About this file
This document appears to be a draft appendix to a Request for Proposals (RFP) for the BCLH IRSC Phase 3 contract opportunity. The BCLH IRSC Phase 3 is a Stewardship Contract issued by the U.S. Forest Service under the Stewardship Authority, with the goal of reducing hazardous fuels and restoring access to roads affected by the 2020 Beachie Creek and Lionshead fires.
The work includes cutting and removing fire-killed trees within 100 feet of roads (approximately 417 mandatory acres and 227 optional acres), falling and leaving hazard trees within special measure areas, performing small fuels treatment within 30 feet of roads (approximately 272 mandatory acres and 150 optional acres), road reconstruction including reconditioning, culvert replacements, and aggregate placement, road maintenance activities, and the delivery of fish logs. The Government estimates the mandatory road reconstruction work to be between $1,000,000 and $5,000,000, and the optional reconstruction work to be between $1,000,000 and $5,000,000. A pre-solicitation site visit is planned for November 5, 2024, and the final solicitation is anticipated to be issued around March 31, 2025, with an award planned for approximately June 6, 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SiteVisitNotes_110424.pdf | ||
| DRAFT_Phase3_Appendix B_103024.docx | DOCX document | |
| DRAFT_Phase3_Appendix A_103024.docx | DOCX document | |
| DRAFT Slope Table 102924.xlsx | XLSX spreadsheet | |
| DRAFT Burn Severity Table 102924.xlsx | XLSX spreadsheet | |
| DRAFT_Phase3_Construction_FSSS_102924.pdf | ||
| DRAFT_ConstructionTypicals_102924.pdf | ||
| DRAFT_Phase3_BurnSeverityMap_102924.pdf | ||
| DRAFT BCLH-Phase 3 CAM_102924.pdf | ||
| Excerpt_DRAFT_RFP_Phase3_102924.pdf | ||
| Attachment1_VICINITY MAPS.pdf | ||
| Attachment2_ProjectAreaAccessInstructions.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
Page X Sale Name: BCLH IRSC PHASE 3
TABLE PURSUANT TO C5.31# – ROAD MAINTENANCE REQUIREMENTS (07/2001)
Purchaser shall maintain roads in accordance with the following
Contract Road Maintenance Requirements Summary:
Contract Road Maintenance Requirements Summary
Road Termini
Miles Applicable Prehaul Road Maintenance Specifications
From To T803 T811 T813 T831 T834 T836 T838 T839 T842 T854 T891
2207000 0.00 16.37 16.37 P P P P P 2209000 0.00 5.43 5.43 P P P P P 2209201 0.00 7.78 7.78 P P P P P 2223000 0.00 4.18 4.18 P 2223000 4.18 10.94 6.76 P P
2225000 0.00 9.39 9.39 P P P P P
Termini
Miles Applicable During Haul Road Maintenance Specifications
From To T803 T811 T813 T831 T834 T836 T838 T839 T842 T854 T891
2207000 0.00 16.37 16.37 P P P P
2209000 0.00 5.43 5.43 P P P P
2209201 0.00 7.78 7.78 P P P P
2223000 0.00 4.18 4.18
2223000 4.18 10.94 6.76 P
2225000 0.00 9.39 9.39 P P P P
Termini
Miles Applicable Post Haul Road Maintenance Specifications
From To T803 T811 T813 T831 T834 T836 T838 T839 T842 T854 T891
2207000 0.00 16.37 16.37 P
2209000 0.00 5.43 5.43 P
2209201 0.00 7.78 7.78 P
2223000 0.00 10.94 10.94 P
2225000 0.00 9.39 9.39 P
DRAFT
Page Sale Name: BCLH IRSC PHASE 3 – OPTIONAL ITEMS
TABLE PURSUANT TO C5.31# – ROAD MAINTENANCE REQUIREMENTS (07/2001)
Purchaser shall maintain roads in accordance with the following
Contract Road Maintenance Requirements Summary:
Termini
Miles Applicable Prehaul Road Maintenance Specifications
From To T803 T811 T813 T831 T834 T836 T838 T839 T842 T854 T891
2223520 0.00 5.66 5.66 P P P P 2225450 0.00 1.3 1.3 P P P P 2225458 0.00 3.7 3.7 P P P P 2225461 0.00 0.95 0.95 P P P P 4695000 0.00 5.2 5.2 P P P P 4695110 0.00 1.64 1.64 P P P P 4695120 0.00 2.98 2.98 P P P P 4695130 0.00 4.04 4.04 P P P P 4695132 0.00 1.02 1.02 P P P P P 4695133 0.00 0.28 0.28 P P P P P 4696701 0.00 4.39 4.39 P P P P
