This document is a well drilling log covering the period from August 1937 through May 1938, documenting daily drilling activities, formations encountered, and operational challenges at a well site location (appears to be in the Dubois/Idaho Falls area based on references).
The log records drilling progression from initial spudding at 5 feet in August through 763 feet by May 1938, with detailed entries noting geological formations such as lava, basalt, ryolite, ash, cinders, sand, and gravel. Early phases (August-September 1937) focused on establishing the wellbore through volcanic rock with significant equipment failures including broken wrist pins, manilla lines, spudding shafts, and bond wheels requiring repairs and replacements. September through October operations involved underrunning, reaming, and equipment teardown after reaching 350 feet, with extended shutdowns for major repairs including samson post reconstruction. November-December 1937 marked a transition to cleaning and reaming operations, with final drilling resuming in late December through formations containing steel, lava rock, and cast iron that required careful hole straightening and filling operations. January-February 1938 focused on drilling out cast iron and lava rock encountered at depth, with periodic equipment maintenance and trips to Idaho Falls for bit hard-surfacing. The final phase (March-May 1938) involved drilling through sandy and gravelly formations, running and cementing 10-inch casing to 717 feet using 26 sacks of cement, and completing well development activities including line cleaning, pump installation, and a 24-hour production test achieving 63 gallons per minute with water level stabilization at 670 feet by mid-May.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date
A.u� 11st
II
II
II
II
II
II
II
II
II
II
II
2L
Log of New ·•rell --- Aup,1 st, 1937
Drilled li'rom
Bo
To ll15
Fonnation--Kind--Color--Hardness-l!uddy--Cav,v---etc.
Lava & Pasalt --soudding & ri�ging up ?asalt--jump8d pin on bit Ryolite or lava--afternoon tour un loading pipe--se+tin� up tools evening tour--run 12 1
1 pipe Lava & Ryolite--broke wrist pin--had it rcoaired Ryolitc, lava---changed over from wire to manilla line--took off sinker bar Lan--hard--broke manilla line--had to splice Lava--very herd and s0ttles back in hole bad--broke line aPain-- run in a cracker--had to repair it twice
Lava arrl layers of ash 2 or 3 feet
• thick
Lava and thin lAyPrs of cinders arrl ash-shut down dress down bit and temper Very hard lava--boulder fell across hole gave some little trouble--bond wheel slipped on shaft--shut down to fix it.
Lav- & ashes--caving lava, sane boulders caving in--rimmP.d hole--cavinr at bottom-took of popoPr--no hole ma0e--repairing bull wheel barrings
Alternete layPrs of l?.ve and ash-pink-broke spuddinf shaft--taking out spudding shaft and reoairi� bond wheel and machine
Did not work Auf1 st 11-19, incl., fishin.a for bit and having drill shaft welded.
No work, .n.u:;ust 29-Jlst,. havine shaft v1eldod.
Date
October 1
If 2
II 3
If 4 ff 5
It 6 n: 7
. II 8
" 9
" 10
Log of New Well--October, 1�37
Drilled From To
Fonnation---Kind---Color---Hardness Mudd_l-_=-Qavy---Etc.
Reamed, broke samson post. Tore down sampson post & spuddi r.g shaft
Got ·new timber for samson post
Framing new samsori post--setting in same-finished repairing machine
Reaming
Reaming
Strung up extra stem--broke beam-broke down e xtra tools & took off old beam
Went and broguht down b eam after sawing it ou t.
Started tea.ring down tools and rig
Still tearing down
Finished tearing down
No work October 10 to November 22 inclusive