O
PL
A
R B
LU
FF
\B
EA
VE
R
L A
K E\
D R
A W
IN
G
S\ B
EA
VE
R L
A K
E M
O D
1-
.D W
G
R09
EASTERN REGION
BEAVER LAKE
DAM
REHABILITATION
MARK TWAIN NATIONAL
FOREST
POPLAR BLUFF RANGER DISTRICT
DETAILS
RKC
RKC
AW
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 15 of 100
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/ 1/
1:
R O
B
ER
TC
O
N A
W A
Y C
PR
O
JE
C
TS
\P O
PL
A
R B
LU
FF
\B
EA
VE
R
L A
K E\
D R
A W
IN
G
S\ B
EA
VE
R L
A K
E M
O D
1-
.D W
G
R09
EASTERN REGION
BEAVER LAKE
DAM
REHABILITATION
MARK TWAIN NATIONAL
FOREST
POPLAR BLUFF RANGER DISTRICT
DETAILS
RKC
RKC
AW
TRASH GUARD DETAIL (N.T.S.)
DETAIL PROVIDED FOR GUIDANCE IF CONTRACTOR IS TO
CONSTRUCT IN-HOUSE.
EQUIVALENT PRE-MANUFACTURED GUARDS ARE ACCEPTABLE.
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 16 of 100
REQUIRED FROM THE
BAFFLE RISER TO THE
FILTER DRAIN PER FP-14
SECTION 209
THE FIRST AND LAST PIPE SEGMENT SHALL BE PLACED AT A SLOPE
NOT EXCEEDING 2%.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/ 1/
1:
R O
B
ER
TC
O
N A
W A
Y C
PR
O
JE
C
TS
\P O
PL
A
R B
LU
FF
\B
EA
VE
R
L A
K E\
D R
A W
IN
G
S\ B
EA
VE
R L
A K
E M
O D
1-
.D W
G
R09
EASTERN REGION
BEAVER LAKE
DAM
REHABILITATION
MARK TWAIN NATIONAL
FOREST
POPLAR BLUFF RANGER DISTRICT
DETAILS
RKC
RKC
AW
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 17 of 100
FP-14 SUPPLEMENTAL SPECIFICATIONS FOR BEAVER LAKE
DAM REHABILITATION
PREFACE
PREFACE_WO_08_25_2022
DELETE ALL BUT THE FIRST PARAGRAPH AND ADD THE FOLLOWING:
THE FOREST SERVICE, US DEPARTMENT OF AGRICULTURE HAS ADOPTED FP-14 WITH
THE FOLLOWING SUPPLEMENTAL SPECIFICATION FOR CONSTRUCTION IMPROVEMENTS
TO STERLING HOLLOW DAM.
101 - TERMS¸ FORMAT¸ AND DEFINITIONS
101.01_NATIONAL_9_15_2016
ADD THE FOLLOWING PARAGRAPH TO SUBSECTION 101.01:
101.01 MEANING OF TERMS.
DELETE ALL REFERENCES TO THE TAR (TRANSPORTATION ACQUISITION REGULATIONS) IN THE
SPECIFICATIONS.
101.03_NATIONAL_4_7_2015
ADD THE FOLLOWING TO SUBSECTION 101.03:
101.03 ABBREVIATIONS.
ADD THE FOLLOWING:
(A) ACRONYMS.
AGAR — AGRICULTURE ACQUISITION REGULATIONS
FSAR — FOREST SERVICE ACQUISITION REGULATIONS
MSHA — MINE SAFETY AND HEALTH ADMINISTRATION
NESC — NATIONAL ELECTRICAL SAFETY CODE
(F) MISCELLANEOUS UNIT ABBREVIATIONS.
MP — MILEPOST LOCATION
PPM — PARTS PER MILLION VOLUME
STA STATION LOCATION
101.04_NATIONAL_9_5_2018
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 18 of 100
MAKE THE FOLLOWING CHANGES TO SUBSECTION 101.04:
DELETE THESE DEFINITIONS AND REPLACE THE FOLLOWING:
BID SCHEDULE — THE SCHEDULE OF ITEMS.
BRIDGE — A STRUCTURE, INCLUDING SUPPORTS, ERECTED OVER A DEPRESSION OR AN OBSTRUCTION SUCH AS WATER ALONG A ROAD, A TRAIL, OR A RAILWAY AND HAVING A DECK FOR CARRYING TRAFFIC
OR OTHER LOADS.
CONTRACTOR — THE INDIVIDUAL OR LEGAL ENTITY CONTRACTING WITH THE GOVERNMENT FOR
PERFORMANCE OF PRESCRIBED WORK. IN A TIMBER SALE CONTRACT, THE CONTRACTOR IS THE
“PURCHASER”.
CULVERT — ANY STRUCTURE WITH A BOTTOM, REGARDLESS OF FILL DEPTH, DEPTH OF INVERT BURIAL, OR PRESENCE OF HORIZONTAL DRIVING SURFACE, OR ANY BOTTOMLESS (NATURAL CHANNEL)
STRUCTURE WITH FOOTINGS THAT WILL NOT HAVE WHEEL LOADS IN DIRECT CONTACT WITH THE TOP
OF THE STRUCTURE.
DRAWINGS — (PUBLIC WORKS CONTRACTS) DESIGN SHEETS OR FABRICATION, ERECTION, OR
CONSTRUCTION DETAILS SUBMITTED TO THE CO BY THE CONTRACTOR ACCORDING TO FAR CLAUSE 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION. ALSO REFERS TO SUBMISSIONS AND
SUBMITTALS.
NOTICE TO PROCEED — (PUBLIC WORKS CONTRACTS) WRITTEN NOTICE TO THE CONTRACTOR TO
BEGIN THE CONTRACT WORK.
RIGHT-OF-WAY — A GENERAL TERM DENOTING (1) THE PRIVILEGE TO PASS OVER LAND IN SOME PARTICULAR LINE (INCLUDING EASEMENT, LEASE, PERMIT, OR LICENSE TO OCCUPY, USE, OR TRAVERSE PUBLIC OR PRIVATE LANDS), OR (2) REAL PROPERTY NECESSARY FOR THE PROJECT, INCLUDING
ROADWAY, BUFFER AREAS, ACCESS, AND DRAINAGE AREAS.
SOLICITATION— (PUBLIC WORKS CONTRACTS) THE COMPLETE ASSEMBLY OF DOCUMENTS (WHETHER
ATTACHED OR INCORPORATED BY REFERENCE) FURNISHED TO PROSPECTIVE BIDDERS.
ADD THE FOLLOWING DEFINITIONS:
ADJUSTMENT IN CONTRACT PRICE — “EQUITABLE ADJUSTMENT,” AS USED IN THE FEDERAL
ACQUISITION REGULATIONS, OR “CONSTRUCTION COST ADJUSTMENT,” AS USED IN THE TIMBER SALE
CONTRACT, AS APPLICABLE.
CHANGE — “CHANGE” MEANS “CHANGE ORDER” AS USED IN THE FEDERAL ACQUISITION
REGULATIONS, OR “DESIGN CHANGE” AS USED IN THE TIMBER SALE CONTRACT.
FOREST SERVICE — THE UNITED STATES OF AMERICA, ACTING THROUGH THE FOREST SERVICE, U.S.
DEPARTMENT OF AGRICULTURE.
NEAT LINE — A LINE DEFINING THE PROPOSED OR SPECIFIED LIMITS OF AN EXCAVATION OR
STRUCTURE.
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 19 of 100
PIONEER ROAD — TEMPORARY CONSTRUCTION ACCESS BUILT ALONG THE ROUTE OF THE PROJECT.
PROTECTED STREAMCOURSE — A DRAINAGE SHOWN ON THE PLANS OR TIMBER SALE AREA MAP THAT
REQUIRES DESIGNATED MITIGATION MEASURES.
ROAD ORDER — AN ORDER AFFECTING AND CONTROLLING TRAFFIC ON ROADS UNDER FOREST SERVICE JURISDICTION. ROAD ORDERS ARE ISSUED BY A DESIGNATED FOREST OFFICER UNDER THE AUTHORITIES
OF 36 CFR, PART 260.
SHOP DRAWINGS — (TIMBER AND STEWARDSHIP CONTRACTS) REFERRED TO AS “DRAWINGS” IN FP-14, INCLUDES DRAWINGS, DIAGRAMS, LAYOUTS, SCHEMATICS, DESCRIPTIVE LITERATURE, ILLUSTRATIONS, LISTS OR TABLES, PERFORMANCE AND TEST DATA, AND SIMILAR MATERIALS FURNISHED BY PURCHASER
TO EXPLAIN IN DETAIL SPECIFIC PORTIONS OF THE WORK REQUIRED BY THE CONTRACT.
102 - BID¸ AWARD¸ AND EXECUTION OF CONTRACT
102.00_NATIONAL_9_15_2016
DELETE SECTION 102 IN ITS ENTIRETY.
103 - SCOPE OF WORK
103.00_NATIONAL_9_15_2016
DELETE SECTIONS 103.02, 103.03, 103.04, 103.05.
ADD THE FOLLOWING TO SECTION 103.01.
THE WORK SHOWN IN THE PLANS AND SPECIFICATIONS INCLUDE THE FOLLOWING:
BASE BID – MAKING IMPROVEMENTS AS NECESSARY TO DRAW DOWN WATER LEVELS, CLEAR AND
GRUB, EXCAVATE AND REMOVE EXISTING OVERFLOW CONDUIT AND APPURTENANCES AND REPAIRING
SPILLWAY EROSION WITH RIPRAP.