Termini
Miles Applicable During Haul Road Maintenance Specifications
From To T803 T811 T813 T831 T834 T836 T838 T839 T842 T854 T891
2223520 0.00 5.66 5.66 P P P 2225450 0.00 1.3 1.3 P P P 2225458 0.00 3.7 3.7 P P P 2225461 0.00 0.95 0.95 P P P 4695000 0.00 5.2 5.2 P P P 4695110 0.00 1.64 1.64 P P P 4695120 0.00 2.98 2.98 P P P 4695130 0.00 4.04 4.04 P P P 4695132 0.00 1.02 1.02 P P P P 4695133 0.00 0.28 0.28 P P P P 4696701 0.00 4.39 4.39 P P P
Termini
Miles Applicable Post Haul Road Maintenance Specifications
From To T803 T811 T813 T831 T834 T836 T838 T839 T842 T854 T891
2223520 0.00 5.66 5.66 P 2225450 0.00 1.3 1.3 P 2225458 0.00 3.7 3.7 P 2225461 0.00 0.95 0.95 P 4695000 0.00 5.2 5.2 P 4695110 0.00 1.64 1.64 P 4695120 0.00 2.98 2.98 P 4695130 0.00 4.04 4.04 P 4695132 0.00 1.02 1.02 P 4695133 0.00 0.28 0.28 P 4696701 0.00 4.39 4.39 P
Contract Name: BCLH IRSC
FOREST SERVICE
SPECIFICATIONS FOR
MAINTENANCE OF
ROADS IN
TIMBER SALES
PACIFIC NORTHWEST REGION
EM 7730-20
JUNE 2020
TIMBER SALE CONTRACT
ROAD MAINTENANCE SPECIFICATIONS
SPEC.# DESCRIPTION Date
T-811 Blading 06/2020
T-813 Surfacing 06/2020
T-838 Maintenance for High Clearance Vehicle Use 06/2020
T-839 Maintenance for Project Use 06/2020
T-842 Cutting Roadway Vegetation 06/2020
SUPPORTING DOCUMENTS FOR MAINTENANCE SPECIFICATIONS
DESCRIPTION DATE
Cover Content Preface 06/2019
Cover Pages 06/2019
Intent and Use Guide 06/2019
NO DRAWINGS ACCOMPANY THESE SPECIFICATIONS.
T-811 - BLADING (06/2020)
811.01 Description
This work consists of surface blading the traveled way to a condition that facilitates traffic and provides proper drainage. Blading includes shaping the crown or slope of travel way, berms, and drainage dips in accordance with this specification. Compaction is required when shown on C(T)5.31#
811.02 Maintenance Requirements
1. Timing - Perform surface blading during the contract period as often as needed to provide conditions stated for the maintenance level of the road.
2. General
a. Blade and shape the existing traveled way and shoulders, including turnouts, to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface, unless otherwise shown in C(T)5.31#, to at least ½ inch per 1 foot of width, but not more than ¾ inch per 1 foot of width. Thoroughly loosen surfacing material to no less than 2 inches depth or the depth of potholes or corrugations.
Scarification to facilitate cutting to the full depth of potholes or corrugations may be elected but will be considered incidental to blading. Do not scarify to a depth that will cause contamination of the surfacing.
b. Apply water during blading when sufficient moisture is not present to prevent segregation.
Supply, haul, and apply water in accordance with Section T-891.
c. Shape existing native rock or aggregate surfaced drainage dips to divert surface runoff to existing outlet devices, ditches, or discharge locations.
d. Establish a blading pattern which provides a uniform driving surface, retains the surfacing on the roadbed, and provides a thorough mixing of the materials within the completed surface width. Upon final blading, no disturbed rock shall protrude more than 2 inches above the adjacent surface unless otherwise provided in the contract. Remove material not meeting this dimension and place outside the roadbed; do not to obstruct drainage ways or structures. This material may be scattered off the roadbed if there is free drainage.
e. Where DESIGNATED ON THE GROUND, included in C(T)5.31#, SHOWN ON THE DRAWINGS, or as ordered by the Contracting Officer, invasive species of concern prevention practices shall be followed as listed below.
Invasive Species of Concern Prevention Practices
To be filled in by local FS invasive plant specialist, if applicable.
3. Routine Blading
a. Conform to the dimensions SHOWN ON THE DRAWINGS or designated in the SUPPLEMENTAL SPECIFICATIONS upon completion of blading.
b. Shape roadbed width in excess of the dimensions shown only as needed to provide drainage away from the traveled way. Do not remove established grasses and other vegetation from the excess width except as incidental to providing drainage or unless otherwise provided in the contract.
4. Compaction
Roads requiring compaction will be included in the C(T)5.31#. Unless Compaction Method B is designated in the C(T)5.31#, all traveled ways requiring compaction may be compacted by Method A. Compaction shall commence immediately following blading.
Compaction Method A: Breaking track over full width of traveled way while operating equipment.
Compaction Method B: 7-10 ton pneumatic, steel, or equivalent vibratory roller, operated to cover the full width two (2) times.
5. Undercutting
Undercutting roadway back slope is not permitted.
T-811 - BLADING (06/2020)
6. Intersections
At intersections, blade the roadbeds of side roads which are not closed or restricted from vehicular use to ensure smooth transitions.
a. Signing, cross ditching in the road surface (traveled way), earth berms, or other devices placed to discourage or eliminate use by passenger cars, are field evidence of road closure or restriction. Roads listed for work under Sections T-835, T-836, T-838, or T-839 are considered restricted.
b. Side roads listed for work under this Section are not restricted.
7. Cleaning of Structures
Do not allow materials resulting from work under this Section to remain on or in structures, such as bridges, culverts, cattle guards, or drainage dips.
8. Berms
Maintain existing berms to the condition of adjacent segments. Do not create new berms.
9. Smooth Blading
Smooth blading may be used as an interim measure to remove loose surfacing material from the wheel paths. Store removed materials in a recoverable windrow until blade processing as described in this section is feasible. Watering will not be required for smooth blading.
Accomplish smooth blading without distorting the existing cross-slope or crown of the traveled way.
Move and store loose surfacing materials on the high side of super-elevated curves and sections with uniform inslope or outslope. In crowned sections, store the material on either or both sides as elected. Windrow and place stored materials to provide not less than 12 feet of smooth traveled way on one-lane segments, or 20 feet of smooth traveled way on two-lane segments, or segments with turnouts. Place holes through windrows for drainage every 500 feet or less to provide drainage.
T-813 - SPOT SURFACING (06/2020)
813.01 Description
This work consists of placing surface aggregate as DESIGNATED ON THE GROUND, or as ordered by the Contracting Officer. It includes preparing the area, furnishing, hauling, and placing all necessary materials and other work necessary to blend with the adjacent road cross section.
813.02 Materials
1. Materials will be Government-furnished when stated in the SUPPLEMENTAL SPECIFICATIONS.
2. Materials furnished by the Purchaser/Contractor shall conform to the gradation and quality requirements of Section 703 of the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-14 U.S. Customary Units" and FS supplements to the FP-14.
3. All materials transported onto National Forest System land shall be free of invasive species of concern. Written documentation of methods used to determine the invasive species of concern free status of any and all materials furnished by the Purchaser/Contractor shall be submitted for approval to the Contracting Officer before transport of any materials onto NFS System land.
The Contracting Officer shall have 5 days, excluding weekends and Federal holidays, to review the methods and inspect the materials after the required written documentation is provided by the Purchaser/Contractor. After satisfactory review and inspection or after 5 days without review and inspection, the Purchaser/Contractor may transport the material onto National Forest System land.
Material receiving unsatisfactory review and inspection shall not be transported onto National Forest System land.
Material or methods appropriate for establishing invasive species of concern free status for the invasive species of concern are listed below.
Invasive Species of Concern
Appropriate Prevention Practices
813.03 Maintenance Requirements
1. Thoroughly loosen the area to be surfaced to a minimum depth of 1 inch prior to placement of aggregate.
2. Mixing and Placing
When scheduled coincidentally with work under Section T-811, and included in the SUPPLEMENTAL SPECIFICATIONS, mix surfacing and existing aggregate with water until a uniform mixture is obtained prior to final shaping and compaction.
Otherwise, spread the material on the prepared area in layers no more than 4 inches in depth.
When more than one (1) layer is required, shape and compact each layer before the succeeding layer is placed. Upon completion, the surfacing shall reasonably conform to the adjacent cross section and provide smooth transitions in the road profile.
3. Compaction Methods
Compaction Method A: Breaking track while operating equipment on the traveled way.
Compaction Method B: 7-10 ton pneumatic, steel, or equivalent vibratory roller, operated to cover the full width two (2) times.
Either Method A or B may be used unless Method B is designated in C(T)5.31#.
T-838 - MAINTENANCE FOR HIGH CLEARANCE VEHICLE USE (06/2020)
838.01 Description
This work consists of making limited use roads passable for project use by Purchaser/Contractor and providing drainage from the traveled way and roadbed.
838.02 Maintenance Requirements
1. Traveled Way
Purchaser/Contractor may smooth or fill existing cross ditches and water bars and, as approved by the Forest Service, modify existing road junctions to enable vehicle access. Prior to beginning haul and resumption of haul after an extended stoppage:
a. Remove rocks, standing or down trees, and other debris from the 12-foot traveled way. No object extending over 4 inches above the road surface shall remain within the 12 feet usable traveled way. Center the usable width on the roadbed or position away from the fill slope.
b. Place all removed materials away from drainages.
c. During use, maintain drainage structures including dips, ditches and culverts in a usable condition.
d. Clean and recondition drainage facilities in accordance with Section T-831 and T-834.
The Purchaser/Contractor may perform the following work prior to beginning haul and resumption of haul after an extended stoppage:
a. Remove rocks, standing or down trees, logs, brush, limbs and other debris from turnouts, turnarounds, or other locations that interfere with maintenance.
b. Remove encroaching limbs to a height of 14 feet above the traveled way surface.
c. Scatter material not meeting utilization standards outside and below the roadbed on the fill side. Limb and remove timber that meets utilization standards or deck at locations approved by the Forest Service.
2. Slough and Slides
a. Slough and slides may be left in place when surface drainage is provided and at least 12 feet of width is available for vehicle passage.
b. Purchaser/Contractor may reposition or ramp over slides and slough when the traveled way width is less than 12 feet providing the material is capable of supporting vehicles. Limit outslope to no more than six percent.
c. Reposition slough or slide materials, which are not capable of supporting a vehicle, on the roadbed to provide the 12 feet width. When directed by the Forest Service, slough or slide material will be removed under Section T-832.
3. Slumps and Washouts
a. Drain the roadbed immediately upgrade of slumps and longitudinal cracks to prevent water from entering slump area.
b. Slumps and longitudinal cracks at the edge of the roadbed shall not be considered a part of the usable width. Usable width may be reduced to 10 feet in the area of the slump.
c. Unless the Forest Service approves material being placed on slumps, ramp the slumps on both ends into undisturbed roadbed to provide at least 10 feet usable width. Use removed materials to guide vehicles to the ramp location or to aid in draining the area.
d. Washouts may be filled with suitable material.
4. Post -haul
At the end of hauling or prior to seasonal shutdowns or a period of extended inactivity:
a. Shape the traveled way and disturbed roadbed to provide functional drainage.
b. Reinstall removed cross ditches and water bars and provide any additional drainage structures necessary to offset changes caused through use and maintenance.
c. Leave roads useable for high clearance vehicles. Remove or reshape Purchaser/Contractor modifications at road junctions to leave the entrance as it was before use, or as agreed at the time of improvement.
T-839 - MAINTENANCE FOR PROJECT USE (06/2020)
839.01 Description
Work consists of providing minimum access required for Purchaser/Contractor's operations and associated Forest Service contract administration while preventing unacceptable resource or road damage.
839.02 Maintenance Requirements
1. Purchaser/Contractor is authorized to perform the following maintenance to provide vehicle passage and drainage:
a. Removing log, earth, and rock barriers and/or improving existing road junctions to enable vehicle access as mutually agreed.
b. Smoothing or filling existing cross ditches and water bars.
c. Installing Purchaser/Contractor-furnished culverts or other temporary drainage structures for shallow stream crossings, as approved by the Contracting Officer.
d. Removing brush, fallen trees, rocks, and other materials from the traveled way and other locations that interfere with needed maintenance:
i. Place all removed materials away from drainages.
ii. Limb and remove timber which meets utilization standards or deck at locations approved by the Contracting Officer. Scatter other woody materials, including limbs, off and below the roadbed without creating concentrations.
e. Clean and recondition drainage structures in accordance with Section T-831 and Section T-834.
f. Reposition or ramp over slough and slides to provide adequate width of traveled way material.
g. Provide traveled way drainage above slumps and seal cracks in slump area. Ramp the slumps on both ends into undisturbed roadbed to provide usable width unless otherwise ordered by the Contracting Officer.
2. During use, the traveled way shall not channel water along the road. Prior to periods of anticipated rains and runoff, perform the following work:
a. Shape the traveled way and roadbed to drain.
b. Reinstall removed cross ditches and water bars and provide any additional drainage structures necessary to offset changes through use and maintenance.
c. Perform work outlined in 839.02 1 (e), (f), and (g).
d. During periods of non-use, replace original barrier or provide and maintain standard MUTCD
Type 3 barricades unless alternate barriers are approved by the Contracting Officer.
839.03 Post Haul Requirements
1. Upon completion of project use, perform work described in the requirements of 839.02 2 and in accordance with 839.03 2 and 3 or as otherwise provided for in the SUPPLEMENTAL SPECIFICATIONS or C(T)5.31#.
2. Roads designated in C(T)5.31# to be blocked shall conform to the requirements of Section T-835.
Unless otherwise approved by the Contracting Officer, remove Purchaser/Contractor-installed temporary structures from National Forest System land. Associated commercially obtained materials shall remain the property of the Purchaser/Contractor.
3. Remove or reshape Purchaser/Contractor improvements at road junctions, as approved by the
Contracting Officer at the time of improvement.
Contract Name:
T-842 - CUTTING ROADWAY VEGETATION (06/2020)
842.01 Description
This work consists of cutting all vegetative growth on roadway surfaces and roadsides, including trees and other vegetation less than 4 inches in diameter measured 6 inches above the ground.
842.02 Maintenance Requirements
1. General
a. Cut brush, trees, and other vegetation within each area treated to a maximum height of 6 inches above the ground surface or obstruction such as rocks or existing stumps. When work is performed under this Section, remove all limbs which extend into the treated area, or over the roadbed, to a height of 14 feet above the traveled way surface elevation.
b. Items to remain will be DESIGNATED ON THE GROUND.
c. Work may be performed either by hand or mechanically unless specifically shown in C(T)5.31#.
Self-propelled equipment is not allowed on cut and fill slopes or in ditches.
d. Correct damage to boles of standing trees caused by Purchaser/Contractor's operation either by treatment with a commercial nursery sealer or by removing the tree as directed by the Contracting Officer.
e. Limb trees within the cutting limits which are over 4 inches in lieu of cutting, measured at 6 inches above the ground.
f. When trees are limbed, cut limbs within 4 inches of the bole.
2. Cutting Side Vegetation
a. Show the width of vegetation to be removed in (C(T)5.31#.
b. Unless otherwise included in the SUPPLEMENTAL SPECIFICATIONS or DESIGNATED ON THE GROUND:
i. Commence work at the edge of the traveled way and proceed away from the road centerline.
ii. Roads without a defined traveled way: The starting point for cutting will be marked on the ground or defined in the SUPPLEMENTAL SPECIFICATIONS.
c. The points for establishing cutting limits are as follows:
i. Fill and daylighted (wide roadbed) section cutting commences at the edge of the traveled way and proceeds away from the road center line.
ii. Drainage ditched section cutting commences at the bottom of the existing ditch and proceeds away from the road center line. Cutting on ditch foreslopes is not required.
iii. Unditched section cutting commences at the intersection of the cutbank and the roadbed and proceeds away from center line.
d. Provide transitions between differing increments of cutting width. Accomplish transitions in a taper length of not less than 50 feet nor more than 70 feet.
3. Debris
a. Materials resulting from the cutting operation in excess of 12 inches in length or 3 inches in diameter is not allowed to remain on roadway slopes within the treated area, in ditches, or within water courses.
b. Remove limbs and chunks in excess of 3 inches in any dimension from the traveled way and shoulders.
c. Materials may be scattered down slope from the roadbed, outside of the work area and drainages unless otherwise listed in D. Invasive Species of Concern.
4. Invasive Species of Concern
Where DESIGNATED ON THE GROUND, included in C(T)5.31#, shown on SALE/CONTRACT AREA MAP or as ordered by the Contracting Officer invasive species of concern prevention practices shall be followed as listed below.
Invasive Species of Concern Prevention Practices
| 811.01 Description |
| 811.02 Maintenance Requirements |
| 813.01 Description |
| 813.02 Materials |
| 813.03 Maintenance Requirements |
| 838.02 Maintenance Requirements |
| 839.01 Description |
| 839.02 Maintenance Requirements |
| 839.03 Post Haul Requirements |
| 842.01 Description |
| 842.02 Maintenance Requirements |
| BCLH PHASE 3 MAND - C5.31#.pdf |
| Road |
| Miles |
| Road |
| Miles |
| Road |
| Miles |
| BCLH PHASE 3 OPT - C5.31#.pdf |
| Road |
| Miles |
| Road |
| Miles |
| Road |
| Miles |
File details come from the government source that posted it. Updated .