A001_5c. Cedar DxP FP-14 Spec List.pdf

PDF 64 KB Posted

Attached to
12363N24R4022 - Cedar DxP IRSC - Solicitation
Solicitation number
12363N24R4022
Issued by

About this file

This document is a Request for Proposals (RFP) for the Cedar DxP IRSC project issued by the USDA Forest Service for the Willamette National Forest. The project aims to reduce the risk of hazardous fuels along important access routes affected by the 2022 Cedar Creek fire. Key services required include cutting and removing timber within 100 feet of roads, falling and leaving hazardous fire-killed trees, slash disposal, road reconstruction and maintenance, and suppression repair treatments. The estimated project area is 3,308 acres, with 1,298 acres of roadside hazard tree abatement and 80 acres of Waldo Lake units. The Forest Service estimates 150,724 tons of biomass from the roadside units and 2,910 tons from the Waldo Lake units. The period of performance is tentatively anticipated to have a final completion date of October 15, 2029. A site visit for prospective contractors is scheduled for August 9, 2024. The solicitation includes various attachments such as the Statement of Work, maps, and wage determinations.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section Date Title 101-109 2014 General Requirements

151 2014 Mobilization 152 2014 Construction Survey and Staking 201 2014 Clearing and Grubbing 203 2014 Removal of Structures and Obstructions 207 2014 Earthwork Geosynthetics 251 2014 Riprap 255 2014 Mechanically-Stabilized Earth Walls 261 2014 Reinforced Soil Slopes 301 2014 Untreated Aggregate Courses 303 2014 Road Reconditioning 403 2014 Asphalt Concrete 602 2014 Culverts and Drains 606 2014 Corrugated Metal Spillways 607 2014 Cleaning, Reconditioning, and Reparing Existing Drainage Structures 625 2014 Turf Establishment 633 2014 Permanent Traffic Control 635 2014 Temporary Traffic Control

Section Date Title Preface 10/15/2020 Preface

101.01 11/9/2016 Meaning of Terms

101.03 11/9/2016 Abbreviations

101.04 1/22/2020 Definitions

102.00 11/9/2016 Delete Section102

103.00 11/9/2016 Delete Subsections 103.02, 103.03, 103.04, 103.05

104.00 11/9/2016 Delete Subsections 104.01, 104.02, 104.04

104.06 11/9/2016 Use of Roads by Contractor

105.02(a) 11/1/2016 Government Provided Sources 105.02(c) 11/1/2016 Contractor-located Sources

105.05 6/29/2020 Use of Material Found in the Work

106.01 7/18/2017 Conformity with Contract Requirements

106.02 11/9/2016 Visual Inspection

107.02 11/1/2016 Protection and Restoration of Property and Landscape

107.05 7/18/2017 Delete Subsection 107.05

108.00 11/9/2016 Delete Section 108

109.00 11/9/2016 Delete Subsections 109.06, 109.07, 109.08, 109.09.

109.01 2/22/2019 Measurement of Work

109.02 11/9/2016 Measurement Terms and Definitions

152.00 12/12/2016 Construction Survey and Staking

155.00 11/9/2016 Delete Section 155

156.00 2/5/2019 Public Traffic

157.04 11/1/2016 General

201.04 9/10/2018 Clearing

201.06 2/22/2018 Disposal

202.00 7/9/2020 Additional Clearing, Grubbing, and Roadside Brushing

Standard Specifications

Supplemental Specifications

All specifications not included in the specification listing, but included by reference, are applicable. "X" denotes applicable standard and/or supplemental specification. The supplementals shown on the specification list are physically attached.

FP-14 SPECIFICATION LIST

Section Date Title

203.05 9/10/2018 Disposing of Material

204.00 11/4/2016 Excavation and Embankment

209.06 7/7/2020 Dewatering

209.09 7/18/2017 Backfill

209.10 7/17/2017 Compacting

262.00 4/1/2024 Low Density Cellular Concrete

301.03 7/17/2017 General

301.05 7/17/2017 Compacting

602.05 6/11/2020 Laying Metal Pipe

607.01 7/9/2020 Cleaning, Relaying, and Reparing Existing Drainage Structures

633.00 11/8/2016 Permanent Traffic Control

703.05(c) 7/18/2017 Surface Course Aggregate (3) Plastic Index

703.05 3/17/2021 Subbase, Base, Surface Course and Screened Aggregate

704.02 7/18/2017 Bedding Material

Supplemental Specifications

File details come from the government source that posted it. Updated .