MAKING IMPROVEMENTS AS NECESSARY TO DRAW DOWN WATER LEVELS, CLEAR AND GRUB,
EXCAVATE AND REMOVE EXISTING OVERFLOW CONDUIT AND APPURTENANCES; INSTALLATION OF A
NEW OVERFLOW CONDUIT, LEVEL CONTROL STRUCTURE AND APPURTENANCES; REGRADING AND
RIPRAP ARMORING OF THE EXISTING SPILLWAY; RECONSTRUCTION OF MISCELLANEOUS ACCESS ROADS
AND INSTALLATION OF ARTICULATED CONCRETE MAT BOAT RAMP.
OPTIONAL BID ITEM 1 – INCLUDES SHALLOW INSTALLATION OF A NEW LEVEL CONTROL CONDUIT
WITHIN THE SPILLWAY.
OPTIONAL BID ITEM 1 – INCLUDES INSTALLATION OF A NEW LEVEL CONTROL AND DRAWDOWN
STRUCTURE, CONDUITS AND APPURTENANCES LOCATED AT THE SITE OF THE EXISTING CONDUIT
REMOVAL>
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 20 of 100
104 - CONTROL OF WORK
DELETE SUBSECTIONS 104.01, 104.02, AND 104.04.
104.06_NATIONAL_9_16_2016
ADD THE FOLLOWING AS SUBSECTION 104.06:
104.06 USE OF ROADS BY CONTRACTOR.
THE CONTRACTOR IS AUTHORIZED TO USE ROADS UNDER THE JURISDICTION OF THE FOREST SERVICE FOR ALL ACTIVITIES NECESSARY TO COMPLETE THIS CONTRACT, SUBJECT TO THE LIMITATIONS AND AUTHORIZATIONS DESIGNATED IN THE ROAD ORDER(S) OR DESCRIBED IN THE CONTRACT, WHEN SUCH USE WILL NOT DAMAGE THE ROADS OR NATIONAL FOREST RESOURCES, AND WHEN TRAFFIC CAN BE
ACCOMMODATED SAFELY. CONTRACTOR SHALL MAINTAIN THE ROADWAYS USED TO ACCESS THE
WORK FOR THE DURATION OF THE CONTRACT.
105 - CONTROL OF MATERIAL
105.05_NATIONAL_6_29_2020
105.05 USE OF MATERIAL FOUND IN THE WORK.
DELETE 105.05 (A) AND (B) AND THE LAST SENTENCE OF THE SECOND PARAGRAPH AND SUBSTITUTE
THE FOLLOWING:
MATERIALS PRODUCED OR PROCESSED FROM GOVERNMENT LANDS IN EXCESS OF THE QUANTITIES REQUIRED FOR PERFORMANCE OF THIS CONTRACT ARE THE PROPERTY OF THE GOVERNMENT. PLACE
EXCESS MATERIAL SAFELY AT GOVERNMENT-APPROVED LOCATION, AT NO ADDITIONAL COST TO
GOVERNMENT.
ADD THE FOLLOWING AS SUBSECTION 105.07:
105.07 LEAD FREE AGGREGATE & ROCK.
ANY STONE SOURCED FROM ANY THE FOLLOWING COUNTIES IN SOUTHEAST MISSOURI WILL NEED TO BE TESTED: CRAWFORD, DENT, SHANNON, WASHINGTON, IRON, REYNOLDS, MADISON, ST. FRANCOIS, ST. GENEVIEVE, AND BOLLINGER COUNTIES. IF STONE IS SOURCED FROM A COUNTY NOT LISTED, IT WILL NOT HAVE TO BE TESTED, HOWEVER CONTRACTOR MUST PROVIDE TICKETS OR INVOICES THAT
CLEARLY SHOW WHERE THOSE MATERIALS WERE SOURCED FROM.
MATERIALS FROM THESE AREAS SHOULD BE VISUALLY INSPECTED TO ENSURE THAT NO HAZARDOUS MINERALIZATION IS PRESENT. MINERALIZATION INCLUDING GALENA, SPHALERITE, AND CHALCOPYRITE
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 21 of 100
SHOULD NOT BE PRESENT IN ANY MATERIALS PLACED ON NATIONAL FOREST SYSTEMS LANDS.
AGGREGATE AND/OR RIP RAP THAT DOES NOT CONTAIN MATERIAL IN THE <2MM FRACTION (PASSES A #10 SIEVE) MAY ONLY NEED TO BE SUBJECT TO VISUAL INSPECTION. AGGREGATE AND/OR RIP RAP THAT CONTAINS MATERIAL IN THE <2MM FRACTION (PASSES A #10 SIEVE) WILL NEED TO BE SAMPLED TO ENSURE THAT THE MATERIAL DOES NOT EXCEED 100 PARTS PER MILLION (PPM) FOR LEAD (PB). THE
METHODS AND EQUIPMENT USED FOR SAMPLING MATERIALS WILL VARY WITH THE FORM AND
CONSISTENCY OF THE MATERIALS TO BE SAMPLED. SAMPLES COLLECTED USING THE SAMPLING
PROTOCOLS LISTED BELOW WILL BE CONSIDERED BY THE AGENCY TO BE REPRESENTATIVE OF THE
MATERIAL. SAMPLING OR SCREENING RESULTS SHOULD BE PROVIDED IN WRITING TO THE
CONTRACTING OFFICER REPRESENTATIVE (COR) PRIOR TO ANY MATERIAL BEING DELIVERED.
CORE OR SCOOP SAMPLING - ASTM STANDARD E1727
ALL EXTRACTION AND ANALYTICAL METHODS MUST FOLLOW THE SW-846 COMPENDIUM
OR
XRF SCREENING - UNE-EN ISO 13196
NUMBER OF SAMPLES REQUIRED, BASED ON QUANTITY REQUIRED IN THE SCHEDULE OF ITEMS
TONS # OF SAMPLES/ SCREENINGS
0-100 3
101-500 5
501-1000 10
106 - ACCEPTANCE OF WORK
106.01_NATIONAL_7_18_2017
DELETE SUBSECTION 106.01 AND REPLACE WITH THE FOLLOWING:
106.01 CONFORMITY WITH CONTRACT REQUIREMENTS.
FOLLOW THE REQUIREMENTS OF FAR CLAUSE 52.246-12 INSPECTION OF CONSTRUCTION.
REFERENCES TO STANDARD TEST METHODS OF AASHTO, ASTM, GSA, AND OTHER RECOGNIZED
STANDARD AUTHORITIES REFER TO THE METHODS IN EFFECT ON THE DATE OF SOLICITATION FOR BIDS.
PERFORM ALL WORK TO THE LINES, GRADES, CROSS-SECTIONS, DIMENSIONS, AND PROCESSES OR
MATERIAL REQUIREMENTS SHOWN ON THE PLANS OR SPECIFIED IN THE CONTRACT.
INCORPORATE MANUFACTURED MATERIALS INTO THE WORK ACCORDING TO THE MANUFACTURER’S
RECOMMENDATIONS OR TO THESE SPECIFICATIONS, WHICHEVER IS MORE STRICT.
PLAN DIMENSIONS AND CONTRACT SPECIFICATION VALUES ARE THE VALUES TO BE STRIVED FOR AND COMPLIED WITH AS THE DESIGN VALUES FROM WHICH ANY DEVIATIONS ARE ALLOWED. PERFORM WORK AND PROVIDE MATERIAL THAT IS UNIFORM IN CHARACTER AND REASONABLY CLOSE TO THE
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 22 of 100
PRESCRIBED VALUE OR WITHIN THE SPECIFIED TOLERANCE RANGE. THE PURPOSE OF A TOLERANCE RANGE IS TO ACCOMMODATE OCCASIONAL MINOR VARIATIONS FROM THE MEDIAN ZONE THAT ARE
UNAVOIDABLE FOR PRACTICAL REASONS.
WHEN STANDARD MANUFACTURED ITEMS ARE SPECIFIED (SUCH AS FENCE, WIRE, PLATES, ROLLED SHAPES, PIPE CONDUITS, ETC., THAT ARE IDENTIFIED BY GAUGE, UNIT MASS, SECTION DIMENSIONS, ETC.), THE IDENTIFICATION WILL BE CONSIDERED TO BE NOMINAL MASSES OR DIMENSIONS. UNLESS SPECIFIC CONTRACT TOLERANCES ARE NOTED, ESTABLISHED MANUFACTURING TOLERANCES WILL BE
ACCEPTED.
THE GOVERNMENT MAY INSPECT, SAMPLE, OR TEST ALL WORK AT ANY TIME BEFORE FINAL
ACCEPTANCE OF THE PROJECT. WHEN THE GOVERNMENT TESTS WORK, COPIES OF TEST REPORTS ARE
FURNISHED TO THE CONTRACTOR UPON REQUEST. GOVERNMENT TESTS MAY OR MAY NOT BE
PERFORMED AT THE WORK SITE. IF CONTRACTOR TESTING AND INSPECTION IS VERIFIED BY THE GOVERNMENT, THE CONTRACTOR’S RESULTS MAY BE USED BY THE GOVERNMENT TO EVALUATE WORK FOR ACCEPTANCE. DO NOT RELY ON THE AVAILABILITY OF GOVERNMENT TEST RESULTS FOR PROCESS
CONTROL.
ACCEPTABLE WORK CONFORMING TO THE CONTRACT WILL BE PAID FOR AT THE CONTRACT UNIT BID PRICE. FOUR METHODS OF DETERMINING CONFORMITY AND ACCEPTING WORK ARE DESCRIBED IN SUBSECTIONS 106.02 TO 106.05 INCLUSIVE. THE PRIMARY METHOD OF ACCEPTANCE IS SPECIFIED IN EACH SECTION OF WORK. HOWEVER, WORK MAY BE REJECTED AT ANY TIME IT IS FOUND BY ANY OF
THE METHODS NOT TO COMPLY WITH THE CONTRACT.
REMOVE, REPAIR, OR REPLACE WORK THAT DOES NOT CONFORM TO THE CONTRACT, OR TO
PREVAILING INDUSTRY STANDARDS WHERE NO SPECIFIC CONTRACT REQUIREMENTS ARE NOTED.
REMOVING, REPAIRING, OR REPLACING WORK; PROVIDING TEMPORARY TRAFFIC CONTROL; AND ANY OTHER RELATED WORK TO ACCOMPLISH CONFORMITY WILL BE AT NO COST TO THE GOVERNMENT.
(A) DISPUTING GOVERNMENT TEST RESULTS. IF THE ACCURACY OF GOVERNMENT TEST RESULTS IS DISPUTED, PROMPTLY INFORM THE CO. IF THE DISPUTE IS UNRESOLVED AFTER REASONABLE STEPS
ARE TAKEN TO RESOLVE THE DISPUTE, FURTHER EVALUATION MAY BE OBTAINED BY WRITTEN
REQUEST. INCLUDE A NARRATIVE DESCRIBING THE DISPUTE AND A PROPOSED RESOLUTION
PROTOCOL THAT ADDRESSES THE FOLLOWING:
1. SAMPLING METHOD.
2. NUMBER OF SAMPLES.
3. SAMPLE TRANSPORT.
4. TEST PROCEDURES.
5. TESTING LABORATORIES.
6. REPORTING.
7. ESTIMATED TIME AND COSTS, AND
8. VALIDATION PROCESS.
IF THE EVALUATION REQUIRES ADDITIONAL SAMPLING OR TESTING BE PERFORMED, MUTUALLY AGREE WITH THE GOVERNMENT ON WITNESSING PROCEDURES AND ON SAMPLING AND TESTING BY A THIRD PARTY LABORATORY. USE A THIRD PARTY LABORATORY ACCREDITED BY THE AASHTO ACCREDITATION
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 23 of 100
PROGRAM. PROVIDE PROOF OF THE LABORATORY’S ACCREDITATION FOR THE TEST PROCEDURES TO BE
USED. DO NOT USE THE SAME LABORATORY THAT PRODUCED THE DISPUTED GOVERNMENT TEST
RESULTS OR THAT PRODUCED THE TEST RESULTS USED AS A BASIS FOR THE DISPUTE.
THE CO WILL REVIEW THE PROPOSED RESOLUTION PROTOCOL AND MAY MODIFY IT BEFORE FINAL
APPROVAL AND EXECUTION.
THE GOVERNMENT WILL USE THE APPROVED RESOLUTION PROTOCOL TEST RESULTS TO DETERMINE THE VALIDITY OF THE DISPUTED TESTING. IF THE GOVERNMENT TEST RESULTS ARE VALIDATED, THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH DEVELOPING AND PERFORMING
THE RESOLUTION PROTOCOL. IF THE GOVERNMENT TEST RESULTS ARE NOT VALIDATED, THE
GOVERNMENT WILL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH DEVELOPING AND
PERFORMING THE RESOLUTION PROTOCOL. IF THE VALIDITY OF THE GOVERNMENT TEST RESULTS
CANNOT BE DETERMINED, THE CONTRACTOR AND GOVERNMENT WILL EQUALLY SHARE ALL COSTS
ASSOCIATED WITH DEVELOPING AND CARRYING OUT THE RESOLUTION PROTOCOL.
(B) ALTERNATIVES TO REMOVING AND REPLACING NON-CONFORMING WORK. AS AN ALTERNATIVE
TO REMOVAL AND REPLACEMENT, THE CONTRACTOR MAY SUBMIT A WRITTEN REQUEST TO:
1. HAVE THE WORK ACCEPTED AT A REDUCED PRICE, OR
BE GIVEN PERMISSION TO PERFORM CORRECTIVE MEASURES TO BRING THE WORK
INTO CONFORMITY.
THE REQUEST MUST CONTAIN SUPPORTING RATIONALE AND DOCUMENTATION. INCLUDE REFERENCES OR DATA JUSTIFYING THE PROPOSAL BASED ON AN EVALUATION OF TEST RESULTS, EFFECT ON SERVICE LIFE, VALUE OF MATERIAL OR WORK, QUALITY, AESTHETICS, AND OTHER TANGIBLE ENGINEERING BASIS.
THE CO WILL DETERMINE DISPOSITION OF THE NONCONFORMING WORK.
106.02_NATIONAL_10_23_2016
DELETE SUBSECTION 106.02 AND REPLACE WITH THE FOLLOWING:
106.02 VISUAL INSPECTION.
ACCEPTANCE IS BASED ON VISUAL INSPECTION OF THE WORK FOR COMPLIANCE WITH THE SPECIFIC CONTRACT REQUIREMENTS. USE PREVAILING INDUSTRY STANDARDS IN THE ABSENCE OF SPECIFIC
CONTRACT REQUIREMENTS OR TOLERANCES.
107 - LEGAL RELATIONS AND RESPONSIBILITY TO THE
PUBLIC
107.05_NATIONAL_7_18_2017
DELETE SUBSECTION 107.05.
108 - PROSECUTION AND PROGRESS
108.00_NATIONAL_9_16_2016
DELETE SECTION 108 IN ITS ENTIRETY.
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 24 of 100
109 - MEASUREMENT AND PAYMENT
109.01_NATIONAL_2_22_2019
DELETE THE THIRD PARAGRAPH AND TABLE 109-1 OF SUBSECTION 109.01 AND
REPLACE WITH THE FOLLOWING:
109.01 MEASUREMENT OF WORK.
TAKE MEASUREMENTS AS DESCRIBED IN SUBSECTION 109.02 UNLESS OTHERWISE MODIFIED BY THE MEASUREMENT SUBSECTION OF THE SECTION CONTROLLING THE WORK BEING PERFORMED. TABLE 109-1 INDICATES THE ACCURACY REQUIRED FOR QUANTITIES OF THE VARIOUS PAY UNITS USED IN THE SCHEDULE OF ITEMS. USE THIS GUIDE TO DETERMINE THE DECIMAL PLACEMENT IN THE FINAL
PAYMENT.
TABLE 109-1
DECIMAL ACCURACY OF QUANTITIES FOR FINAL PAYMENT
PAY ITEM LEVEL OF
PRECISION
LINEAR FOOT 1
EXCEPTION--TIMBER, STEEL, AND CONCRETE PILES 0.1
STATION 0.1
MILE 0.01
SQUARE FOOT 0.1
SQUARE YARD 0.1
EACH 1
ACRE 0.01
GALLON 1
M-GALS. 0.1
CUBIC YARD 1
EXCEPTION--STRUCTURE EXCAVATION;
SHEATHING
MATERIALS; BEDDING, BED COURSE, AND
BACKFILL
MATERIALS; GABIONS;
0.1
EXCEPTION--CONCRETE; MASONRY 0.01
POUND 1
TON 0.1
EXCEPTION--CALCIUM CHLORIDE;
SODIUM CHLORIDE; HYDRATED LIME;
BITUMINOUS MATERIALS; PAVEMENTS;
BED COURSE MATERIALS
0.01
HOUR 0.1
MFBM 0.01
STATION YARD 1
CUBIC YARD MILE 1
TON MILE 1
ADD THE FOLLOWING SENTENCE TO SUBSECTION 109.02(B):
109.02 MEASUREMENT TERMS AND DEFINITIONS.
(B) CONTRACT QUANTITY.
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 25 of 100
CONTRACT QUANTITIES WILL BE ADJUSTED ONLY WHEN THERE ARE ERRORS IN THE ORIGINAL
DESIGN OF 15% OR MORE.
109.00_NATIONAL_9_16_2016
DELETE SUBSECTIONS 109.06, 109.07, 109.08, AND 109.09:
157 - SOIL EROSION AND SEDIMENT CONTROL
DELETE SUBSECTION 157.03 AND REPLACE WITH THE FOLLOWING:
157.03 SOIL EROSION, SEDIMENT CONTROL, AND DEWATERING PLAN.
REVIEW CONSTRUCTION PLANS AND THEN DEVELOP A SOIL EROSION, SEDIMENT CONTROL AND
DEWATERING PLAN. THE FOLLOWING CONCEPT IS PROVIDED AS A GUIDE AND SHOULD NOT
SUPERSEDE THE CONTRACTOR PREFERRED MEANS AND METHODS OF CONSTRUCTION. THE
CONTRACTOR CAN PRESENT OTHER METHODS IN THE PLAN. THE PLAN MUST BE APPROVED BY THE COR 20-DAYS PRIOR TO LAND DISTURBANCE ACTIVITIES. MAJOR OPERATIONS CONSIDERED IN PLAN
THAT REQUIRE DETAILED EROSION AND SEDIMENT CONTROL SHALL INCLUDE LAKE DRAWDOWN,
EXCAVATION & EMBANKMENT FOR CONDUIT AND SPILLWAY INSTALLATION. THE PLAN SHALL INCLUDE
CONTROL EROSION AND SEDIMENT BMPS TO BE UTILIZED DURING ALL OPERATIONS OF LAND
DISTURBANCE NOT CONTAINED WITHIN THE INTERIOR BOUNDARY OF THE NORMAL POOL ELEVATION.
THE LAKE MAY BE DRAWDOWN BY MEANS OF SIPHON OR PUMP (1). IF A SIPHON IS UTILIZED IT WILL
REQUIRE 3-STAGES OF OPERATION. THE MAXIMUM SIPHON SIZE IS 12” IN DIAMETER. PEAK
DRAWDOWN FLOWRATES MUST DROP WATER SURFACE NO MORE THAN 2-FT PER DAY TO ENSURE
UPSTREAM DAM SLOPE STABILITY. DRAWDOWN OPERATIONS SHALL MINIMIZE SEDIMENT REMOVAL FROM THE LAKE. DISCHARGE WATER SHALL HAVE A TOTAL SETTLEABLE SOLIDS (TSS) LESS THAN OR EQUAL TO 2.5 ML/L/HR. TESTING OF SETTLEABLE SOLIDS SHALL OCCUR WHEN REQUESTED BY COR TO
VERIFY PERFORMANCE OF EROSION AND SEDIMENT CONTROL MEASURES.
