Well Project Sign In_Dubois_04_02_2026.pdf

PDF 230 KB Posted

Attached to
Dubois Well Repair
Solicitation number
1232SA26Q0355
Issued by

About this file

This document is an attendance record for a pre-bid or pre-construction meeting related to federal contract opportunity 1232SA26Q0355 for the Dubois Water Systems Improvement project. The document lists government personnel and contractor personnel who were present at the meeting.

The government was represented by one attendee: Jennifer Barnett from USDA, AES, USSES (phone: 208-374-5360). The contractor personnel present included representatives from multiple organizations: Dallin Polson from GSE Construction/JAMCON; Jim Schnittgen from Rivers West Construction; Austin Drew from McKenzie Construction; Brad Allen from Elysian Project Management; Rick Uddin from GeoTech; Danny Cornilsen from Western Water; Karl Slayton from Agricultural Services/Engineering; Kenny Vollmer and Rick Upton from Vollmer Well Drilling and GeoTech; Brad Allen and Mark Senest from Elysian IM and IES; and Brau Whitehead from Cutting Edge Electric. This appears to be a sign-in sheet documenting participant attendance at a project meeting or site visit related to the water systems improvement initiative.

View the file

Other files

File Type Posted
USSES New Well Log 1937.pdf PDF
Water line drawings from Well House.pdf PDF
USSES Main Well Log.pdf PDF
USSES East Well Log.pdf PDF
Updated Specifications.pdf PDF
Sol_1232SA26Q0355_v2.pdf PDF
Sol_1232SA26Q0355_Amd_0001.pdf PDF
Responses to RFIs for Dubois Water Well.docx DOCX document
Attachment 1 - Drawings.pdf PDF
Attachment 3 - Wage Determination ID20260046.pdf PDF
Attachment 2 - Specifications.pdf PDF
Sol_1232SA26Q0355.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .