GSER Presolicitation Draft Schedule of Items.pdf
PDF 188 KB Posted
- Solicitation number
- 12363N23Q4001
- Issued by
-
Department of Agriculture Forest Service
About this file
This pre-solicitation notice outlines a stewardship contract opportunity for fuels management services across several national forests in California. The Forest Service seeks to award multiple contracts to complete hazardous fuels reduction treatments in Giant Sequoia groves through a combination of mechanical operations, hand crews, and prescribed burns. Mandatory work includes cutting, skidding, decks, and removing timber fuels from nine treatment areas, with an estimated 50,919 tons of mixed conifer products to be removed. Optional work includes transporting surplus timber products and preparing control lines for prescribed burns. The period of performance is from award date through December 31, 2023. Pre-bid site visits will be held on October 19th, 20th, 26th, and 27th for prospective contractors to discuss operational requirements. The request for quotes is anticipated for release on October 17th, with contracts to be awarded as firm fixed price using best value selection.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Giant Sequoia Emergency Response (GSER) IRSC Sequoia and Sierra National Forests
Solicitation 12363N23Q4001
Pre-Solicitation DRAFT Schedule of Items
ITEM
NO.
DESCRIPTION OF
WORK ACTIVITIES
UNIT
ESTIMATED
QUANTITY
UNIT
PRICE
TOTAL
Item #1 - Black Mountain Grove Mechanical Fuels Reduction
1a
Cut and Remove Included Timber
Fuels Units 1, 2, 4-8 (Mandatory) Acre 203 $ $
1b
Cut and Remove Included Timber
Fuels Unit 3 (Mandatory) Acre 25 $ $
1c
Cut and Remove Included Timber
Roadside Fuels Units 101-111 (Mandatory) Acre 293 $ $
Total Logging Cost of Items 1a-1c (cut, skid, process, haul, profit, etc.): $_________________
Total Delivered Value of Items 1a-1c (all products removed combined value): $__________________
Items 1a, 1b, and 1c combined total cost shall equal Total Logging Cost minus Total Delivered Value
1d
Mechanical Fuels Treatment
Fuels Units 301-306 (Mandatory) Acre 61 $ $
1e Removal of TSA Products (Optional) Ton $ $
Timber Subject to Agreement (TSA) consists of tops, limbs, chunks, cull logs, and any other forest products associated with Items 1a-1d that are not required removal, enter proposed estimated tons to be removed, unit price, and total price. If awarded, this will be awarded as a capped tonnage for payment.
Total TSA Removal Cost (loading/chipping and trucking): $_______________
Total Delivered Value: $________________
Item 1e total cost shall equal Total TSA Removal Cost minus Delivered Value
Item 1 Total Cost $
DESCRIPTION OF
WORK ACTIVITIES
UNIT
ESTIMATED
QUANTITY
UNIT
PRICE
TOTAL
Item #2 - Indian Basin Grove Mechanical Fuels Reduction
2a
Cut and Remove Included Timber
Fuels Units 701, 703, and 705 (Mandatory) Acre 239 $ $
2b
Cut and Remove Included Timber
Recreation Fuels Unit 724 (Mandatory) Acre 26 $ $
Total Logging Cost of Items 2a and 2b (cut, skid, process, haul, profit, etc.): $_________________
Total Delivered Value of Items 2a and 2b (all products removed combined value): $__________________
Items 2a and 2b combined total cost shall equal Total Logging Cost minus Total Delivered Value
2c
Mastication
Fuels Units 701, 703, and 705 (Mandatory) Acre 239 $ $
2d Removal of TSA Products (Optional) Ton $ $
Timber Subject to Agreement (TSA) consists of tops, limbs, chunks, cull logs, and any other forest products associated with Items 2a and 2b that are not required removal, enter proposed estimated tons to be removed, unit price, and total price. If awarded, this will be awarded as a capped tonnage for payment.
Total TSA Removal Cost (loading/chipping and trucking): $_______________
Total Delivered Value: $________________
Item 2d total cost shall equal Total TSA Removal Cost minus Delivered Value
Item 2 Total Cost $
DESCRIPTION OF
WORK ACTIVITIES
UNIT
ESTIMATED
QUANTITY
UNIT
PRICE
TOTAL
Item #3 - Landslide Grove Mechanical Fuels Reduction
3a
Cut and Remove Included Timber
Fuels Units 64 and 615 (Mandatory) Acre 42 $ $
3b
Cut and Remove Included Timber
Plantation Unit 627 (Mandatory) Acre 15 $ $
Total Logging Cost of Items 3a and 3b (cut, skid, process, haul, profit, etc.): $_________________
Total Delivered Value of Items 3a and 3b (all products removed combined value): $__________________
Items 3a and 3b combined total cost shall equal Total Logging Cost minus Total Delivered Value
3c
Mastication
Fuels Units 64 and 615 (Mandatory) Acre 42 $ $
3d Removal of TSA Products (Optional) Ton $ $
Timber Subject to Agreement (TSA) consists of tops, limbs, chunks, cull logs, and any other forest products associated with Items 3a and 3b that are not required removal, enter proposed estimated tons to be removed, unit price, and total price. If awarded, this will be awarded as a capped tonnage for payment.
Total TSA Removal Cost (loading/chipping and trucking): $_______________
Total Delivered Value: $________________
Item 3d total cost shall equal Total TSA Removal Cost minus Delivered Value
Item 3 Total Cost $
DESCRIPTION OF
WORK ACTIVITIES
UNIT
ESTIMATED
QUANTITY
UNIT
PRICE
TOTAL
Abbot Hand Fuels Treatment
Units 401 - 404 (Mandatory) Acre 25 $ $
Grant Hand Fuels Treatment
Units 501 – 506 (Mandatory) Acre 292 $ $
Landslide Hand Fuels Treatment
Units 61 – 63, 67, and 612 (Mandatory) Acre 76 $ $
7a
Black Mountain Hand Fuels Treatment
Interior Fuels Units 201 - 216 (Mandatory) Acre 545 $ $
7b
Black Mountain Hand Fuels Treatment
Roadside Fuels Units 221 - 230 (Optional) Acre 64 $ $
7c
Black Mountain Hand Fuels Treatment
PAC Fuels Units 241 - 246 (Mandatory) Acre 92 $ $
Indian Basin Hand Fuels Treatment
Recreation Fuel Unit 725 (Mandatory) Acre 17 $ $
9a
McKinley Hand Fuels Treatment
Units 548, 557, 569, and 607 (Mandatory) Acre 70 $ $
9b
McKinley Rx Burn Control Hand Lines
(Mandatory) Miles 0.3 $ $
Items 4-9 Total Cost $
DESCRIPTION OF
WORK ACTIVITIES
UNIT
ESTIMATED
QUANTITY
UNIT
PRICE
TOTAL
Transport of Surplus Timber Products
(Optional) Ton $ $
Item 10 Total Cost $
**Timber cruise is being re-ran. Timber Removal Price Schedule with estimated product volumes will be provided with the final solicitation contract documents. **
Notes: Multiple Awards MAY be made from this solicitation. Items numbers 1 – 3 have been designed for individual awards per Item, or all awarded to one contractor if determined best value to Forest Service (FS). Item numbers 4-9 have been designed to be awarded to one contractor, but MAY be multiple awards. These schedules are for pricing/payment purposes.
Contractors interested in Mechanical Operations only MUST provide Price Proposals for
Items 1 - 3 in Schedules including all Mandatory Work sub-Items and for the associated
Timber or other products Removal Price Schedules. Unit prices prevail.
All Included Timber products designated for removal have been determined to be deficit by the FS after deducting the associated logging costs from the estimated delivered value.
Cost data for total logging costs and total delivered value IS REQUIRED to receive award for Items 1 – 3. This information is proprietary, will not be shared outside the FS, and will be removed from awarded contract documents.
Optional Items 1e, 2d, and 3d Price Proposals are not required for contract award if removal of Timber Subject to Agreement (TSA) products is not desired. No entry indicates no desire to remove TSA. For contractors proposing to remove TSA Products, offerors
MUST enter a quantity and Offer (Flat) in the Timber Removal Price Schedule. No entry indicates no desire to remove TSA. Final awarded TSA quantity, if any, will be negotiated and agreed to at time of award or by modification post award.
Contractors interested in Hand Treatment only MUST provide Price Proposals for Items 4
- 9 in Schedules including all Mandatory and Optional Work sub-Items.
Offerors that propose to complete all work, Mechanical and Hand Treatment, for Items 1 –
9 will rank higher in technical than those offerors that do not.
Price proposal for Optional Item 10 is NOT required to receive award. Enter an estimated quantity, unit price/ton and total price for the total amount of timber products being proposed for transport via rail. The total quantity proposed shall not exceed the total of all
Included Products and TSA proposed. Total estimated logging costs required for Items 1, 2, and 3 shall only include cost of trucking transport to the delivery point prior to loading on rail carts. This Item shall only include cost of rail transport.
PERIOD OF PERFORMANCE IS FROM DATE OF AWARD THROUGH DECEMBER
31, 2023