This is a Questions and Answers document for federal contract opportunity 1232SA26Q0282, issued as of 23 April 2026. The document addresses nine industry inquiries regarding HVAC and building system specifications with corresponding government responses clarifying project scope and technical requirements.

Key clarifications from government responses include: small amounts of new ductwork are required on MH101 for CV-3, FPB-1, and FPB-2 (with references to updated drawings MD101 and MH101); the original roofer ("X roofing contractor") must be used to maintain roof warranty when performing penetrations; servicing of existing HVAC equipment is excluded from scope; no refrigerant gauges, air compressors, or new unfired pressure vessels are required; the existing expansion tank is to remain in place with no new tank needed; boiler flue piping must be AL29-4C material with PVC intakes (not stainless steel or SCH 40 PVC as previously mentioned); and an air dirt separator is required with no additional air separation tank needed. The document clarifies several apparent contradictions or ambiguities in the original specification documents, particularly regarding material specifications and equipment requirements for the mechanical systems work.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions from Industry 1232SA26Q0282 As of 23 April 2026

1. Multiple call-outs mention ducting, (acoustic flex, acoustic insulated duct, acoustic sealed registers, etc.) however, the final drawings omit any mention or schedule for it. I suspect the drawings we received are incomplete. Please clarify.

Govt Response: There is a small amount of new ductwork on MH101 for CV-3. There will also be a small amount of ducting for FPB-1 and FPB-2. See update MD101 and MH101.

2. How are we to stay within the roof warranty standards? Should we bring the original roofer to flash in our penetrations? And who is the original roofer?

Govt Response: Use X roofing contractor to maintain warranty.

3. Should the existing and remaining hvac equipment be thoroughly inspected and serviced during this work period?

Govt Response: No, servicing existing equipment is not part of this scope of work.

4. Are the refrigerant pressure and temperature gauges to be permanently installed? Or should they remain on site for maintenance staff to utilize?

Govt Response: No refrigerant pressure or temperature gauges are called for on the project.

5. Will you provide more information about the requirements for the air compressor unit to be provided and/or installed?

Govt Response: No air compressor is called for in the drawings.

6. Provide an unfired pressure vessel. Is this applicable within this building plan?

Govt Response: There is no new unfired pressure vessels called for in this job. There is an existing expansion tank that is to be reused.

7. What Material is to be used on the flue piping for the boilers, it is specified that it is to be stainless steel, and specified to use SCH 40 PVC, Please clarify.

Govt Response: Flues are to be AL29-4C, and intakes are to be PVC.

8. Provide hot water expansion tank, the plans also state that the hot water expansion tank is to remain, Please clarify

Govt Response: There is no requirement for a new expansion tank. The expansion tank is existing to remain.

9. Provide a steel air separation tank. Is this overlapping the air dirt separator speced from spirotherm?

Please clarify.

Govt Response: Please provide an air dirt separator. No other air separation tank is required.