(1) DRAWDOWN LEVEL IS VARIABLE BASED ON CONTRACTOR’S CONSTRUCTION MEANS.
UTILIZATION OF TEMPORARY COFFER DAMS OR SIMILAR MEANS TO REDUCE THE DRAWDOWN
LEVEL IS ACCEPTABLE. THE ESTIMATED BOTTOM OF BASIN IS 533’. MAINTAINING A 6’
MINIMUM WATER DEPTH IS DESIRABLE TO AVOID AQUATIC ORGANISM MORTALITY (2).
DISCHARGE POINT TO DOWNSTREAM CHANNEL MUST BE AT LEAST 10-FT DOWNSTREAM OF THE TOE
OF THE DAM. THIS DISCHARGE POINT WILL REQUIRE EROSION CONTROL. CONSIDER PROPERLY
DESIGNED SEDIMENT FILTER BAGS (FP-14 713.19 SEDIMENT FILTER BAGS) OR OTHER MEANS IF THE SIPHON/PUMP IS PICKING UP SEDIMENT. IF FILTER BAGS ARE USED, CONTRACTOR SHALL DISPOSE OF
BAGS OFF SITE UPON COMPLETION OF THE PROJECT.
DELETE SUBSECTION 157.04
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 26 of 100
201 – CLEARING AND GRUBBING
MODIFY SUBSECTION 201.01 TO ADD THE FOLLOWING:
PRIMARY CLEARING LIMITS INCLUDE THE LIMITS OF CONSTRUCTION. SECONDARY LIMITS SHALL
EXTEND TO AND INCLUDE ANY ACCESS ROADWAYS, LAYDOWN AND STORAGE/STAGING AREAS AS
REQUIRED TO COMPLETE THE WORK.
203 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
DELETE SUBSECTION 203.01 AND REPLACE WITH THE FOLLOWING:
203.01 THIS WORK CONSISTS OF REMOVING ALL OR A PORTION OF THE EXISTING LAKE DRAINAGE PIPE AND
APPURTENANCES.
DELETE SUBSECTION 203.04 AND REPLACE WITH THE FOLLOWING:
203.04 REMOVING MATERIAL
EXISTING CULVERT AND APPURTENANCES MARKED AS TO BE REMOVED SHALL BE REMOVED IN THEIR
ENTIRETY AND DISPOSED OF OFF SITE AT A RECYCLING FACILITY OR LANDFILL.
204 – EXCAVATION AND EMBANKMENT
DELETE SUBSECTION 204.01 AND REPLACE WITH THE FOLLOWING:
204.01 THIS WORK CONSISTS OF EXCAVATION AND THE CONSTRUCTION OF EARTH EMBANKMENTS, OTHER
EARTHFILLS, AND EARTH BACKFILLS REQUIRED BY THE DRAWINGS AND SPECIFICATIONS.
DELETE SUBSECTION 204.02 AND REPLACE WITH THE FOLLOWING:
204.02 DEFINITIONS AND REFERENCES
EARTHFILL IS COMPOSED OF NATURAL EARTH MATERIALS THAT CAN BE PLACED AND COMPACTED BY
CONSTRUCTION EQUIPMENT OPERATED CONVENTIONALLY.
EARTH BACKFILL IS COMPOSED OF NATURAL EARTH MATERIAL PLACED AND COMPACTED IN CONFINED SPACES OR ADJACENT TO STRUCTURES (INCLUDING PIPES) BY HAND TAMPING, MANUALLY DIRECTED
POWER TAMPERS OR VIBRATING PLATES, OR THEIR EQUIVALENT.
UNCLASSIFIED EXCAVATION IS DEFINED AS THE EXCAVATION OF ALL MATERIALS ENCOUNTERED, INCLUDING ROCK MATERIALS, REGARDLESS OF THEIR NATURE OR THE MANNER IN WHICH THEY ARE
REMOVED.
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 27 of 100
ASTM D422 - STANDARD TEST METHOD FOR PARTICLE-SIZE ANALYSIS OF SOILS (GRAIN SIZE WITH
HYDROMETER)
ASTM D698 - STANDARD TEST METHODS FOR LABORATORY COMPACTION CHARACTERISTICS OF SOIL
USING STANDARD EFFORT (12,400 FT-LBF/FT3).
ASTM D1556 – STANDARD TEST METHOD FOR DENSITY OF SOIL IN-PLACE BY THE SAND-CONE METHOD.
ASTM D2216 - STANDARD TEST METHOD FOR LABORATORY DETERMINATION OF WATER (MOISTURE)
CONTENT OF SOIL AND ROCK BY MASS.
ASTM D2487 – STANDARD PRACTICES FOR CLASSIFICATION OF SOIL FOR ENGINEERING PURPOSES
(UNIFIED SOIL CLASSIFICATION SYSTEM)
ASTM D2922 - STANDARD TEST METHOD FOR DENSITY OF SOIL AND SOIL-AGGREGATE IN-PLACE BY
NUCLEAR METHODS (SHALLOW DEPTH).
ASTM D2937 - STANDARD TEST METHOD FOR DENSITY OF SOIL IN-PLACE BY THE DRIVE-CYLINDER
METHOD TEST.
ASTM D4318 - STANDARD TEST METHODS FOR LIQUID LIMIT, PLASTIC LIMIT, AND PLASTICITY INDEX OF
SOILS.
DELETE SUBSECTION 204.03 AND REPLACE WITH THE FOLLOWING:
204.03 EXCAVATION AND MATERIALS
EXCAVATIONS MUST COMPLY WITH THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
CONSTRUCTION INDUSTRY STANDARDS SUBPART P, EXCAVATIONS, TRENCHING, AND SHORING (29 CFR
PT. 1926). ALL EXCAVATIONS MUST BE COMPLETED AND MAINTAINED IN A SAFE AND STABLE
CONDITION THROUGHOUT THE TOTAL CONSTRUCTION PHASE. STRUCTURE AND TRENCH EXCAVATIONS MUST BE COMPLETED TO THE SPECIFIED ELEVATIONS AND TO THE LENGTH AND WIDTH REQUIRED TO SAFELY INSTALL, ADJUST, AND REMOVE ANY FORMS, BRACING, OR SUPPORTS NECESSARY FOR THE
INSTALLATION OF THE WORK. EXCAVATIONS OUTSIDE THE LINES AND LIMITS SHOWN ON THE
DRAWINGS OR SPECIFIED HEREIN ARE REQUIRED TO MEET SAFETY REQUIREMENTS AND MUST BE THE
RESPONSIBILITY OF THE CONTRACTOR IN CONSTRUCTING AND MAINTAINING A SAFE, STABLE
EXCAVATION.
EXCAVATION SHALL BE UNCLASSIFIED.
ALL FILL/BORROW MATERIAL MUST BE OBTAINED FROM THE TOP, FRONT OR NEAR SIDES OF THE EXISTING EMBANKMENT DAM. THE SELECTION, BLENDING, ROUTING, AND DISPOSITION OF MATERIAL
IN THE VARIOUS FILLS MUST BE SUBJECT TO APPROVAL BY THE CO/COR.
FILL MATERIALS MUST CONTAIN NO FROZEN SOIL, SOD, BRUSH, ROOTS, OR OTHER PERISHABLE MATERIAL. ROCK PARTICLES LARGER THAN TWO-THIRDS OF THE SPECIFIED PRE-COMPACTION LAYER DEPTH FOR EACH TYPE OF FILL MUST BE REMOVED, OR REDUCED IN SIZE, PRIOR TO COMPACTION OF
THE FILL.
12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 28 of 100
DELETE SUBSECTION 204.04 AND REPLACE WITH THE FOLLOWING:
204.04 FOUNDATION PREPARATION
THE TYPES OF MATERIAL USED IN THE VARIOUS FILLS MUST BE AS LISTED AND DESCRIBED IN THE SPECIFICATIONS AND DRAWINGS. FOUNDATIONS FOR EARTHFILL MUST BE STRIPPED TO REMOVE
VEGETATION AND OTHER UNSUITABLE MATERIAL OR MUST BE EXCAVATED AS SPECIFIED.
EXCEPT AS OTHERWISE SPECIFIED, EARTH FOUNDATION SURFACES MUST BE GRADED TO REMOVE SURFACE IRREGULARITIES AND MUST BE SCARIFIED PARALLEL TO THE AXIS OF THE FILL OR OTHERWISE ACCEPTABLY SCORED AND LOOSENED TO A MINIMUM DEPTH OF 2 INCHES. THE MOISTURE CONTENT OF THE LOOSENED MATERIAL MUST BE CONTROLLED AS SPECIFIED FOR THE EARTHFILL AND THE SURFACE MATERIAL OF THE FOUNDATION MUST BE COMPACTED AND BONDED WITH THE FIRST LAYER
OF EARTHFILL AS SPECIFIED FOR SUBSEQUENT LAYERS OF EARTHFILL.
EARTH ABUTMENT SURFACES MUST BE FREE OF LOOSE, UNCOMPACTED EARTH IN EXCESS OF 2 INCHES IN DEPTH NORMAL TO THE SLOPE AND MUST BE AT SUCH A MOISTURE CONTENT THAT THE EARTHFILL
CAN BE COMPACTED AGAINST THEM TO PRODUCE A GOOD BOND BETWEEN THE FILL AND THE
ABUTMENTS.
ROCK FOUNDATION AND ABUTMENT SURFACES MUST BE CLEARED OF ALL LOOSE MATERIAL BY HAND OR OTHER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .