DRAFT_Phase3_BurnSeverityMap_102924.pdf

PDF 3 MB Posted

Attached to
BCLH Stewardship IRSC Phase 3 Federal contract opportunity
Solicitation number
12363N25R4003
Issued by
Department of Agriculture Forest Service

About this file

This document is a pre-solicitation notice for the BCLH Stewardship IRSC Phase 3 contract opportunity. The contract objectives are to reduce hazardous fuels along roads and perform road reconstruction in the areas affected by the 2020 Beachie Creek and Lionshead Fires near Detroit, Oregon. The mandatory work includes cutting and removing fire-killed trees within 100 feet of roads, falling and leaving hazard trees in special measure areas, performing small fuels treatment, and road reconstruction. Optional work includes additional hazard tree mitigation and road reconstruction. The contract will be awarded using a best value source selection method. A site visit is scheduled for November 5, 2024, and the solicitation is anticipated to be issued around March 31, 2025, with award planned for approximately June 6, 2025. The government estimates the value of the mandatory and optional construction work to be between $1,000,000 and $5,000,000 each. Bonding requirements include a 20% bid bond and 100% payment and performance bonds.

View the file

Other files for this federal contract opportunity

Other files attached to BCLH Stewardship IRSC Phase 3, newest first.
File Type Posted
SiteVisitNotes_110424.pdf PDF
DRAFT_Phase3_Appendix B_103024.docx DOCX document
DRAFT_Phase3_Appendix A_103024.docx DOCX document
DRAFT Slope Table 102924.xlsx XLSX spreadsheet
DRAFT Burn Severity Table 102924.xlsx XLSX spreadsheet
DRAFT_Phase3_Construction_FSSS_102924.pdf PDF
DRAFT_ConstructionTypicals_102924.pdf PDF
DRAFT Phase 3 Appendix C_102924.pdf PDF
DRAFT BCLH-Phase 3 CAM_102924.pdf PDF
Excerpt_DRAFT_RFP_Phase3_102924.pdf PDF
Attachment1_VICINITY MAPS.pdf PDF
Attachment2_ProjectAreaAccessInstructions.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B C

-2BC-3

B C -3

BC-

BC-5

LH-7

LH

-7

LH

-7 A

LH

-7 B

Esri, NASA, NGA, USGS, FEMA, The USDA Forest Service makes no warranty, expressed or implied, including the warranties of merchantability and fitness for a particular purpose, nor assumes any legal liability or responsibility for the accuracy, reliability, completeness or utility of these geospatial data, or for the improper or incorrect use of these geospatial data. These geospatial data and related maps or graphics are not legal documents and are not intended to be used as such. The data and maps may not be used to determine title, ownership, legal descriptions or boundaries, legal jurisdiction, or restrictions that may be in place on either public or private land. Natural hazards may or may not be depicted on the data and maps, and land users should exercise due caution. The data are dynamic and may change over time.

The user is responsible to verify the limitations of the geospatial data and to use the data accordingly., Oregon State Parks, State of Oregon GEO, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METI/

NASA, USGS, Bureau of Land Management, EPA, NPS, USDA, USFWS

0 1.5 30.75 Miles

Legend BCLH_Phase3_units

File details come from the government source that posted it. Updated .