This is a Request for Quotes (RFQ) Amendment 2 for dam rehabilitation services issued by the USDA Forest Service. The solicitation number is 12363N26Q4161 for Mark Twain National Forest Beaver Lake Dam Rehabilitation in Butler County, Missouri. The work involves making improvements to draw down water levels, clearing and grubbing, excavating and removing an existing 15-inch corrugated metal pipe overflow conduit with associated appurtenances, and repairing spillway erosion with Class 3 riprap. The base bid includes removal of structures and undermining remediation, while Optional Bid Item 1 offers installation of a 30-inch reinforced concrete pressure pipe (RCPP) level control pipe, and Optional Bid Item 2 includes a 30-inch RCPP level control pipe with an 18-inch RCPP and sluice gate drawdown structure.

The solicitation is set aside for small businesses under NAICS code 237310 (Highway, Street, and Bridge Construction) with a $45 million size standard. Quotes are due by July 20, 2026, at 11:00 AM CST, with a proposed performance period from July 30, 2026, to December 31, 2026. A mandatory site visit is scheduled for May 28, 2026, at 11:00 AM CST at Beaver Lake coordinates 36.800194N, 90.623668W. Proposals must be submitted in two separate parts: a technical proposal addressing relevant past performance, technical approach, and experience/qualifications, and a price proposal using the provided schedule of items. The government intends to award a firm fixed-price contract to the responsible offeror providing the best value based on comparative evaluation. Quotes must remain valid for a minimum of 60 calendar days after submission. Submissions and inquiries should be directed to Contracting Officer Thomas Tran at thomas.tran2@usda.gov, with a Questions deadline of June 29, 2026, close of business.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. GENERAL INFORMATION

Document Type:

Solicitation Number:

Posted Date:

Original Response Date:

Current Response Date:

Product or Service Code:

Set Aside:

NAICS Code:

Combined Synopsis/Solicitation 12363N26Q4161 5/22/2026 7/20/2026 N/A

Z1LB

Small Business 237310 Highway, Street, and Bridge Construction – $45 Million

Contracting Office Address

USDA Forest Service Procurement and Property Services National Stewardship Contracting Branch 1400 Independence Ave. SW, MS-1138 Washington DC 20250-1138

This is a combined synopsis/solicitation for commercial services prepared in accordance with FAR 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued.

Solicitation number 12363N26Q4161 has been issued as a Request for Quotes (RFQ) for the Mark Twain NF Beaver Lake Dam Rehabilitation.

This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.

The associated North American Industrial Classification System (NAICS) code for this procurement is 237310 – Highway, Street, and Bridge Construction, with a small business size standard of $45 Million. The product service code is Z1LB. The government intends to award a Firm Fixed Price contract resulting from this combined synopsis/solicitation to the responsible offeror whose offer, conforming to the synopsis/solicitation, will be most advantageous to the government (as determined by the solicitation evaluation criteria). All responsible sources may submit a quotation which will be considered by the agency, and proposals shall be valid for 60 days after the date of receipt for the solicitation.

Points of Contact

Thomas Tran, Contracting Officer, thomas.tran2@usda.gov Site Visit: Please contact Rachel if you plan on attending the site visit.

Time – May 28, 2026 at 11am CST Location – Beaver Lake (lat: 36.800194°, long: -90.623668°) COR – Rachel Uetrecht, 573-308-5798

Offerors shall quote in accordance with the SOW. Please provide your price and technical proposal separately.

Technical proposals that fail to adequately address all evaluation factors and criteria may receive a reduced score or may not be considered.

Quotes shall be valid for a minimum of 60 calendar days after submission.

Please label file name by format below:

Company name, price or technical proposal or both and name of project Ex. USDA Price/Technical Proposal Solicitation #

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 1 of 100 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-12 http://www.acquisition.gov/ mailto:thomas.tran2@usda.gov

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

5. REQUISITION/PURCHASE REQUEST NO.

1156438

USDA-FS STEWARDSHIP CONTRACTING BR

1400 INDEPENDENCE AVE SW

MS-1138

WASHINGTON DC 20250-1138

363N

THOMAS TRAN

b. EMAIL thomas.tran2@usda.gov

5/22/2026

1. SOLICITATION NO.

12363N26Q4161

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

11. The Contractor shall begin performance upon receipt of notice to proceed and shall be completed no later than December 31, 2026.

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

negotiable. (See FAR Clause 52.211-10)

13. ADDITIONAL SOLICITATION REQUIREMENTS

a. Offers to perform the work specified in Item 10 shall be submitted by 11:00 am CDT, July 20, 2026. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing bid bonds shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.) 10

NSN 7540-01-155-3212

mandatory

30 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

USDA-FS STEWARDSHIP CONTRACTING BR

1400 INDEPENDENCE AVE SW

MS-1138

WASHINGTON DC 20250-1138

SOLICITATION FOR PRICING AND TECHNICAL PROPOSALS

1156438 R8 MO Mark Twain NF Beaver Lake Dam Rehab

See Schedule of Items, specific work description, supplemental specifications/terms and conditions, and attachments that apply to the work. These terms supplement the base IDIQ terms and conditions.

**ALL DOCUMENTS, INCLUDING A SCANNED COPY OF THE FULLY EXECUTED BID BOND IF REQUIRED, SHALL BE SUBMITTED ELECTRONICALLY TO THOMAS TRAN AT thomas.tran2@usda.gov AND

RECEIVED BY THE DEADLINE IN BLOCK 13.

xThis performance period is x x (If total price exceeds $150,000 - see page 5) x

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 2 of 100

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

See schedule

USDA-FS STEWARDSHIP CONTRACTING BR

1400 INDEPENDENCE AVE SW

MS-1138

WASHINGTON DC 20250-1138

363N

INVOICE PROCESSING PLATFORM IPP

ALL INVOICES MUST BE SUBMITTED

ELECTRONICALLY THROUGH THE

INVOICE PROCESSING PLATFORM IPP

VIA WWW IPP GOV

THOMAS T. TRAN

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 3304(a)x x

STANDARD FORM 1442 (REV. 8/2014) BACK

Continued...

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 3 of 100

Payment will be made via EFT. Invoice using IPP.Gov Set Aside For: Large Small

Woman- Owned SDVOSB Hubzone 8(a)

(Please check all that apply) x

**MUST HAVE ALL INFO BELOW**

Company Name:

Vendor Rep:

Phone:

Email:

Mailing Address:

UEI SAM #

Estimated Period of Performance 07/30/2026 – 12/31/2026

Contractor Signature: ______________________________________

Contractor Parent BPA/IDIQ #: ______________________________________

**QUOTES ARE DUE BY: 07/20/2026 by 11:00AM CST** Questions are due 06/29/2026 by COB

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 4 of 100

BEAVER LAKE DAM REHABILITATION Section B

Pg. 1

SECTION B SCHEDULE OF ITEMS

BEAVER LAKE DAM REHABILITATION

POPLAR BLUFF RANGER DISTRICT

MARK TWAIN NATIONAL FOREST

STATE OF MISSOURI

BASE BID ESTIMATE

FP-14

Section

Pay Item Description Estimated

Qty Unit Total Price

151 Mobilization and Demobilization 1 LS $___________

152 Construction Surveying & Staking 1 LS $___________

153 Contractor Quality Control 1 LS $___________

Sec 204 Sampling & Testing - Excavation & Embankment (Per FP-14 Table 204-1)

1 LS $___________

Sec 209 Sampling & Testing - Structure Excavation & Backfill (Per FP-14 Table 209-1)

1 LS $___________

155 Schedules for Construction Contracts 1 LS $___________

Soil Erosion and Sediment Control, Lake Drawdown and/or Cofferdam

1 LS $___________

201 Clearing and Grubbing 1 LS $___________

203 Removal of Structures & Obstructions (Removal and Remediation of Existing Drain Structure and Undermining)

1 LS $___________

251 Class 3 Riprap (Spillway Channel) 400 CY $___________

624/625 Topsoil and Turf Establishment 1 LS $___________

TOTAL BASE BID ESTIMATE $___________

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 5 of 100

Pg. 2

OPTIONAL BID ITEM 1 – 30” RCPP LEVEL CONTROL PIPE

FP-14

Section

Pay Item Description Estimated

Qty Unit Total Price

152 Construction Surveying & Staking 1 LS $__________

Sec 601 & 614 Sampling & Testing - Cast-in-place Concrete (Per FP-14 Table 552-9; Only Compressive Strength on 3 Test Cylinders: 1 @ 7 & 2@ 28 days)

1 LS $__________

201 Clearing and Grubbing 1 LS $__________

252 Rockery (Outfall Pipe Plunge Pool)

10 CY $___________

601 Minor Concrete Structures (30” FES AND Outfall Headwall)

1 LS $___________

602 Culverts & Drains (30” Low Pressure Concrete Pipe) With Lean Concrete Bedding/Cradle.

150 LF $___________

717 Structural Metal (30” Rodent Protection and Trash Rack)

1 LS $___________

TOTAL OBI 1 ESTIMATE $___________

OPTIONAL BID ITEM 2 – 30” RCPP LEVEL CONTROL PIPE WITH 18” RCPP

AND SLUICE GATE DRAWDOWN STRUCTURE

FP-14

Section

Pay Item Description Estimated

Qty Unit Total Price

152 Construction Surveying & Staking 1 LS $___________

Sec 204 Sampling & Testing - Excavation & Embankment (Per FP-14 Table 204-1)

1 LS $___________

Sec 209 Sampling & Testing - Structure Excavation & Backfill (Per FP-14 Table 209-1)

1 LS $___________

Sec 601 & 614 Sampling & Testing - Cast-in-place Concrete (Per FP-14 Table 552-9; Only Compressive Strength on 3 Test Cylinders: 1 @ 7 & 2@ 28 days)

1 LS $___________

209 Structure Excavation & Backfill 40 CY $___________

252 Rockery (Outfall Pipe Plunge Pool)

10 CY $___________

601 Minor Concrete Structures (30” FES AND Outfall Headwall)

1 LS $___________

602 Culverts & Drains (18” Low Pressure Concrete Pipe) With

50 LF $___________

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 6 of 100

Pg. 3

FP-14

Section

Pay Item Description Estimated

Qty Unit Total Price

Lean Concrete Bedding/Cradle.

602 Culverts & Drains (30” Low Pressure Concrete Pipe) With Lean Concrete Bedding/Cradle.

86 LF $___________

604 Manholes, Inlets & Catch Basins (Lake Drawdown Structure With Sluice Gate)

1 EA $___________

605 Underdrains, Sheet Drains, and Pavement Edge Drains (Granular Filter Drain)

25 LF $___________

624/625 Topsoil and Turf Establishment 1 LS $___________

717 Structural Metal (18” Rodent Protection and Trash Rack) 1 LS $___________

717 Structural Metal (30” Rodent Protection and Trash Rack) 1 LS $___________

TOTAL OBI 2 ESTIMATE $___________

Total Contract Award (Base + Option 1 and Option 2) =_______________________________

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 7 of 100

EVALUATION CRITERIA:

TECHNICAL PROPOSAL INSTRUCTIONS

General Proposals shall be submitted in two parts: a technical proposal and a price proposal. Each part shall be separate and complete in itself so that evaluation of one may be accomplished independently of the other. The price proposal shall be submitted with the solicitation forms.

Offerors are cautioned that sufficient and detailed information must be presented in their proposals to enable the Government to evaluate their proposals fully in accordance with the evaluation and award criteria contained herein. The Government is not obligated to ask for additional information and in the absence of appropriate information, the proposal will be rated deficient.

Price Proposal A completed schedule of items with pricing information completes this requirement.

Technical Proposal Offerors shall submit technical information for their firm and any proposed major subcontractors. Please submit your past performance with the technical information. Also, the offeror shall submit information that illustrates a technical understanding of the work to be performed.

1) Relevant Past Performance:

Relevant Past Performance shall be obtained from previous work with the Federal Government and utilized for evaluation on this contract. Please provide at least 3 past performances with references.

2) Technical Approach:

All offerors should show a high level of understanding of the work to be performed. This can be accomplished by submitting with the proposal the following information:

1. Description of how the work will be performed

2. Schedule (accomplishing work while meeting weather conditions)

3. Key Personnel

4. List of equipment to be used

3) Experience/Qualification:

The Offeror will be evaluated on the experience and qualifications of their company and personnel.

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 8 of 100

Technical Evaluation Criteria Technical proposals will be evaluated and rated by a Technical Evaluation Panel. Proposals shall be prepared in accordance with the proposal preparation instructions. The Government intends to evaluate quotations using a comparative evaluation methodology. This means quotations will be compared against one another to determine which provides the best value to the Government, based on the evaluation factors outlined in this solicitation.

The Government may consider quotations that exceed minimum requirements and offer additional value or benefits, even if they are not the lowest priced.

1) Relevant Past Performance:

a) Relevant Past Performance shall be provided and utilized for evaluation on this contract.

2) Technical Approach:

b) Understanding of Proposed Work: Offeror demonstrates a technical understanding of the proposed work including but not limited to preliminary scheduling, equipment requirements, site conditions and location, project challenges, and material requirements.

3) Experience/Qualification:

Evaluates the company’s history, background, and ability to perform work of similar size, scope, and complexity. Specialized work and accomplishments relative to the scope of work.

4) Acceptability:

An offeror’s documented response to the solicitation will not be deemed acceptable, if not received by the specified closing date and time, and the submitted proposal not clearly demonstrate the offerors understanding the needed work. In such cases the offeror will be viewed as having “failed” this criterion and will not be considered for award.

5) Cost or Price:

Each acceptable offer will be evaluated for reasonableness of proposal price. This criterion will include consideration of cost information provided. It is the Government's intent to assess the unit prices to determine reasonableness and offeror's understanding of the work and ability to perform the contract. The importance of price may become greater as the differences between technical proposals decrease. Where technical proposals are determined to be substantially equal, price may control award.

(b) Award. A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 9 of 100

FROM POPLAR BLUFF TAKE US-60W TO C.R. 411/HWY PP (8.8 MI). TURN LEFT ON 411/PP

AND PROCEED 1.6 MILES. TURN RIGHT ON C.R. 435 THEN IMMEDIATELY RIGHT AGAIN

ON C.R. 426 FOR 1.2 MILES. AT TEE, STAY STRAIGHT ON C.R.428 FOR 2.4 MILES. AT

TEE, TURN LET ON C.R. 436 FOR 0.8 MILES.TURN RIGHT ONTO FSR 3899 AND PROCEED

0.3 MILES TO BEAVER LAKE.

36.801777 N, 90.622492 W.

FOREST LOCATION MAP

PROJECT LOCATION MAP

TRAVEL DIRECTIONS:

SHEET OF

United States Department of Agriculture Forest Service

BEAVER LAKE

DAM REHABILITATION

RECOMMENDED BY:

APPROVED:

FOREST ENGINEER

DISTRICT RANGER DATE

DATE

DIRECTOR OF ENGINEERING DATE

FOREST SUPERVISOR DATE

RO DAM PROGRAM MANAGER DATE

5/ 1/

0:

R O

B

ER

TC

O

N A

W A

Y C

PR

O

JE

C

TS

\P O

PL

A

R B

LU

FF

\B

EA

VE

R

L A

K E\

D R

A W

IN

G

S\ B

EA

VE

R L

A K

E M

O D

1-

.D W

G

STATE OF MISSOURI

BUTLER COUNTY

EASTERN REGION

MARK TWAIN NATIONAL FOREST

POPLAR BLUFF RANGER DISTRICT

INDEX OF SHEETS

SHEET SHEET TITLE DATE

G-01 COVERSHEET 05/01/26

C-01 OVERALL PLAN 05/01/26

C-02 EXISTING CONDITIONS & BASE BID 05/01/26

C-03 OBI-1 30" LC PIPE 05/01/26

C-04 OBI-2 30" LC PIPE & 18" GATE 05/01/26

C-05 DETAILS 05/01/26

C-06 DETAILS 05/01/26

C-07 DETAILS 05/01/26

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 10 of 100

CP 100

X: 783962.49 Y: 352036.70

Z: 564.13

CP 101

X: 783831.15 Y: 352271.67 Z: 563.15

0+00

0+50

1+00

1+50

1+86

BASE BID:

REPAIR DAM BREACH BY;

1. EXCAVATE AND REMOVE EX. 15" CMP AND 24" VAULT AND VALVES

2. EXCAVATE EACH END, REMOVE 24" VAULT AND VALVES AND GROUT

PIPE AND UNDERMINED AREA.

3. HAUL AND PLACE 510 TONS OF CLASS II RIPRAP TO REPAIR SPILLWAY.

OPTIONAL BID ITEMS:

OBI 1 - INSTALL 30" RCPP LEVEL CONTROL PIPE IN SPILLWAY.

OBI 2 - INSTALL 30" RCPP LEVEL CONTROL AND DRAWDOWN STRUCTURE

THROUGH DAM EMBANKMENT.

12" Oak

20" Pine

24" PINE

24" PINE

24" PINE

18" PINE

18" PINE

CP 1000

X: 784114.06 Y: 351845.29

Z: 564.46

545550

560555550

EXISTING BOAT ACCESS

SPILLWAY REPAIR.

0+00

0+50

1+00

1+50

2+00

2+32

OBI 1.

OBI 2.

GENERAL NOTES:

1. USFS SHALL PROVIDE SITE CONTROL POINTS (CP).

CONTRACTOR SHALL VERIFY CP INFO AND EXISTING

CONDITIONS PRIOR TO START OF CONSTRUCTION.

2. CONTRACTOR SHALL SUBMIT PROPOSED STAGING AND

LAYDOWN AREAS TO THE CO/COR. ANY CLEARING SHALL

BE THE CONTRACTOR'S RESPONSIBILITY TO RETURN TO

LIKE OR BETTER CONDITION UPON COMPLETION (LESS

TREE REPLACEMENT).

3. ANY TREES REMOVED DURING CLEARING SHALL INCLUDE

THE ROOT WAD. TREES LARGER THAN 12" SHALL BE

TOPPED AND LOGS/STUMPS (WITH ROOT WAD) MAY BE

RANDOMLY PLACED INSIDE THE LAKE JUST BELOW THE

PROPOSED WSE. ALL OTHER CLEARING WASTE MAY BE

DISPOSED OF/PLACED BELOW THE DAM AND UTILIZED TO

ASSIST WITH EROSION CONTROL.

4. USFS WILL REMOVE TREES IN SPILLWAY. STUMPS TO

REMAIN AND NOT BE REMOVED BY CONTRACTOR.

5. CONTRACTOR SHALL SUBMIT EROSION, DEWATERING

AND STORM/SURFACE WATER CONTROL PLAN TO COR

FOR REVIEW. SEE SUPPLEMENTAL SPECIFICATIONS

SECTION 157.

Cut/Fill Summary - SPILLWAY RIPRAP Name

SPILL GRADE (1)

Totals

Cut

53.28 Cu. Yd.

53.28 Cu. Yd.

Fill

406.78 Cu. Yd.

406.78 Cu. Yd.

Net

353.49 Cu. Yd.<Fill>

353.49 Cu. Yd.<Fill>

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/ 1/

0:

R O

B

ER

TC

O

N A

W A

Y C

PR

O

JE

C

TS

\P O

PL

A

R B

LU

FF

\B

EA

VE

R

L A

K E\

D R

A W

IN

G

S\ B

EA

VE

R L

A K

E M

O D

1-

.D W

G

R09

EASTERN REGION

BEAVER LAKE

DAM

REHABILITATION

MARK TWAIN NATIONAL

FOREST

POPLAR BLUFF RANGER DISTRICT

OVERALL PLAN

RKC

RKC

AW

Feet

0 40 80

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 11 of 100

CP 100

X: 783962.49 Y: 352036.70

Z: 564.13

CP 101

X: 783831.15 Y: 352271.67 Z: 563.15

EXISTING 15" CMP

TO BE REMOVED

FL=541.8

EXISTING VALVES AND

STRUCTURE TO BE

REMOVED. FL=551.2

FSR 3899

CP 1000

X: 784114.06 Y: 351845.29

Z: 564.46

CURRENT WATER SURFACE

ELEVATION = 551.2'.

PROPOSED WATER SURFACE

ELEVATION = 556.0.

545550

560555550

REPAIR

SPILLWAY.

CL CENTERLINE

CMP CORRUGATED METAL PIPE

CMU CONCRETE MASONRY UNIT

CP CONTROL POINT

CO CONTRACTING OFFICER

CONC CONCRETE

COR CO REPRESENTATIVE

DIA DIAMETER

EX EXISTING

FL FLOW LINE

FSR FOREST SERVICE ROAD

LC LEVEL CONTROL

MFR MANUFACTURER

OBI OPTIONAL BID ITEM

RCPP REINFORCED CONCRETE PRESSUR

STA STATION

WSE WATER SURFACE ELEVATION

FLOOD LIGHT

CABLE MARKER

WATER METER

WATER VALVE

FIRE HYDRANT

LIGHT POLE

EX EDGE OF WATER

EX EASEMENT LINE

CLEANOUT

ELECTRICAL MANHOLE

STORM SEWER MANHOLE

CABLE TV PEDESTAL

TRAFFIC CONTROL BOX

TELEPHONE PEDESTAL

ELECTRIC BOX

GAS VALVE

GAS METER

GAS DRIP

WATER SPRINKLER

TRAFFIC STANDARD

BOLLARD

EX 5' CONTOUR

EX UNDERGROUND TELEPHONE

EX PROPERTY LINE (APPROXIMATE)

EX SANITARY SEWER

EX STORM PIPE

EX 1' CONTOUR

EX UNDERGROUND ELECTRIC

EX OVERHEAD ELECTRIC

EX RIGHT-OF-WAY

PROPOSED 5' CONTOUR

PROPOSED 1' CONTOUR

(500)

AREA LIGHT

EX UNDERGROUND CABLE

EX CONCRETE PAVING

EX ASPHALT PAVING

EX GRANULAR PAVING

EX BUILDING LINE/ / / / / / / / / / / /

TELEPHONE MANHOLE

SANITARY SEWER MANHOLE

POWER POLE & GUY WIRE

EX BARBED WIRE FENCE

PROPOSED SILT FENCE

PROPOSED STORM PIPE

EX WATER LINE

PROPOSED GRANULAR PAVING

PROPOSED CONCRETE PAVING

PROPOSED ASPHALT PAVING

MAILBOX

PROPOSED SANITARY SEWER

EX FORCE MAIN

PROPOSED FORCE MAIN

EX CHAIN LINK FENCE

EX WOOD FENCE

EX GUARD RAIL

EX NATURAL GAS

PROPOSED INLET PROTECTION

WATER WELL

ELECTRIC METER

WATER MANHOLE

PARKING METER

PROPOSED GAS LINE

PROPOSED WATER LINE

IRRIGATION CONTROL VALVE

SIGN

PROPOSED PAD MOUNTED TRANSFORM

PROPOSED STREET LIGHT

PROPOSED FIRE HYDRANT

PROPOSED WATER VALVE

PROPOSED WATER METER

PROPOSED CLEANOUT

PROPOSED SANITARY SEWER MANHOL

STANDARD LEGEND

CONTROL POINT

E L

E V

A T

IO

N

F

E E

T

E L

E V

A T

IO

N

F

E E

T

EXISTING PIPE PROFILE

0+000+501+001+501+86

F L

.7

S

T A

.1

C

M P

V A

U L

T W

IT

H

V A

LV

E

S

F L

.8

S T

A

.5

E N

D O

F

5" C

M P

115 LF 15" CMP

F L

.2

S T

A

.2

IN

L

E T

5"

C M

P

R U

S T

E D

A N

D U

N D

E R

M

IN

E D

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/ 1/

0:

R O

B

ER

TC

O

N A

W A

Y C

PR

O

JE

C

TS

\P O

PL

A

R B

LU

FF

\B

EA

VE

R

L A

K E\

D R

A W

IN

G

S\ B

EA

VE

R L

A K

E M

O D

1-

.D W

G

R09

EASTERN REGION

BEAVER LAKE

DAM

REHABILITATION

MARK TWAIN NATIONAL

FOREST

POPLAR BLUFF RANGER DISTRICT

EXISTING CONDITIONS

& BASE BID

RKC

RKC

AW

Feet

0 100 200

REMOVAL OF STRUCTURES - OPTION B - EXCAVATE AND

REMOVE FROM INLET TO VAULT, AND OUTLET TO

STA 1+30 AND FILL REMAINING PIPE AND UNDERMINED

AREA WITH NON-SHRINK FLOWABLE GROUT.

(ASSUMED OPTION FOR OBI 1)

REMOVAL OF STRUCTURES - OPTION A - EXCAVATE AND REMOVE ALL EXISTING PIPE AND

APPURTENANCES AND REPLACE SOIL IN COMPACTED LIFTS.

(ASSUMED OPTION FOR OBI 2)

EX. WSE = 551.2

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 12 of 100

E L

E V

A T

IO

N

F

E E

T

E L

E V

A T

IO

N

F

E E

T

LC 30 PIPE PROFILE

0+000+501+001+502+002+30

R

IP

R

A P

P L

U N

G E

P O

O L

F L=

3.

S T

A

.6

0"

R C

P P

F E

S A

N D

T O

E W

A L

L

F L=

6.

S T

A

.1

0"

I N

L E

T

T R

A S

H G

U A

R D

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/ 1/

0:

R O

B

ER

TC

O

N A

W A

Y C

PR

O

JE

C

TS

\P O

PL

A

R B

LU

FF

\B

EA

VE

R

L A

K E\

D R

A W

IN

G

S\ B

EA

VE

R L

A K

E M

O D

1-

.D W

G

R09

EASTERN REGION

BEAVER LAKE

DAM

REHABILITATION

MARK TWAIN NATIONAL

FOREST

POPLAR BLUFF RANGER DISTRICT

OBI-1

30" LC PIPE

RKC

RKC

AW

Feet 0 20 40

SPILLWAY REPAIR

PROPOSED GRADE

30" RCPP FES WITH

RODENT GUARD PER

DETAIL SHEET C-05

150 LF OF 30" RCPP @ 1.88 %

BASE BID - SPILLWAY

REPAIR/RIPRAP GRADE

30" TRASH GUARD PER

DETAIL SHEET C-06

FL = 556.0

RIPRAP PLUNGE POOL

PER DETAIL SHEET C-05

EXISTING SPILLWAY GRADE

OBI 1 - 30" RCPP LEVEL

CONTROL PIPE WITH TRASH

GUARD AND PLUNGE POOL

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 13 of 100

E L

E V

A T

IO

N

F

E E

T

E L

E V

A T

IO

N

F

E E

T

0+000+501+001+501+86

F L

0"

I N

.6

S T

A

.0 F

L

O

U T

.0

S T

A

.0 L

E V

E L

C O

N T

R O

L

S

LU

IC

E

G A

T E

F L

8"

I N

.4

S T

A

.0

R

IP

R

A P

P L

U N

G E

P O

O L

F L=

0.

S

T A

0"

R C

P P

F E

S A

N D

T O

E W

A L

L

PROPOSED WATER

SURFACE EL = 556.0

F L=

0.

S T

A

.0

8"

I N

L E

T

T R

A S

H G

U A

R D

F L=

6.

S T

A

.0

0"

I N

L E

T

T R

A S

H G

U A

R D

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/ 1/

0:

R O

B

ER

TC

O

N A

W A

Y C

PR

O

JE

C

TS

\P O

PL

A

R B

LU

FF

\B

EA

VE

R

L A

K E\

D R

A W

IN

G

S\ B

EA

VE

R L

A K

E M

O D

1-

.D W

G

R09

EASTERN REGION

BEAVER LAKE

DAM

REHABILITATION

MARK TWAIN NATIONAL

FOREST

POPLAR BLUFF RANGER DISTRICT

OBI-2

30" LC PIPE & 18" GATE

RKC

RKC

AW

Feet 0 20 40

25 LF OF FILTER DRAIN

PER DETAIL SHEET C-05

6' X 4' CONCRETE BOX

WITH 3O" INLET AND OUTLET

AND 18" SLUICE GATE

TOP = 563.0

SEE DETAIL SHEET C-06

50 LF OF 18" RCPP @ 12%

56 LF OF 30" RCPP @ 16%

30 LF OF 30" RCPP @ 1.3%

EXISTING 15" CMP

AND 24" CMP STRUCTURES

30" TRASH GUARD PER

DETAIL SHEET C-06

30" RCPP FES WITH

RODENT GUARD PER

DETAIL SHEET C-05

18" TRASH GUARD PER

DETAIL SHEET C-06

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 14 of 100

1. MINIMUM REINFORCING OF #4 BARS ON

12-INCH CENTERS EACH WAY REQUIRED

IN HEADWALL, TOEWALL, AND

FOUNDATION/FOOTING.

FINE DRAIN FILL

MATERIAL

COARSE DRAIN

FILL MATERIAL

SECTION OF FILTER DRAIN - OUTLET PIPE

STANDARD

SIEVE SIZE

FINE FILL

LIMITS

1" 3/4" 1/2" 3/8" #4 #8

#16 #30 #50 #100 #200

96-100 80-100 50-85 25-60 5-30 0-10 0-3

75-100 40-80 20-50 0-30 0-15

COARSE FILL

LIMITS

DRAIN FILL MATERIAL

9" 9"

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/ 1/

0:

R O

B

ER

TC

O

N A

W A

Y C

PR

O

JE

C

TS

\P O

PL

A

R B

LU

FF

\B

EA

VE

R

L A

K E\

D R

A W

IN

G

S\ B

EA

VE

R L

A K

E M

O D

1-

.D W

G

R09

EASTERN REGION

BEAVER LAKE

DAM

REHABILITATION

MARK TWAIN NATIONAL

FOREST

POPLAR BLUFF RANGER DISTRICT

DETAILS

RKC

RKC

AW

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 15 of 100

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/ 1/

1:

R O

B

ER

TC

O

N A

W A

Y C

PR

O

JE

C

TS

\P O

PL

A

R B

LU

FF

\B

EA

VE

R

L A

K E\

D R

A W

IN

G

S\ B

EA

VE

R L

A K

E M

O D

1-

.D W

G

R09

EASTERN REGION

BEAVER LAKE

DAM

REHABILITATION

MARK TWAIN NATIONAL

FOREST

POPLAR BLUFF RANGER DISTRICT

DETAILS

RKC

RKC

AW

TRASH GUARD DETAIL (N.T.S.)

DETAIL PROVIDED FOR GUIDANCE IF CONTRACTOR IS TO

CONSTRUCT IN-HOUSE.

EQUIVALENT PRE-MANUFACTURED GUARDS ARE ACCEPTABLE.

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 16 of 100

REQUIRED FROM THE

BAFFLE RISER TO THE

FILTER DRAIN PER FP-14

SECTION 209

THE FIRST AND LAST PIPE SEGMENT SHALL BE PLACED AT A SLOPE

NOT EXCEEDING 2%.

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/ 1/

1:

R O

B

ER

TC

O

N A

W A

Y C

PR

O

JE

C

TS

\P O

PL

A

R B

LU

FF

\B

EA

VE

R

L A

K E\

D R

A W

IN

G

S\ B

EA

VE

R L

A K

E M

O D

1-

.D W

G

R09

EASTERN REGION

BEAVER LAKE

DAM

REHABILITATION

MARK TWAIN NATIONAL

FOREST

POPLAR BLUFF RANGER DISTRICT

DETAILS

RKC

RKC

AW

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 17 of 100

FP-14 SUPPLEMENTAL SPECIFICATIONS FOR BEAVER LAKE

DAM REHABILITATION

PREFACE

PREFACE_WO_08_25_2022

DELETE ALL BUT THE FIRST PARAGRAPH AND ADD THE FOLLOWING:

THE FOREST SERVICE, US DEPARTMENT OF AGRICULTURE HAS ADOPTED FP-14 WITH

THE FOLLOWING SUPPLEMENTAL SPECIFICATION FOR CONSTRUCTION IMPROVEMENTS

TO STERLING HOLLOW DAM.

101 - TERMS¸ FORMAT¸ AND DEFINITIONS

101.01_NATIONAL_9_15_2016

ADD THE FOLLOWING PARAGRAPH TO SUBSECTION 101.01:

101.01 MEANING OF TERMS.

DELETE ALL REFERENCES TO THE TAR (TRANSPORTATION ACQUISITION REGULATIONS) IN THE

SPECIFICATIONS.

101.03_NATIONAL_4_7_2015

ADD THE FOLLOWING TO SUBSECTION 101.03:

101.03 ABBREVIATIONS.

ADD THE FOLLOWING:

(A) ACRONYMS.

AGAR — AGRICULTURE ACQUISITION REGULATIONS

FSAR — FOREST SERVICE ACQUISITION REGULATIONS

MSHA — MINE SAFETY AND HEALTH ADMINISTRATION

NESC — NATIONAL ELECTRICAL SAFETY CODE

(F) MISCELLANEOUS UNIT ABBREVIATIONS.

MP — MILEPOST LOCATION

PPM — PARTS PER MILLION VOLUME

STA STATION LOCATION

101.04_NATIONAL_9_5_2018

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 18 of 100

MAKE THE FOLLOWING CHANGES TO SUBSECTION 101.04:

DELETE THESE DEFINITIONS AND REPLACE THE FOLLOWING:

BID SCHEDULE — THE SCHEDULE OF ITEMS.

BRIDGE — A STRUCTURE, INCLUDING SUPPORTS, ERECTED OVER A DEPRESSION OR AN OBSTRUCTION SUCH AS WATER ALONG A ROAD, A TRAIL, OR A RAILWAY AND HAVING A DECK FOR CARRYING TRAFFIC

OR OTHER LOADS.

CONTRACTOR — THE INDIVIDUAL OR LEGAL ENTITY CONTRACTING WITH THE GOVERNMENT FOR

PERFORMANCE OF PRESCRIBED WORK. IN A TIMBER SALE CONTRACT, THE CONTRACTOR IS THE

“PURCHASER”.

CULVERT — ANY STRUCTURE WITH A BOTTOM, REGARDLESS OF FILL DEPTH, DEPTH OF INVERT BURIAL, OR PRESENCE OF HORIZONTAL DRIVING SURFACE, OR ANY BOTTOMLESS (NATURAL CHANNEL)

STRUCTURE WITH FOOTINGS THAT WILL NOT HAVE WHEEL LOADS IN DIRECT CONTACT WITH THE TOP

OF THE STRUCTURE.

DRAWINGS — (PUBLIC WORKS CONTRACTS) DESIGN SHEETS OR FABRICATION, ERECTION, OR

CONSTRUCTION DETAILS SUBMITTED TO THE CO BY THE CONTRACTOR ACCORDING TO FAR CLAUSE 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION. ALSO REFERS TO SUBMISSIONS AND

SUBMITTALS.

NOTICE TO PROCEED — (PUBLIC WORKS CONTRACTS) WRITTEN NOTICE TO THE CONTRACTOR TO

BEGIN THE CONTRACT WORK.

RIGHT-OF-WAY — A GENERAL TERM DENOTING (1) THE PRIVILEGE TO PASS OVER LAND IN SOME PARTICULAR LINE (INCLUDING EASEMENT, LEASE, PERMIT, OR LICENSE TO OCCUPY, USE, OR TRAVERSE PUBLIC OR PRIVATE LANDS), OR (2) REAL PROPERTY NECESSARY FOR THE PROJECT, INCLUDING

ROADWAY, BUFFER AREAS, ACCESS, AND DRAINAGE AREAS.

SOLICITATION— (PUBLIC WORKS CONTRACTS) THE COMPLETE ASSEMBLY OF DOCUMENTS (WHETHER

ATTACHED OR INCORPORATED BY REFERENCE) FURNISHED TO PROSPECTIVE BIDDERS.

ADD THE FOLLOWING DEFINITIONS:

ADJUSTMENT IN CONTRACT PRICE — “EQUITABLE ADJUSTMENT,” AS USED IN THE FEDERAL

ACQUISITION REGULATIONS, OR “CONSTRUCTION COST ADJUSTMENT,” AS USED IN THE TIMBER SALE

CONTRACT, AS APPLICABLE.

CHANGE — “CHANGE” MEANS “CHANGE ORDER” AS USED IN THE FEDERAL ACQUISITION

REGULATIONS, OR “DESIGN CHANGE” AS USED IN THE TIMBER SALE CONTRACT.

FOREST SERVICE — THE UNITED STATES OF AMERICA, ACTING THROUGH THE FOREST SERVICE, U.S.

DEPARTMENT OF AGRICULTURE.

NEAT LINE — A LINE DEFINING THE PROPOSED OR SPECIFIED LIMITS OF AN EXCAVATION OR

STRUCTURE.

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 19 of 100

PIONEER ROAD — TEMPORARY CONSTRUCTION ACCESS BUILT ALONG THE ROUTE OF THE PROJECT.

PROTECTED STREAMCOURSE — A DRAINAGE SHOWN ON THE PLANS OR TIMBER SALE AREA MAP THAT

REQUIRES DESIGNATED MITIGATION MEASURES.

ROAD ORDER — AN ORDER AFFECTING AND CONTROLLING TRAFFIC ON ROADS UNDER FOREST SERVICE JURISDICTION. ROAD ORDERS ARE ISSUED BY A DESIGNATED FOREST OFFICER UNDER THE AUTHORITIES

OF 36 CFR, PART 260.

SHOP DRAWINGS — (TIMBER AND STEWARDSHIP CONTRACTS) REFERRED TO AS “DRAWINGS” IN FP-14, INCLUDES DRAWINGS, DIAGRAMS, LAYOUTS, SCHEMATICS, DESCRIPTIVE LITERATURE, ILLUSTRATIONS, LISTS OR TABLES, PERFORMANCE AND TEST DATA, AND SIMILAR MATERIALS FURNISHED BY PURCHASER

TO EXPLAIN IN DETAIL SPECIFIC PORTIONS OF THE WORK REQUIRED BY THE CONTRACT.

102 - BID¸ AWARD¸ AND EXECUTION OF CONTRACT

102.00_NATIONAL_9_15_2016

DELETE SECTION 102 IN ITS ENTIRETY.

103 - SCOPE OF WORK

103.00_NATIONAL_9_15_2016

DELETE SECTIONS 103.02, 103.03, 103.04, 103.05.

ADD THE FOLLOWING TO SECTION 103.01.

THE WORK SHOWN IN THE PLANS AND SPECIFICATIONS INCLUDE THE FOLLOWING:

BASE BID – MAKING IMPROVEMENTS AS NECESSARY TO DRAW DOWN WATER LEVELS, CLEAR AND

GRUB, EXCAVATE AND REMOVE EXISTING OVERFLOW CONDUIT AND APPURTENANCES AND REPAIRING

SPILLWAY EROSION WITH RIPRAP.

MAKING IMPROVEMENTS AS NECESSARY TO DRAW DOWN WATER LEVELS, CLEAR AND GRUB,

EXCAVATE AND REMOVE EXISTING OVERFLOW CONDUIT AND APPURTENANCES; INSTALLATION OF A

NEW OVERFLOW CONDUIT, LEVEL CONTROL STRUCTURE AND APPURTENANCES; REGRADING AND

RIPRAP ARMORING OF THE EXISTING SPILLWAY; RECONSTRUCTION OF MISCELLANEOUS ACCESS ROADS

AND INSTALLATION OF ARTICULATED CONCRETE MAT BOAT RAMP.

OPTIONAL BID ITEM 1 – INCLUDES SHALLOW INSTALLATION OF A NEW LEVEL CONTROL CONDUIT

WITHIN THE SPILLWAY.

OPTIONAL BID ITEM 1 – INCLUDES INSTALLATION OF A NEW LEVEL CONTROL AND DRAWDOWN

STRUCTURE, CONDUITS AND APPURTENANCES LOCATED AT THE SITE OF THE EXISTING CONDUIT

REMOVAL>

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 20 of 100

104 - CONTROL OF WORK

DELETE SUBSECTIONS 104.01, 104.02, AND 104.04.

104.06_NATIONAL_9_16_2016

ADD THE FOLLOWING AS SUBSECTION 104.06:

104.06 USE OF ROADS BY CONTRACTOR.

THE CONTRACTOR IS AUTHORIZED TO USE ROADS UNDER THE JURISDICTION OF THE FOREST SERVICE FOR ALL ACTIVITIES NECESSARY TO COMPLETE THIS CONTRACT, SUBJECT TO THE LIMITATIONS AND AUTHORIZATIONS DESIGNATED IN THE ROAD ORDER(S) OR DESCRIBED IN THE CONTRACT, WHEN SUCH USE WILL NOT DAMAGE THE ROADS OR NATIONAL FOREST RESOURCES, AND WHEN TRAFFIC CAN BE

ACCOMMODATED SAFELY. CONTRACTOR SHALL MAINTAIN THE ROADWAYS USED TO ACCESS THE

WORK FOR THE DURATION OF THE CONTRACT.

105 - CONTROL OF MATERIAL

105.05_NATIONAL_6_29_2020

105.05 USE OF MATERIAL FOUND IN THE WORK.

DELETE 105.05 (A) AND (B) AND THE LAST SENTENCE OF THE SECOND PARAGRAPH AND SUBSTITUTE

THE FOLLOWING:

MATERIALS PRODUCED OR PROCESSED FROM GOVERNMENT LANDS IN EXCESS OF THE QUANTITIES REQUIRED FOR PERFORMANCE OF THIS CONTRACT ARE THE PROPERTY OF THE GOVERNMENT. PLACE

EXCESS MATERIAL SAFELY AT GOVERNMENT-APPROVED LOCATION, AT NO ADDITIONAL COST TO

GOVERNMENT.

ADD THE FOLLOWING AS SUBSECTION 105.07:

105.07 LEAD FREE AGGREGATE & ROCK.

ANY STONE SOURCED FROM ANY THE FOLLOWING COUNTIES IN SOUTHEAST MISSOURI WILL NEED TO BE TESTED: CRAWFORD, DENT, SHANNON, WASHINGTON, IRON, REYNOLDS, MADISON, ST. FRANCOIS, ST. GENEVIEVE, AND BOLLINGER COUNTIES. IF STONE IS SOURCED FROM A COUNTY NOT LISTED, IT WILL NOT HAVE TO BE TESTED, HOWEVER CONTRACTOR MUST PROVIDE TICKETS OR INVOICES THAT

CLEARLY SHOW WHERE THOSE MATERIALS WERE SOURCED FROM.

MATERIALS FROM THESE AREAS SHOULD BE VISUALLY INSPECTED TO ENSURE THAT NO HAZARDOUS MINERALIZATION IS PRESENT. MINERALIZATION INCLUDING GALENA, SPHALERITE, AND CHALCOPYRITE

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 21 of 100

SHOULD NOT BE PRESENT IN ANY MATERIALS PLACED ON NATIONAL FOREST SYSTEMS LANDS.

AGGREGATE AND/OR RIP RAP THAT DOES NOT CONTAIN MATERIAL IN THE <2MM FRACTION (PASSES A #10 SIEVE) MAY ONLY NEED TO BE SUBJECT TO VISUAL INSPECTION. AGGREGATE AND/OR RIP RAP THAT CONTAINS MATERIAL IN THE <2MM FRACTION (PASSES A #10 SIEVE) WILL NEED TO BE SAMPLED TO ENSURE THAT THE MATERIAL DOES NOT EXCEED 100 PARTS PER MILLION (PPM) FOR LEAD (PB). THE

METHODS AND EQUIPMENT USED FOR SAMPLING MATERIALS WILL VARY WITH THE FORM AND

CONSISTENCY OF THE MATERIALS TO BE SAMPLED. SAMPLES COLLECTED USING THE SAMPLING

PROTOCOLS LISTED BELOW WILL BE CONSIDERED BY THE AGENCY TO BE REPRESENTATIVE OF THE

MATERIAL. SAMPLING OR SCREENING RESULTS SHOULD BE PROVIDED IN WRITING TO THE

CONTRACTING OFFICER REPRESENTATIVE (COR) PRIOR TO ANY MATERIAL BEING DELIVERED.

CORE OR SCOOP SAMPLING - ASTM STANDARD E1727

ALL EXTRACTION AND ANALYTICAL METHODS MUST FOLLOW THE SW-846 COMPENDIUM

OR

XRF SCREENING - UNE-EN ISO 13196

NUMBER OF SAMPLES REQUIRED, BASED ON QUANTITY REQUIRED IN THE SCHEDULE OF ITEMS

TONS # OF SAMPLES/ SCREENINGS

0-100 3

101-500 5

501-1000 10

106 - ACCEPTANCE OF WORK

106.01_NATIONAL_7_18_2017

DELETE SUBSECTION 106.01 AND REPLACE WITH THE FOLLOWING:

106.01 CONFORMITY WITH CONTRACT REQUIREMENTS.

FOLLOW THE REQUIREMENTS OF FAR CLAUSE 52.246-12 INSPECTION OF CONSTRUCTION.

REFERENCES TO STANDARD TEST METHODS OF AASHTO, ASTM, GSA, AND OTHER RECOGNIZED

STANDARD AUTHORITIES REFER TO THE METHODS IN EFFECT ON THE DATE OF SOLICITATION FOR BIDS.

PERFORM ALL WORK TO THE LINES, GRADES, CROSS-SECTIONS, DIMENSIONS, AND PROCESSES OR

MATERIAL REQUIREMENTS SHOWN ON THE PLANS OR SPECIFIED IN THE CONTRACT.

INCORPORATE MANUFACTURED MATERIALS INTO THE WORK ACCORDING TO THE MANUFACTURER’S

RECOMMENDATIONS OR TO THESE SPECIFICATIONS, WHICHEVER IS MORE STRICT.

PLAN DIMENSIONS AND CONTRACT SPECIFICATION VALUES ARE THE VALUES TO BE STRIVED FOR AND COMPLIED WITH AS THE DESIGN VALUES FROM WHICH ANY DEVIATIONS ARE ALLOWED. PERFORM WORK AND PROVIDE MATERIAL THAT IS UNIFORM IN CHARACTER AND REASONABLY CLOSE TO THE

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 22 of 100

PRESCRIBED VALUE OR WITHIN THE SPECIFIED TOLERANCE RANGE. THE PURPOSE OF A TOLERANCE RANGE IS TO ACCOMMODATE OCCASIONAL MINOR VARIATIONS FROM THE MEDIAN ZONE THAT ARE

UNAVOIDABLE FOR PRACTICAL REASONS.

WHEN STANDARD MANUFACTURED ITEMS ARE SPECIFIED (SUCH AS FENCE, WIRE, PLATES, ROLLED SHAPES, PIPE CONDUITS, ETC., THAT ARE IDENTIFIED BY GAUGE, UNIT MASS, SECTION DIMENSIONS, ETC.), THE IDENTIFICATION WILL BE CONSIDERED TO BE NOMINAL MASSES OR DIMENSIONS. UNLESS SPECIFIC CONTRACT TOLERANCES ARE NOTED, ESTABLISHED MANUFACTURING TOLERANCES WILL BE

ACCEPTED.

THE GOVERNMENT MAY INSPECT, SAMPLE, OR TEST ALL WORK AT ANY TIME BEFORE FINAL

ACCEPTANCE OF THE PROJECT. WHEN THE GOVERNMENT TESTS WORK, COPIES OF TEST REPORTS ARE

FURNISHED TO THE CONTRACTOR UPON REQUEST. GOVERNMENT TESTS MAY OR MAY NOT BE

PERFORMED AT THE WORK SITE. IF CONTRACTOR TESTING AND INSPECTION IS VERIFIED BY THE GOVERNMENT, THE CONTRACTOR’S RESULTS MAY BE USED BY THE GOVERNMENT TO EVALUATE WORK FOR ACCEPTANCE. DO NOT RELY ON THE AVAILABILITY OF GOVERNMENT TEST RESULTS FOR PROCESS

CONTROL.

ACCEPTABLE WORK CONFORMING TO THE CONTRACT WILL BE PAID FOR AT THE CONTRACT UNIT BID PRICE. FOUR METHODS OF DETERMINING CONFORMITY AND ACCEPTING WORK ARE DESCRIBED IN SUBSECTIONS 106.02 TO 106.05 INCLUSIVE. THE PRIMARY METHOD OF ACCEPTANCE IS SPECIFIED IN EACH SECTION OF WORK. HOWEVER, WORK MAY BE REJECTED AT ANY TIME IT IS FOUND BY ANY OF

THE METHODS NOT TO COMPLY WITH THE CONTRACT.

REMOVE, REPAIR, OR REPLACE WORK THAT DOES NOT CONFORM TO THE CONTRACT, OR TO

PREVAILING INDUSTRY STANDARDS WHERE NO SPECIFIC CONTRACT REQUIREMENTS ARE NOTED.

REMOVING, REPAIRING, OR REPLACING WORK; PROVIDING TEMPORARY TRAFFIC CONTROL; AND ANY OTHER RELATED WORK TO ACCOMPLISH CONFORMITY WILL BE AT NO COST TO THE GOVERNMENT.

(A) DISPUTING GOVERNMENT TEST RESULTS. IF THE ACCURACY OF GOVERNMENT TEST RESULTS IS DISPUTED, PROMPTLY INFORM THE CO. IF THE DISPUTE IS UNRESOLVED AFTER REASONABLE STEPS

ARE TAKEN TO RESOLVE THE DISPUTE, FURTHER EVALUATION MAY BE OBTAINED BY WRITTEN

REQUEST. INCLUDE A NARRATIVE DESCRIBING THE DISPUTE AND A PROPOSED RESOLUTION

PROTOCOL THAT ADDRESSES THE FOLLOWING:

1. SAMPLING METHOD.

2. NUMBER OF SAMPLES.

3. SAMPLE TRANSPORT.

4. TEST PROCEDURES.

5. TESTING LABORATORIES.

6. REPORTING.

7. ESTIMATED TIME AND COSTS, AND

8. VALIDATION PROCESS.

IF THE EVALUATION REQUIRES ADDITIONAL SAMPLING OR TESTING BE PERFORMED, MUTUALLY AGREE WITH THE GOVERNMENT ON WITNESSING PROCEDURES AND ON SAMPLING AND TESTING BY A THIRD PARTY LABORATORY. USE A THIRD PARTY LABORATORY ACCREDITED BY THE AASHTO ACCREDITATION

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 23 of 100

PROGRAM. PROVIDE PROOF OF THE LABORATORY’S ACCREDITATION FOR THE TEST PROCEDURES TO BE

USED. DO NOT USE THE SAME LABORATORY THAT PRODUCED THE DISPUTED GOVERNMENT TEST

RESULTS OR THAT PRODUCED THE TEST RESULTS USED AS A BASIS FOR THE DISPUTE.

THE CO WILL REVIEW THE PROPOSED RESOLUTION PROTOCOL AND MAY MODIFY IT BEFORE FINAL

APPROVAL AND EXECUTION.

THE GOVERNMENT WILL USE THE APPROVED RESOLUTION PROTOCOL TEST RESULTS TO DETERMINE THE VALIDITY OF THE DISPUTED TESTING. IF THE GOVERNMENT TEST RESULTS ARE VALIDATED, THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH DEVELOPING AND PERFORMING

THE RESOLUTION PROTOCOL. IF THE GOVERNMENT TEST RESULTS ARE NOT VALIDATED, THE

GOVERNMENT WILL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH DEVELOPING AND

PERFORMING THE RESOLUTION PROTOCOL. IF THE VALIDITY OF THE GOVERNMENT TEST RESULTS

CANNOT BE DETERMINED, THE CONTRACTOR AND GOVERNMENT WILL EQUALLY SHARE ALL COSTS

ASSOCIATED WITH DEVELOPING AND CARRYING OUT THE RESOLUTION PROTOCOL.

(B) ALTERNATIVES TO REMOVING AND REPLACING NON-CONFORMING WORK. AS AN ALTERNATIVE

TO REMOVAL AND REPLACEMENT, THE CONTRACTOR MAY SUBMIT A WRITTEN REQUEST TO:

1. HAVE THE WORK ACCEPTED AT A REDUCED PRICE, OR

BE GIVEN PERMISSION TO PERFORM CORRECTIVE MEASURES TO BRING THE WORK

INTO CONFORMITY.

THE REQUEST MUST CONTAIN SUPPORTING RATIONALE AND DOCUMENTATION. INCLUDE REFERENCES OR DATA JUSTIFYING THE PROPOSAL BASED ON AN EVALUATION OF TEST RESULTS, EFFECT ON SERVICE LIFE, VALUE OF MATERIAL OR WORK, QUALITY, AESTHETICS, AND OTHER TANGIBLE ENGINEERING BASIS.

THE CO WILL DETERMINE DISPOSITION OF THE NONCONFORMING WORK.

106.02_NATIONAL_10_23_2016

DELETE SUBSECTION 106.02 AND REPLACE WITH THE FOLLOWING:

106.02 VISUAL INSPECTION.

ACCEPTANCE IS BASED ON VISUAL INSPECTION OF THE WORK FOR COMPLIANCE WITH THE SPECIFIC CONTRACT REQUIREMENTS. USE PREVAILING INDUSTRY STANDARDS IN THE ABSENCE OF SPECIFIC

CONTRACT REQUIREMENTS OR TOLERANCES.

107 - LEGAL RELATIONS AND RESPONSIBILITY TO THE

PUBLIC

107.05_NATIONAL_7_18_2017

DELETE SUBSECTION 107.05.

108 - PROSECUTION AND PROGRESS

108.00_NATIONAL_9_16_2016

DELETE SECTION 108 IN ITS ENTIRETY.

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 24 of 100

109 - MEASUREMENT AND PAYMENT

109.01_NATIONAL_2_22_2019

DELETE THE THIRD PARAGRAPH AND TABLE 109-1 OF SUBSECTION 109.01 AND

REPLACE WITH THE FOLLOWING:

109.01 MEASUREMENT OF WORK.

TAKE MEASUREMENTS AS DESCRIBED IN SUBSECTION 109.02 UNLESS OTHERWISE MODIFIED BY THE MEASUREMENT SUBSECTION OF THE SECTION CONTROLLING THE WORK BEING PERFORMED. TABLE 109-1 INDICATES THE ACCURACY REQUIRED FOR QUANTITIES OF THE VARIOUS PAY UNITS USED IN THE SCHEDULE OF ITEMS. USE THIS GUIDE TO DETERMINE THE DECIMAL PLACEMENT IN THE FINAL

PAYMENT.

TABLE 109-1

DECIMAL ACCURACY OF QUANTITIES FOR FINAL PAYMENT

PAY ITEM LEVEL OF

PRECISION

LINEAR FOOT 1

EXCEPTION--TIMBER, STEEL, AND CONCRETE PILES 0.1

STATION 0.1

MILE 0.01

SQUARE FOOT 0.1

SQUARE YARD 0.1

EACH 1

ACRE 0.01

GALLON 1

M-GALS. 0.1

CUBIC YARD 1

EXCEPTION--STRUCTURE EXCAVATION;

SHEATHING

MATERIALS; BEDDING, BED COURSE, AND

BACKFILL

MATERIALS; GABIONS;

0.1

EXCEPTION--CONCRETE; MASONRY 0.01

POUND 1

TON 0.1

EXCEPTION--CALCIUM CHLORIDE;

SODIUM CHLORIDE; HYDRATED LIME;

BITUMINOUS MATERIALS; PAVEMENTS;

BED COURSE MATERIALS

0.01

HOUR 0.1

MFBM 0.01

STATION YARD 1

CUBIC YARD MILE 1

TON MILE 1

ADD THE FOLLOWING SENTENCE TO SUBSECTION 109.02(B):

109.02 MEASUREMENT TERMS AND DEFINITIONS.

(B) CONTRACT QUANTITY.

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 25 of 100

CONTRACT QUANTITIES WILL BE ADJUSTED ONLY WHEN THERE ARE ERRORS IN THE ORIGINAL

DESIGN OF 15% OR MORE.

109.00_NATIONAL_9_16_2016

DELETE SUBSECTIONS 109.06, 109.07, 109.08, AND 109.09:

157 - SOIL EROSION AND SEDIMENT CONTROL

DELETE SUBSECTION 157.03 AND REPLACE WITH THE FOLLOWING:

157.03 SOIL EROSION, SEDIMENT CONTROL, AND DEWATERING PLAN.

REVIEW CONSTRUCTION PLANS AND THEN DEVELOP A SOIL EROSION, SEDIMENT CONTROL AND

DEWATERING PLAN. THE FOLLOWING CONCEPT IS PROVIDED AS A GUIDE AND SHOULD NOT

SUPERSEDE THE CONTRACTOR PREFERRED MEANS AND METHODS OF CONSTRUCTION. THE

CONTRACTOR CAN PRESENT OTHER METHODS IN THE PLAN. THE PLAN MUST BE APPROVED BY THE COR 20-DAYS PRIOR TO LAND DISTURBANCE ACTIVITIES. MAJOR OPERATIONS CONSIDERED IN PLAN

THAT REQUIRE DETAILED EROSION AND SEDIMENT CONTROL SHALL INCLUDE LAKE DRAWDOWN,

EXCAVATION & EMBANKMENT FOR CONDUIT AND SPILLWAY INSTALLATION. THE PLAN SHALL INCLUDE

CONTROL EROSION AND SEDIMENT BMPS TO BE UTILIZED DURING ALL OPERATIONS OF LAND

DISTURBANCE NOT CONTAINED WITHIN THE INTERIOR BOUNDARY OF THE NORMAL POOL ELEVATION.

THE LAKE MAY BE DRAWDOWN BY MEANS OF SIPHON OR PUMP (1). IF A SIPHON IS UTILIZED IT WILL

REQUIRE 3-STAGES OF OPERATION. THE MAXIMUM SIPHON SIZE IS 12” IN DIAMETER. PEAK

DRAWDOWN FLOWRATES MUST DROP WATER SURFACE NO MORE THAN 2-FT PER DAY TO ENSURE

UPSTREAM DAM SLOPE STABILITY. DRAWDOWN OPERATIONS SHALL MINIMIZE SEDIMENT REMOVAL FROM THE LAKE. DISCHARGE WATER SHALL HAVE A TOTAL SETTLEABLE SOLIDS (TSS) LESS THAN OR EQUAL TO 2.5 ML/L/HR. TESTING OF SETTLEABLE SOLIDS SHALL OCCUR WHEN REQUESTED BY COR TO

VERIFY PERFORMANCE OF EROSION AND SEDIMENT CONTROL MEASURES.

(1) DRAWDOWN LEVEL IS VARIABLE BASED ON CONTRACTOR’S CONSTRUCTION MEANS.

UTILIZATION OF TEMPORARY COFFER DAMS OR SIMILAR MEANS TO REDUCE THE DRAWDOWN

LEVEL IS ACCEPTABLE. THE ESTIMATED BOTTOM OF BASIN IS 533’. MAINTAINING A 6’

MINIMUM WATER DEPTH IS DESIRABLE TO AVOID AQUATIC ORGANISM MORTALITY (2).

DISCHARGE POINT TO DOWNSTREAM CHANNEL MUST BE AT LEAST 10-FT DOWNSTREAM OF THE TOE

OF THE DAM. THIS DISCHARGE POINT WILL REQUIRE EROSION CONTROL. CONSIDER PROPERLY

DESIGNED SEDIMENT FILTER BAGS (FP-14 713.19 SEDIMENT FILTER BAGS) OR OTHER MEANS IF THE SIPHON/PUMP IS PICKING UP SEDIMENT. IF FILTER BAGS ARE USED, CONTRACTOR SHALL DISPOSE OF

BAGS OFF SITE UPON COMPLETION OF THE PROJECT.

DELETE SUBSECTION 157.04

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 26 of 100

201 – CLEARING AND GRUBBING

MODIFY SUBSECTION 201.01 TO ADD THE FOLLOWING:

PRIMARY CLEARING LIMITS INCLUDE THE LIMITS OF CONSTRUCTION. SECONDARY LIMITS SHALL

EXTEND TO AND INCLUDE ANY ACCESS ROADWAYS, LAYDOWN AND STORAGE/STAGING AREAS AS

REQUIRED TO COMPLETE THE WORK.

203 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS

DELETE SUBSECTION 203.01 AND REPLACE WITH THE FOLLOWING:

203.01 THIS WORK CONSISTS OF REMOVING ALL OR A PORTION OF THE EXISTING LAKE DRAINAGE PIPE AND

APPURTENANCES.

DELETE SUBSECTION 203.04 AND REPLACE WITH THE FOLLOWING:

203.04 REMOVING MATERIAL

EXISTING CULVERT AND APPURTENANCES MARKED AS TO BE REMOVED SHALL BE REMOVED IN THEIR

ENTIRETY AND DISPOSED OF OFF SITE AT A RECYCLING FACILITY OR LANDFILL.

204 – EXCAVATION AND EMBANKMENT

DELETE SUBSECTION 204.01 AND REPLACE WITH THE FOLLOWING:

204.01 THIS WORK CONSISTS OF EXCAVATION AND THE CONSTRUCTION OF EARTH EMBANKMENTS, OTHER

EARTHFILLS, AND EARTH BACKFILLS REQUIRED BY THE DRAWINGS AND SPECIFICATIONS.

DELETE SUBSECTION 204.02 AND REPLACE WITH THE FOLLOWING:

204.02 DEFINITIONS AND REFERENCES

EARTHFILL IS COMPOSED OF NATURAL EARTH MATERIALS THAT CAN BE PLACED AND COMPACTED BY

CONSTRUCTION EQUIPMENT OPERATED CONVENTIONALLY.

EARTH BACKFILL IS COMPOSED OF NATURAL EARTH MATERIAL PLACED AND COMPACTED IN CONFINED SPACES OR ADJACENT TO STRUCTURES (INCLUDING PIPES) BY HAND TAMPING, MANUALLY DIRECTED

POWER TAMPERS OR VIBRATING PLATES, OR THEIR EQUIVALENT.

UNCLASSIFIED EXCAVATION IS DEFINED AS THE EXCAVATION OF ALL MATERIALS ENCOUNTERED, INCLUDING ROCK MATERIALS, REGARDLESS OF THEIR NATURE OR THE MANNER IN WHICH THEY ARE

REMOVED.

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 27 of 100

ASTM D422 - STANDARD TEST METHOD FOR PARTICLE-SIZE ANALYSIS OF SOILS (GRAIN SIZE WITH

HYDROMETER)

ASTM D698 - STANDARD TEST METHODS FOR LABORATORY COMPACTION CHARACTERISTICS OF SOIL

USING STANDARD EFFORT (12,400 FT-LBF/FT3).

ASTM D1556 – STANDARD TEST METHOD FOR DENSITY OF SOIL IN-PLACE BY THE SAND-CONE METHOD.

ASTM D2216 - STANDARD TEST METHOD FOR LABORATORY DETERMINATION OF WATER (MOISTURE)

CONTENT OF SOIL AND ROCK BY MASS.

ASTM D2487 – STANDARD PRACTICES FOR CLASSIFICATION OF SOIL FOR ENGINEERING PURPOSES

(UNIFIED SOIL CLASSIFICATION SYSTEM)

ASTM D2922 - STANDARD TEST METHOD FOR DENSITY OF SOIL AND SOIL-AGGREGATE IN-PLACE BY

NUCLEAR METHODS (SHALLOW DEPTH).

ASTM D2937 - STANDARD TEST METHOD FOR DENSITY OF SOIL IN-PLACE BY THE DRIVE-CYLINDER

METHOD TEST.

ASTM D4318 - STANDARD TEST METHODS FOR LIQUID LIMIT, PLASTIC LIMIT, AND PLASTICITY INDEX OF

SOILS.

DELETE SUBSECTION 204.03 AND REPLACE WITH THE FOLLOWING:

204.03 EXCAVATION AND MATERIALS

EXCAVATIONS MUST COMPLY WITH THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

CONSTRUCTION INDUSTRY STANDARDS SUBPART P, EXCAVATIONS, TRENCHING, AND SHORING (29 CFR

PT. 1926). ALL EXCAVATIONS MUST BE COMPLETED AND MAINTAINED IN A SAFE AND STABLE

CONDITION THROUGHOUT THE TOTAL CONSTRUCTION PHASE. STRUCTURE AND TRENCH EXCAVATIONS MUST BE COMPLETED TO THE SPECIFIED ELEVATIONS AND TO THE LENGTH AND WIDTH REQUIRED TO SAFELY INSTALL, ADJUST, AND REMOVE ANY FORMS, BRACING, OR SUPPORTS NECESSARY FOR THE

INSTALLATION OF THE WORK. EXCAVATIONS OUTSIDE THE LINES AND LIMITS SHOWN ON THE

DRAWINGS OR SPECIFIED HEREIN ARE REQUIRED TO MEET SAFETY REQUIREMENTS AND MUST BE THE

RESPONSIBILITY OF THE CONTRACTOR IN CONSTRUCTING AND MAINTAINING A SAFE, STABLE

EXCAVATION.

EXCAVATION SHALL BE UNCLASSIFIED.

ALL FILL/BORROW MATERIAL MUST BE OBTAINED FROM THE TOP, FRONT OR NEAR SIDES OF THE EXISTING EMBANKMENT DAM. THE SELECTION, BLENDING, ROUTING, AND DISPOSITION OF MATERIAL

IN THE VARIOUS FILLS MUST BE SUBJECT TO APPROVAL BY THE CO/COR.

FILL MATERIALS MUST CONTAIN NO FROZEN SOIL, SOD, BRUSH, ROOTS, OR OTHER PERISHABLE MATERIAL. ROCK PARTICLES LARGER THAN TWO-THIRDS OF THE SPECIFIED PRE-COMPACTION LAYER DEPTH FOR EACH TYPE OF FILL MUST BE REMOVED, OR REDUCED IN SIZE, PRIOR TO COMPACTION OF

THE FILL.

12363N26Q4161 Mark Twain NF Beaver Lake Dam Rehabilitation Page 28 of 100

DELETE SUBSECTION 204.04 AND REPLACE WITH THE FOLLOWING:

204.04 FOUNDATION PREPARATION

THE TYPES OF MATERIAL USED IN THE VARIOUS FILLS MUST BE AS LISTED AND DESCRIBED IN THE SPECIFICATIONS AND DRAWINGS. FOUNDATIONS FOR EARTHFILL MUST BE STRIPPED TO REMOVE

VEGETATION AND OTHER UNSUITABLE MATERIAL OR MUST BE EXCAVATED AS SPECIFIED.

EXCEPT AS OTHERWISE SPECIFIED, EARTH FOUNDATION SURFACES MUST BE GRADED TO REMOVE SURFACE IRREGULARITIES AND MUST BE SCARIFIED PARALLEL TO THE AXIS OF THE FILL OR OTHERWISE ACCEPTABLY SCORED AND LOOSENED TO A MINIMUM DEPTH OF 2 INCHES. THE MOISTURE CONTENT OF THE LOOSENED MATERIAL MUST BE CONTROLLED AS SPECIFIED FOR THE EARTHFILL AND THE SURFACE MATERIAL OF THE FOUNDATION MUST BE COMPACTED AND BONDED WITH THE FIRST LAYER

OF EARTHFILL AS SPECIFIED FOR SUBSEQUENT LAYERS OF EARTHFILL.

EARTH ABUTMENT SURFACES MUST BE FREE OF LOOSE, UNCOMPACTED EARTH IN EXCESS OF 2 INCHES IN DEPTH NORMAL TO THE SLOPE AND MUST BE AT SUCH A MOISTURE CONTENT THAT THE EARTHFILL

CAN BE COMPACTED AGAINST THEM TO PRODUCE A GOOD BOND BETWEEN THE FILL AND THE

ABUTMENTS.

ROCK FOUNDATION AND ABUTMENT SURFACES MUST BE CLEARED OF ALL LOOSE MATERIAL BY…