Attachment 7 Specifications 8Mar24.pdf
PDF 1 MB Posted
- Attached to
- Greenhouse Construction, Blueberry and Cranberry Research Station, Chatsworth, New Jersey
- Solicitation number
- 12305B24R0030
About this file
This document is a solicitation for a federal contract opportunity for the construction of two 30' x 100' aluminum framed greenhouses at the Blueberry and Cranberry Research Station in Chatsworth, New Jersey. The project includes installing HVAC systems, lighting, irrigation, and control systems for the greenhouses. The solicitation consists of a base bid and three optional contract line items for additional greenhouse work. The estimated magnitude of construction is between $1,000,000 and $5,000,000, and the contract will be awarded as a Firm Fixed-Price. The solicitation is a Total Small Business Set-Aside with a NAICS code of 236220 Commercial and Institutional Building Construction. The period of performance is 180 days after receipt of the Notice to Proceed. Bonds are required if the contract exceeds $35,000. An organized site visit is scheduled for July 24, 2024, and the deadline for submitting requests for information is August 1, 2024.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDITION TO CRANBERRY
BREEDING AND GENETICS
GREENHOUSE
100% SUBMITTAL
SPECIFICATIONS
CONTRACT NUMBER: 12305B21D0013/12305B23F0208
BLUEBERRY AND CRANBERRY RESEARCH CENTER
CHATSWORTH, NJ
Prepared For:
U.S. DEPARTMENT OF AGRICULTURE
Agricultural Research Service
Prepared By:
THE JOHNSON-McADAMS FIRM, P.A.
Greenwood, Mississippi
March 8, 2024 jferguson
ADDI TI ON TO CRANBERRY BREEDI NG AND GENETI CS GREENHOUSE 6223A
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 00 01 01/ 20 WARRANTY OF CONSTRUCTI ON
01 00 11 06/ 20 GENERAL PARAGRAPHS
01 00 21 01/ 20 CONTRACTOR QUALI TY CONTROL
01 01 00 8/ 10/ 22 GENERAL REQUI REMENTS
01 33 00 08/ 18 SUBMI TTAL PROCEDURES
01 42 00 02/ 19 SOURCES FOR REFERENCE PUBLI CATI ONS
01 50 00 01/ 20 PROJECT CLOSEOUT
01 57 50 10/ 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 78 23 08/ 15 OPERATI ON AND MAI NTENANCE DATA
DI VI SI ON 03 - CONCRETE
03 30 00 02/ 19 CAST- I N- PLACE CONCRETE
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 92 00 08/ 16 JOI NT SEALANTS
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 34 13 11/ 11 GREENHOUSE
DI VI SI ON 26 - ELECTRI CAL
26 20 00 08/ 19, CHG 3: 11/ 21 I NTERI OR DI STRI BUTI ON SYSTEM
26 51 00 05/ 20, CHG 2: 11/ 21 I NTERI OR LI GHTI NG
DI VI SI ON 31 - EARTHWORK
31 23 00 02/ 11 EXCAVATI ON AND FI LL
DI VI SI ON 33 - UTI LI TI ES
33 71 02 08/ 21 UNDERGROUND ELECTRI CAL DI STRI BUTI ON
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 1
THI S PAGE I NTENTI ONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 2
SECTI ON 01 00 01
WARRANTY OF CONSTRUCTI ON
01/ 20
PART 1 GENERAL
1. 1 WARRANTY OF CONSTRUCTI ON
1. 1. 1 Gener al
I n addi t i on t o any ot her war r ant i es set out el sewher e i n t hi s cont r act , t he Cont r act or war r ant s t hat wor k per f or med under t hi s cont r act conf or ms t o t he cont r act r equi r ement s and i s f r ee of any def ect of equi pment , mat er i al or desi gn f ur ni shed, or wor kmanshi p per f or med by t he Cont r act or or any of hi s subcont r act or s or suppl i er s at any t i er . Such war r ant y shal l cont i nue f or a per i od of one year f r om t he dat e of f i nal accept ance of t he pr oj ect . Under t hi s war r ant y, t he Cont r act or shal l r emedy at hi s own expense any such f ai l ur e t o conf or m or any such def ect . I n addi t i on, t he Cont r act or shal l r emedy at hi s own expense any damage t o Gover nment owned or cont r ol l ed r eal or per sonal pr oper t y, when t hat damage i s t he r esul t of t he Cont r act or ' s f ai l ur e t o conf or m t o cont r act r equi r ement s or any such def ect of equi pment , mat er i al , wor kmanshi p, or desi gn. The Cont r act or shal l al so r est or e any wor k damaged i n f ul f i l l i ng t he t er ms of t hi s c l ause. The Cont r act or ' s war r ant y wi t h r espect t o wor k r epai r ed or r epl aced her eunder wi l l r un f or one year f r om t he dat e of such r epai r or r epl acement .
1. 1. 2 Not i f i cat i on and Compl i ance
The Gover nment shal l not i f y t he Cont r act or i n wr i t i ng wi t hi n a r easonabl e t i me af t er t he di scover y of any f ai l ur e, def ect , or damage. Shoul d t he Cont r act or f ai l t o r emedy any f ai l ur e, def ect , or damage descr i bed i n par agr aph 1. 1. 1 above wi t hi n a r easonabl e t i me af t er r ecei pt of not i ce t her eof , t he Gover nment shal l have t he r i ght t o r epl ace or r epai r and have t he cost bi l l ed t o t he Cont r act or .
1. 2 EXPRESSED WARRANTY
I n addi t i on t o t he ot her r i ght s and r emedi es pr ovi ded by t hi s c l ause, al l subcont r act or s ' , manuf act ur er s ' , and suppl i er s ' war r ant i es expr essed or i mpl i ed, r espect i ng any wor k and mat er i al s shal l , at t he di r ect i on of t he Gover nment , be enf or ced by t he Cont r act or f or t he benef i t of t he Gover nment . I n such case, i f t he Cont r act or ' s war r ant y under par agr aph
1. 1. 1 above has expi r ed, any sui t di r ect ed by t he Gover nment t o enf or ce a subcont r act or ' s, manuf act ur er ' s, or suppl i er ' s war r ant y shal l be at t he expense of t he Gover nment . The Cont r act or shal l obt ai n any war r ant i es whi ch t he subcont r act or s, manuf act ur er s, or suppl i er s woul d gi ve i n nor mal commer ci al pr act i ce. I f so di r ect ed by t he Cont r act i ng Of f i cer , t he Cont r act or shal l r equi r e any such war r ant i es t o be execut ed i n wr i t i ng t o t he Gover nment .
1. 3 LATENT DEFECTS
The War r ant y speci f i ed her ei n shal l not l i mi t t he Gover nment ' s r i ght s wi t h r espect t o l at ent def ect s, gr oss mi st ake, or f r aud.
SECTI ON 01 00 01 Page 1
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Sect i on - -
SECTI ON 01 00 01 Page 2
SECTI ON 01 00 11
GENERAL PARAGRAPHS
06/ 20
PART 1 GENERAL
1. 1 DESCRI PTI ON OF WORK
1. 1. 1 Wor k To Be Done
The wor k t o be done consi st of f ur ni shi ng al l l abor , mat er i al s, and equi pment and per f or mi ng al l wor k i n st r i ct accor dance wi t h t hese speci f i cat i ons f or const r uct i ng t wo 30' x 100' , 3, 000 squar e f oot , ( 6, 000 squar e f oot t ot al ) ( as i ndi cat ed) al umi num f r amed gr eenhouses wi t h 6 mi l pol y i nf l at ed f i l m cover i ng, shade cl ot h, 8 mm doubl e wal l pol ycar bonat e panel s at headwal l s, door s, l ouver s, concr et e f oot i ng, wal ks, and ent r y pads. I nst al l at i on of headwal l mount ed exhaust f ans and l ouver s.
I nst al l at i on of pr opane f i r ed f ur naces t hat wi l l di st r i but e ai r t hr oughout t he gr eenhouses ut i l i z i ng pol y- duct t hat i s mount ed t o t he f l oor .
I nst al l at i on of c i r cul at i on f ans l ocat ed wi t hi n t he gr eenhouses.
I nst al l at i on of a gr eenhouses cont r ol s syst em. I nst al l at i on of a new domest i c wat er mai n t o ser ve t he gr eenhouse and i nst al l at i on of hose bi bbs wi t h t i mer s t o suppor t t he gr eenhouses i r r i gat i on syst ems. I nst al l at i on of pr opane t ank and pi pi ng t o suppor t pr opane f ur naces. Pr ovi de nor mal and st andby el ect r i cal ser vi ce by new under gr ound duct bank f r om exi st i ng di st r i but i on equi pment l ocat ed at t he headhouse. Pr ovi de 6 zone commer ci al hor t i cul t ur e gr ow l i ght i ng syst em cont r ol l ed by mechani cal t i mer s at each gr eenhouse.
The pr oj ect consi st s of a Base Bi d and t hr ee Bi d Opt i ons as f ol l ows:
Base Bi d:
The Base Bi d consi st s of al l i t ems descr i bed above.
Bi d Opt i on #1:
Bi d Opt i on #1 consi st s of i nst al l at i on of evapor at i ve cool i ng pads f or Gr eenhouse #1 as det ai l ed and speci f i ed.
Bi d Opt i on #2:
Bi d Opt i on #2 consi st s of const r uct i ng a second gr eenhouse st r uct ur e, Gr eenhouse #2, connect ed t o Gr eenhouse #1 as det ai l ed and speci f i ed.
Bi d Opt i on #3:
Bi d Opt i on #3 consi st s of i nst al l at i on of evapor at i ve cool i ng pads f or Gr eenhouse #2 as det ai l ed and speci f i ed.
1. 1. 2 Locat i on
The si t e of wor k i s at t he USDA/ ARS Bl ueber r y and Cr anber r y Resear ch Cent er , 125 Lake Oswego Road, Chat swor t h, New Jer sey 08019.
SECTI ON 01 00 11 Page 1
1. 1. 3 Pr i nci pal Feat ur es of Wor k
Concr et e Foundat i on Gr eenhouse St r uct ur e Vent i l at i on Syst em Heat i ng Syst em Li ght i ng, Power and Cont r ol Syst ems Pl umbi ng Syst ems f or Gr eenhouse i r r i gat i on as i dent i f i ed i n Gr eenhouse speci f i cat i on sect i on
1. 2 SI TE VI SI T
A si t e v i s i t and i nspect i on t our wi l l be hel d at USDA/ ARS Bl ueber r y and Cr anber r y Resear ch Cent er i n Chat swor t h, New Jer sey. Al l pot ent i al bi dder s wi l l be not i f i ed of t he exact t i me and dat e and ar e st r ongl y ur ged t o at t end t he si t e v i s i t . I nspect i on may onl y be made at t hi s t i me, unl ess pr i or wr i t t en appr oval i s obt ai ned t o i nspect at anot her dat e and t i me.
1. 3 COORDI NATI ON OF WORK
1. Wor k space and space avai l abl e f or st or i ng mat er i al s shal l be subj ect t o t he appr oval of t he Cont r act i ng Of f i cer . Do not st or e mat er i al s and equi pment i n ot her t han assi gned ar eas.
2. Execut e wor k so as t o i nt er f er e as l i t t l e as possi bl e wi t h nor mal f unct i oni ng of t he f aci l i t y , i ncl udi ng oper at i ons of ut i l i t y ser vi ces and any exi st i ng equi pment , and wi t h wor k bei ng done by Gover nment .
3. Mi ni mi ze i nt er f er ence of const r uct i on act i v i t i es wi t h t he f l ow of t r af f i c by keepi ng r oads, wal ks and ent r ances t o gr ounds, t o par ki ng ar eas and t o occupi ed ar eas of bui l di ngs c l ear of const r uct i on mat er i al s, debr i s, const r uct i on equi pment and vehi c l es except wher e not ed on pl ans or i n speci f i cat i ons. Pr ovi de unobst r uct ed access t o ar eas r equi r ed t o r emai n i n oper at i on.
4. The Cont r act or shal l compl et e al l wor k wi t hi n 90 consecut i ve cal endar days af t er Not i ce t o Pr oceed. Wi t hi n 14 cal endar days af t er Cont r act Awar d, t he Cont r act or shal l pr ovi de t he Gover nment wi t h a det ai l ed schedul e of dat es on whi ch t he Cont r act or pl ans t o accompl i sh t he wor k. I n addi t i on, t he Cont r act or shal l not i f y t he Cont r act i ng Of f i cer 20 days i n advance of st ar t i ng wor k. A pl anned wor k schedul e shal l be submi t t ed t o t he Cont r act i ng Of f i cer f or appr oval . The schedul e shal l i ncl ude a det ai l ed descr i pt i on of t he met hods and equi pment t o be used f or each oper at i on and t he sequence of oper at i ons. Thi s schedul e shal l be updat ed mont hl y and submi t t ed t o t he Cont r act i ng Of f i cer f or appr oval .
5. The Cont r act or shal l t ake al l measur es and pr ovi de al l mat er i al necessar y f or pr ot ect i ng exi st i ng equi pment , pr oper t y, and ongoi ng oper at i ons i n af f ect ed ar eas of const r uct i on agai nst dust , noi se and debr i s.
6. Power sour ces f or t he Cont r act or ' s oper at i ons wi l l be avai l abl e and suppl i ed by t he Gover nment t o t he Cont r act or as l ong as i t s use does not i nt er f er e wi t h t he oper at i ons of t he Gover nment ' s f aci l i t i es. Wat er sour ces wi l l be avai l abl e and suppl i ed by t he Gover nment t o t he Cont r act or as l ong as i t s use does not i nt er f er e wi t h t he oper at i ons of any bui l di ng. The Cont r act or i s r esponsi bl e
SECTI ON 01 00 11 Page 2 f or ext endi ng ut i l i t y sour ces t o hi s wor k l ocat i ons. Such ext ensi ons shal l be r emoved af t er wor k i s compl et ed, t o t he sat i sf act i on of t he Cont r act i ng Of f i cer .
7. Al l r ef er ences i n t he speci f i cat i ons t o t he Cont r act i ng Of f i cer and Cont r act i ng Of f i cer ' s Repr esent at i ve shal l const i t ut e r ef er r al s i ni t i al l y t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve.
8. Cont r act or shal l pr ovi de sani t ar y f aci l i t i es f or use by hi s empl oyees and t he empl oyees of hi s subcont r act or s wor ki ng on j ob s i t e.
1. 4 DRAWI NGS
Al l di mensi ons shown of exi st i ng wor k and al l di mensi ons r equi r ed f or wor k t hat i s t o be connect ed wi t h exi st i ng wor k shal l be ver i f i ed by t he Cont r act or by act ual f i el d measur ement s. Any wor k at var i ance wi t h t hat speci f i ed or shown on t he dr awi ngs, shal l not be per f or med by t he Cont r act or unt i l t he Cont r act or has r ecei ved appr oval i n wr i t i ng f r om t he Cont r act i ng Of f i cer .
1. 5 MATERI AL SAFETY DATA SHEETS ( MSDS)
Mat er i al Saf et y Dat a Sheet s must be submi t t ed t o t he Cont r act i ng Of f i cer pr i or t o t he commencement of any wor k wi t h any subst ance t hat may be consi der ed hazar dous.
1. 6 UTI LI TI ES OR STRUCTURAL I TEMS CONFLI CTI NG WI TH PROPOSED CONSTRUCTI ON
I n t he event t he Cont r act or f i nds an ar ea wher e exi st i ng ut i l i t i es or st r uct ur al i t ems conf l i c t wi t h pr oposed const r uct i on, t he Cont r act i ng Of f i cer shal l be not i f i ed i mmedi at el y. The Cont r act or shal l t hen pr opose a met hod of sol v i ng t he pr obl em. Wor k shal l not r esume i n t he pr obl em ar ea unt i l t he Cont r act or has r ecei ved wr i t t en appr oval f r om t he Cont r act i ng Of f i cer . Ther e shal l be no addi t i onal cost t o t he Gover nment .
1. 7 ACCEPTANCE OF WORK
1. Fi nal i nspect i on wi l l not be made unt i l t he cont r act wor k i s compl et ed. The Cont r act or shal l not i f y i n wr i t i ng t he Cont r act i ng Of f i cer f i f t een wor ki ng days pr i or t o t he dat e on whi ch t he wor k wi l l be r eady f or f i nal i nspect i on.
2 Fi nal i nspect i on and accept ance of t he wor k shown by t he dr awi ngs and speci f i cat i ons f or mi ng a par t of t hi s cont r act shal l not be bi ndi ng or concl usi ve on t he Gover nment i f i t shal l be shown t hat ( 1) t he Cont r act or has wi l l f ul l y or t hr ough col l usi on wi t h per sons or f i r ms engaged i n t he per f or mance of t he cont r act suppl i ed i nf er i or mat er i al s, equi pment , or wor kmanshi p, or ( 2) t he Cont r act or has ot her wi se depar t ed f r om t he t er ms of t he cont r act .
PART 2 PRODUCTS
Al l pr oduct s shal l be i n compl i ance wi t h t he Buy Amer i can Act .
PART 3 EXECUTI ON
Not used.
SECTI ON 01 00 11 Page 3
SECTI ON 01 00 11 Page 4
SECTI ON 01 00 21
CONTRACTOR QUALI TY CONTROL
01/ 20
PART 1 GENERAL
1. 1 GENERAL
Thi s sect i on cover s t he qual i t y cont r ol i nspect i on, sampl i ng, and t est i ng of al l mat er i al s, ser vi ces, and wor kmanshi p r equi r ed t o be per f or med by t he cont r act dr awi ngs, speci f i cat i ons, and ot her cont r act r equi r ement s.
The Cont r act or shal l per f or m al l qual i t y cont r ol i nspect i on, sampl i ng, and t est i ng r equi r ed by t hi s cont r act and shal l r evi ew and cer t i f y t hat each submi t t al i s cor r ect and i n st r i ct conf or mance wi t h t he cont r act dr awi ngs and speci f i cat i ons f or al l shop dr awi ngs and l i s t s of mat er i al s, f i x t ur es, and equi pment . Al l wor k per f or med under t hi s cont r act shal l be i n st r i ct accor dance wi t h pr ocedur es and r equi r ement s det ai l ed on t he pl ans and speci f i cat i ons.
1. 1. 1 Cer t i f i cat e of Compl i ance
Upon compl et i on of t he cont r act wor k and pr i or t o f i nal accept ance, t he Cont r act or shal l submi t t o t he Cont r act i ng Of f i cer a cer t i f i cat e of compl i ance whi ch st at es t hat al l mat er i al s, equi pment , desi gn, and wor kmanshi p i ncor por at ed i n t he wor k ar e i n st r i ct compl i ance wi t h cont r act dr awi ngs and speci f i cat i ons except f or appr oved devi at i ons. The cer t i f i cat es of compl i ance shal l be s i gned and dat ed by bot h t he manuf act ur er ' s r epr esent at i ve and t he Cont r act or . Based upon t hi s cer t i f i cat e of compl i ance and ot her cont r act r equi r ement s, t he Cont r act or shal l be r esponsi bl e f or cor r ect i ng at hi s expense any def ect s, omi ssi ons, and devi at i ons ( ot her t han t hose pr evi ousl y appr oved) whi ch ar e det ect ed dur i ng t he cont r act per i od or dur i ng t he one- year war r ant y per i od as def i ned i n Sect i on 01 00 01, WARRANTY OF CONSTRUCTI ON.
1. 2 I NSPECTI ON
The Cont r act or shal l i nspect al l mat er i al s, ser vi ces, and wor kmanshi p t o assur e conf or mance wi t h cont r act r equi r ement s.
1. 3 REVI EW AND APPROVAL OF SHOP DRAWI NGS, SUBMI TTALS, MATERI ALS, FI XTURES,
AND EQUI PMENT
1. Pr i or t o submi ssi on t o t he Gover nment f or appr oval , t he Cont r act or shal l r evi ew and cer t i f y t hat al l shop dr awi ngs, submi t t al s, l i s t s of mat er i al s, f i x t ur es, and equi pment as cal l ed f or under t he var i ous headi ngs of t hese speci f i cat i ons ar e cor r ect and i n st r i ct compl i ance wi t h t he cont r act dr awi ngs and speci f i cat i ons. These dr awi ngs, submi t t al s and l i s t s shal l be accur at e, compl et e, and adequat el y det ai l ed. The t op copy of dat a compr i s i ng each i t em l i st ed on t he t r ansmi t t al f or m shal l be i dent i f i ed as havi ng r ecei ved t he qual i t y cont r ol i nspect or ' s appr oval by bei ng so st amped, s i gned and dat ed.
Appr oval of shop dr awi ngs, submi t t al s, mat er i al s, f i x t ur es, and equi pment by t he Cont r act i ng Of f i cer wi l l not r el i eve t he Cont r act or of t he r esponsi bi l i t y f or any er r or s whi ch may exi st and t he Cont r act or shal l be r esponsi bl e f or t he sat i sf act or y const r uct i on of al l wor k. Al l sampl es of mat er i al s submi t t ed as r equi r ed by t hese speci f i cat i ons shal l be pr oper l y i dent i f i ed and l abel ed f or r eady i dent i f i cat i on, and upon bei ng appr oved, st or ed at t he s i t e of t he
SECTI ON 01 00 21 Page 1 wor k f or j obsi t e use unt i l al l wor k has been accept ed by t he Cont r act i ng Of f i cer . The Cont r act or shal l pr ovi de f our ( 4) set s of al l shop dr awi ngs.
2. Al l pr oposed devi at i ons r equi r ed by t he Cont r act or shal l be not ed i n t he " Remar ks" col umn of t he For m. The Cont r act or shal l set f or t h i n wr i t i ng t he r eason f or any devi at i ons and annot at e such devi at i ons on t he shop dr awi ng. The Gover nment r eser ves t he r i ght t o r esci nd i nadver t ent appr oval of shop dr awi ngs cont ai ni ng unnot ed devi at i ons.
1. 4 DAI LY RECORDS
The Cont r act or shal l mai nt ai n a dai l y r ecor d of qual i t y cont r ol measur es per f or med f or each shi f t of Cont r act or or Subcont r act or oper at i ons on an appr opr i at e f or mat . These r ecor ds shal l pr ovi de f act ual evi dence t hat cont i nuous qual i t y cont r ol i nspect i ons have been per f or med, i ncl udi ng but not l i mi t ed t o t he f ol l owi ng: j ob pr ogr ess, pr obl ems encount er ed;
pr obl ems r esol ved; t ype and number of i nspect i ons; r esul t s of i nspect i ons or t est s i ncl udi ng al l comput at i ons; nat ur e of def ect s; causes f or r ej ect i on; saf et y v i ol at i ons; pr oposed r emedi al act i on; and cor r ect i ve act i on t aken. These r ecor ds shal l cover bot h conf or mi ng and def ect i ve i t ems and shal l i ncl ude a st at ement t hat al l suppl i es and mat er i al s i ncor por at ed i n t he wor k ar e i n f ul l compl i ance wi t h t he t er ms of t he cont r act . The Cont r act or shal l mai nt ai n a cur r ent r ecor d of al l i nspect i ons and shal l f ur ni sh t o t he Cont r act i ng Of f i cer on a dai l y basi s, l egi bl e copi es of al l i nspect i on r ecor ds f or hi s per manent r et ent i on. The dai l y r ecor ds of i nspect i ons shal l cover al l wor k pl acement subsequent t o t he pr evi ous r epor t , and shal l be ver i f i ed by t he Cont r act or ' s desi gnat ed r epr esent at i ve.
1. 5 RECURRI NG DEFI CI ENCI ES
I f r ecur r i ng def i c i enci es i n an i t em or i t ems bei ng i nspect ed by t he Cont r act or i ndi cat e t hat t he i nspect i on syst em i s not pr ovi di ng adequat e qual i t y cont r ol , t he Cont r act or shal l t ake such cor r ect i ve measur es as deemed necessar y by t he Cont r act i ng Of f i cer .
1. 6 CONFLI CTS
I n t he event of a di f f er ence of opi ni on bet ween t he Cont r act or and t he Cont r act i ng Of f i cer , t he Cont r act i ng Of f i cer shal l gover n.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
SECTI ON 01 00 21 Page 2
SECTI ON 01 01 00
GENERAL REQUI REMENTS
8/ 10/ 22
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s sect i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
ASTM I NTERNATI ONAL ( ASTM)
ASTM E84 ( 2020) St andar d Test Met hod f or Sur f ace Bur ni ng Char act er i st i cs of Bui l di ng Mat er i al s
NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)
NFPA 10 ( 2022; ERTA 1 2021) St andar d f or Por t abl e Fi r e Ext i ngui sher s
NFPA 30 ( 2021; TI A 20- 1; TI A 20- 2) Fl ammabl e and Combust i bl e Li qui ds Code
NFPA 51B ( 2019; TI A 20- 1) St andar d f or Fi r e Pr event i on Dur i ng Wel di ng, Cut t i ng, and Ot her Hot Wor k
NFPA 70 ( 2020; ERTA 20- 1 2020; ERTA 20- 2 2020;
ERTA 20- 3 2020; TI A 20- 1; TI A 20- 2; TI A
20- 3; TI A 20- 4; TI A 20- 5; TI A 20- 6; TI A
20- 7; TI A 20- 8; TI A 20- 9; TI A 20- 10; TI A
20- 11; TI A 20- 12; TI A 20- 13; TI A 20- 14;
TI A 20- 15; TI A 20- 16; ERTA 20- 4 2022)
Nat i onal El ect r i cal Code
NFPA 101 ( 2021) Li f e Saf et y Code
NFPA 241 ( 2022) St andar d f or Saf eguar di ng Const r uct i on, Al t er at i on, and Demol i t i on Oper at i ons
U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)
29 CFR 1926 Saf et y and Heal t h Regul at i ons f or Const r uct i on
1. 2 GENERAL I NTENTI ON
A. Cont r act or shal l compl et el y pr epar e t he si t e f or bui l di ng oper at i ons, i ncl udi ng demol i t i on and r emoval of exi st i ng st r uct ur es, and f ur ni sh l abor and mat er i al s and per f or m wor k as r equi r ed by t he cont r act document s.
B. Al l empl oyees of gener al cont r act or and subcont r act or s shal l compl y wi t h ARS secur i t y management pr ogr am, obt ai n per mi ssi on of t he ARS Locat i on Manager , be i dent i f i ed by pr oj ect and empl oyer by wear i ng
SECTI ON 01 01 00 Page 1 cont r act or i ssued i dent i f i cat i on badges at al l t i mes on ARS pr oper t y, and r est r i ct ed f r om unaut hor i zed access.
C. Pr i or t o commenci ng wor k:
1. The Gener al Cont r act or shal l pr ovi de pr oof t hat an OSHA cer t i f i ed " compet ent per son" ( CP) 29 CFR 1926. 20( b) ( 2) wi l l mai nt ai n a pr esence at t he wor k s i t e whenever t he gener al or subcont r act or s ar e pr esent .
2. The Gener al Cont r act or and Tr adesmen shal l r ecei ve an On- si t e Saf et y br i ef i ng f r om t he l ocat i on Faci l i t i es Manager or desi gnat ed r epr esent at i ve.
D. Tr ai ni ng:
1. Al l empl oyees of t he gener al cont r act or or subcont r act or s shal l have t he 10- hour OSHA cer t i f i ed Const r uct i on Saf et y cour se and / or ot her r el evant compet ency t r ai ni ng. Super vi sor s shal l have compl et ed t he 30- hour OSHA t r ai ni ng.
2. Submi t t r ai ni ng r ecor ds of al l such empl oyees t o t he Cont r act i ng Of f i cer f or appr oval bef or e t he st ar t of wor k.
1. 3 PROJECT COORDI NATI ON
A. Const r uct i on Pr oj ect Schedul e: See cont r act , FAR 52. 236- 15 Schedul es f or Const r uct i on Cont r act s. The Cont r act or wi l l not begi n wor k on si t e unt i l t he const r uct i on pr oj ect schedul e has been appr oved by t he Cont r act i ng Of f i cer . The Cont r act or shal l submi t one el ect r oni c copy of t he updat ed const r uct i on pr oj ect schedul e wi t h each pr ogr ess payment r equest .
B. Cont r act I nspect or ' s Dai l y Repor t : Cont r act or shal l submi t t o t he Cont r act i ng Of f i cer a dai l y r epor t l i s t i ng t he names of al l t hose pr esent on t he j ob s i t e each day, al ong wi t h t hei r Job Cl assi f i cat i on, hour s of wor k and a br i ef descr i pt i on of t he wor k per f or med by each on t hat day.
The Cont r act I nspect or ' s Dai l y Repor t i s t o be submi t t ed at t he begi nni ng of wor k each day f or t he pr evi ous day' s wor k and shal l be mai nt ai ned t hr oughout t he t er m of t he cont r act .
C. For mal Meet i ngs: Any meet i ng ( deemed f or mal by t he cont r act or , t he Cont r act i ng Of f i cer Repr esent at i ve ( COR) or t he Cont r act i ng Of f i cer wi l l have t he mi nut es of sai d meet i ng pr epar ed by t he cont r act or wi t h copi es pr ovi ded t o t he COR and Cont r act i ng Of f i cer wi t hi n t went y- f our ( 24) hour s of meet i ng t i me. The mi nut es wi l l i ncl ude Dat e, Name of At t endees ( wi t h cont act i nf o) , Ol d Busi ness, and New Busi ness subj ect s ( or nar r at i ves) .
Regar dl ess of who r equest s a meet i ng ( t he COR or t he Cont r act or or t he Cont r act i ng Of f i cer ) t he cont r act or may be r equi r ed t o pr ovi ded har d copy pi ct ur es of t he i ssues t o be di scussed. Each i ssue wi l l be l i nked t o a cont r act speci f i cat i on sect i on number and/ or subj ect ar ea by page number .
I ssues di scussed wi l l al so i ncl ude an act i on/ compl et i on dat e.
1. 4 SUBMI TTALS - GENERAL
A. Al l submi t t al s r ef er enced by t he pr ocur ement document s i ncl udi ng but not l i mi t ed t o Pl ans, Speci f i cat i ons, St at ement s of Wor k ( SOW) , Suppl ement al I nf or mat i on, et c. shal l be submi t t ed el ect r oni cal l y t o t he Cont r act i ng Of f i cer ( CO) and Const r uct i on Of f i cer Repr esent at i ve ( COR) .
SECTI ON 01 01 00 Page 2
B. Al l mat er i al sampl e submi t t al s r ef er enced by t he pr ocur ement document s i ncl udi ng but not l i mi t ed t o Pl ans, Speci f i cat i ons, St at ement s of Wor k ( SOW) , Suppl ement al I nf or mat i on, et c. shal l be pr ovi ded t o t he Cont r act i ng Of f i cer ( CO) , Const r uct i on Of f i cer Repr esent at i ve ( COR) and Locat i on Manager / Faci l i t i es Manager ( LM/ FM) .
C. Al l i t ems submi t t ed shal l be accompani ed by t he SUBMI TTAL LOG appended t o t he GENERAL SPECI FI CATI ONS.
1. The Cont r act or shal l mai nt ai n one ( 1) l og f or al l submi t t al s and shal l updat e t he i nf or mat i on as r equi r ed by Const r uct i on Pr ogr ess.
1. 5 SAFETY SUBMI TTALS
A. Cont r act or shal l submi t a " s i t e speci f i c" Saf et y Pl an t o t he Cont r act i ng Of f i cer t hat descr i bes how t he cont r act or i s t o compl y wi t h al l appl i cabl e OSHA st andar ds and NFPA codes per t ai ni ng t o const r uct i on wor k t o i ncl ude, but not l i mi t ed t o: Gener al Saf et y and Heal t h Pr ovi s i ons, Occupat i onal Heal t h and Envi r onment al Cont r ol s, Per sonal Pr ot ect i ve and Li f e Savi ng Equi pment , Hand and Power Tool s, Wel di ng and Cut t i ng, El ect r i cal , Scaf f ol ds, Fal l Pr ot ect i on, Excavat i ons, Demol i t i on, St ai r ways and Ladder s, Toxi c and Hazar dous Subst ances, Conf i ned Space Ent r y, Lockout / Tagout , Respi r at or y Pr ot ect i on, Hear i ng Pr ot ect i on. Saf et y Pl an shal l i dent i f y Cont r act or and sub- cont r act or empl oyees who ar e aut hor i zed/ qual i f i ed t o per f or m el ect r i cal wor k. No wor k shal l pr oceed unt i l wr i t t en appr oval of t he Saf et y Pl an by t he Cont r act i ng Of f i cer .
Saf et y Pl an shal l descr i be how t he Cont r act or and/ or sub- cont r act or s ar e t o secur e equi pment , suppl i es, t ool s, and chemi cal pr oduct s. Cont r act or and/ or sub- cont r act or equi pment , suppl i es, t ool s, and chemi cal pr oduct s ar e t o be under t he cont r ol of t he Cont r act or at al l t i mes, equi pment , suppl i es t ool s, and chemi cal pr oduct s f ound not t o be under t he cont r ol of t he Cont r act or or sub- cont r act or ar e subj ect t o conf i scat i on and wi l l be r epor t ed t o t he Cont r act i ng Of f i cer .
B. Cont r act or must f ol l ow al l cur r ent Feder al , St at e and Local Pandemi c Speci f i c Requi r ement s f or access t o al l BARC and USNA l ocat i ons and wor ksi t es. Cur r ent r equi r ement s shal l be pr ovi ded by t he Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) , Locat i on Coor di nat or ( LC) or Saf et y and Occupat i onal Heal t h Uni t ( SOHU) Manager .
C. The Cont r act or shal l i nspect t he ent i r e const r uct i on s i t e dai l y, i ncl udi ng days wi t hout const r uct i on wor k i f t her e ar e NFPA 101 Li f e Saf et y Code def i c i enci es exi st i ng whi l e const r uct i on wor k i s shut down, t he r esul t s of t hat i nspect i on shal l be document ed on t he at t achment " DAI LY I NSPECTI ON FORM" , and t he f or m i s t o be si gned and submi t t ed t o t he Cont r act i ng Of f i cer .
D. Cont r act or shal l pr ovi de cont i nuous moni t or i ng f or noi se, dust , chemi cal vapor gener at i on, vol at i l e or gani c compounds, and vi br at i on. At no t i me shal l noi se exposur e t o any ARS st af f exceed 75 dB. Cont r act or shal l pr ovi de t o t he COR wi t h copi es t o t he Cont r act i ng Of f i cer a wr i t t en weekl y updat e of t he al l t est r esul t s i n addi t i on t o t he pr oposed wor k f or t he subsequent t wo weeks ( a t wo week " l ook- ahead" ) i nvol v i ng any const r uct i on act i v i t y t hat wi l l pr oduce l oud noi ses, heavy vi br at i ons, st r ong smel l s, or s i gni f i cant dust i nsi de ARS st af f occupi ed space.
E. Cont r act or and sub- cont r act or s shal l not i f y i n wr i t i ng t he Cont r act i ng Of f i cer at l east one week pr i or t o execut i ng hi gh r i sk wor k ( t hi s may be i ncl uded i n t he t wo week " l ook- ahead" updat e) . Hi gh r i sk wor k i ncl udes, SECTI ON 01 01 00 Page 3 but i s not l i mi t ed t o, t asks r equi r i ng Lockout / Tag Out , l i ve el ect r i cal wor k, hot wor k, wor k at hei ght s, t r enchi ng/ shor i ng, cr ane oper at i ons, and conf i ned space ent r y. Cont r act or ' s Compet ent Per son shal l pr ovi de t he COR wi t h a copy t o t he Cont r act i ng Of f i cer wr i t t en weekl y document ed saf et y i nspect i on r esul t s.
F. Cont r act or shal l pr ovi de t o t he Cont r act i ng Of f i cer f or appr oval , copi es of Saf et y Dat a Sheet s ( SDS) f or EVERY CHEMI CAL WI THOUT EXCEPTI ON pr i or t o br i ngi ng such chemi cal on t he wor k s i t e.
1. 6 CONSTRUCTI ON SECURI TY REQUI REMENTS
A. Secur i t y Pl an:
1. The secur i t y pl an def i nes bot h physi cal and admi ni st r at i ve secur i t y pr ocedur es t hat wi l l r emai n ef f ect i ve f or t he ent i r e dur at i on of t he pr oj ect .
2. The Gener al Cont r act or i s r esponsi bl e f or assur i ng t hat al l sub- cont r act or s wor ki ng on t he pr oj ect and t hei r empl oyees al so compl y wi t h t hese r egul at i ons.
B. Cont r act or Per sonnel
1. The r equi r ed Cont r act or Per sonnel i nf or mat i on and t he secur i t y appl i cat i on pr ocedur es var y dependi ng upon t he pr oj ect wor ksi t e l ocat i on. Each Task Or der Request f or Pr oposal ( RFP) wi l l cont ai n t he Cont r act or Per sonnel i nf or mat i on and secur i t y appl i cat i on pr ocedur es r equi r ed f or t he speci f i c s i t e.
2. Each empl oyee shal l be f ur ni shed wi t h a badge by t he Gover nment f or access t o const r uct i on s i t e. Thi s badge must be wor n so as t o be cl ear l y v i s i bl e at al l t i mes whi l e on t he wor k s i t e.
C. Secur i t y Pr ocedur es:
1. Cont r act or ' s empl oyees shal l not ent er t he pr oj ect s i t e wi t hout appr opr i at e badges. They may al so be subj ect t o i nspect i on of t hei r per sonal ef f ect s when ent er i ng or l eavi ng t he pr oj ect s i t e.
2. For wor ki ng out si de t he " r egul ar hour s" as def i ned i n t he cont r act , The Cont r act or shal l gi ve a t en ( 10) day not i ce t o t he Cont r act i ng Of f i cer so t hat secur i t y ar r angement s can be pr ovi ded f or t he empl oyees. Thi s not i ce i s separ at e f r om any not i ces r equi r ed f or ut i l i t y shut down descr i bed l at er i n t hi s sect i on.
3. No phot ogr aphy of ARS pr emi ses i s al l owed wi t hout wr i t t en per mi ssi on of t he Cont r act i ng Of f i cer .
4. ARS r eser ves t he r i ght t o c l ose or shut down t he pr oj ect s i t e and or der t he Cont r act or ' s empl oyees of f t he pr emi ses i n t he event of a nat i onal emer gency or Gover nment shut down. The Cont r act or may r et ur n t o t he s i t e onl y wi t h t he wr i t t en appr oval of t he Cont r act i ng Of f i cer .
D. Document Cont r ol :
1. The Cont r act or i s r esponsi bl e f or saf ekeepi ng of al l dr awi ngs, pr oj ect manual s and ot her pr oj ect i nf or mat i on. Thi s i nf or mat i on shal l be shar ed onl y wi t h t hose wi t h a speci f i c need t o accompl i sh t he
SECTI ON 01 01 00 Page 4 pr oj ect .
2. These document s shal l not be r emoved or t r ansmi t t ed f r om t he pr oj ect s i t e wi t hout t he wr i t t en appr oval of Cont r act i ng Of f i cer .
3. Al l paper wast e or el ect r oni c medi a such as CD' s and di sket t es shal l be shr edded and dest r oyed i n a manner accept abl e t o t he ARS.
E. Mot or Vehi c l e Rest r i ct i ons
1. Vehi c l e aut hor i zat i on r equest shal l be r equi r ed f or any vehi c l e ent er i ng t he si t e and such r equest shal l be submi t t ed 24 hour s bef or e t he dat e and t i me of access. Access shal l be r est r i ct ed t o pi cki ng up and dr oppi ng of f mat er i al s and suppl i es and Cont r act or must be on si t e t o r ecei ve al l del i ver i es.
2. Separ at e per mi t s shal l be i ssued f or Cont r act or and i t s empl oyees f or par ki ng i n desi gnat ed ar eas onl y.
1. 7 FI RE SAFETY
A. Appl i cabl e Publ i cat i ons: Publ i cat i ons l i s t ed bel ow f or m par t of t hi s Ar t i c l e t o ext ent r ef er enced. Publ i cat i ons ar e r ef er enced i n t ext by basi c desi gnat i ons onl y.
1. Amer i can Soci et y f or Test i ng and Mat er i al s ( ASTM) :
ASTM E84 Sur f ace Bur ni ng Char act er i st i cs of Bui l di ng Mat er i al s
2. Nat i onal Fi r e Pr ot ect i on Associ at i on ( NFPA) :
NFPA 10 St andar d f or Por t abl e Fi r e Ext i ngui sher s
NFPA 30 Fl ammabl e and Combust i bl e Li qui ds Code
NFPA 51B St andar d f or Fi r e Pr event i on dur i ng Wel di ng, Cut t i ng and Ot her Hot Wor k
NFPA 70 Nat i onal El ect r i cal Code
NFPA 241 St andar d f or Saf eguar di ng Const r uct i on, Al t er at i on, and Demol i t i on Oper at i ons
3. Occupat i onal Saf et y and Heal t h Admi ni st r at i on ( OSHA) :
29 CFR 1926 Saf et y and Heal t h Regul at i ons f or Const r uct i on
B. Fi r e Saf et y Pl an: Est abl i sh and mai nt ai n a f i r e pr ot ect i on pr ogr am i n accor dance wi t h 29 CFR 1926. Pr i or t o st ar t of wor k, pr epar e a pl an det ai l i ng pr oj ect - speci f i c f i r e saf et y measur es, i ncl udi ng per i odi c st at us r epor t s, and submi t t o t he Cont r act i ng Of f i cer f or r evi ew f or compl i ance wi t h cont r act r equi r ement s. Pr i or t o any wor ker f or t he cont r act or or subcont r act or s begi nni ng wor k, t hey shal l under go a saf et y br i ef i ng pr ovi ded by t he cont r act or ' s compet ent per son per OSHA r equi r ement s. Thi s br i ef i ng shal l i ncl ude i nf or mat i on on t he const r uct i on l i mi t s, ARS saf et y gui del i nes, means of egr ess, br eak ar eas, wor k hour s, l ocat i ons of r est r ooms, use of ARS equi pment , et c. Document at i on shal l be pr ovi ded t o
SECTI ON 01 01 00 Page 5 t he Cont r act i ng Of f i cer t hat i ndi v i dual s have under gone cont r act or ' s saf et y br i ef i ng.
C. Si t e and Bui l di ng Access: Mai nt ai n f r ee and unobst r uct ed access t o f aci l i t y emer gency ser vi ces and f or f i r e, pol i ce and ot her emer gency r esponse f or ces i n accor dance wi t h NFPA 241.
D. Separ at e t empor ar y f aci l i t i es, such as t r ai l er s, st or age sheds, and dumpst er s, f r om exi st i ng bui l di ngs and new const r uct i on by di st ances i n accor dance wi t h NFPA 241. For smal l f aci l i t i es wi t h l ess t han 20 f eet exposi ng over al l l engt h, separ at e by 10 f eet .
E. Tempor ar y Heat i ng and El ect r i cal : I nst al l , use and mai nt ai n i nst al l at i ons i n accor dance wi t h 29 CFR 1926, NFPA 241 and NFPA 70.
F. Means of Egr ess: Do not bl ock exi t i ng f or occupi ed bui l di ngs, i ncl udi ng pat hs f r om exi t s t o r oads. Mi ni mi ze di sr upt i ons and coor di nat e wi t h Cont r act i ng Of f i cer .
G. Egr ess Rout es f or Const r uct i on Wor ker s: Mai nt ai n f r ee and unobst r uct ed egr ess. I nspect dai l y. Repor t f i ndi ngs and cor r ect i ve act i ons weekl y t o t he Cont r act i ng Of f i cer .
H. Fi r e Ext i ngui sher s: Pr ovi de and mai nt ai n ext i ngui sher s i n const r uct i on ar eas and t empor ar y st or age ar eas i n accor dance wi t h 29 CFR 1926, NFPA 241 and NFPA 10.
I . Fl ammabl e and Combust i bl e Li qui ds: St or e, di spense and use l i qui ds i n accor dance wi t h 29 CFR 1926, NFPA 241 and NFPA 30.
J. Exi st i ng Fi r e Pr ot ect i on: Do not i mpai r aut omat i c spr i nkl er s, smoke and heat det ect i on, and f i r e al ar m syst ems, except f or por t i ons i mmedi at el y under const r uct i on, and t empor ar i l y f or connect i ons. Pr ovi de f i r e wat ch f or i mpai r ment s mor e t han 4 hour s i n a 24- hour per i od. Request i nt er r upt i ons i n accor dance wi t h par agr ap " OPERATI ONS AND STORAGE AREAS" , and coor di nat e wi t h t he Cont r act i ng Of f i cer . Al l exi st i ng or t empor ar y f i r e pr ot ect i on syst ems ( f i r e al ar ms, spr i nkl er s) l ocat ed i n const r uct i on ar eas shal l be t est ed as coor di nat ed wi t h t he Cont r act i ng Of f i cer .
Par amet er s f or t he t est i ng and r esul t s of any t est s per f or med shal l be r ecor ded by t he Gener al Cont r act or and copi es pr ovi ded t o t he Cont r act i ng Of f i cer .
K. Smoke Det ect or s: Pr event acci dent al oper at i on. Remove t empor ar y cover s at end of wor k oper at i ons each day. Coor di nat e wi t h t he Cont r act i ng Of f i cer .
L. Hot Wor k: Per f or m and saf eguar d hot wor k oper at i ons i n accor dance wi t h NFPA 241 and NFPA 51B. Coor di nat e wi t h t he Cont r act i ng Of f i cer .
Desi gnat e cont r act or ' s r esponsi bl e pr oj ect - s i t e f i r e pr event i on pr ogr am manager t o coor di nat e per mi t hot wor k.
M. Fi r e Hazar d Pr event i on and Saf et y I nspect i ons: I nspect ent i r e const r uct i on ar ea on adai l y basi s. Coor di nat e wi t h, and r epor t f i ndi ngs and cor r ect i ve act i ons weekl y t o t he COR wi t h a copy t o t he Cont r act i ng Of f i cer . See USDA St andar d For ms f or Dai l y I nspect i on For m.
N. Smoki ng: Smoki ng i s pr ohi bi t ed i n and adj acent t o const r uct i on ar eas i nsi de exi st i ng bui l di ngs and addi t i ons under const r uct i on. I n separ at e and det ached bui l di ngs under const r uct i on, smoki ng i s pr ohi bi t ed except i n
SECTI ON 01 01 00 Page 6 desi gnat ed smoki ng r est ar eas.
O. Di spose of wast e and debr i s i n accor dance wi t h NFPA 241. Remove f r om bui l di ngs dai l y.
P. Per f or m ot her const r uct i on, al t er at i on, and demol i t i on oper at i ons i n accor dance wi t h 29 CFR 1926.
1. 8 OPERATI ONS AND STORAGE AREAS
A. The Cont r act or shal l conf i ne al l oper at i ons ( i ncl udi ng st or age of mat er i al s) on Gover nment pr emi ses t o ar eas aut hor i zed or appr oved by t he Cont r act i ng Of f i cer . The Cont r act or shal l hol d and save t he Gover nment , i t s of f i cer s, and agent s, f r ee and har ml ess f r om l i abi l i t y of any nat ur e occasi oned by t he Cont r act or ' s per f or mance.
B. The Cont r act or shal l , under r egul at i ons pr escr i bed by t he Cont r act i ng Of f i cer , use onl y est abl i shed r oadways, or use t empor ar y r oadways const r uct ed by t he Cont r act or when and as aut hor i zed by t he Cont r act i ng Of f i cer . When mat er i al s ar e t r anspor t ed i n pr osecut i ng t he wor k, vehi c l es shal l not be l oaded beyond t he l oadi ng capaci t y r ecommended by t he manuf act ur er of t he vehi c l e or pr escr i bed by any Feder al , St at e, or l ocal l aw or r egul at i on. When i t i s necessar y t o cr oss cur bs or s i dewal ks, t he Cont r act or shal l pr ot ect t hem f r om damage. The Cont r act or shal l r epai r or pay f or t he r epai r of any damaged cur bs, s i dewal ks, or r oads.
C. Wor ki ng space and space avai l abl e f or st or i ng mat er i al s shal l be as det er mi ned by t he Cont r act i ng Of f i cer .
D. Wor ker s ar e subj ect t o r ul es of t he Locat i on appl i cabl e t o t hei r conduct whi ch shal l be pr ovi ded by t he Cont r act i ng Of f i cer .
E. Execut e wor k so as t o i nt er f er e as l i t t l e as possi bl e wi t h nor mal f unct i oni ng of Locat i on as a whol e, i ncl udi ng oper at i ons of ut i l i t y ser vi ces, f i r e pr ot ect i on syst ems and any exi st i ng equi pment , and wi t h wor k bei ng done by Gover nment . Use of equi pment and t ool s t hat t r ansmi t v i br at i ons and noi ses t hr ough t he bui l di ng st r uct ur e, ar e not per mi t t ed i n bui l di ngs t hat ar e occupi ed dur i ng const r uct i on except as per mi t t ed by t he Cont r act i ng Of f i cer wher e r equi r ed by l i mi t ed wor ki ng space.
1. Do not st or e mat er i al s and equi pment i n ot her t han assi gned ar eas.
2. Schedul e del i ver y of mat er i al s and equi pment t o i mmedi at e const r uct i on wor ki ng ar eas wi t hi n bui l di ngs i n use by t he ARS i n quant i t i es suf f i c i ent f or not mor e t han t wo ( 2) wor kdays.
3. Wher e access by ARS per sonnel t o vacat ed por t i ons of bui l di ngs i s not r equi r ed, st or age of Cont r act or ' s mat er i al s and equi pment may be per mi t t ed subj ect t o f i r e and saf et y r equi r ement s.
F. Cont r act or shal l t ake al l measur es and pr ovi de al l mat er i al necessar y f or pr ot ect i ng exi st i ng equi pment and pr oper t y i n af f ect ed ar eas of const r uct i on agai nst dust and debr i s, so t hat equi pment and af f ect ed ar eas t o be used i n t he ARS oper at i ons wi l l not be hi nder ed. Cont r act or shal l per mi t access t o ARS per sonnel t hr ough const r uct i on ar eas whi ch ser ve as r out es of access t o such af f ect ed ar eas and equi pment . Coor di nat e al t er at i on wor k i n ar eas occupi ed by ARS so t hat oper at i ons wi l l cont i nue dur i ng t he const r uct i on per i od.
SECTI ON 01 01 00 Page 7
G. Ut i l i t i es Ser vi ces: Mai nt ai n exi st i ng ut i l i t y ser vi ces f or ARS at al l t i mes. Pr ovi de t empor ar y f aci l i t i es, l abor , mat er i al s, equi pment , connect i ons, and ut i l i t i es t o assur e uni nt er r upt ed ser vi ces. Wher e necessar y t o cut exi st i ng wat er , st eam, gases, sewer or ai r pi pes, or condui t s, wi r es, cabl es, et c. of ut i l i t y ser vi ces or of f i r e pr ot ect i on syst ems and communi cat i ons syst ems ( i ncl udi ng t el ephone) , t hey shal l be cut and capped at sui t abl e pl aces wher e shown; or , i n absence of such i ndi cat i on, wher e di r ect ed by t he Cont r act i ng Of f i cer .
1. No ut i l i t y ser vi ce such as wat er , gas, st eam, sewer s or el ect r i c i t y, or f i r e pr ot ect i on syst ems and communi cat i ons syst ems may be i nt er r upt ed wi t hout pr i or wr i t t en appr oval of t he Cont r act i ng Of f i cer . El ect r i cal wor k shal l be accompl i shed wi t h al l af f ect ed ci r cui t s or equi pment de- ener gi zed. When an el ect r i cal out age cannot be accompl i shed, wor k on any ener gi zed ci r cui t s or equi pment shal l not commence wi t hout t he Cont r act i ng Of f i cer ' s pr i or knowl edge and wr i t t en appr oval .
2. Cont r act or shal l submi t a r equest t o i nt er r upt any such ser vi ces t o t he Cont r act i ng Of f i cer , i n wr i t i ng, Two weeks advanced not i ce and agai n 48 hour s i n advance of pr oposed i nt er r upt i on. Request shal l st at e r eason, dat e, exact t i me of , and appr oxi mat e dur at i on of such i nt er r upt i on.
3. Cont r act or wi l l be advi sed ( i n wr i t i ng) of appr oval of r equest , or of whi ch ot her dat e and/ or t i me such i nt er r upt i on wi l l cause l east i nconveni ence t o oper at i ons of ARS. I nt er r upt i on t i me appr oved by ARS may occur at ot her t han Cont r act or ' s nor mal wor ki ng hour s.
4. I n case of a cont r act const r uct i on emer gency, ser vi ce wi l l be i nt er r upt ed on appr oval of t he Cont r act i ng Of f i cer . Such appr oval wi l l be conf i r med i n wr i t i ng as soon as pr act i cal .
H. To mi ni mi ze i nt er f er ence of const r uct i on act i v i t i es wi t h f l ow of ARS t r af f i c , compl y wi t h t he f ol l owi ng:
1. Keep r oads, wal ks and ent r ances t o gr ounds, t o par ki ng and t o occupi ed ar eas of bui l di ngs c l ear of const r uct i on mat er i al s, debr i s and st andi ng const r uct i on equi pment and vehi c l es.
I . Coor di nat e t he wor k f or t hi s cont r act wi t h ot her const r uct i on oper at i ons as di r ect ed by Cont r act i ng Of f i cer . Thi s i ncl udes t he schedul i ng of t r af f i c and t he use of r oadways, as speci f i ed i n par agr aph
" USE OF ROADWAYS" .
1. 9 ALTERATI ONS
A. Sur vey: Bef or e any wor k i s st ar t ed, t he Cont r act or shal l make a t hor ough sur vey wi t h t he Cont r act i ng Of f i cer or t hei r desi gnat ed r epr esent at i ve, of ar eas of t he bui l di ng i n whi ch al t er at i ons occur and ar eas whi ch ar e ant i c i pat ed r out es of access, and f ur ni sh a r epor t , s i gned, t o t he COR wi t h a copy t o t he Cont r act i ng Of f i cer .
1. Shal l not e any di scr epanci es bet ween dr awi ngs and exi st i ng condi t i ons at s i t e.
2. Shal l desi gnat e ar eas f or wor ki ng space, mat er i al s st or age and r out es of access t o ar eas wi t hi n bui l di ngs wher e al t er at i ons occur , and whi ch have been agr eed upon by Cont r act or and Cont r act i ng Of f i cer .
SECTI ON 01 01 00 Page 8
1. 10 DI SPOSAL AND RETENTI ON
A. Mat er i al s and equi pment accr ui ng f r om wor k r emoved and f r om demol i t i on of bui l di ngs or st r uct ur es, or par t s t her eof , shal l be di sposed of as f ol l ows:
1. I t ems t hat r emai n pr oper t y of t he Gover nment shal l be r emoved or di s l odged f r om pr esent l ocat i ons i n such a manner as t o pr event damage whi ch woul d be det r i ment al t o r e- i nst al l at i on and r euse. St or e such i t ems wher e di r ect ed by Cont r act i ng Of f i cer .
2. I t ems not r eser ved shal l become pr oper t y of t he Cont r act or and be r emoved by Cont r act or f r om ARS pr oper t y.
3. I t ems of por t abl e equi pment and f ur ni shi ngs l ocat ed i n r ooms and spaces i n whi ch wor k i s t o be done under t hi s cont r act shal l r emai n t he pr oper t y of t he Gover nment . When r ooms and spaces ar e vacat ed by t he ARS dur i ng t he al t er at i on per i od, such i t ems whi ch ar e NOT r equi r ed by dr awi ngs and speci f i cat i ons t o be ei t her r el ocat ed or r eused wi l l be r emoved by t he Gover nment i n advance of wor k t o avoi d i nt er f er i ng wi t h Cont r act or ' s oper at i on.
B. Upon compl et i on of cont r act , del i ver wor k compl et e and undamaged.
Exi st i ng wor k ( wal l s, cei l i ngs, par t i t i ons, f l oor s, mechani cal and el ect r i cal wor k, l awns, pavi ng, r oads, wal ks, et c. ) di st ur bed or r emoved as a r esul t of per f or mi ng r equi r ed new wor k, shal l be pat ched, r epai r ed, r ei nst al l ed, or r epl aced wi t h new wor k, and r ef i ni shed and l ef t i n as good condi t i on as exi st ed bef or e commenci ng wor k.
C. At Cont r act or ' s own expense, Cont r act or shal l i mmedi at el y r est or e t o ser vi ce and r epai r any damage caused by Cont r act or ' s wor ker s t o exi st i ng pi pi ng and condui t s, wi r es, cabl es, et c. , of ut i l i t y ser vi ces or of f i r e pr ot ect i on syst ems and communi cat i ons syst ems ( i ncl udi ng t el ephone) whi ch ar e i ndi cat ed on dr awi ngs and whi ch ar e not schedul ed f or di scont i nuance or abandonment .
1. 11 USE OF ROADWAYS
A. For haul i ng, use onl y est abl i shed publ i c r oads and r oads on ARS pr oper t y and, when aut hor i zed by t he Cont r act i ng Of f i cer , such t empor ar y r oads whi ch ar e necessar y i n t he per f or mance of cont r act wor k. Tempor ar y r oads shal l be const r uct ed by t he Cont r act or at Cont r act or ' s expense.
1. 12 AVAI LABI LI TY AND USE OF UTI LI TY SERVI CES
A. See cont r act , FAR Cl ause 52. 236- 14, Avai l abi l i t y and Use of Ut i l i t y Ser vi ces.
1. 13 TESTS
A. Conduct f i nal t est s r equi r ed i n var i ous sect i ons of speci f i cat i ons i n pr esence of an aut hor i zed r epr esent at i ve of t he Cont r act i ng Of f i cer .
Cont r act or shal l f ur ni sh al l l abor , mat er i al s, equi pment , i nst r ument s, and f or ms, t o conduct and r ecor d such t est s.
1. 14 CONSTRUCTI ON WASTE MANAGEMENT
A. Responsi bi l i t i es. The cont r act or shal l empl oy pr ocesses t hat ensur e
SECTI ON 01 01 00 Page 9 t he gener at i on of as l i t t l e wast e as possi bl e and shal l avoi d t he gener at i on of wast e due t o t he f ol l owi ng:
1. Over - packagi ng.
2. Er r or .
3. Poor pl anni ng, l ayout .
4. Over or der i ng.
5. Br eakage
6. Mi shandl i ng
7. Cont ami nat i on
8. Gener al weat her damage, excl udi ng ext r eme act s of nat ur e ( i . e.
t or nados, hur r i canes, f l ash f l oods, bl i zzar ds, et c. ) .
B. Pr ocedur es.
1. Of t he i nevi t abl e wast e t hat i s gener at ed, as many of t he wast e mat er i al s as economi cal l y f easi bl e shal l be r eused, sal vaged or r ecycl ed.
2. Wast e di sposal i n l andf i l l s shal l be mi ni mi zed t o t he gr eat est ext ent possi bl e.
i . Wast e Di ver si on Goal s.
a) Demol i t i on, Maj or Remodel i ng: Mi ni mum 10% of t ot al pr oj ect wast e shal l be di ver t ed f r om l andf i l l .
b) I nt er i or Remodel i ng: Mi ni mum 10% of t ot al pr oj ect wast e shal l be di ver t ed f r om l andf i l l .
i i . The f ol l owi ng wast e cat egor i es, at a mi ni mum, shal l be di ver t ed f r om l andf i l l :
a) Gr een wast e ( bi odegr adabl e l andscapi ng mat er i al s) .
( i ) Soi l .
( i i ) I ner t mat er i al ( concr et e, asphal t , masonr y) .
( i i i )…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .