A003 SF30 Cedar DxP IRSC.pdf
PDF 306 KB Posted
- Attached to
- 12363N24R4022 - Cedar DxP IRSC - Solicitation
- Solicitation number
- 12363N24R4022
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is an amendment to a solicitation for the Cedar DxP IRSC stewardship contract, Solicitation No. 12363N24R4022, issued by the USDA Forest Service. The amendment makes changes to the payment terms, work quality standards, and remeasurement provisions. Key details include:
The contract is for hazardous fuels reduction and road access restoration within the area affected by the 2022 Cedar Creek fire on the Willamette National Forest. Work includes removing hazard trees, reducing roadside fuels, reconstructing roads, and delivering logs for habitat restoration. The total estimated area is 3,308 acres, with 1,298 acres of roadside hazard tree abatement and 80 acres of Waldo Lake units. The estimated timber volume is 150,724 tons from the roadside units and 2,910 tons from the Waldo Lake units. The period of performance is anticipated to be completed by October 15, 2029. Payment will be made only for completed and accepted acres treated, with reduced or no payment for work not meeting quality standards. The contractor may request remeasurement if the stated acreage is disputed, with the government or contractor bearing the cost depending on the variance.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
363N 1 4
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
003 09/09/2024 1134353
6. ISSUED BY CODE 363N 7. ADMINISTERED BY (If other than Item 6) CODE 363N
USDA Forest Service Procurement & Property Services National Stewardship Contracting Branch 1400 Independence Ave. SW, MS-1138 Washington DC 20250-1138
Same as issuing office
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
X 12363N24R4022
9B. DATED (SEE ITEM 11)
08/09/2024
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: 52.211.18 THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 1 and 2.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
CEDAR DXP IRSC
WILLAMETTE NATIONAL FOREST
MIDDLE FORK RANGER DISTRICT
AMENDMENT 003
** See page 2 for Amendment details**
Except as provided herein, all terms and conditions of the documents referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
MARK T. PHILLIPP
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE 2 of 5
Amendment
CEDAR DXP IRSC
WILLAMETTE NATIONAL FOREST
MIDDLE FORK RANGER DISTRICT
12363N24R4022
This amendment makes the following changes to the Cedar DxP IRSC:
1. Appendix A - Section V – Payment Methods: Because the acres on the schedule of items are an estimation, acres treated will be calculated as work progresses and included estimated acres not requiring treatment will be deducted from units as they are accepted. Payment will only be made for completed and accepted acres treated.
Cedar DxP IRSC Willamette National Forest Page 16 of 19 Middle Fork Ranger District
Amendment 003
Revised 01.06.2022
Unsatisfactory Cutting and Fuels Removal
1. If the work quality falls below the minimum AQL, the COR will immediately notify the Contractor, in writing the need for a rework.
2. If after rework has been performed and reinspected, and work quality still falls below minimum AQL percent, payment will either be made at a reduced rate, or not at all, as determined in SECTION V below.
3. Repeated failure to produce work quality at or above the minimum acceptable standard will be considered reason for contract termination for cause.
Reinspection Upon Contractor Request
1. If Government inspection results are unacceptable to the Contractor, a reinspection may be requested, in writing, within 5 business days after receipt of notice of said inspection results. The same inspection procedure will be used; however, the inspection pattern will be shifted so that new inspection plots will not overlap previously inspected plots.
2. If reinspection results – rounded up to the nearest whole percent – indicate a variance of more than 5 percent from the first inspection, the results of the second inspection will be used to calculate work quality and payment, and the Government will bear the cost of reinspection.
3. If reinspection results – rounded up to the nearest whole percent – are within 5 percent of the first inspection, plots from the initial inspection and the reinspection will be combined and used to calculate work quality and payment, and the Contractor shall bear the cost of reinspection.
SECTION V – PAYMENT METHODS
Method of Measurement for Acreages
Acreages were determined by using ArcGIS and Imagery and are an estimation. Acres treated will be calculated as work progresses and included estimated acres not requiring treatment will be deducted from units as they are accepted.
Payment will only be made for completed and accepted acres treated. The acreage for each work item will be rounded to the nearest acre and is final unless:
a. The contract is modified or,
b. The Government makes a determination to remeasure or,
c. The Contractor exercises his/her option under the following Remeasurement provisions:
Remeasurement
1. The Contractor may request, in writing, remeasurement of any units under this contract if he/she feels that acreage stated on the project maps is incorrect. The remeasurement must be within the existing perimeter of the respective unit. No variance of the unit perimeters as laid out on the ground for this contract will be allowed.
All requests for remeasurement must be made prior to payment for each completed unit. Remeasurement will be performed by the Government.
2. If remeasurement indicates that a variance of ten percent or less exists on units of 1 to 5 acres, five percent or less exists on units of more than five but less than 20 acres, or if three percent or less exists on units of 20 acres or larger, the Contractor shall pay for the actual costs of the remeasurement. Under this condition, payment will be made on the acreage stated on the project maps. If the remeasurement indicates the actual acreage varies by more than the above factors from that stated on the project maps, the payment will be made on the remeasured acreage and the Forest Service will pay for the cost of the remeasurement.
Cedar DxP IRSC Willamette National Forest Page 17 of 19 Middle Fork Ranger District
Amendment 003
Revised 01.06.2022
Acceptance and Payment – Items 2, 3, and 9
1. Acres treated will be calculated as work progresses and included estimated acres not requiring treatment will be deducted from units as they are accepted. Payment will only be made for completed and accepted
2. Full payment will be made when visual and/or measurement inspection meets 100% AQL.
Acceptance and Payment- Item 6 Road Reconstruction of Haul Routes
1. Measurement and payment will be in accordance with the applicable section in FP-14 for each line item.
2. If informal visual inspection indicates acceptable work quality, the Contractor will be paid 100 percent of their bid rate.
Acceptance and Payment – Item 7 Cut Remove & Deliver 7,000 Fish Logs to Deck Locations on the 1934 road
1. Full payment will be made when visual and/or measurement inspection meets 100% AQL.
2. Payment may be made by percentage of the total lump sum and for no less than 500 logs transferred.
Example:
Per Log Price = Total Cost ÷ 7,000 Logs
Invoice Total = 500 Logs × Per Log Price
Acceptance and Payment – Item 4, 5, 8, 10, 11, 12
1. Acres treated will be calculated as work progresses and included estimated acres not requiring treatment will be deducted from units as they are accepted. Payment will only be made for completed and accepted
2. If informal visual inspection indicates acceptable work quality, the Contractor will be paid 100 percent of their bid rate.
3. In the event that formal inspections are used, the rate of payment to the Contractor will be calculated as follows:
a) Work quality of 90 percent or higher, Contractor will be paid 100 percent of their bid rate.
b) Work quality less than 90%, the work is unacceptable and will either require rework or no payment will be made.