Attachment 2 REV 1 Final Drawings.pdf
PDF 2 MB Posted
- Attached to
- Upgrade HVAC for Bee Lab/Headhouse in Logan, UT
- Solicitation number
- 1232SA26Q0282
About this file
These are mechanical design drawings for an HVAC upgrade project at Utah State University's USDA Bee Lab/Headhouse Facility located at 880 East 1400 North, Logan, Utah 84131. The project involves comprehensive replacement and renovation of the facility's heating, ventilation, and air conditioning systems.
The scope includes installation of two new Lochinvar FBN1001 condensing fire tube boilers with 999 MBH input and 961 MBH output capacity, two Bell & Gossett end suction footed volute pumps (P-1 and P-2) for hot water circulation at 51 GPM and 55 feet head, and two inline circulator pumps (P-3 and P-4) by Grundfos for boiler service. The system incorporates variable air volume (VAV) terminal units with hydronic heating coils, fan-powered terminal units, unit heaters by Modine at 53,000 BTUH, and exhaust fans with variable frequency drives. Cooling is provided through ductless split systems (Mitsubishi Electric units at 36,000 BTUH each) for freezer rooms and incubators. Humidification is supplied by Dristeem units with capacities of 4 and 30 lbs/hr. The mechanical piping uses Type L copper with brazed joints for lines 3 inches and under, and Schedule 40 steel pipe with welded joints for larger lines, all charged with 35% propylene glycol. All equipment requires factory-authorized startup, BACnet controllers, and commissioning by a third-party licensed mechanical engineer. The project includes demolition of existing boilers, piping, VAV boxes, and related equipment, with provisions for replacing grooved fittings with welded connections throughout the system.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
A J C
A R
C H
IT
E
C T
S P
C A
N D
W E
R E
C R
E A
T E
D
E V
O L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T
E
S P
E C
IF
IE
D P
R O
J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F A
J C
A R
C H
IT
E
C
S
P C
W
R
IT
T E
N D
IM
E
N S
IO
N
S O
N T
H E
S E
D R
A W
IN
G
S S
H A
L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F
N
Y V
A R
IA
T
IO
N
F R
O M
T H
E D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
S H
O W
N B
Y T
H E
S E
D R
A W
IN
G
S
W A
R N
IN
G
R
E P
R O
D U
C T
IO
N
H E
R E
O F
I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A D
E S
E C
R E
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
SHEET NUMBER:
ISSUE DATE:
ISSUE TYPE:
DRAWN BY:
CHECKED BY:
PROJECT#:
PROJECT DESCRIPTION
SHEET NAME:
REVISIONS
ARCHITECT / CONSULTANT
703 east 1700 south salt lake city, ut 84105 ajcarchitects.com
A u to d e sk
D o c s:
-3
U
S D
A B e e
L a b H
V A
C L o g a n
-M e c h U
S D
A B e e
.r v t
:5
:1
A
M
01.12.2026
CONDOC
RHB
RHB
ME001
2024-32
POLLINATING INSECT-BIOLOGY
MANAGEMENT, SYSTEMATICS
RESEARCH UNIT
UTAH STATE UNIVERSITY
880 EAST 1400 NORTH
LOGAN, UT 84131
UPGRADE HVAC FOR
USDA BEE
LAB/HEADHOUSE
FACILITY
MECHANICAL COVER
SHEET
MECHANICAL SHEET INDEX
ME001 MECHANICAL COVER SHEET
ME501 MECHANICAL DETAILS
ME601 MECHANICAL SCHEDULES
ME602 MECHANICAL SCHEDULES
MD101 LEVEL 1 MECHANICAL DEMO PLAN
MD102 ROOF MECHANICAL DEMO PLAN
MH101 LEVEL 1 MECHANICAL PLAN
MH102 ROOF MECHANICAL PLAN
MH401 ENLARGED MECHANICAL PLANS
ABBREVIATIONS
NOTE: ALL ABBREVIATIONS MAY NOT BE USED.
DEFINITIONS
NOTE: ALL DEFINITIONS MAY NOT BE USED.
INDICATED: THE TERM "INDICATED" REFERS TO GRAPHIC REPRESENTATIONS,
NOTES, OR SCHEDULES ON THE DRAWINGS, OTHER PARAGRAPHS OR
SCHEDULES IN THE SPECIFICATIONS, AND SIMILAR REQUIREMENTS IN THE
CONTRACT DOCUMENTS. WHERE TERMS SUCH AS "SHOWN", "NOTED",
"SCHEDULED", AND "SPECIFIED" ARE USED, IT IS TO HELP THE READER LOCATE
THE REFERENCE, NO LIMITATION ON LOCATION IS INTENDED.
DIRECTED: TERMS SUCH AS "DIRECTED", "REQUESTED", AUTHORIZED",
"SELECTED", "APPROVED", "REQUIRED", AND "PERMITTED" MEAN "DIRECTED BY
THE ENGINEER", "REQUESTED BY THE ENGINEER", AND SIMILAR PHRASES.
APPROVED: THE TERM "APPROVED", WHERE USED IN CONJUNCTION WITH THE
ENGINEER'S ACTION ON THE CONTRACTOR'S SUBMITTALS, APPLICATIONS, AND
REQUESTS, IS LIMITED TO THE ENGINEER'S DUTIES AND RESPONSIBILITIES AS
STATED IN GENERAL AND SUPPLEMENTARY CONDITIONS.
FURNISH: THE TERM "FURNISH" IS USED TO MEAN "SUPPLY AND DELIVER TO
THE PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY,
INSTALLATION, AND SIMILAR OPERATIONS."
INSTALL: THE TERM "INSTALL" IS USED TO DESCRIBE OPERATIONS AT PROJECT
SITE INCLUDING THE ACTUAL "UNLOADING, UNPACKING, ASSEMBLY, ERECTION,
PLACING, ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING, CURING,
PROTECTING, CLEANING, AND SIMILAR OPERATIONS."
PROVIDE: THE TERM "PROVIDE" MEANS "TO FURNISH AND INSTALL, COMPLETE
AND READY FOR THE INTENDED USE."
INSTALLER: AN "INSTALLER" IS THE CONTRACTOR OR AN ENTITY ENGAGED BY
THE CONTRACTOR, EITHER AS AN EMPLOYEE, SUBCONTRACTOR, OR SUB-
SUBCONTRACTOR, FOR PERFORMANCE OF A PARTICULAR CONSTRUCTION
ACTIVITY, INCLUDING INSTALLATION, ERECTION, APPLICATION, AND SIMILAR
OPERATIONS. INSTALLERS ARE REQUIRED TO BE EXPERIENCED IN THE
OPERATIONS THEY ARE ENGAGED TO PERFORM.
(E) EXISTING
(F) FUTURE
AC AIR CONDITION(-ING,-ED)
APD AIR PRESSURE DROP
BD BALANCING DAMPER
BHP BRAKE HORSE POWER
BTU BRITISH THERMAL UNIT
BTUH BTU/HOUR
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CV CONTROL VALVE
DB DRY BULB TEMPERATURE
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RECIRC
DP DEPTH, DEEP, OR DROP IN PRESSURE
EA EXHAUST AIR
EER ENERGY EFFICIENCY RATIO
EFF EFFICIENCY
ELEC ELECTRIC
ELEV ELEVATION
ENT ENTERING
EVAP EVAPORAT(-E, -ING, -ED, -OR)
EWT ENTERING WATER TEMPERATURE
EXT EXTERNAL
FD FIRE DAMPER
FLA FULL LOAD AMPS
FPI FINS PER INCH
FPM FEET PER MINUTE
FPS FEET PER SECOND
FSD FIRE SMOKE DAMPER
GE GREASE EXHAUST
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HD HEAD
HG MERCURY
HP HORSEPOWER
HR HOUR
HTG HEATING
HZ HERTZ (FREQUENCY)
IN INCH
KW KILOWATT
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LH LATENT HEAT
LRA LOCKED ROTOR AMPS
LVG LEAVING
LWT LEAVING WATER TEMPERATURE
MBH THOUSAND BTU PER HOUR
MCA MINIMUM CIRCUIT AMPS
MFR MANUFACTUR(-ER, -ED)
NC NORMALLY CLOSED OR NOISE CRITERIA
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OD OUTSIDE DIAMETER
OZ OUNCE
PD PRESSURE DROP OR DIFFERENCE
PG PROPOLENE GLYCOL
PH PHASE
PPM PARTS PER MILLION
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSIA PSI ABSOLUTE
PSIG PSI GAUGE
RA RETURN AIR
RECIRC RECIRCULATE (-ER, -ED, -ING)
REFR REFRIGERATION
REQD REQUIRED
RLA RATED LOAD AMPS
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR
SCFM STANDARD CUBIC FEET PER MINUTE
SCW SOFT COLD WATER
SH SENSIBLE HEAT
SP STATIC PRESSURE
SPEC(S) SPECIFICATION(S)
SQ SQUARE
SS SANITARY SEWER, SOIL, WASTE
STD STANDARD
TA TRANSFER AIR
TD TEMP. DROP OR DIFF.
TEMP TEMPERATURE
TOT TOTAL
TSTAT THERMOSTAT
TYP TYPICAL
V VOLT, VOLTAGE OR VENT
VAC VACUUM
VAV VARIABLE AIR VOLUME
VEL VELOCITY
VENT VENT, VENTILATION
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
VTR VENT THROUGH ROOF
WB WET BULB TEMP
WC WATER COLUMN
WG WATER GAUGE
WPD WATER PRESSURE DROP
WTR WATER
SHUT OFF VALVE
SYMBOL LEGEND - PIPING
DESCRIPTIONSYMBOL
NOTE: ALL ABBREVIATIONS MAY NOT BE USED.
GATE VALVE
CHECK VALVE
AUTOMATIC 2-WAY VALVE
AUTOMATIC 3-WAY VALVE
GLOBE VALVE
BALL VALVE
RELIEF VALVE
PRESSURE REDUCING VALVE
BUTTERFLY VALVE
SOLENOID VALVE
ANGLE VALVE
S
VENTURI VALVE
BALANCING OR PLUG COCK
FLOW SETTER
EXPANSION VALVE
GAS COCK
MAV MANUAL AIR VENT
STRAINER
GAUGE COCK
FLEXIBLE CONNECTION
PRESSURE GAUGE
THERMOMETER
PIPE REDUCER
REFRIGERANT SITE GLASS
REFRIGERANT STRAINER
90 DEGREE ELBOW UP
90 DEGREE ELBOW DOWN
90 DEGREE TEE UP
90 DEGREE TEE DOWN
PIPE UNION
PIPE CAP
PIPE ANCHOR
FLOAT AND THERMOSTATIC TRAP
REFRIGERANT FILTER DRIER
SYMBOL LEGEND - DUCTWORK
DESCRIPTION
NOTE: ALL ABBREVIATIONS MAY NOT BE USED.
RECTANGULAR SUPPLY DUCT UP
RECTANGULAR SUPPLY DUCT DOWN
RECTANGULAR RETURN DUCT UP
RECTANGULAR RETURN DUCT DOWN
RECTANGULAR EXHAUST DUCT UP
RECTANGULAR EXHAUST DUCT DOWN
ROUND SUPPLY DUCT UP
ROUND SUPPLY DUCT DOWN
ROUND RETURN DUCT UP
ROUND RETURN DUCT DOWN
ROUND EXHAUST DUCT UP
ROUND EXHAUST DUCT DOWN
OVAL SUPPLY DUCT UP
OVAL SUPPLY DUCT DOWN
OVAL RETURN DUCT UP
OVAL RETURN DUCT DOWN
OVAL EXHAUST DUCT UP
OVAL EXHAUST DUCT DOWN
SPIRAL OVAL DUCT
SPIRAL ROUND DUCT
DUCT INSULATION
DUCT LINING
90° RECTANGULAR ELBOW
WITH TURNING VANES
90° ROUND RADIUS ELBOW
GORED OVAL RADIUS ELBOW
DUCT SIZE OR SHAPE TRANSITION
SYMBOL
PIPING LEGEND
DESCRIPTIONABBREVIATION
NOTE: ALL ABBREVIATIONS MAY NOT BE USED.
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
FIRE PROTECTION
HEATING HOT WATER SUPPLY
HEATING HOT WATER RETURN
NITROUS OXIDE
REFRIGERANT LIQUID
REFRIGERANT GAS
SNOW MELT RETURN
SNOW MELT SUPPLY
CHILLED WATER SUPPLY
CHILLED WATER RETURN
COMPRESSED AIR
CONDENSATE DRAIN
GLYCOL SUPPLY
GLYCOL RETURN
MEDICAL AIR
LIQUID PROPANE GAS
NATURAL GAS
OXYGEN
VACUUM
CHWR
CHWS
CA
CD
CWR
CWS
FP
GR
GS
HHWR
HHWS
LPG
MA
NG
NO
O
RL
RG
SMR
SMS
VAC
FUEL OIL SUPPLY
FUEL OIL RETURN
FUEL OIL VENT
FOR
FOS
FOV
MEDIUM PRESSURE CONDENSATE
HIGH PRESSURE CONDENSATEHPC
MPC
HIGH PRESSURE STEAM
LOW PRESSURE CONDENSATELPC
HPS
LOW PRESSURE STEAM
MEDIUM PRESSURE STEAMMPS
LPS
PUMPED CONDENSATEPC
SYMBOL LEGEND - MISC
DESCRIPTIONSYMBOL
VIEW OR DETAIL INDICATOR: # INDICATES DETAIL NUMBER,
SHEET INDICATES DRAWING SHEET WHERE VIEW OR DETAIL
IS SHOWN.
REFERENCE LINES AND SYMBOLS
ELEVATION OR SECTION INDICATOR: # INDICATES VIEW
NUMBER, SHEET INDICATES DRAWING SHEET WHERE VIEW IS
SHOWN.
NAME
### ROOM / SPACE INDICATOR
# KEYNOTE INDICATOR
# REVISION INDICATOR
XX-##
XX-##
TAG
CFM
PLUMBING FIXTURE INDICATOR
EQUIPMENT INDICATOR
REGISTER, GRILLE, OR DIFFUSER INDICATOR
BREAKLINE
MATCHLINE INDICATOR
CONTRACT LIMIT LINE: DASHDOT, WIDE LINE
NEW CONNECTION TO EXISTING
POINT OF DEMOLITION
OR
MATCH LINE
SEE XX/XXX
SQUARE OR RECTANGULAR
SUPPLY DIFFUSER
SYMBOL LEGEND - MECH
DESCRIPTIONSYMBOL
NOTE: ALL ABBREVIATIONS MAY NOT BE USED.
DUCT HIGH EFFICIENCY TAKE OFF
WITH BALANCING DAMPER
SQUARE OR RECTANGULAR
RETURN DIFFUSER
SQUARE OR RECTANGULAR
EXHAUST DIFFUSER
ROUND DIFFUSER
SIDEWALL GRILLE OR REGISTER
BALANCING DAMPER
FIRE DAMPER
FIRE / SMOKE COMBINATION
DAMPER
LINEAR SLOT GRILLE OR DIFFUSER
FLEXIBLE DUCT
C02 CARBON DIOXIDE
T S H THERMOSTAT - SENSOR - HUMIDISTAT
1. THE MECHANICAL DRAWINGS SHOW THE GENERAL DESIGN, ARRANGEMENT,
& EXTENT OF THE MECHANICAL SYSTEM. BECAUSE OF THE SMALL SCALE OF
THE DRAWINGS, THESE DRAWINGS DO NOT SHOW ALL OFFSETS, BENDS, OR
ELBOWS NECESSARY FOR THE COMPLETE INSTALLATION IN THE SPACE
PROVIDED. CONTRACTOR SHALL MAKE ALTERATIONS AS MAY BE
NECESSARY TO MAKE THE SYSTEM COMPLETE & OPERATIONAL IN
ACCORDANCE WITH THE DESIGN INTENT.
2. MAJOR DEVIATIONS SUCH AS CHANGES IN SIZES, WEIGHTS, QUANTITIES, OR
MATERIAL REQUIRE PRIOR APPROVAL BY THE DESIGN ENGINEER.
3. THE DRAWINGS & SPECIFICATIONS HAVE BEEN PREPARED TO SUPPLEMENT
EACH OTHER & SHALL BE INTERPRETED AS AN INTEGRAL UNIT WITH THE
ITEMS SHOWN ON ONE & NOT THE OTHER BEING FURNISHED & INSTALLED
AS THOUGH SHOWN AND CALLED OUT IN BOTH DOCUMENTS.
4. THE ENTIRE MECHANICAL INSTALLATION SHALL CONFORM TO THE
REQUIREMENTS OF THE MOST RECENTLY ADOPTED BUILDING CODES,
MECHANICAL CODE, PLUMBING CODE, ELECTRICAL CODE, & ALL OTHER
APPLICABLE CITY, COUNTY, STATE, & FEDERAL CODES & REGULATIONS IN
EFFECT.
5. THE ENTIRE MECHANICAL INSTALLATION SHALL CONFORM TO ALL CODES,
RULES, REGULATIONS, & REQUIREMENTS OF THE BUILDING OWNER.
6. ALL MECHANICAL COMPONENTS AND EQUIPMENT SHALL BE INSTALLED TO
CONFORM WITH ANY APPLICABLE LOCAL SEISMIC REQUIREMENTS.
7. PRIOR TO FABRICATION & INSTALLATION OF ANY MECHANICAL COMPONENT
THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL
MECHANICAL WORK WITH ALL OTHER BUILDING TRADES, INCLUDING
BUILDING TRADES HIRED DIRECTLY BY THE OWNER. WHERE CONFLICTS
MAY OCCUR, THEY SHALL BE RESOLVED PRIOR TO INSTALLATION.
8. VERIFY ALL REQUIRED SERVICE CONNECTIONS, INCLUDING ELECTRICAL
CHARACTERISTICS, FOR ALL EQUIPMENT PRIOR TO ORDERING OR
FABRICATING MECHANICAL EQUIPMENT AND COMPONENTS.
9. THE SPACE ABOVE CEILINGS IS LIMITED. CAREFUL COORDINATION IS
REQUIRED WITH ALL TRADES BEFORE ANY PIPE, DUCT, OR EQUIPMENT IS
ORDERED &/OR INSTALLED. ANY CONFLICTS &/OR CHANGES FOUND DURING
INSTALLATION THAT RESULTS FROM THE LACK OF COORDINATION BY THE
CONTRACTORS DURING THE SHOP DRAWING PROCESS ARE THE
RESPONSIBILITY OF THE CONTRACTOR.
10. ALL MECHANICAL INFORMATION IS NOT SHOWN ON THE MECHANICAL
DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION
OF ALL INFORMATION ON ALL OTHER CONSTRUCTION DOCUMENTS.
11. THE CONTRACTOR SHALL BE RESPONSIBLE TO REVIEW & USE, WHERE
APPROPRIATE, ALL THE MECHANICAL DETAILS SHOWN ON THE DRAWINGS.
DETAILS MAY OR MAY NOT BE CALLED OUT ON THE DRAWINGS WITH
SYMBOLS OR KEYED NOTES. ANY CHANGES RESULTING FROM FAILURE TO
INSTALL THE MECHANICAL SYSTEM WITHOUT USING THE INCLUDED DETAILS
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
12. ALL EQUIPMENT SHALL BE INDEPENDENTLY SUPPORTED FROM
STRUCTURAL MEMBERS. STRUCTURAL ELEMENTS SHOWN IN DETAILS MAY
OR MAY NOT PERTAIN TO ANY PORTION OF THE BUILDING. COORDINATE ALL
MOUNTING REQUIREMENTS WITH ARCHITECTURAL & STRUCTURAL
DRAWINGS AND SPECIFICATIONS.
13. ALL MECHANICAL COMPONENTS AND EQUIPMENT SHALL BE INSTALLED IN
ACCORDANCE WITH ALL MANUFACTURER RECOMMENDATIONS.
14. ALL SIMILAR EQUIPMENT SHALL BE OF THE SAME MANUFACTURER. AIR
INLETS & OUTLETS OF SIMILAR TYPES SHALL BE OF THE SAME
MANUFACTURER.
15. ANY PART OF THE MECHANICAL INSTALLATION THAT FAILS, IS DEEMED
UNFIT, OR BECOMES DAMAGED DURING CONSTRUCTION SHALL BE
REPAIRED OR REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO
THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EQUIPMENT
CHECK-IN, SAFEKEEPING, & DAMAGE.
16. COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT
LOCATION OF ALL CEILING DIFFUSERS & GRILLES.
17. CONTRACTOR SHALL OPERATE INSTALLED &/OR MODIFIED SYSTEMS &
DEMONSTRATE ALL ASPECTS OF THE SYSTEM TO THE ENGINEER &/OR
OWNER TO PROVE ALL ASSOCIATED SYSTEMS ARE OPERATIONAL.
18. DURING CONSTRUCTION THE CONTRACTOR SHALL MAINTAIN A SET OF AS-
BUILT REDLINED RECORD DRAWINGS AT THE PROJECT SITE. ALL CHANGES
OR DEVIATIONS IN LAYOUT, ROUTING, EQUIPMENT, COMPONENTS, &
ACCESSORIES SHALL BE RECORDED. THESE REDLINED DRAWINGS SHALL
BE GIVEN TO THE ARCHITECT / ENGINEER AFTER THE FINAL INSPECTION IN
ACCORDANCE WITH PROJECT SPECIFICATIONS.
19. ALL DUCT ELBOWS SHALL BE LONG RADIUS, UNLESS NOTED OTHERWISE.
MECHANICAL GENERAL NOTES
DUCT TO BE DEMOLISHED
MARK DATE DESCRIPTION
RETURN
SUPPLY
UNION (TYP)
1/2" DRAIN LINE WITH VALVE,
HOSE CONNECTION, AND CAP
SHUT-OFF VALVE (TYP)
P & T TEST PLUG (TYP)
STRAINER - BLOWDOWN WITH VALVE,
HOSE CONNECTION, AND CAP.
SAME SIZE AS BLOWDOWN
REDUCER (TYP)
MANUAL GLOBE-STYLE CONTROL
VALVE WITH MEMORY STOPS AND
REMOVABLE HANDLE. CONTROL
VALVE TO HAVE 3-5 PSI dP
COIL
1/2" MANUAL AIR VENT WITH
HOSE END CONNECTION
BALANCING VALVEMAY BE REPLACED WITH PRESSURE
INDEPENDENT BALANCING AND
CONTROL VALVE (PIBCV). PICBV SHALL
HAVE 100% CONTROL VALVE AUTHORITY
AND HAVE LINEAR FLOW
CHARACTERISTIC
TEMPORARY BYPASS AND
SHUTOFFS FOR FLUSHING,
FILLING, AND TREATING WHEN
ADDING A NEW COIL TO AN
EXISTING SYSTEM.
TEMPORARY LINE TO BE
REMOVED AFTER FLUSHING
FILLING AND TREATING
HOT TAP EXISTING PIPING
M
NOTE:
1. CONNECT SUPPLY TO LOWER SIDE OF COIL.
RETURN
SUPPLY
UNION (TYP)
1/2" DRAIN LINE WITH VALVE,
HOSE CONNECTION, AND CAP
SHUT-OFF VALVE (TYP)
P & T TEST PLUG (TYP)
STRAINER - BLOWDOWN WITH VALVE,
HOSE CONNECTION, AND CAP.
SAME SIZE AS BLOWDOWN
REDUCER (TYP)
MANUAL GLOBE-STYLE THREE WAY
CONTROL VALVE WITH MEMORY STOPS AND
REMOVABLE HANDLE. THREE WAY CONTROL
VALVE TO HAVE 3-5 PSI dP
COIL
1/2" MANUAL AIR VENT WITH
HOSE END CONNECTION
BALANCING VALVE (TYP)
TEMPORARY BYPASS AND
SHUTOFFS FOR FLUSHING,
FILLING, AND TREATING
WHEN ADDING A NEW COIL
TO AN EXISTING SYSTEM.
TEMPORARY LINE TO BE
REMOVED AFTER FLUSHING
FILLING AND TREATING
HOT TAP EXISTING PIPING
M
NOTES:
1. CONNECT SUPPLY TO LOWER SIDE OF COIL.
2. BALANCE FLOW TO COIL WITH BYPASS CLOSED
THEN BALANCE BYPASS TO MATCH FLOW OF COIL.
GAUGE COCK
PRESSURE GAUGE
STEEL SUPPORT
6" CONCRETE PAD
CIRCULATION PUMP
SUCTION DIFFUSER
BUTTERFLY VALVE
TRIPLE DUTY VALVE
FLEXIBLE PIPE CONNECTION
FLEXIBLE PIPE CONNECTION
BELL REDUCER
1/4" COPPER TUBING (TYP)
BRASS CONNECTION
OR TRUMPET VALVE
BELL REDUCER
SHUTOFF VALVE (TYP)
OMIT WITH TRUMPET VALVE
ASME PRESSURE RELIEF
VALVE SET AT 125 PSI
HOT WATER RETURN
SEE PLANS FOR SIZE
BOILER DRAIN
4" HIGH CONCRETE PAD
RELIEF VALVE
OUTLET
ISOLATION VALVE (TYP)
UNION (TYP)
BOILER
RUN PIPING TO
TRENCH DRAIN
HOT WATER SUPPLY-SEE PLANS FOR SIZE
NOTE:
1. PROVIDE AIR VENTS AT HIGH POINTS OF PIPING SYSTEM.
MOTORIZED CONTROL VALVE
Y-STRAINER
GAS PRESSURE REGULATOR.
COORDINATE WITH AND INSTALL PER ALL
MANUFACTURER RECOMMENDATIONS.
REGULATOR IS TYPICALLY TO BE LOCATED
A MIN. 10' AWAY FROM BOILER
CONNECT TO EXISTING GAS PIPING IN
MECH ROOM APPROXIMATELY 15'
UPSTREAM FROM BOILER .
THERMOMETER
PRESSURE GAUGE
NOTES:
1. EXISTING PIPING, COILS, VALVES, AND ACCESSORIES TO REMAIN. NEW UNIONS TO BE
PROVIDED. FIELD VERIFY EXISTING PIPING ARRANGEMENT AND NOTIFY DESIGN ENGINEER IF
DISCREPANCIES EXIST.
NEW 1-1/2" UNIONS
(TYPICAL OF 4)
RETURN
NEW 2" UNIONS
SUPPLY
HSP-2°F HSP CSP CSP-2°F
WATER
VALVE
OPEN
100%
HEATING
MAX
COOLING
MAX
INCREASE
IN
AIRFLOW
WATER VALVE
OPEN 30%
ROOM TEMPERATURE INCREASE
C F
M I N
C R
E A
S E
AN INCREASE IN ROOM
TEMPERATURE OVER
COOLING SETPOINT CAUSES
AIRFLOW TO MODULATE
FROM MINIMUM TO COOLING
MAXIMUM, WHICH IS REACHED
AT TWO DEGREES OVER THE
COOLING SETPOINT.
BETWEEN HEATING SETPOINT
AND COOLING SETPOINT (5 DEGREE
DEADBAND) AIRFLOW WILL BE AT
MINIMUM. A DECREASE IN
ROOM TEMPERATURE BELOW
HEATING SETPOINT FIRST
CAUSES THE WATER VALVE
TO MODULATE TO 30% OPEN
AT MINIMUM AIRFLOW. ANY
ADDITIONAL DECREASE IN
ROOM TEMPERATURE WILL
CAUSE THE AIRFLOW AND
WATER VALVE TO MODULATE
FROM MINIMUM (APPROXIMATELY 30%) TO
HEATING MAXIMUM.
TEMPERATURE SETPOINTS
CAN BE DIFFERENT FOR
OCCUPIED, UNOCCUPIED,
AND NIGHT SETBACK STATES.
VALVE
CLOSED
MODULATING
HEAT
AIRFLOW
AS-1
GLF-1 ET-1 P-1 P-2B-2B-1
HHWR HHWS
P-3
P-4
4"
4" 4"
3" 3" 3" 3"
3"
3"
3"4"
4"
4"
4"
3"
3"
3"
3"
3"
3"3"
3" 3"
2" PIPE COLUMN (TYP)
6" x 6" x 3/8"
THICK PLATE
3" x 3" x 1/4" (TYP)
3/8" EXPANSION
BOLT (TYP)
NOTES:
1. ALL WELDED CONSTRUCTION
2. FOR LENGTHS LESS THAN 4'-0" OMIT MIDDLE MEMBER
A S
R E
Q U
IR
E
D
LENGTH TO S
UIT E
QUIPMENT
W
IDTH TO SUIT EQUIPMENT
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
A J C
A R
C H
IT
E
C T
S P
C A
N D
W E
R E
C R
E A
T E
D
E V
O L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
E
S P
E C
IF
IE
D P
R O
J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F A
J C
A R
C H
IT
E
C
W
R
IT
T E
N D
IM
E
N S
IO
N
S O
N T
H E
S E
D R
A W
IN
G
S S
H A
L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D
Y V
A R
IA
T
IO
N
F R
O M
T H
E D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
S H
O W
N B
Y T
H E
S E
D R
A W
IN
G
S
W A
R N
IN
G
R
E P
R O
D U
C T
IO
N
H E
R E
O F
I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A D
E S
E C
R
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
SHEET NUMBER:
ISSUE DATE:
ISSUE TYPE:
DRAWN BY:
CHECKED BY:
PROJECT#:
PROJECT DESCRIPTION
SHEET NAME:
REVISIONS
ARCHITECT / CONSULTANT
703 east 1700 south salt lake city, ut 84105 ajcarchitects.com
A u to d e sk
D o c s:
-3
U
S D
A B e e
L a b H
V A
C L o g a n
-M e c h U
S D
A B e e
.r v t
:5
:1
A
M
01.12.2026
CONDOC
RHB
RHB
ME501
2024-32
POLLINATING INSECT-BIOLOGY
MANAGEMENT, SYSTEMATICS
RESEARCH UNIT
UTAH STATE UNIVERSITY
880 EAST 1400 NORTH
LOGAN, UT 84131
UPGRADE HVAC FOR
USDA BEE
LAB/HEADHOUSE
FACILITY
MECHANICAL DETAILS
SCALE: 1/8" = 1'-0"1
COIL PIPING DETAIL
SCALE: 1/8" = 1'-0"2
COIL PIPING WITH THREE WAY VALVE DETAIL
SCALE: 1/8" = 1'-0"4
PUMP - BASE MOUNTED DETAIL
SCALE: 1/8" = 1'-0"3
BOILER PIPING DETAIL
SCALE: 1/8" = 1'-0"5
AHU COIL PIPING SCHEMATIC
SCALE: 1/8" = 1'-0"6
VAV SEQUENCE DETAIL
SCALE: 1/2" = 1'-0"7
BOILER PIPING SCHEMATIC
SCALE: 1/8" = 1'-0"8
FAN SUPPORT FRAME DETAIL
L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
A J C
A R
C H
IT
E
C T
S P
C A
N D
W E
R E
C R
E A
T E
D
E V
O L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
E
S P
E C
IF
IE
D P
R O
J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F A
J C
A R
C H
IT
E
C
W
R
IT
T E
N D
IM
E
N S
IO
N
S O
N T
H E
S E
D R
A W
IN
G
S S
H A
L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D
Y V
A R
IA
T
IO
N
F R
O M
T H
E D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
S H
O W
N B
Y T
H E
S E
D R
A W
IN
G
S
W A
R N
IN
G
R
E P
R O
D U
C T
IO
N
H E
R E
O F
I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A D
E S
E C
R
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
SHEET NUMBER:
ISSUE DATE:
ISSUE TYPE:
DRAWN BY:
CHECKED BY:
PROJECT#:
PROJECT DESCRIPTION
SHEET NAME:
REVISIONS
ARCHITECT / CONSULTANT
703 east 1700 south salt lake city, ut 84105 ajcarchitects.com
A u to d e sk
D o c s:
-3
U
S D
A B e e
L a b H
V A
C L o g a n
-M e c h U
S D
A B e e
.r v t
:5
:1
A
M
01.12.2026
CONDOC
RHB
RHB
ME601
2024-32
POLLINATING INSECT-BIOLOGY
MANAGEMENT, SYSTEMATICS
RESEARCH UNIT
UTAH STATE UNIVERSITY
880 EAST 1400 NORTH
LOGAN, UT 84131
UPGRADE HVAC FOR
USDA BEE
LAB/HEADHOUSE
FACILITY
MECHANICAL
SCHEDULES
LOCHINVAR
AERCO
CLEAVER BROOKS
(1) PROVIDE WITH HIGH AND LOW GAS PRESSURE SWITCHES WITH MANUAL RESET.
(2) PROVIDE WITH LOW WATER CUT-OFF SWITCH WITH MANUAL TEST AND RESET.
(3) PROVIDE WITH FLOW PROVING SWITCH.
(4) PROVIDE 18" CLEAR ON ALL SIDES OF THE BOILER.
(5) PROVIDE WITH VENTLESS GAS PRESSURE REGULATOR BY PIETRO FIORENTINI OR EQUAL.
REGULATOR TO HAVE A MINIMUM OF TEN FEET OF PIPING BETWEEN BOILER AND REGULATOR.
(6) PROVIDE WITH BACNET CONTROLLER.
(7) PROVIDE WITH 125 PSI ASME RELIEF VALVE
(8) PROVIDE WITH EMERGENCY SHUT-OFF SWITCH.
(9) BOILER TO HAVE MINIMUM THERMAL EFFICIENCY OF 96% AS TESTED BY DOE 10 CFR PART 431.
(10) PROVIDE Y-STRAINER AND ISOLATION VALVE ON RETURN PIPING AND ASME RELIEF VALVE, MOTORIZED CONTROL VALVE, AND ISOLATION ON SUPPLY PIPING.
(11) PROVIDE CONDENSATE NEUTRALIZATION KIT
(12) FLUE TO BE AL29-4C. INSTALL FLUE WITH A CONTINUOUS 1/4" PER FOOT SLOPE TOWARD BOILER.
(13) PROVIDE FACTORY AUTHORIZED STARTUP OF EQUIPMENT INCLUDING STARTUP OF ANY FACTORY CONTROLS TO ENSURE PROPER
SEQUENCING AND/OR COMMUNICATION TO BMS.
PLUMB = DIVISION 22
MECH = DIVISION 23
ELEC = DIVISION 26
MNFR = MANUFACTURER
ACCEPTABLE MANUFACTURERS: REMARKS: SCHEDULE KEY:
BOILER SCHEDULE (GAS FIRED)
LABEL TYPE SERVES
HEATING CAPACITY WATER
GAS
CONNECTION
FLUE
INTAKE
SIZE
ELECTRICAL
DISCONNECT
PROVIDED BY
(MECH/ ELEC)
OPERATING
WEIGHT
(LBS) MANUFACTURER MODEL REMARKSINPUT OUTPUT
TURN
DOWN EFFICIENCY
EWT
(°F)
LWT
(°F)
MIN
FLOW
(GPM)
MAX
FLOW
(GPM)
INLET
SIZE
(IN)
OUTLET
SIZE
(IN)
PD
(IN-WC) SIZE TYPE
MAX
LENGTH VOLTS PHASE Hz FLA
EMERG
POWER
B-1 CONDENSING FIRE TUBE HEATING HOT WATER 999 961 20:1 96.2 120 160 18 350 3" 3" 6 1.25" 6" AL29-4C 50' - 0" 50" 120 1 60 6 NO ELEC 2,000 Lochinvar FBN1001 1-13
B-2 CONDENSING FIRE TUBE HEATING HOT WATER 999 961 20:1 96.2 120 160 18 350 3" 3" 6 1.25" 6" AL29-4C 50' - 0" 50" 120 1 60 6 NO ELEC 2,000 Lochinvar FBN1001 1-13
BELL & GOSSETT
ARMSTRONG
TACO
GRUNDFOS
1. PROVIDE NEMA 4 TEFC MOTOR WITH CLASS F INSULATION.
2. INTEGRAL VARIABLE SPEED CONTROLLER.
3. PROVIDE PRESSURE SENSOR IN MAIN JUST OUTSIDE BOILER ROOM PRIOR TO ANY BRANCH TAKE OFFS
4. PROVIDE FACTORY AUTHORIZED STARTUP OF EQUIPMENT INCLUDING STARTUP OF ANY FACTORY CONTROLS TO ENSURE PROPER SEQUENCING AND/OR COMMUNICATION TO BMS.
PLUMB = DIVISION 22
MECH = DIVISION 23
ELEC = DIVISION 26
MNFR = MANUFACTURER
ACCEPTABLE MANUFACTURERS: REMARKS: SCHEDULE KEY:
PUMP SCHEDULE (MECHANICAL EQUIPMENT)
LABEL PUMP TYPE SERVES FLUID TYPE
FLOW
(GPM)
PRESSURE
(FT)
NPSH
REQUIRED
(FT) RPM
WIRE TO
WATER
EFFICIENCY
ELECTRICAL
DISCONNECT
PROVIDED BY
(MECH/ ELEC)
WEIGHT
(LBS) MANUFACTURER MODEL REMARKS
BHP
(WATT
S) HP VOLTS PHASE Hz
EMERG
POWER
P-1 END SUCTION FOOTED VOLUTE HEATING HOT WATER PROPYLENE GLYCOL 35% 51 GPM 55.00 6 2000 52.3 1.01 3 208 3 60 NO ELEC 175 Bell & Gossett e-1532X 1.25AD 1-4
P-2 END SUCTION FOOTED VOLUTE HEATING HOT WATER PROPYLENE GLYCOL 35% 51 GPM 55.00 6 2000 52.3 1.01 3 208 3 60 NO ELEC 175 Bell & Gossett e-1532X 1.25AD 1-4
P-3 INLINE CIRCULATOR BOILER 1 PROPYLENE GLYCOL 35% 48 GPM 10.00 1 3200 0 (277) 1/2 120 1 60 NO ELEC 50 Grundfos MAGNA3 40-80 F 2,4
P-4 INLINE CIRBULATOR BOILER 2 PROPYLENE GLYCOL 35% 48 GPM 10.00 1 3200 0 (277) 1/2 120 1 60 NO ELEC 50 Grundfos MAGNA3 40-80 F 2,4
PRICE
KRUEGER
TITUS
(1) INLET STATIC PRESSURE OF 1.75" AND DISCHARGE OF .25"
(2) NC RATING BASED OFF OF AHRI STANDARD 885-2008
(3) PROVIDE WITH 1/2 IN. THICK, MIN. 1.5 LB DENSITY FIBERGLASS INTERNAL INSULATION
(4) PRESSURE INDEPENDENT OPERATION.
(5) PROVIDE NEMA 1 ENCLOSURE FOR CONTROLS.
(6) PROVIDE WITH BACNET CONTROLLER.
(7) PROVIDE INSULATED ACCESS PANEL.
(8) CONTROLS CONTRACTOR TO PROVIDE 120V TO 24V TRANSFORMER,
APPROX. ONE TRANSFORMER FOR EVERY SIX VAV BOXES.
ACCEPTABLE MANUFACTURERS: REMARKS:
VAV TERMINAL UNIT SCHEDULE (HYDRONIC HEAT)
LABEL SERVES
AIRFLOW
INLET
SIZE
HOT WATER HEATING COIL
MAX
DISCHARGE
NC MANUFACTURER MODEL REMARKS
MAX
(CFM)
MIN
(CFM)
MAX
AIRFLOW
(CFM)
CAPACITY
(BTUH)
EAT
(°F)
LAT
(°F)
FLOW
RATE
(GPM)
EWT
(°F)
LWT
(°F)
WATER PD
(FT) ROWS
CONTROL
VALVE
CV-3 CORNER OFFICE 400 120 8" 400 9,195 65 90 0.5 160 120 1.5 2 TWO WAY 35 PRICE SDV 1-8
PRICE
KRUEGER
TITUS
(1) INLET STATIC PRESSURE OF 1.75" AND DISCHARGE OF .25"
(2) NC RATING BASED OFF OF AHRI STANDARD 885-2008
(3) PROVIDE WITH 1/2 IN. THICK, MIN. 1.5 LB DENSITY FIBERGLASS INTERNAL INSULATION
(4) PRESSURE INDEPENDENT OPERATION.
(5) PROVIDE NEMA 1 ENCLOSURE FOR CONTROLS.
(6) PROVIDE WITH BACNET CONTROLLER.
(7) PROVIDE INSULATED ACCESS PANEL.
(8) EC MOTOR
(9) PROVIDE WITH MERV 13 FILTER.
PLUMB = DIVISION 22
MECH = DIVISION 23
ELEC = DIVISION 26
MNFR = MANUFACTURER
ACCEPTABLE MANUFACTURERS: REMARKS: SCHEDULE KEY:
FAN POWERED TERMINAL UNIT SCHEDULE (HYDRONIC HEAT)
LABEL
PARALLEL
OR
SERIES SERVES
PRIMARY AIRFLOW
INLET
SIZE
MAX
AIRFLOW
(CFM)
MOTOR
POWER
(WATTS) VOLTS PHASE FLA
HOT WATER HEATING COIL
DISCONNECT
PROVIDED BY
(MECH/ ELEC)
MAX
DISCHARGE
NC
WEIGHT
(LBS) MANUFACTURER MODEL REMARKS
MAX
(CFM)
MIN
(CFM)
CAPACITY
(BTUH)
EAT
(°F)
LAT
(°F)
FLOW
RATE
(GPM)
EWT
(°F)
LWT
(EWT
(°F)
WATER PD
(FT) ROWS
CONTROL
VALVE
FPB-1 SERIES LAB 410 135 8" 950 1/3 115 1 4.6 9,424 65 90 1 GPM 160 120 0.50 2 TWO WAY ELEC 35 75 PRICE FDC SIZE 10 1-9
FPB-2 SERIES LAB 1250 310 12" 1,250 1/3 115 1 4.6 28,733 65 90 2 GPM 160 120 0.50 2 TWO WAY ELEC 35 75 PRICE FDC SIZE 20 1-9
HUMIDIFIER SCHEDULE
LABEL SERVES
OPERATING
CONDITIONS
CAPACITY
(LBS/HR) CFM
ELECTRICAL
MAKE & MODELHP kW VOLTS MCA HUM-1 / BEE REARING 50% RH 12 4 208 19.5 DRISTEEM Low Maintenance 4 kW (3 phase)
SDU-1 / BEE REARING 50% RH 30 760 1/5 120 2.07 DRISTEEM SDU-I-RX
TRANE/ MITSUBISHI
LG
FUJITSU
DIAKIN
(1) PROVIDE WITH HAIL GUARDS.
(2) PROVIDE WITH MIRO INDUSTRIES LD SUPPORT/MOUNTING FRAME.
(3) PROVIDE WITH NEOPRENE PADS AT ALL MOUNTING CONNECTION POINTS.
(4) PROVIDE REFRIGERANT PIPING SIZED AS PER MANUFACTURER'S RECOMMENDATIONS. "ACR" COPPER ONLY.
(5) COORDINATE REFRIGERANT CHARGE AND PIPING SIZES WITH EQUIVALENT LINE LENGTH TO MINIMIZE
PRESSURE DROP AND CAPACITY LOSS.
(6) PROVIDE BOOT AT ANY CONDENSER LINE PENETRATIONS INTO BUILDING ENVELOPE.
(7) PROVIDE WITH WIND BAFFLE FOR COOLING AT -5 F.
(8) INDOOR UNIT POWERED FROM OUTDOOR UNIT.
(9) PROVIDE FACTORY AUTHORIZED STARTUP OF EQUIPMENT INCLUDING STARTUP OF ANY FACTORY CONTROLS TO ENSURE PROPER
SEQUENCING AND/OR COMMUNICATION TO BMS.
PLUMB = DIVISION 22
MECH = DIVISION 23
ELEC = DIVISION 26
MNFR = MANUFACTURER
ACCEPTABLE MANUFACTURERS: REMARKS: SCHEDULE KEY
CONDENSING UNIT SCHEDULE
LABEL SERVES
NOMINAL
COOLING
(BTUH) EER2
HEAT PUMP
CAPACITY
(BTUH) COP
REFRIGERANT
TYPE
MAX TOTAL
REFRIGERANT
PIPE LENGTH
(FT)
ELECTRICAL
DISCONNECT
PROVIDED BY
(MECH/ ELEC)
SOUND
RATING
(dBA)
WEIGHT
(LBS) MANUFACTURER MODEL REMARKSVOLTS PHASE Hz
MCA
(EACH)
MOCP
(EACH)
EMERG
POWER
CU-1 FREEZER ROOM 36,000 12.9 38,000 4.38 R-454B 100 208 1 60 25 30 NO ELEC 53 211 Mitsubishi Electric PUY-A36NKA7(-BS) ALL
CU-2 FREEZER ROOM 36,000 12.9 38,000 4.38 R-454B 100 208 1 60 25 30 NO ELEC 53 211 Mitsubishi Electric PUY-A36NKA7(-BS) ALL
SPIROVENT
CALEFFI
(1) PROVIDE VENTLESS / AUTOMATIC AIR VENT SEPARATOR.
(2) PROVIDE WITH DRAIN LINE WITH SHUT OFF VALVE. ROUTE TO NEAREST FLOOR SINK.
(3) PROVIDE ASME RATED SEPARATOR.
ACCEPTABLE MANUFACTURERS: REMARKS:
AIR / DIRT SEPARATOR SCHEDULE
LABEL TYPE SERVES
PIPE
DIAMETER
FLOW RATE
(GPM)
PD
(IN-WC)
VOLUME
(GAL)
OPERATING
WEIGHT
(LBS) MANUFACTURER MODEL REMARKS
AS-1 AIR AND DIRT HEATING HOT WATER 4" 110 1 7 250 SPIROTHERM VDT400 1-3
TRANE/ MITSUBISHI
LG
FUJITSU
DIAKIN
(1) INDOOR UNIT RECEIVES POWER FROM OUTDOOR UNIT THROUGH FIELD SUPPLIED WIRING.
(2) PROVIDE WITH CONDENSATE PUMP.
(3) RUN CONDENSATE DRAIN LINE TO NEAREST DRAIN.
(4) PROVIDE REFRIGERANT PIPING SIZED AS PER MANUFACTURER'S RECOMMENDATIONS.
"ACR" COPPER ONLY.
(5) COORDINATE REFRIGERANT CHARGE AND PIPING SIZES WITH EQUIVALENT
LINE LENGTH TO MINIMIZE PRESSURE DROP AND CAPACITY LOSS.
(6) PROVIDE FACTORY AUTHORIZED STARTUP OF EQUIPMENT INCLUDING
STARTUP OF ANY FACTORY CONTROLS TO ENSURE PROPER SEQUENCING
AND/OR COMMUNICATION TO BMS.
PLUMB = DIVISION 22
MECH = DIVISION 23
ELEC = DIVISION 26
MNFR = MANUFACTURER
ACCEPTABLE MANUFACTURERS: REMARKS: SCHEDULE KEY:
DUCTLESS SPLIT SYSTEM INDOOR UNIT
LABEL TYPE SERVES
TOTAL
COOLING
CAPACITY
(BTUH)
ELECTRICAL
DISCONNECT
PROVIDED BY
(MECH/ ELEC)
SOUND
LEVEL
(dBA)
WEIGHT
(LBS) MANUFACTURER MODEL REMARKSVOLTS PHASE Hz MCA
EMERG
POWER
(E)AC Ceiling cassette FREEZER ROOM 36,000 208 1 60 2 NO ELEC 44 95 Mitsubishi Electric Corporation PLA-A36EA8 1-7
AC-2 Ceiling cassette FREEZER ROOM 36,000 208 1 60 2 NO ELEC 44 95 Mitsubishi Electric Corporation PLA-A36EA8 1-7
AC-1 Ceiling cassette FREEZER ROOM 36,000 208 1 60 2 NO ELEC 44 95 Mitsubishi Electric Corporation PLA-A36EA8 1-7
L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
A J C
A R
C H
IT
E
C T
S P
C A
N D
W E
R E
C R
E A
T E
D
E V
O L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F A
J C
A R
C H
IT
E
C
W
R
IT
T E
N D
IM
E
N S
IO
N
S O
N T
H E
S E
D R
A W
IN
G
S S
H A
L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D
Y V
A R
IA
T
IO
N
F R
O M
T H
E D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
S H
O W
N B
Y T
H E
S E
D R
A W
IN
G
S
W A
R N
IN
G
R
E P
R O
D U
C T
IO
N
H E
R E
O F
I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A D
E S
E C
R
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
SHEET NUMBER:
ISSUE DATE:
ISSUE TYPE:
DRAWN BY:
CHECKED BY:
PROJECT#:
PROJECT DESCRIPTION
SHEET NAME:
REVISIONS
ARCHITECT / CONSULTANT
703 east 1700 south salt lake city, ut 84105 ajcarchitects.com
A u to d e sk
D o c s:
-3
U
S D
A B e e
L a b H
V A
C L o g a n
-M e c h U
S D
A B e e
.r v t
:5
:1
A
M
01.12.2026
CONDOC
RHB
RHB
ME602
2024-32
POLLINATING INSECT-BIOLOGY
MANAGEMENT, SYSTEMATICS
RESEARCH UNIT
UTAH STATE UNIVERSITY
880 EAST 1400 NORTH
LOGAN, UT 84131
UPGRADE HVAC FOR
USDA BEE
LAB/HEADHOUSE
FACILITY
MECHANICAL
SCHEDULES
PENN BARRY
LOREN COOK
TWIN CITY
GREENHECK
BROAN
PANASONIC
(A) VARIABLE FREQUENCY DRIVE INTELOCKED WITH
CONTROLS SYSTEM. FAN TO MODULATE BASED OFF OF
COOLING AND VENTILATION NEEDS OF SPACE.
(1) PROVIDE WITH BACKDRAFT DAMPER, DISCONNECT SWITCH,
SUPPORT STAND AND BRACKETS, ISOLATOR, AND EXTERNAL RATED ENCLOSURE.
(2) PROVIDE WITH VARIABLE FREQUENCY DRIVE
(3) PROVIDE WITH BUG GUARD ON FAN INLET.
(4) PROVIDE FACTORY AUTHORIZED STARTUP OF EQUIPMENT
INCLUDING STARTUP OF ANY FACTORY CONTROLS TO ENSURE
PROPER SEQUENCING AND/OR COMMUNICATION TO BMS.
PLUMB = DIVISION 22
MECH = DIVISION 23
ELEC = DIVISION 26
MNFR = MANUFACTURER
ACCEPTABLE MANUFACTURERS: CONTROLS: REMARKS: REMARKS CONTINUED: SCHEDULE KEY
EXHAUST FAN SCHEDULE - ADDITIVE ALTERNATE #1
LABEL SERVES TYPE CFM
ESP
(IN-WC) FAN RPM
ELECTRICAL DISCONNECT
PROVIDED BY
(MECH/ ELEC)
CONTROL
METHOD
INLET
SONES
WEIGHT
(LBS) MANUFACTURER MODEL REMARKSVOLTS PHASE Hz HP BHP FLA MOCP
EF-G1 GREENHOUSE INLINE 10000 0.75 856 208 3 60 3 2.1 10.6 20 ELEC A 13.3 650 GREENHECK SQ-22-M2-VG 1,2,3,4
EF-G2 GREENHOUSE INLINE 10000 0.75 856 208 3 60 3 2.1 10.6 20 ELEC A 13.3 650 GREENHECK SQ-22-M2-VG 1,2,3,4
EF-G3 GREENHOUSE INLINE 10000 0.75 856 208 3 60 3 2.1 10.6 20 ELEC A 13.3 650 GREENHECK SQ-22-M2-VG 1,2,3,4
EF-G4 GREENHOUSE INLINE 10000 0.75 856 208 3 60 3 2.1 10.6 20 ELEC A 13.3 650 GREENHECK SQ-22-M2-VG 1,2,3,4
EF-G5 GREENHOUSE INLINE 10000 0.75 856 208 3 60 3 2.1 10.6 20 ELEC A 13.3 650 GREENHECK SQ-22-M2-VG 1,2,3,4
EF-G6 GREENHOUSE INLINE 10000 0.75 856 208 3 60 3 2.1 10.6 20 ELEC A 13.3 650 GREENHECK SQ-22-M2-VG 1,2,3,4
MODINE
REZNOR
TRANE
STERLING
RUNTAL
(1) PROVIDE WITH BACNET CONTROLLER.
(2) PROVIDE WITH FINGER PROOF FAN GUARD.
PLUMB = DIVISION 22
MECH = DIVISION 23
ELEC = DIVISION 26
MNFR = MANUFACTURER
ACCEPTABLE MANUFACTURERS: REMARKS: SCHEDULE KEY:
UNIT HEATER SCHEDULE (HOT WATER)
LABEL TYPE
MOUNTING
HEIGHT
AIRFLOW
(CFM)
HEATING
CAPACITY
(BTUH)
FLOW
(GPM)
PD
(FT)
EWT
(°F)
LWT
(°F)
CONTROL
VALVE
ELECTRICAL DISCONNECT
PROVIDED BY
(MECH/ ELEC)
WEIGHT
(LBS) MANUFACTURER MODEL REMARKSVOLTS PHASE Hz HP
UH-1 HORIZONTAL DISCHARGE 13' - 0" 1,775 53,000 10 3.4 160 120 TWO WAY 120 1 60 1/5 ELEC 100 MODINE HSB 121 ALL
UH-2 HORIZONTAL DISCHARGE 13' - 0" 1,775 53,000 10 3.4 160 120 TWO WAY 120 1 60 1/5 ELEC 100 MODINE HSB 121 ALL
UH-3 HORIZONTAL DISCHARGE 13' - 0" 1,775 53,000 10 3.4 160 120 TWO WAY 120 1 60 1/5 ELEC 100 MODINE HSB 121 ALL
UH-4 HORIZONTAL DISCHARGE 13' - 0" 1,775 53,000 10 3.4 160 120 THREE WAY 120 1 60 1/5 ELEC 100 MODINE HSB 121 ALL
UH-5 HORIZONTAL DISCHARGE 13' - 0" 1,775 53,000 10 3.4 160 120 TWO WAY 120 1 60 1/5 ELEC 100 MODINE HSB 121 ALL
MARK DATE DESCRIPTION
VARIABLE FREQUENCY DRIVE SCHEDULE - ADD ALTERNATE #1
LABEL SERVES
LOAD DATA
WIRE AND
CONDUIT SIZE
OVERCURRENT
PROTECTION
DEVICE MANUFACTURER MODELHP
OUTPUT
(A) VOLTAGE PHASE Hz
VFD-1 EF-G1 3 10.6 208 3 60 3 #12, #12 GR
0.75" CND
20/3 CB YASKAWA HV60U2011CFA
VFD-2 EF-G2 3 10.6 208 3 60 3 #12, #12 GR
0.75" CND
20/3 CB YASKAWA HV60U2011CFA
VFD-3 EF-G3 3 10.6 208 3 60 3 #12, #12 GR
0.75" CND
20/3 CB YASKAWA HV60U2011CFA
VFD-4 EF-G4 3 10.6 208 3 60 3 #12, #12 GR
0.75" CND
20/3 CB YASKAWA HV60U2011CFA
VFD-5 EF-G5 3 10.6 208 3 60 3 #12, #12 GR
0.75" CND
20/3 CB YASKAWA HV60U2011CFA
VFD-6 EF-G6 3 10.6 208 3 60 3 #12, #12 GR
0.75" CND
20/3 CB YASKAWA HV60U2011CFA
A DB C
-2
(E)HUM
(E)CV-9
(E)CV-5
(E)CV-4
(E)CV-2
(E)CV-1
(E)CV-6
(E)CV-7
(E)CV-8
(E)CV-10
CUH
CUH
CUH
MH401
REMOVE
EXISTING
HUMIDIFIER
EXISTING
AC TO
REMAIN
REMOVE
EXISTING
VAV BOX
REMOVE
EXISTING BASE
MOUNTED PUMPS
REMOVE EXISTING
AIR SEPARATOR
REMOVE EXISTING
INLINE PUMPS
REMOVE EXISTING
BOILER AND
ASSOCIATED PIPING IN
BOILER ROOM.
REMOVE
EXISTING
VAV BOX
ADDITIVE ALTERNATE #1.
REMOVE EXISTING
EXHAUST FAN.
ADDITIVE ALTERNATE #1.
REMOVE EXISTING
EXHAUST FAN.
ADDITIVE ALTERNATE #1.
REMOVE EXISTING
EXHAUST FAN.
ADDITIVE ALTERNATE #1.
REMOVE EXISTING
EXHAUST FAN.
ADDITIVE ALTERNATE #1.
REMOVE EXISTING
EXHAUST FAN.
ADDITIVE ALTERNATE #1.
REMOVE EXISTING
EXHAUST FAN.
ADDITIVE ALTERNATE #1.
REMOVE EXISTING
EXHAUST FAN.
ADDITIVE ALTERNATE #1.
REMOVE EXISTING
EXHAUST FAN.
ADDITIVE ALTERNATE #1.
REMOVE EXISTING
EXHAUST FAN.
ADDITIVE ALTERNATE #1.
REMOVE EXISTING
EXHAUST FAN.
ADDITIVE ALTERNATE #1.
REMOVE EXISTING
EXHAUST FAN.
ADDITIVE ALTERNATE #1.
REMOVE EXISTING
EXHAUST FAN.
ADDITIVE ALTERNATE #1.
REMOVE EXISTING
EVAPORATIVE COOLING
MEDIA.
ADDITIVE ALTERNATE #1.
REMOVE EXISTING
EVAPORATIVE COOLING
MEDIA.
ADD ALT #1:
REMOVE EXISTING
GREENHOUSE
CONTROLS.
MECHANICAL GENERAL NOTES:
A. THIS CONTRACTOR SHALL CLOSELY COORDINATE MECHANICAL AND
PLUMBING WITH ELECTRICAL, ARCHITECTURAL, AND BUILDING STRUCTURE.
B. ALL LOW PRESSURE RECTANGULAR DUCTWORK TO BE LINED WITH
INSULATION WITH AN R-VALUE OF R-6. ALL LOW PRESSURE ROUND
DUCTWORK TO BE WRAPPED WITH INSULATION WITH AN R-VALUE OF R-6. NO
DUCT LINER IN OUTSIDE AIR DUCTWORK OR DUCTWORK WITH IN DUCT
HUMIDIFIERS.
C. ALL MEDIUM PRESSURE DUCTWORK TO BE 1" ACOUSTICAL DOUBLE WALL
WITH PERFORATED INTERIOR DUCTWORK.
D. NO DUCT LINER IN OUTSIDE AIR DUCTWORK OR DUCTWORK WITH IN DUCT
HUMIDIFIERS.
E. ALL DUCT DIMENSIONS ARE INSIDE CLEAR DIMENSIONS.
F. FLEXIBLE DUCT MAY BE USED AT FINAL TERMINATION OF DUCT TO DIFFUSER
OR GRILLE. MAXIMUM FLEXIBLE DUCT LENGTH IS 5'-0". PROVIDE DUCT
SUPPORTS EVERY 3 FEET. FLEX DUCT SHALL NOT BE COMPRESSED OR
KINKED BY ANY OBJECTS SUCH AS STRUCTURE, PIPING, ETC.
G. GRILLES AND DUCTWORK ARE SIZED INDEPENDENTLY. THE NECK SIZE OF
GRILLES MAY NOT MATCH THE ASSOCIATED DUCT SIZE. PROVIDE TRANSITION
TO GRILLES AS NECESSARY.
H. PROVIDE BALANCING DAMPER WITH LOCKING QUADRANT IN EACH DUCT
BRANCH OF SUPPLY AND EXHAUST DUCTWORK.
I. PROVIDE REMOTE CABLE OPERATED DAMPER SYSTEM FOR ALL DUCTWORK
ABOVE HARD LID CEILINGS OR WHERE DAMPER IS INACCESSIBLE OR PROVIDE
OPPOSED BLADE DAMPER WITH NYLON BUSHINGS AT GRILLE.
J. PROVIDE ACCESS DOORS FOR ALL SERVICEABLE EQUIPMENT OR VALVES
ABOVE HARD LID CEILINGS OR IN WALLS. ALL ACCESS PANELS ARE TO BE
PAINTED TO MATCH ADJACENT SURFACES.
K. GC TO HIRE NEBB OR AABC CERTIFIED THIRD PARTY TEST AND BALANCE (TAB)
CONTRACTOR. FOLLOW PROCEDURES AS LAID FORTH IN THE CURRENT
VERSION OF "PROCEDURAL STANDARDS FOR TESTING ADJUSTING AND
BALANCING OF ENVIRONMENTAL SYSTEMS" BY NEBB. PROVIDE REPORT ON
NEBB FORMS TO ENGINEER FOR REVIEW.
L. ALL MATERIALS WITHIN PLENUMS SHALL BE NONCOMBUSTIBLE OR SHALL BE
LISTED AND LABELED AS HAVING A FLAME SPREAD INDEX OF NOT MORE THAN
25 AND A SMOKE-DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED IN
ACCORDANCE WITH ASTM E 84 OR UL 723.
M. INSULATE ALL PLASTIC PIPING IN CEILING PLENUM. COMPLETELY ENCLOSE
PLASTIC PIPE IN INSULATION THAT MEETS THE FLAME SPREAD INDEX OF NOT
MORE THAN 25 AND A SMOKE-DEVELOPED INDEX OF NOT MORE THAN 50.
N. THIS PROJECT WILL REQUIRE AFTER HOURS AND WEEKEND WORK TO RUN
PIPING/DUCTWORK OR MODIFY SYSTEMS IN OR AFFECTING OCCUPIED
SPACES. COORDINATE ALL SHUTDOWNS 72 HOURS IN ADVANCE WITH OWNER
AND USERS. A SCHEDULE WITH ANTICIPATED SHUT DOWNS, DURATION,
WHICH SYSTEMS WILL BE IMPACTED, ETC. MUST BE PROVIDED AT THE
BEGINNING OF THE PROJECT AND UPDATED AT EACH OAC MEETING. HEATING
WATER SYSTEM IS ONLY PERMITTED TO BE SHUT DOWN BETWEEN MAY AND
SEPTEMBER.
O. CONTROLS TO MATCH EXISTING JOHNSON CONTROLS. TIE INTO EXISTING
JOHNSON CONTROLS DDC SYSTEM AND UPDATED GRAPHICS.
P. COORDINATE EXACT THERMOSTAT LOCATIONS WITH FURNITURE AND OWNER.
FAILURE TO DO SO MAY REQUIRE MOVING THERMOSTATS AT CONTRACTORS
COST.
Q. ALL CONTROLS WIRING SHALL BE INSTALLED IN RACEWAYS AND BE THE
RESPONSIBILITY OF THE CONTROLS CONTRACTOR. RACEWAYS SHALL
CONFORM TO THE FOLLOWING ELECTRICAL SPECIFICATIONS; HANGERS AND
SUPPORTS FOR ELECTRICAL SYSTEMS, RACEWAYS AND BOXES FOR
ELECTRICAL SYSTEMS AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS.
R. CONTRACTOR SHALL FIELD VERIFY EXISTING FIELD CONDITIONS PRIOR TO
ORDERING OR FABRICATING. ADDITIONAL COST WILL NOT BE ALLOWED FOR
CONTRACTOR'S FAILURE TO BECOME FAMILIAR WITH EXISTING SITE
CONDITIONS.
S. PROVIDE SOUND BOOT ON ALL RETURN GRILLES. SOUND BOOT TO BE SHEET
METAL WITH ACOUSTICAL DUCT LINER. DUCT BOARD IS NOT AN APPROVED
MATERIAL FOR SOUND BOOTS. SEE SOUND BOOT DETAIL.
T. PRESSURE TEST HYDRONIC PIPING. USE AMBIENT TEMPERATURE WATER
UNLESS THERE IS RISK OF FREEZING. WHILE FILLING SYSTEM USING DRAINS
AND VENTS TO ENSURE NO AIR IN SYSTEM. ISOLATE EXPANSION TANK(S).
SUBJECT PIPING SYSTEM TO 1.5 TIMES THE SYSTEM'S WORKING PRESSURE
FOR 20 MINUTES. EXAMINE PIPING, JOINTS, AND CONNECTIONS FOR LEAKAGE.
ELIMINATE LEAKS BY TIGHTENING, REPAIRING, OR REPLACING COMPONENTS,
AND REPEAT HYDROSTATIC TEST UNTIL THERE ARE NO LEAKS. PREPARE
WRITTEN REPORT OF TESTING.
U. BALL VALVES SHALL BE FULL PORT WITH BRONZE BODY AND BRASS BALL.
PROVIDE WITH HANDLE/STEM EXTENSIONS FOR PROPER FUNCTION WHEN
FULLY INSULATED. EXTENSIONS TO BE SEALED AND VAPOR PROOF.
V. INSTALL INSULATION OVER FITTINGS, VALVES, STRAINERS, FLANGES, UNIONS,
AND OTHER SPECIALTIES WITH CONTINUOUS THERMAL AND VAPOR-
RETARDER INTEGRITY. STRAINERS, CONTROL VALVES, AND BALANCING
VALVES SHALL HAVE REMOVABLE INSULATION WITH LABEL INDICATED WHAT
TYPE OF PIPE ACCESSORY IS BELOW INSULATION. INSULATION SHALL NOT
IMPEDE PROPER OPERATION OF ACCESSORY.
W. TREAT ALL WATER IN HYDRONIC PIPING. CLEAN PIPING PRIOR TO ADDING
CHEMICAL TREATMENT BY FILLING SYSTEM WITH FRESH WATER AND ADD
LIQUID ALKALINE COMPOUND WITH EMULSIFYING AGENTS AND DETERGENTS
TO REMOVE GREASE AND PETROLEUM PRODUCTS FROM PIPING. CIRCULATE
SOLUTION FOR A MINIMUM OF 24 HOURS, DRAIN, CLEAN STRAINER SCREENS,
AND REFILL WITH FRESH WATER. DO NOT USE SYSTEM PUMPS FOR CLEAN OR
TREATING. A SEPARATE/TEMPORARY FLUSH PUMP MUST BE USED. PERFORM
AN ANALYSIS OF MAKEUP WATER TO DETERMINE TYPE AND QUANTITIES OF
CHEMICAL TREATMENT NEEDED TO KEEP SYSTEM FREE OF SCALE,
CORROSION, AND FOULING AND ADD NECESSARY CHEMICALS TO SYSTEM.
PROVIDE SYSTEM WITH CHEMICAL POT FEEDER. PROVIDE WRITTEN REPORTS
OF TESTING RESULTS TO ENGINEER FOR REVIEW. INCLUDE 1 YEAR OF
SERVICE FOR CHEMICAL TREATMENT INCLUDING CHEMICALS. APPROVED
CHEMICAL TREATMENT CONTRACTORS ARE POWERS ENGINEERING AND
W.E.S.T. INC.
X. PROVIDE SUCTION DIFFUSERS ON ALL HYDRONIC PUMPS. REMOVE PUMP
STARTUP SCREENS AFTER INITIAL STARTUP.
Y. PROVIDE INVERTER DUTY MOTOR THAT COMPLIES WITH NEMA MG-1 SECTION
IV PART 31 AND INSULATED MOTOR BEARINGS AND SHAFT GROUNDING FOR
ALL MOTORS UTILIZING VFDS. PROVIDE OUTPUT AND DV/DT FILTER FOR ALL
VFDS.
Z. PROVIDE FACTORY AUTHORIZED STARTUP OF ALL EQUIPMENT INCLUDING
STARTUP OF ANY FACTORY CONTROLS TO ENSURE PROPER SEQUENCING
AND/OR COMMUNICATION TO BMS.
AA. PROVIDE OPERATION AND MAINTENANCE MANUALS (O&M) WITHIN 30 DAYS OF
CERTIFICATE OF OCCUPANCY FOR ALL EQUIPMENT IN DIGITAL FORMAT TO
ENGINEER FOR REVIEW. O&M'S SHALL INCLUDE DOCUMENTATION OF ALL
WARRANTIES, REPORTS AND TESTS, RECORD DRAWINGS, CONTROLS
SEQUENCE OF OPERATIONS WITH DIAGRAMS, & EQUIPMENT INFORMATION.
EQUIPMENT INFORMATION INCLUDES MAKE & MODEL, WIRING, PIPING,
STARTUP, SHUTDOWN, TROUBLE SHOOTING SYSTEM BALANCING REPORT,
FINAL COMMISSIONING REPORT AND MAINTENANCE PROCEDURES.
BB. PIPING AND DUCTWORK SHALL NOT BE SUPPORTED FROM THE ROOF DECK,
JOIST BRIDGING OR OTHER PIPES. HANG PIPES FROM BEAMS, JOIST OR
SUPPLEMENTARY STRUCTURAL MEMBERS. WHERE POSSIBLE INSTALL ALL
PIPING AND DUCTWORK WITHIN 12" FROM SUPPORTING STRUCTURE.
CC. CONTRACTOR IS RESPONSIBLE FOR PROVIDING SEISMIC RESTRAINT AND
SUPPORT ENGINEERED BY A LICENSED STRUCTURAL ENGINEER. PROVIDE
DESIGN DRAWINGS TO AUTHORITY HAVING JURISDICTION AND MECHANICAL
ENGINEER FOR REVIEW. INCLUDE ALL DETAILS FOR INSTALLING NECESSARY
RESTRAINT.
DD. GENERAL CONTRACTOR SHALL HIRE A 3RD PARTY COMMISSIONING AGENT TO
COMMISSION NEW HVAC EQUIPMENT. COMMISSIONING AGENT SHALL BE
LICENSED MECHANICAL ENGINEER. COMMISSIONING AGENT TO PROVIDE
COMMISSIONING PLAN LISTING EQUIPMENT AND TEST TO BE PERFORMED TO
ENGINEER FOR REVIEW. COMMISSIONING AGENT SHALL PROVIDE REPORT
STATING ANY SYSTEM DEFICIENCIES AND LISTING ANY DEFERRED TESTS.
EE. MECHANICAL PIPING SCHEDULE:
A. HYDRONIC PIPING 3" AND UNDER = TYPE L COPPER - BRAZED JOINTS
B. HYDRONIC PIPING OVER 3" = SCHEDULE 40 STEEL PIPE - WROUGHT STEEL
FITTINGS WELDED JOINTS OR POLYPROPYLENE FUSION WELDED
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
A J C
A R
C H
IT
E
C T
S P
C A
N D
W E
R E
C R
E A
T E
D
E V
O L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
E
S P
E C
IF
IE
D P
R O
J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F A
J C
A R
C H
IT
E
C
W
R
IT
T E
N D
IM
E
N S
IO
N
S O
N T
H E
S E
D R
A W
IN
G
S S
H A
L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D
Y V
A R
IA
T
IO
N
F R
O M
T H
E D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
S H
O W
N B
Y T
H E
S E
D R
A W
IN
G
S
W A
R N
IN
G
R
E P
R O
D U
C T
IO
N
H E
R E
O F
I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A D
E S
E C
R
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
SHEET NUMBER:
ISSUE DATE:
ISSUE TYPE:
DRAWN BY:
CHECKED BY:
PROJECT#:
PROJECT DESCRIPTION
SHEET NAME:
REVISIONS
ARCHITECT / CONSULTANT
703 east 1700 south salt lake city, ut 84105 ajcarchitects.com
A u to d e sk
D o c s:
-3
U
S D
A B e e
L a b H
V A
C L o g a n
-M e c h U
S D
A B e e
.r v t
:5
:1
A
M
01.12.2026
CONDOC
RHB
RHB
MD101
2024-32
POLLINATING INSECT-BIOLOGY
MANAGEMENT, SYSTEMATICS
RESEARCH UNIT
UTAH STATE UNIVERSITY
880 EAST 1400 NORTH
LOGAN, UT 84131
UPGRADE HVAC FOR
USDA BEE
LAB/HEADHOUSE
FACILITY
LEVEL 1 MECHANICAL
DEMO PLAN
SCALE: 1/8" = 1'-0"1
LEVEL 1 MECHANICAL DEMOLITION PLAN
MARK DATE DESCRIPTION
1 4/27/26 BIDDER
QUESTIONS
-2
REMOVE EXISTING
BOILER FLUE.
PATCH AND REPAIR
ROOF WATER
TIGHT.
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
A J C
A R
C H
IT
E
C T
S P
C A
N D
W E
R E
C R
E A
T E
D
E V
O L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F A
J C
A R
C H
IT
E
C
W
R
IT
T E
N D
IM
E
N S
IO
N
S O
N T
H E
S E
D R
A W
IN
G
S S
H A
L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D
Y V
A R
IA
T
IO
N
F R
O M
T H
E D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
S H
O W
N B
Y T
H E
S E
D R
A W
IN
G
S
W A
R N
IN
G
R
E P
R O
D U
C T
IO
N
H E
R E
O F
I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A D
E S
E C
R
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
SHEET NUMBER:
ISSUE DATE:
ISSUE TYPE:
DRAWN BY:
CHECKED BY:
PROJECT#:
PROJECT DESCRIPTION
SHEET NAME:
REVISIONS
ARCHITECT / CONSULTANT
703 east 1700 south salt lake city, ut 84105 ajcarchitects.com
A u to d e sk
D o c s:
-3
U
S D
A B e e
L a b H
V A
C L o g a n
-M e c h U
S D
A B e e
.r v t
:5
:1
A
M
01.12.2026
CONDOC
RHB
RHB
MD102
2024-32
POLLINATING INSECT-BIOLOGY
MANAGEMENT, SYSTEMATICS
RESEARCH UNIT
UTAH STATE UNIVERSITY
880 EAST 1400 NORTH
LOGAN, UT 84131
UPGRADE HVAC FOR
USDA BEE
LAB/HEADHOUSE
FACILITY
ROOF MECHANICAL
DEMO PLAN
SCALE: 1/8" = 1'-0"1
ROOF MECHANICAL DEMOLITION PLAN
-2
MH401
B-1
B-2
FPB-1
P-2P-1
FPB-2
UH-4
UH-5UH-1
UH-2
UH-3
HUM-1
3/4"ø HHWS
3/4"ø HHWR
3/4"ø HHWS
3/4"ø HHWR
3/4"ø HHWR
3/4"ø HHWS
3/4"ø HHWR
3/4"ø HHWS
1"ø HHWS
1"ø HHWR
ADD ALT #1
ADD ALT #1
ADD ALT #1
ADD ALT #1
ADD ALT #1
ADD ALT #1
ADD ALT #1
ADD ALT #1
ADD ALT #1
ADD ALT #1
ADD ALT #1
ADD ALT #1
ADD ALT #1
ADD ALT #1
ADD ALT #1:
PROVIDE NEW
EVAPORATIVE
COOLING PADS
WITH 3' TALL BY
4" THICK PADS
THE LENGTH OF
THE WALL.
ADD ALT #1:
PROVIDE NEW
VARIABLE SPEED
FANS. REUSE
EXISTING OPENINGS
WHERE POSSIBLE.
(E)AC AC-2
CV-3 1
"x
S A
8"ø SA
3/4"ø HHWS 3/4"ø HHWR
REPLACE ALL GROOVED
FITTINGS AND DIELECTRIC
UNIONS ON ALL HEATING HOT
WATER SUPPLY AND RETURN
PIPING. REPLACE GROOVED
FITTINGS WITH WELDED.
SDU-1
MAINTAIN 5' CLEAR
IN FRONT OF UNIT
FREEZER/INCUBATOR ROOM
OFFICE
01 VEST
OFFICE
CORR
CORR
MOLECULAR LAB
MOLECULAR LAB
LAB ROOM
BREAK ROOM
COLD ROOM
MECHANICAL
ELECTRICAL
11 PATH LAB
LAB
LAB
LAB WORKROOM
GREENHOUSE
GREENHOUSE
TOILET
JAN
TOILET
OFFICE
OFFICE
CORR
1"ø HHWR 4"ø HHWS
3/4"ø HHWR
4"ø HHWS
3/4"ø HHWS
2"ø HHWS
2"ø HHWR
4"ø HHWS 4"ø HHWR
4"ø HHWR
1"ø HHWS
1"ø HHWR
3"ø HHWR
1 1/4"ø HHWS
3"ø HHWR
1 1/4"ø HHWS
1 1/4"ø HHWS
3"ø HHWR
1 1/2"ø HHWS 3"ø HHWR
1 1/4"ø HHWS 3"ø HHWR
1 1/2"ø HHWS 3"ø HHWR
3"ø HHWS
2 1/2"ø HHWR
2"ø HHWR
2 1/2"ø HHWS
3"ø HHWS1 1/4"ø HHWR
2 1/2"ø HHWR 2 1/2"ø HHWS
ADD ALT #1:
PROVIDE NEW
VARIABLE SPEED
FANS. REUSE
EXISTING OPENINGS
WHERE POSSIBLE.
ADD ALT #1:
PROVIDE NEW
EVAPORATIVE
COOLING PADS
WITH 3' TALL BY
4" THICK PADS
THE LENGTH OF
THE WALL.
ADD ALT #1:
PROVIDE NEW
EVAPORATIVE
COOLING PADS
WITH 3' TALL BY
4" THICK PADS
THE LENGTH OF
THE WALL.
ADD ALT #1:
PROVIDE NEW
EVAPORATIVE
COOLING PADS
WITH 3' TALL BY
4" THICK PADS
THE LENGTH OF
THE WALL.
ADD ALT #1:
PROVIDE NEW
EVAPORATIVE
COOLING PADS
WITH 3' TALL BY
4" THICK PADS
THE LENGTH OF
THE WALL.
ADD ALT #1:
PROVIDE NEW
EVAPORATIVE
COOLING PADS
WITH 3' TALL BY
4" THICK PADS
THE LENGTH OF
THE WALL.
ADD ALT #1:
REPLACE
OPERABLE
ROOF PANEL
ACTUATOR
ADD ALT #1:
REPLACE
OPERABLE
WALL PANEL
ACTUATOR
ADD ALT #1:
REPLACE
OPERABLE
WALL PANEL
ACTUATOR
ADD ALT #1:
REPLACE
OPERABLE
ROOF PANEL
ACTUATOR
AC-1
ADD ALT #1:
REPLACE
OPERABLE
ROOF PANEL
ACTUATOR
ADD ALT #1:
REPLACE
OPERABLE
ROOF PANEL
ACTUATOR
ADD ALT #1:
REPLACE
OPERABLE
ROOF PANEL
ACTUATOR
EF-G3
EF-G4
EF-G2
EF-G5
EF-G1
EF-G6
VFD-1 VFD-6
VFD-2 VFD-5
VFD-3 VFD-4
PROVIDE dP SENSOR.
EXISTING THREE WAY
VALVE TO REMAIN.
ALL THREE WAY VALVES ARE
TO BE REPLACE WITH 2 WAY
VALVES UNLESS NOTED TO
REMAIN.
EXISTING THREE WAY
VALVE TO REMAIN.
PROVIDE THREE WAY
VALVE AT THIS
LOCATION.
ADD ALT#1: NEW BMS PANEL LOCATION.
TIE GREENHOUSE EQUIPMENT INTO
EXISTING JOHNSON CONTROL BMS.
8"ø SA
12"x12" SA
CONNECT TO
EXISTING DUCT IN
THIS APPROXIMATE
LOCATION.
CONNECT TO
EXISTING DUCT IN
THIS APPROXIMATE
LOCATION.
20"x12" SA
CONNECT TO
EXISTING DUCT IN
THIS APPROXIMATE
LOCATION.
MECHANICAL GENERAL NOTES:
A. THIS CONTRACTOR SHALL CLOSELY COORDINATE MECHANICAL AND
PLUMBING WITH ELECTRICAL, ARCHITECTURAL, AND BUILDING STRUCTURE.
B. ALL LOW PRESSURE RECTANGULAR DUCTWORK TO BE LINED WITH
INSULATION WITH AN R-VALUE OF R-6. ALL LOW PRESSURE ROUND
DUCTWORK TO BE WRAPPED WITH INSULATION WITH AN R-VALUE OF R-6. NO
DUCT LINER IN OUTSIDE AIR DUCTWORK OR DUCTWORK WITH IN DUCT
HUMIDIFIERS.
C. ALL MEDIUM PRESSURE DUCTWORK TO BE 1" ACOUSTICAL DOUBLE WALL
WITH PERFORATED INTERIOR DUCTWORK.
D. NO DUCT LINER IN OUTSIDE AIR DUCTWORK OR DUCTWORK WITH IN DUCT
HUMIDIFIERS.
E. ALL DUCT DIMENSIONS ARE INSIDE CLEAR DIMENSIONS.
F. FLEXIBLE DUCT MAY BE USED AT FINAL TERMINATION OF DUCT TO DIFFUSER
OR GRILLE. MAXIMUM FLEXIBLE DUCT LENGTH IS 5'-0". PROVIDE DUCT
SUPPORTS EVERY 3 FEET. FLEX DUCT SHALL NOT BE COMPRESSED OR
KINKED BY ANY OBJECTS SUCH AS STRUCTURE, PIPING, ETC.
G. GRILLES AND DUCTWORK ARE SIZED INDEPENDENTLY. THE NECK SIZE OF
GRILLES MAY NOT MATCH THE ASSOCIATED DUCT SIZE. PROVIDE TRANSITION
TO GRILLES AS NECESSARY.
H. PROVIDE BALANCING DAMPER WITH LOCKING QUADRANT IN EACH DUCT
BRANCH OF SUPPLY AND EXHAUST DUCTWORK.
I. PROVIDE REMOTE CABLE OPERATED DAMPER SYSTEM FOR ALL DUCTWORK
ABOVE HARD LID CEILINGS OR WHERE DAMPER IS INACCESSIBLE OR PROVIDE
OPPOSED BLADE DAMPER WITH NYLON BUSHINGS AT GRILLE.
J. PROVIDE ACCESS DOORS FOR ALL SERVICEABLE EQUIPMENT OR VALVES
ABOVE HARD LID CEILINGS OR IN WALLS. ALL ACCESS PANELS ARE TO BE
PAINTED TO MATCH ADJACENT SURFACES.
K. GC TO HIRE NEBB OR AABC CERTIFIED THIRD PARTY TEST AND BALANCE (TAB)
CONTRACTOR. FOLLOW PROCEDURES AS LAID FORTH IN THE CURRENT
VERSION OF "PROCEDURAL STANDARDS FOR TESTING ADJUSTING AND
BALANCING OF ENVIRONMENTAL SYSTEMS" BY NEBB. PROVIDE REPORT ON
NEBB FORMS TO ENGINEER FOR REVIEW.
L. ALL MATERIALS WITHIN PLENUMS SHALL BE NONCOMBUSTIBLE OR SHALL BE
LISTED AND LABELED AS HAVING A FLAME SPREAD INDEX OF NOT MORE THAN
25 AND A SMOKE-DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED IN
ACCORDANCE WITH ASTM E 84 OR UL 723.
M. INSULATE ALL PLASTIC PIPING IN CEILING PLENUM. COMPLETELY ENCLOSE
PLASTIC PIPE IN INSULATION THAT MEETS THE FLAME SPREAD INDEX OF NOT
MORE THAN 25 AND A SMOKE-DEVELOPED INDEX OF NOT MORE THAN 50.
N. THIS PROJECT WILL REQUIRE AFTER HOURS AND WEEKEND WORK TO RUN
PIPING/DUCTWORK OR MODIFY SYSTEMS IN OR AFFECTING OCCUPIED
SPACES. COORDINATE ALL SHUTDOWNS 72 HOURS IN ADVANCE WITH OWNER
AND USERS. A SCHEDULE WITH ANTICIPATED SHUT DOWNS, DURATION,
WHICH SYSTEMS WILL BE IMPACTED, ETC. MUST BE PROVIDED AT THE
BEGINNING OF THE PROJECT AND UPDATED AT EACH OAC MEETING. HEATING
WATER SYSTEM IS ONLY PERMITTED TO BE SHUT DOWN BETWEEN MAY AND
SEPTEMBER.
O. CONTROLS TO MATCH EXISTING JOHNSON CONTROLS. TIE INTO EXISTING
JOHNSON CONTROLS DDC SYSTEM AND UPDATED GRAPHICS.
P. COORDINATE EXACT THERMOSTAT LOCATIONS WITH FURNITURE AND OWNER.
FAILURE TO DO SO MAY REQUIRE MOVING THERMOSTATS AT CONTRACTORS
COST.
Q. ALL CONTROLS WIRING SHALL BE INSTALLED IN RACEWAYS AND BE THE
RESPONSIBILITY OF THE CONTROLS CONTRACTOR. RACEWAYS SHALL
CONFORM TO THE FOLLOWING ELECTRICAL SPECIFICATIONS; HANGERS AND
S…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .