RFI 2 - Clarification.pdf
PDF 81 KB Posted
- Attached to
- Recirculating Aquaculture System Upgrades Federal contract opportunity
- Solicitation number
- 1232SA26Q0302
About this file
This is a Requests for Information (RFI) document for Solicitation 1232SA26Q0302, issued on April 14, 2026, containing a single question and answer regarding electrical service specifications.
The question addresses whether wiring to the service should be upgraded to 2000 amps and requests clarification on wire sizing, noting that the feeder schedule on sheet ES-601 only carries up to 1600 amps. The answer clarifies that the plan sheets are correct and the contractor is to provide a 1600A switchboard (SWBD) with a 1600A main breaker and 1600A of wire as indicated on the drawings. The response specifies that the total connected load is approximately 1200A with a metered historical demand of 308A, which allows for future electrical capacity expansion as needed. This RFI document serves to clarify electrical specifications and resolve potential ambiguity regarding service capacity requirements for the project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30 - Amendment 02.pdf | ||
| Site Visit Sign In Sheet - Mar 18.pdf | ||
| Site Visit Sign In Sheet - Mar 17.pdf | ||
| RFIs.pdf | ||
| SF30 - Amendment 01.pdf | ||
| Attachment 6 - Specifications - Options 2 and 3.pdf | ||
| Attachment 1 - Solicitation Terms and Conditions.pdf | ||
| Attachment 2 - Drawings - Base.pdf | ||
| Attachment 3 - Specifications - Base.pdf | ||
| Attachment 4 - Drawing - Option 1.pdf | ||
| Attachment 5 - Drawings - Options 2 and 3.pdf | ||
| Wage Determination.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requests for Information Solicitation 1232SA26Q0302
RFI #2
April 14, 2026
Question 1: Is the wiring to the service to be upgraded to 2000 amps also? If so, can you please clarify the wire sizing required? The feeder schedule on sheet ES-601 only carries up to 1600 amps.
Answer 1: The plan sheets are correct. The contractor is to provide a 1600A SWBD w/a
1600A main breaker, and 1600A main breaker, and 1600A of wire as indicated on the drawings. The total connected load is approx. 1200A and a metered historical demand of 308A allowing for future electrical capacity as needed.
File details come from the government source that posted it. Updated .