About this file

This document provides details for an upcoming Giant Sequoia Emergency Response stewardship contract to be awarded by the USDA Forest Service. The contract will require fuels reduction treatments across several Giant Sequoia groves located on the Sequoia and Sierra National Forests to increase resiliency and reduce wildfire risk. Treatments will include hand cutting, piling, and mechanical operations such as cutting, skidding, decking, and piling of forest fuels. An estimated 50,919 tons of mixed conifer saw timber, biomass, and cull logs must be removed from some groves. Pre-solicitation meetings will be held on October 19th, 20th, 26th, and 27th for interested contractors to visit treatment areas. The solicitation is expected to be issued on October 17th for multiple awards with a period of performance ending December 31st, 2023. The contract will use best value selection and be a firm fixed price commercial services agreement awarded by the USDA Forest Service.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

!(106

!(104

!(2

!(242

!(241

!(222

!(243

!(224

!(224

!(104

!(104 !(244

!(245

!(246

!(6

!(4

!(8 !(7

!(1

!(5

!(2

!(2

!(3 !(306

!(305

!(304

!(303

!(302 !(301

!(101

!(102

!(102

!(103

!(104

!(105

!(106

!(107

!(108

!(109 !(110

!(111

!(210

!(211

!(212

!(205

!(204

!(203

!(213

!(214

!(202

!(201

!(206

!(207

!(208

!(209

!(215

!(216

!(222

!(230

!(224

!(225

!(223

!(221

!(228

!(226

!(227

!(105

!(229

T2 1 S

R

E T2

1 S R

E

T21 S R30 E T20 S R30 E

T21 S R31 E T20 S R30 E T21 S R31 E

T20 S R31 ET2

0 S

R3 0 E

T2 0 S

R3 1 E

11 7

S2

5B

S2

5D

21S94

S2

5C

S5

21S25A

21S12B 21S

S2

21S12

Tule River Indian

Reservation

Contract Area Map 2 of 6 - Black Mountain Grove Giant Sequoia Emergency Response IRSC

Sierra and Sequoia National Forests 0 0.2 0.4 0.60.1

Miles

1:7,920 1 inch = 660 feetWhen printed at 24" x 36":

DRAFT

Legend Contract Area Boundary, B1.1 Cutting Unit, Mechanical Treatment, B1.1, Item 1 Cutting Unit, Hand Treatment, B1.1, Item 7a Cutting Unit, Hand Treatment, B1.1, Item 7b Cutting Unit, Hand Treatment, B1.1, Item 7c

((( Limited Operating Period (LOP1) - Goshawk, C6.315#

*** Limited Operating Period (LOP2) - Spotted Owl, C6.315# Streamside Management Zone, C6.5# Riparian Conservation Area Existing Transportation System

Non-FS Ownership Inventoried Roadless Area

Tule River Indian

Reservation

Sequoia National Forest

Sequoia National Forest

Sierra National Forest

Inyo National Forest

Inyo National Forest

UV65

UV201

UV137

UV216

UV43

UV198UV63

UV245

UV180

UV168

UV63

UV198

UV145

UV41

UV41

UV190

UV136

UV190

UV99

UV99

£¤395

Kings Canyon National Park

Sequoia National

Park

Tables forthcoming

DRAFT

DRAFT

DRAFT

File details come from the government source that posted it. Updated .