Attachment_9_-_BTO__3_(Skykomish),_FY18.pdf
PDF 4 MB Posted
- Attached to
- Road Maintenance Multiple Award Task Order Contract (MATOC) Federal contract opportunity
- Solicitation number
- 1205M618R0002
About this file
Attachment 9 - BTO #3 (Skykomish)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_02.pdf | ||
| Attachment_8_-_BTO__2_(Darrington),_FY18.pdf | ||
| Attachment_7_-_BTO__1_(Mt_Baker),_FY18.pdf | ||
| Amendment_01.pdf | ||
| Attachment_11_-_BTO__5_(Enumclaw),_FY18.pdf | ||
| Attachment_10_-_BTO__4_(North_Bend),_FY18.pdf | ||
| RFP_No._1205M618R0002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. 6. SOLICITATION ISSUE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
RFQ IFB RFP
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NAICS:
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8 (A)
EDWOSB
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
SOLICITATION NUMBER
1205M618R0002
Brian A. Johnson, CO (425) 783-6056 05M6 100
05M6
Same as Block 9.
Invoice Processing Platform (IPP)
238910
$14 million
USDA Forest Service Mt. Baker-Snoqualmie NF 2930 Wetmore Ave., Suite 3A Everett, WA 98201-4067
LOCAL TIME
4/18/18 @ 1400
Not Rated
IPP
BRIAN A. JOHNSON
3/15/2018 bajohnson03@fs.fed.us
X
Road Maintenance Services BTO #3 (Skykomish), FY18 DOCUMENTS TO SUBMIT: Only submit page 1-6 to the CO.
905899
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 1 of 74 bajohnson03 Highlight bajohnson03 Highlight
B.1 SCHEDULE OF ITEMS
Item No. Description Period of
Performance
001 Blanket Task Order Funding (Ceiling) 365 Days after BTO Award
Sub-Item No. Description Estimated
Quantity Unit Unit Price Total
251 (1) Riprap Machine placed 0.5 Cubic Yds. $_______________ $_______________
251 (2) Riprap Hand placed 0.5 Square Yard $_______________ $_______________
640 (1) Install Road Closure Devices, Earth/Rock Berms from material on-site 1 Each $_______________ $_______________
803(1) Snow removal 0.5 Mile $_______________ $_______________
807 (1) Water Truck, 2,000 gall min, filled 0.5 Hour $_______________ $_______________
807(2)a Excavator, Small (40 - 50 hp) with thumb and blade 0.5 Hour $_______________ $_______________
807(2)b Excavator, Medium (90 hp) 25' min reach with thumb 0.5 Hour $_______________ $_______________
807(2)c Excavator, Large (230 hp min) 30' min arm reach with thumb 0.5 Hour $_______________ $_______________
807(3) Backhoe, Extend-a-hoe with thumb and 4 - 1 bucket 0.5 Hour $_______________ $_______________
Not To Exceed Amount
$0.00
The sum of all work orders issued under this Task Order SHALL not exceed the Not To Exceed amount listed. Performance of work in excess of the funds available or work not specified below is at the contractors risk and may not be paid. The Government may add additional funds as they come available or may solicit the MATOC contractors for a new BTO for this area.
The quantities below represent the most common quantities ordered on work orders. Actual work orders issued may list more or less than the quantity listed below.
MBS ROAD MAINTENANCE SERVICES MATOC
BTO #3 (Skykomish), FY18
ROAD MAINTENANCE - SKYKOMISH RANGER DISTRICT
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 2 of 74
Sub-Item No. Description Estimated
Quantity Unit Unit Price Total
807(4) Grader, 12G min equivalent 0.5 Hour $_______________ $_______________
807(5)a Crawler Tractor / Dozer, D3 min 0.5 Hour $_______________ $_______________
807(5)b Crawler Tractor / Dozer, D5 min 0.5 Hour $_______________ $_______________
807(6) Dump Truck, 10 CY min capacity 0.5 Hour $_______________ $_______________
807(7) Front End Loader 2 yard minimum 0.5 Hour $_______________ $_______________
807(10) Trailer - Min 2 axle 0.5 Hour $_______________ $_______________
807(11) 3 Axle Low Boy with Tractor and Operator 0.5 Hour $_______________ $_______________
807(12) Service Truck W / Chain Saw & Operator 0.5 Hour $_______________ $_______________
807(13) Compactor, Steel Wheel, Vibratory, 64" drum width min. 0.5 Hour $_______________ $_______________
811(1) Surface Maintenance Level 3-5 Roads 0.5 Single Lane Mile $_______________ $_______________
811(2) Surface Maintenance Level 3-5 Roads 0.5 Double Lane Mile $_______________ $_______________
811(4) Shoulder Maintenance 0.5 Road Mile $_______________ $_______________
813(1) Spot Surfacing, Forest Service Furnished from nearby Govt Pit source 0.5 Cubic Yard $_______________ $_______________
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 3 of 74
Quantity Unit Unit Price Total
813(3) Spot Surfacing, Commercial Source 0.5 Ton $_______________ $_______________
813(4) Haul - 10 CY Min 0.5 Cubic Yard Mile $_______________ $_______________
813(5) Haul - 10 CY Min 0.5 Truck Hour $_______________ $_______________
814(1) Pothole Patching, Hot Mix AR4000 Oil, 1/2" size minus aggregate 0.5 Ton $_______________ $_______________
814(6) Paved Surface Cleaning (Double Lane), Power Broom, 48" min width Self Propelled with Lights
0.5 Mile $_______________ $_______________
832(1) Load, Haul and Place Material under 3 miles one way, minimum 10 CY Dump Truck
0.5 Cubic Yard $_______________ $_______________
832(2) Load, Haul and Place Material over 3 miles one way, minimum 10 CY Dump Truck
0.5 Cubic Yard/Mile $_______________ $_______________
832(4) Haul, minimum 10 CY Dump Truck 0.5 Cubic Yard Mile $_______________ $_______________
834(1) Clean and Recondition Culverts 24 inch Diameter and under 1 Each $_______________ $_______________
834(2) Clean and Recondition Culverts over 24 inch through 48 inch Diameter 1 Each $_______________ $_______________
834(3) Clean and Recondition Culverts Over 48 Inch Diameter 1 Each $_______________ $_______________
834(4) Clean Ditches 0.5 Mile $_______________ $_______________
834(5) Clean Ditches and Drainage Structures 0.5 Mile $_______________ $_______________
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 4 of 74
Quantity Unit Unit Price Total
834(6) Clean Drainage Structures 0.5 Mile $_______________ $_______________
838(1) 838 MAINTENANCE FOR LIMITED
USE (ML 2) 0.5 Mile $_______________ $_______________
839(1) Spring Recurrent Maintenance of ML 4 and 5 Roads 0.5 Mile $_______________ $_______________
839(2) Spring Recurrent Maintenance of ML 3 Roads 0.5 Mile $_______________ $_______________
842(1)a Vegetation Maintenance - Level 5 Road 0.5 Mile $_______________ $_______________
842(1)b Vegetation Maintenance - Level 4 Road 0.5 Mile $_______________ $_______________
842(2) Vegetation Maintenance - Level 3 Road 0.5 Mile $_______________ $_______________
842(3) Vegetation Maintenance - Level 2 Road 0.5 Mile $_______________ $_______________
851(2)
Danger Tree Removal, Fall trees outside of roadway, Trees fell on roadway and inside clearing limits are to be removed to outside of roadway
1 Each $_______________ $_______________
851(3) Hazard or Obstruction Removal ML 3-5 Roads 1 Miles $_______________ $_______________
851(4) Hazard or Obstruction Removal ML 2 Roads 1 Miles $_______________ $_______________
861(4)
Recondition/clean traffic gate, repair by welding locking mechanism, remove graffiti, reinstall Government Furnished signs and hardware
1 Each $_______________ $_______________
872(1) Clean Sign Face, return sign by removing surfacing debris, remove graffiti 1 Each $_______________ $_______________
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 5 of 74
Quantity Unit Unit Price Total
872(3) Recondition Sign Face Government Materials 1 Each $_______________ $_______________
872(4)
Install or Replace Post, Government furnished - Carsonite markers, 4x4 treated posts, to dimensions and depths meeting MUTCD standards
1 Each $_______________ $_______________
872(8) Install or Replace Sign Government Furnished 1 Each $_______________ $_______________
872(10) Remount Sign 1 Each $_______________ $_______________
872(12) Maintain Marker 1 Each $_______________ $_______________
872(14) Replace Marker Government Furnished 1 Each $_______________ $_______________
881(3)a Equipment Moving – Tilt-bed with Road Grader 16 Miles $_______________ $_______________
881(3)b Equipment Moving – Tilt-bed with Backhoe 16 Miles $_______________ $_______________
881(3)c Equipment Moving - Tilt-bed with Excavator (all sizes) 16 Miles $_______________ $_______________
881(3)d Equipment Moving – 3 Axle Low boy Loaded with Equipment 1 Miles $_______________ $_______________
TOTAL PRICE: $_______________
B.2 PERSONNEL AUTHORIZED TO ISSUE WORK ORDERS
The following personnel are authorized to place and administer work orders under this BTO:
Name, Position, Phone, Email Ron Hausinger, South Zone Engineering, (425) 888-8776, rhausinger@fs.fed.us Santino Pascua, South Zone Road Manager, (425) 888-8784, spascua02@fs.fed.us
Note: Work Orders will include Pay Item Numbers and Quantity of each Subitem ordered. A Work Order will be issued designating the roads to be maintained and the time frame in which the work shall be accomplished. If the contractor fails to perform the ordered work within the timeframe required, the ordered work may be deleted from the contract and performed by other means.
Work Orders can ONLY be issued for those items that are listed and pre-priced in the Schedule of Items in this BTO. Only a warranted FS Contracting Officer is authorized to modify this BTO and any items in the schedule.
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 6 of 74
SECTION C - DESCRIPTION/SPECIFICATION/WORK STATEMENT
C.1 SCOPE OF CONTRACT
a. The intent of this performance based service contract is to provide for road maintenance of National Forest System Roads on the Mt. Baker-Snoqualmie National Forest (Snoqualmie Ranger District - Skykomish Area).
b. A District map may be obtained at the district office: Snoqualmie Ranger District, 902 S.E. North Bend Way, North Bend, WA. For a complete list of roads contact Ron
Hausinger at rhausinger@fs.fed.us.
c. The Contractor shall assume all risk, loss, damage, or expense arising out of the prosecution of the work, except as otherwise provided in the contract.
d. Locations that may be used for staging of equipment and materials are available. The government will not be held liable for contractor’s equipment and material stored in these locations.
C.2 FURNISHING OF MATERIAL
a. Unless otherwise stated in the Special Project Specifications, the contractor shall furnish all material required for performance of the contract. All material shall comply with the specifications.
b. The Contractor shall furnish and deliver the material to the site of the work in such a manner that their quality and fitness for the work is preserved.
c. The Contractor shall start work when directed within three calendar days from the date of work order.
d. Measurement and payment for contract work will be made only for those pay items included in the Schedule of Items.
e. The Contractor shall be responsible for furnishing warning devices and complying with Federal and any State or local safety standards and traffic management procedures.
C.3 COORDINATION OF CONTRACT DOCUMENTS
The specifications, drawings, and all other provisions are essential parts of the contract. They are intended to be mutually complementary. In the case of discrepancy, the following is the order of precedance: a. Drawings; b. Standard Specifications for Maintenance of Roads.
C.4 TECHNICAL SPECIFICATIONS FOR MAINTENANCE OF ROAD
The specifications are numbered in the "800" series codes. Only those sections which are applicable to this contract are included. There will be gaps between the section numbers due to the fact that many sections have been purposely omitted or because certain specification sections have been reserved for possible future inclusion in the "800" series.
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 7 of 74 mailto:spascua02@fs.fed.us
C.5 APPLICABLE PUBLICATIONS AND FORMS
Publications and forms that apply to this contract. Publications and forms listed can be obtained via the Internet, ordered through the U.S. Government Printing Office, or through the Mt. Baker- Snoqualmie National Forest. Supplements or amendments to listed publications from any organizational level may be issued throughout the performance period. The Contractor shall immediately implement those changes that result in a decrease or no change in cost and notify the contracting officer in writing of such changes. Before implementing any change that will result in an increase in cost, the Contractor shall submit to the contracting officer a price proposal within 30 calendar days following receipt of the change by the Contractor.
Publication Publication Number or WWW Address Revision Date
Manual of Uniform Traffic Control Devices. MUTCD 2009 2009
Sign and Poster Guidelines for the Forest Service. EM-7100-15 2010
Mt. Baker-Snoqualmie National Forest Road Rules Document.
Copy of Commercial Road Rules Listing is available upon request.
1991 or as amended
Mt. Baker-Snoqualmie N.F. Programmatic Biological Assessment for North Zone Road Maintenance (2012).
A copy of the Biological Assessment is available upon request. 2012
Memorandum of Agreement between the USDA Forest Service, Region 6 and the Washington State Department of Ecology.
Copy of MOA is available upon request. 2000
Roads Maintenance Level Guide for Forest Service Roads.
San Dimas Guide for Road Maintenance Levels 0577-1205-SDTC. 2005
MEMORANDUM OF UNDERSTANDING
Between Washington State Department of Fish and Wildlife And USDA Forest Service, Pacific Northwest Region.
Copy of MOU is available upon request. 2012
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 8 of 74
SECTION F--DELIVERIES OR PERFORMANCE
F.1 AGAR 452.211-75 EFFECTIVE PERIOD OF CONTRACT (FEB 1988)
The effective period of this contract is from DATE OF AWARD through: 365 calendar days.
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 9 of 74
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at: TBD.
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 10 of 74
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 PROSECUTION OF WORK -- WORK HOUR LIMITS -- WORK ITEM LIMITS
The Contractor shall conduct activities so that interference with the public shall be kept at a minimum.
When excavation work prevents traffic flow, the Contractor is authorized to delay traffic not to exceed 30 minutes.
Any activities requiring closure to the public shall be scheduled with the CO at least 14 days in advance.
The Contractor shall shut down all equipment when there is 1 inch precipitation in a 24 hour period and/or ½ inch precipitation in 1 hour.
H.2 USE OF PREMISES
General - The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform the contract in a manner that will not interrupt or interfere with the conduct of Government business.
Camps - Before any camp or storage site is opened or operated on National Forest land or lands administered by the Government, written permission shall be obtained through the Government.
Camp is interpreted to include the campsite or trailer parking area of any employee or subcontractor working on the project. Such permission, if granted, will be without charge to the Contractor.
H.3 USE OF ROADS BY CONTRACTOR
The Contractor is authorized to use all roads under the jurisdiction of the Forest Service that are open and necessary for direct route access to the contract work sites for all activities necessary to complete this contract. This authorization is subject to the limitations described below, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
Keep existing roads open to all traffic during contract work, and maintain them in a condition that will adequately accommodate traffic. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a Written Plan for the satisfactory handling of traffic has been approved. Post Traffic Control Signs and Devices in conformance with the “Manual on Uniform Traffic Control Devices” (MUTCD). Do not proceed with work on the project until all required signs are in place and approved.
Before shutting down any operations, leave all travel ways in a condition suitable for traffic.
Unless otherwise provided, traffic delays may not exceed 30 minutes.
If the Contractor requests use of a National Forest road or road segment not listed above, the Forest Service may authorize such use if not in conflict with the current Road Rules document.
Authorization to use such additional roads may include maintenance requirements and use limitations.
The roads authorized for use will be subject to the following provisions:
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 11 of 74
(a) The current National Forest Road Use Rules Document is applicable to all commercial road users. This document is available for inspection at the office of the Forest Supervisor and shall be applicable except when modified by provisions of this contract. Copies are available upon request.
(b) Federal Regulations contained in 36 CFR 261.54 as applied to the area by an order issued under 36 CFR 261.50. These regulations authorized the Forest Service, as a sovereign act, to issue additional restrictions to those shown in the current Road Use Rules Document and will be posted on the road.
H.4 TRAFFIC CONTROL, FLAGGERS, BARRICADES, WARNING SIGNS, AND OTHER DEVICES
The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, flaggers, pilot cars, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Barricades and other obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic. Keep traffic devices current with maintenance operation and remove upon completion.
All operations and signing shall conform to the current requirements and guidelines of the Occupational Safety and Health Administration (OSHA) and the Manual of Uniform Traffic Control Devices (MUTCD).
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points, where the new work crosses or coincides with an existing road or trail. Required signs may be mounted on portable or temporary mountings. Use standard MUTCD shapes, colors, sizes, and legends.
Mark hazards incidental to the work within or on the traveled way, shoulders, or turnouts with hazard identification markers, illuminated beacons, and other MUTCD devices to safely guide road users through the area. Mark work segments not completed on a daily basis appropriately for night travel. Obtain authorization before commencing work at night.
Advisory speed plates may be used to control traffic through the work area.
Flaggers - Provide properly equipped, trained and certified, flag person(s) where the traffic is required to stop before proceeding. Stop traffic in locations which provide width enough for passage of traffic and reasonable protection for vehicles. When flag control is used, advance warning signs are required.
H.5 MOTORIZED EQUIPMENT
Use of motorized equipment other than hand-held equipment such as power saws and brush cutters will not be permitted off designated roads in the project area without approval of the Contracting Officer or as elsewhere provided herein.
H.6 EQUIPMENT REQUIREMENTS
The Contractor shall furnish equipment meeting OSHA (Occupational Safety and Health Act) requirements. When the Contractor is paid for furnishing and operating equipment on an hourly or daily basis, it shall be operated at its design speed, or the maximum speed feasible under prevailing conditions.
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 12 of 74
Equip all vehicles and machinery operating on or from the traveled way or road shoulder with flashing lights, strobes, or rotary beacons operated continuously while work is in progress. Use truck headlights at all times while operating. Backup horns are required on all self-propelled equipment in excess of 5 ½ tons gross weight.
Park vehicles and machinery not currently used in the maintenance operation off the traveled way at approved locations to minimize interference with normal use.
H.7 SPECIAL REQUIREMENTS FOR WATER DRAFTING EQUIPMENT
Water drafting equipment may be used only at water sources designated on the Vicinity Map, task order, or provided by the Contracting Officer. Such equipment shall include a screen around the intake (foot valve) with openings no larger than 1/8 - inch. An air gap or positive antisiphon device shall be provided between the water source and the vehicle being loaded if the vehicle has been used for other than water haul, if the source is a domestic potable water supply, or the water is used for tank mixing with any other materials. Materials must be readily available and appropriate measures taken to prevent petroleum products from entering the water source.
H.8 HAZARDOUS MATERIAL SPILL CLEAN-UP KIT
A hazardous material spill clean-up kit shall be maintained and readily available for potential use on the project at each work site. Spill clean-up kits shall contain the following items as a minimum:
• 1 case absorbent pads suitable for absorbing hydraulic fluid, engine oil, and fuel
• 1 gallon "Plug-a-Dike" or equivalent material
• A nineteen liter (five-gallon) mixing container
• 20 meters of 150 mm absorbent, floating booms for absorbing hydraulic fluid, engine oil, and fuel from a water surface
H.9 LANDSCAPE PRESERVATION AND HAZARDOUS MATERIALS
(a) The Contractor shall give attention to the effect of contract operation upon the landscape, shall take care to maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following requirements:
1. Prevention of the Landscape Defacement. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or natural features unless specifically authorized by the Government. Unless otherwise provided in the Special Project Specifications, the Contractor shall confine contract operations to within the areas designated in contract documents.
Unless otherwise provided in this contract, the Contractor shall gather rock which falls outside the roadway due to contract operations and dispose of it as directed by the Government.
2. Protection of Streams, Lakes, and Reservoirs. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes, small ponds, and reservoirs with fuels, oils, bitumen’s, dust palliatives, silt, or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the Government.
(b) The Contractor shall confine operations to within the work area limits, immediate work area, or other areas designated in the contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 13 of 74
The Contractor shall make all reasonable attempts to preserve the scenic and natural environment within and adjacent to this project.
(c) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, lakes, reservoirs, and other surface waters.
1. Wash water or waste from concrete, aggregate or other operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
2. Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.
(d) No petroleum products or other hazardous substances shall be released on or into land or rivers, streams, impoundments or other waters, or into natural or manmade channels leading thereto or therefrom. Servicing of all equipment shall be done only in the areas approved by the Contracting Officer. The Contractor shall transport off government lands all waste oil, vehicle oil filters (drained of free-flowing oil), and oily rags and shall dispose of such materials in accordance with applicable State and Federal regulations.
1. If the total on-site oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer. This plan shall include notification of appropriate state and local officials, the Contracting Officer and other appropriate agencies.
2. At all on-site work areas (including Contractor storage, transfer, fueling, mixing sites, etc., for oil, oil products or any hazardous materials), the Contractor shall take appropriate preventive measures to insure that any release of hazardous products does not enter any stream or other waters of the United States or any of the individual States and shall conform to the federal, state and local regulations. Planned spill containment locations in stream courses shall be established prior to commencement of work activities. These locations will be reviewed by the Contracting Officer or representative. When deemed appropriate, additional planned preventive measures shall be established for review by the Contracting Officer or representative.
3. The Contractor, acting independently, shall immediately take action to notify the appropriate agencies including the Contracting Officer, and to contain and clean up, without expense to the Government, all petroleum products or other hazardous substance releases which are on or in the vicinity of the project and which are caused by the Contractor's employees, directly or indirectly. The Contractor shall have the necessary materials on site to contain a spill which may occur on land or within live streams as appropriate for any potential flow conditions likely to occur. This may require absorbent pads and/or booms, or other containment devices. In the event the Government determines that additional resources beyond those of the Contractor's are required, the Contractor may be held liable for all damages and costs including, but not limited to additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and clean-
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 14 of 74 up of petroleum products or other hazardous substance releases caused by Contractor's employees or resulting from or related to construction operations.
4. The Contractor shall notify the Contracting Officer of any hazardous materials to be used on the job and shall have Material Safety Data Sheets (MSDS) for those materials available on the job.
H.10 PROTECTION OF BOTANICAL RESOURCES
Previously unknown or unlisted populations of Protected, Endangered, Threatened, or Sensitive (PETS) plant species, or potential habitat for PETS species, may be located within contract project boundaries. The modification of contract specifications may be required to protect previously unknown PETS plant populations.
(a) Government's Responsibility - The Government will identify, as they become known, locations of PETS species that the Contractor could encounter in the progress of work under this contract.
(b) Contractor's Responsibility - The Contractor shall protect these areas that contain PETS species, as directed in writing by the Government.
H.11 CONTROL OF NOXIOUS WEEDS--CLEANING OF EQUIPMENT
To prevent the introduction and control the spread of seeds of noxious weeds onto and around National Forest land, the Contractor shall ensure all equipment moved onto National Forest land is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. When the Contractor is working in an area that has been identified as a noxious weed infestation area, the Contractor shall ensure equipment is cleaned of weed seeds prior to moving to another work area on the Forest. The Contractor shall employ whatever cleaning methods necessary, this may require a pressure hose, to ensure compliance with the terms of this provision, and shall notify the Forest Service prior to moving each piece of equipment onto National Forest land, unless otherwise agreed in writing. Notification will include identifying the location of the equipment's most recent operations.
The Contractor shall certify, in writing, compliance with the terms of this clause prior to each start-up of operations. For the purposes of this clause, "equipment" includes all motorized equipment operated off system roads, transport vehicles, and all motorized equipment used in road maintenance. Not included are log trucks, chip vans, pickup trucks, cars, or other vehicles used to daily transport personnel.
Special care shall be taken to assure removal of noxious weeds and their seed, specifically any species on the Washington State Noxious Weed Control Board website:
http://www.nwcb.wa.gov/weed_list/weed_list.htm
1. If any previously undiscovered Threatened Endangered or Sensitive vascular plants, bryophytes, lichens, or fungi are discovered, before or during project implementation, halt work until a USFS botanist is consulted and necessary mitigation measures are enacted. The list of rare plants of concern can be found on the following website:
http://www.fs.fed.us/r6/sfpnw/issssp/agency-policy/.
2. Treat known infestations before ground disturbance begins.
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 15 of 74 http://www.nwcb.wa.gov/weed_list/weed_list.htm http://www.fs.fed.us/r6/sfpnw/issssp/agency-policy/
3. For actions conducted or authorized by written permit by the Forest Service that will operate outside the limits of the road prism, require the cleaning of all heavy equipment prior to entering NFS Lands. See engineering contract specs H.12.
4. Suppliers must provide annual documentation to the USFS indicating that the following products have been examined by a qualified inspector and deemed free of State listed noxious weeds:
• Straw or other Mulch
• Gravel, Rock, or other fill
• Seeds (according to AOSA standards)
5. If weeds are present in the project area, all equipment and gear must be cleaned before leaving the project area to avoid spreading the infestation further.
6. If weeds are present in the project area, work from relatively weed-free areas into the infested area rather than vica-versa.
Revegetate all areas of bare soil exposed by project activities if there is a risk of noxious weed invasion. Native plant materials are the first choice in revegetation where timely natural regeneration of the native plant community is not likely to occur. Follow revegetation criteria and specifications for this project (see Spec. 841.06 Seed Mix)
H.12 CONTROL POINTS
The Contractor is responsible for the preservation of existing bench marks and other control points. The cost of replacing them may be charged against the Contractor and may be deducted from the payment for the work. If the Contractor finds missing controls they shall notify the Government who will replace them within two (2) days.
H.13 SUBMITTALS
The following submittals are required for this project:
Title Referenced by Contract Clause or Specification No.
Time of Government Approval After Submittal
Quality Assurance Plan Section F and Specifications 7 days
Traffic Control Plan Use of Roads by Contractor clause 7 days
Safety Plan, Including Blasting Plan, Where Applicable
Accident Prevention clause
(FAR 52.236-13) N/A
Engineered Spill Prevention Plan
Landscape Preservation and Hazardous Materials clause 2 days
Fire Plan R6-FS-6300-55 and Certification that your Fire Tools and Equipment are in full compliance with the contract requirements
R6-FS-6300-52 part 2 N/A
Progress Schedule Section F N/A
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 16 of 74
H.14 SALVAGE RIGHTS
Sign maintenance under specification SPS872F1 allows for sign post, signs replaced and applicable hardware to become property of the Contractor. No other Contractor salvage rights exist under the contract unless specifically provided elsewhere herein.
H.15 MATERIAL SOURCES
Rock and mineral soil excavated within the normal excavation shall be conserved and used as needed.
Borrow sources are identified on the plans or elsewhere herein if made available by the Government. If alternate borrow sources are needed, they must be approved in advance by the COR. Such borrow sources shall be restored to a natural appearance. Materials acquired from commercial sources shall conform to government specifications and be from acceptable certified weed free commercial sources.
H.16 FURNISHING OF MATERIALS
Unless otherwise stated in the Special Project Specifications, the Contractor shall furnish all material required for performance of the contract. All material shall comply with the specifications. The Contractor shall verify the kind and amount of work that may be necessary in furnishing the material.
H.17 STORAGE OF MATERIALS AND EQUIPMENT
Materials shall be stored to assure the preservation of their quality and fitness for work.
Approved portions of the right-of-way or other areas on Government land may be used for storage purposes. All storage sites approved by the Government shall be restored to a satisfactory condition at the Contractor's expense.
H.18 LEGAL RELATIONS AND RESPONSIBILITIES
Government's Responsibility for Utilities
1. The Government will identify the roads in the Road Listing of, known locations of underground installations other than culverts and drains the Contractor could encounter in the progress of work under the contract; electric, telephone cables, water supply pipes, and induction loops within the road right of way.
Contractor's Responsibility for Utilities
1. The Contractor will notify Washington UULC 1-800-424-5555 and the utility companies and request utilities be marked on the ground prior to excavation.
2. The Contractor will notify all utility companies or other parties affected and make arrangements for all necessary adjustments of the public or private utility fixtures, pipelines, and other appurtenances affected by work under the contract.
In the event of interruption to utility services because of accidental breakage the Contractor shall promptly notify the utility authority and shall cooperate with that authority in the
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 17 of 74 restoration of service. If damage occurs to the utilities the Contractor will be liable for damage to underground utilities.
H.19 ARCHAEOLOGICAL OR HISTORICAL SITES (AGAR 452.236-73) (FEB 1988)
If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 18 of 74
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 FAR 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)
In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.
This Statement is for Information Only:
It is not a Wage Determination
Employee Class Monetary Wage--Fringe Benefits
WG-4, Step 3 (Supervisory) WG-4, Step 2 (Non-Supervisory)
WG-2, Step 3 (Supervisory) WG-2, Step 2 (Non-Supervisory)
$22.38 (Plus Fringe) $21.53 (Plus Fringe)
$19.28 (Plus Fringe) $18.55 (Plus Fringe
Monetary Wage based on: The schedules above have been established under authority of DoD Instruction 5120.39, dated October 1, 2015, subject to the limitations contained in CPM 2017-20, dated 22 December 2017.
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 19 of 74 http://uscode.house.gov/ http://uscode.house.gov/
SECTION J
CONTRACT DOCUMENTS, EXHIBITS OR ATTACHMENTS
Attachment No. Description Total Pages
See C.1b.
3A,B,C,D 44
District Location Map Road Listing Wage Determinations (All Counties)
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 20 of 74
Attachment 1 – District Location Map
A district map for the applicable areas may be obtained at the specific district office below:
DARRINGTON RANGER DISTRICT
Darrington Ranger District – Darrington Office 1405 Emens Avenue North Darrington, WA 98241 Telephone: (360) 436-1155
Operating Hours
Monday-Friday 8:00 am – 4:30 pm Closed for lunch 12:00 – 1:00 pm Closed federal holidays
MT. BAKER RANGER DISTRICT
810 State Route 20 Sedro-Woolley, WA 98284 Telephone: (360) 856-5700 Ext 515
Operating Hours
Monday-Friday 8:00 am – 4:30 pm
SKYKOMISH RANGER DISTRICT
74920 NE Stevens Pass Hwy P.O. Box 305 Skykomish, WA 98288 Telephone: (360) 677-2414
Operating Hours
Monday-Friday 8:00 am – 4:30 pm Closed for lunch 12:00 – 12:30 pm
SNOQUALMIE RANGER DISTRICT
North Bend Office 902 S.E. North Bend Way, Bldg. 1 North Bend, WA 98045 Telephone: (425) 888-1421
Operating Hours
Monday-Friday 8:00 am – 4:30 pm
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 21 of 74
Attachment 2 – Road Listing (Skykomish)
- Road Listing -
The following is a list of primary roads that will be maintained with this contract. Not included in this list are the roads that have a Objective Maintenance level lower than 3. For a complete list of roads contact Ron Hausinger at rhausinger@fs.fed.us. Maintenance on roads not shown will primarily be opening and drainage, as funding allows. The objective of this contract is to provide appropriate maintenance of the Forest roads, with the following priority for maintenance 1st: user safety, 2nd: resource protection and 3rd: user comfort.
Rd. #
NAME BEGIN
TERMINI
END
BMP
EMP
OPER M L
OBJE M L SURF.
TYPE
LANES
6000610
RIVERVIE
W CG
HWY 2
SEC 25
0.2
AC
6000710
DECEPTI
ON FALLS
CG
SEC 25
6000820
DECEPTI
ON CR
SEC 30
0.35
AGG
6020000 276 LK
SERENE HWY 2 SEC 30 0 0.5 3 3 AGG 1
6020000 276 LK
SERENE HWY 2 SEC 30 1.5 3.2 3 3 AGG 1
6020110
LAKE
SERENE
TH
RD 6020
SEC 19
RD 6020
0.4
6024000
BARCLAY
CR
SEC 31
4.4
6066000 BECKLER
PEAK HWY 2 SEC 21 0 0.5 3 3 AGG 1
6066000 BECKLER
PEAK HWY 2 SEC 21 0.5 6.5 3 3 AGG 1
6066000 BECKLER
PEAK HWY 2 SEC 21 6.5 6.85 3 3 AGG 1
6095000
TUNNEL
CR.
SEC 26
1.25
6095115 RD
6095000 SEC 26 0 0.3 2 3 NATIVE 1
6099050 SNOWSH
ED
RD
6099000
SNOWSH
ED 0 0.5 4 4 AGG 1
6200000
NORTH
FORK
TOLT RD
2.8
FORK
TOLT RD
5.9
6220000
PROCTO
R CR.
RD 62 S LINE
SEC 34
6300000
290 N. FK.
SKYKOMI
SH
SEC 32
13.7
14.7
14.7
18.4
18.4
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 22 of 74 mailto:rhausinger@fs.fed.us
6300410
TROUBLE
SOME CR
CG-BOTH
LOOPS
RD 63
0.8
6300440 2807 SAN
JUAN CG RD 63 SEC 23 0 0.1 3 4 AGG 1
6300820
DEER
FALLS
RD
SEC 19
0.16
6300914
LK
BLANCA
TRAIL
PARKING
AREA
SEC 18
6330000
SALMON
RD 6335
SEC 13
1.5
6335000
MINERAL
CITY
SEC 05
0.16
6400110
MONEY
CR CG
RD
6400000
WESTSID
E LOOP
0.5
6400110
MONEY
CR CG
RD
6400000
WESTSID
E LOOP
0.9
6410110
MILLER
RIV CG
RD 6410
SEC 04
0.6
6412000
2522 E.F.
MILLER
RIVER
RD 6410
SEC 34
6420000
MONEY
RD 64
SEC 33
5.7
6.9
6500000
BECKLER
0.73
0.73
2.11
2.11
7.4
7.4
14.9
6500104 PAT'S
KNOB RD 6500 SEC 24 0 0.2 3 3 AGG 1
6500104 PAT'S
KNOB RD 6500 SEC 24 0.2 0.56 3 3 AGG 1
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 23 of 74
6500110
280-A
RD 65 SEC 24-
EASTSIDE
6500110
280-A
RD 65 SEC 24-
EASTSIDE
NATIVE
6500115 WASTE
AREA RD 65 SEC 32 0 1.1 1 3 NATIVE 1
6510000
BOLT
CRK
RD 65
0.1
6514000
EAGLE
CRK
RD
6510000
NNW LINE
SEC 12
3.58
EAGLE
CRK
RD
6510000
3.58
8.8
EAGLE
CRK
RD
6510000
8.8
10.1
6520000
JOHNSON
RD 6500
2.78
6520000
JOHNSON
2.78
5.6
6526000 273-A RD 6520 SEC 27 0 1.3 3 3 AGG 1
6530000
RAPID
WILD
BNDRY
4.5
6550000
RIV
JACKS
PASS
1.32
4.36
5.36
5.36
6.08
6554000
EVERGRE
EN CREEK
RD 6550
1.7
6554000
EVERGRE
EN
CREEK
RD 6550
8.05
6710000
MARTIN
RD 67
3.44
6800000 2622
FOSS RIV HWY 2 SEC 12 2 2.5 4 4 AGG 1
FOSS RIV HWY 2 SEC 12 2.5 3.54 3 3 AGG 1
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 24 of 74
FOSS RIV HWY 2 SEC 12 3.54 8.2 3 3 AGG 1
6830000
TONGA
RDG.
RD 68
6.76
6830310 2605-A MT
SAWYER
RD 6830
SEC 09
TRAIL
1.36
6835000 W FORK
FOSS
TRAIL
1.9
6846000 2504-B
ROCK LK. RD 68 SEC 19 0 2.7 3 3 AGG 1
6000267 267 HWY 2 SEC 22 0 0.5 2 2 AGG 1
6000510 2681
HAZE HWY 2 SEC 21 0 1 2 2 AGG 1
6000700 HWY 2 SEC 27 0 0.1 2 2 AGG 1
6000709 ALPINE
FALLS HWY 2 SEC 26 0 0.4 2 2 AGG 1
6000810 HWY 2 SEC 25 0 0.584 2 2 AGG 1
6000840
SCENIC
COMPOU
ND
SEC 29
6000850
POWERLI
NE
ACCESS-
SEC 28
SEC 28
0.547
6000920
STEVENS
PASS
LOOP/TO
WER
ACCESS
0.3
6000925
RADIO
TOWER/S
KYLINE
LAKE
6000920
SEC 11
6010000 6010 CO
SNO-
REITER
SEC 09
6010210
2708-B
RAGGED
RIDGE
RD 6010
SEC 16
6010220 RD 6010 SEC 08 0 0.2 2 2 AGG 1
6010222 RD
6010220 SEC 09 0 0.2 2 2 AGG 1
6010310 2708-C
ROCKY
RD
6010000 SEC 04 0 1 2 2 AGG 1
6010410 RD 6010 SEC 09 0 0.1 2 2 AGG 1
6012000
WALLACE
R.
6010000
SEC 24
6012110 2800-A RD
6012000
SEC 02
TRAIL 0 1 2 2 AGG 1
6020210 RD
6020000
E LINE
SEC 29 0 0.8 2 2 AGG 1
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 25 of 74
6020310 HUC ROAD
6020210
1.2 1.53 2 2 AGG 1
6020310 HUC ROAD
6020210
0 1.2 2 2 AGG 1
6020311 HUC ROAD
6020310
0.1 0.4 2 2 AGG 1
6020311 HUC ROAD
6020310
0 0.1 2 2 AGG 1
6020312 HUC ROAD
6020310
ROAD
6020310 0 0.24 2 2 AGG 1
6020315 HUC ROAD
6020310
0.25 0.31 2 2 AGG 1
6020315 HUC ROAD
6020310
0 0.25 2 2 AGG 1
6020316 HUC 6020310 0.04 0.22 2 2 AGG 1
6020316 HUC 6020310 0 0.04 2 2 AGG 1
6022000
HEYBRO
OK L.O.
SEC 21
3.998
6022113
HAYBRO
OK TS
SEC 22
6022120
HAYBRO
OK TS
SEC 23
1.33
6024101
NE
ACCESS
SEC 35
0.444
6024103
NE
ACCESS
0.121
6024106
NE
ACCESS
0.068
6024110
278-A
LOWER
BARCLAY
0.4
6024112 RD
6024110 SEC 35 0 0.088 2 2 AGG 1
6024310 RD 6024 SEC 26 0 0.8 2 2 AGG 1
6024510 HUC ROAD
6024000
0 1.05 2 2 AGG 1
6024512 HUC ROAD
6024510
0 0.4 2 2 AGG 1
6024514 HUC ROAD
6024510
0 0.17 2 2 AGG 1
6024516 HUC ROAD
6024510
0 0.51 2 2 AGG 1
6028000
BARING
MTN
SEC 07
1.556
6028110 RD 6028 SEC 12 0.5 0.8 2 2 AGG 1
6028110 RD 6028 SEC 12 0 0.5 2 2 AGG 1
6030000 2612 LOW
CR
HWY 2
BARING
RD
6400000 3 6.1 2 2 AGG 1
6030000 2612 LOW
CR
HWY 2
BARING
RD
6400000 0 3 2 2 AGG 1
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 26 of 74
6030110 RD
6030000 SEC 29 0 0.5 2 2 AGG 1
6030210 HUC ROAD
6030000
0 0.47 2 2 AGG 1
6066106 RD 6066 SEC 29 0 0.4 2 2 AGG 1
6066108 RD 6066 SEC 29 0 1 2 2 AGG 1
6067000 SEC 23 RD
6066000 SEC 23 0 4.3 2 2 AGG 1
6095105 RD
6095000 SEC 26 0 0.8 2 2 AGG 1
6099110
GUNTOW
ER
ACCESS
6099000
6100050 RD
6100000 SEC 27 0 4.5 2 2 AGG 1
6100210 RD
6100000 SEC 36 0 3 2 2 AGG 1
6100310 RD 6100 SEC 34 0 0.3 2 2 AGG 1
6100810 RD 6100 SEC 20 0 4 2 2 AGG 1
6122000
29011
LOWER
SULTAN
RIV.
6120000
6122000
29011
LOWER
SULTAN
RIV.
6120000
6122110 SPADA
SPUR RD 6122 SEC 29 0 0.2 2 2 AGG 1
6126000 WILLIAMS
ON CR RD
RD 61
SEC 06-
DARR RD
7.2
6126000 WILLIAMS
ON CR RD
RD 61
SEC 06-
DARR RD
6126110 RD
6126000 SEC 24 0 0.2 2 2 AGG 1
6126112 RD
6126000 SEC 23 0 0.5 2 2 AGG 1
6126114 RD
6126000 SEC 23 0 0.4 2 2 AGG 1
6126120 RD
6126000 SEC 24 0 0.2 2 2 AGG 1
6200330
(SEC 04)
0.75
6200330
(SEC 04)
6220410 RD 6220 SEC 03 0 0.8 2 2 AGG 1
6221000 RD 62 SEC 19 0 4 2 2 AGG 1
6221050 RD 6221 SEC 29 0 1.4 2 2 AGG 1
6240110 HUC ROAD
4.3 4.62 2 2 AGG 1
6240110 HUC ROAD
0 4.3 2 2 AGG 1
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 27 of 74
6240210 HUC ROAD
2.34 2.44 2 2 AGG 1
6240210 HUC ROAD
1.2 2.34 2 2 AGG 1
6240210 HUC ROAD
0 1.2 2 2 AGG 1
6240212 HUC ROAD
6240210
1.45 1.5 2 2 AGG 1
6240212 HUC ROAD
6240210
0 1.45 2 2 AGG 1
6242000 MOUNT
LEE
RD
6240000 SEC 15 0 2.62 2 2 AGG 1
6242210 LAKE
TITICACA
RD
6242000 SEC 22 0 0.7 2 2 AGG 1
6244000 RD
6240000 SEC 13 0 1.7 2 2 AGG 1
6250000 RD
6200000 SEC 32 7 9.5 2 2 AGG 1
6250000 RD
6200000 SEC 32 5.5 7 2 2 AGG 1
6250000 RD
6200000 SEC 32 0 5.5 2 2 AGG 1
6250450 6250000 0 0.1 2 2 AGG 1
6250575 6250570 0 0.1 2 2 AGG 1
6251560 RD 6250 SEC 25 0 0.7 2 2 AGG 1
6251570 RD 6251 SEC 25 0 0.4 2 2 AGG 1
6300750 RD 63 RD
6300820 0 0.5 2 2 AGG 1
6305000
LEWIS
CREEK/N
HAYBRO
OK TS
RD 6022
2.21
6310000
290-E
BITTER
1.41
6310000
290-E
BITTER
1.41
6334000 MINERAL
BUTTE RD 6330 SEC 18 0 4.7 2 2 AGG 1
6334110 RD 6334 SEC 13 0 0.506 2 2 AGG 1
6334115 RD 6334 SEC 18 0 0.2 2 2 AGG 1
6334210 RD 6334 SEC 18 0 1 2 2 AGG 1
6335000
0.157
4.71
6410000
MILLER
RIV
6400000
3.7
7.7
6410210
2516-B
CASHMA
N
SEC 27
0.05
6410210
2516-B
CASHMA
N
SEC 27
0.05
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 28 of 74
6420610 DAMON
MINE RD 6420 SEC 33 0 0.2 2 2 AGG 1
6500710 W CADY
JCT RD 65 SEC 19 0 0.937 2 2 AGG 1
6500712 W CADY
SPUR
6500710 SEC 19 0 0.283 2 2 AGG 1
4.33
6510105 6510 0 0.468 2 2 AGG 1
6512000 2602
KLINGER RD 6510 SEC 14 2.94 3.34 2 2 AGG 1
6512000 2602
KLINGER RD 6510 SEC 14 2.3 2.94 2 2 AGG 1
6512000 2602
KLINGER RD 6510 SEC 14 0 2.3 2 2 AGG 1
6512105 RD 6512 RD
6000510 0 1.7 2 2 AGG 1
6514114 SEC 13 RD 6514 SEC 13 0 0.2 2 2 AGG 1
6516000 2779-A
DRY CRK. RD 6514 SEC 15 0 3.16 2 2 AGG 1
6516000 2779-A
DRY CRK. RD 6514 SEC 15 3.16 3.96 2 2 AGG 1
6516710 2779-N RD
6516110
S LINE
SEC 10 0 0.2 2 2 AGG 1
6520210 SEC 27
SPUR RD 6520 SEC 27 0 0.2 2 2 AGG 1
6522000 2775 CO.
LINE RD 6520 0 2.42 2 2 AGG 1
6522000 2775 CO.
LINE RD 6520 3 7.28 2 2 AGG 1
6522000 2775 CO.
LINE RD 6520 2.42 3 2 2 AGG 1
6522310
PRIVATE
LAND
(HUC)
RD 6522
0.38
6525710 HUC ROAD
6525000
0 0.65 2 2 AGG 1
6.2
6540000
FLAPJAC
K
1.29
6540000
FLAPJAC
K
1.29
6546000
FOURTH
OF JULY
SEC 24
1.837
6548000
BOULDER
RD 6546
1.725
6550616
TO TOP
OF ROCK
PIT
6550610
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 29 of 74
6554610 285-A
EN MTN
RD 6554
6560000
TEDDY
1.2
6570000
2860 SAN
JUAN
HILL
3.5
6710210 RD 6710 SEC 17 1.7 2 2 2 AGG 1
6710210 RD 6710 SEC 17 0 1.7 2 2 AGG 1
6800120 FORMER
RD 6842 RD 68 SEC 08 0 1 2 2 AGG 1
6810000 2622-A E
FK FOSS RD 68 SEC 27 0 1 2 2 AGG 1
6810000 2622-A E
FK FOSS RD 68 SEC 27 1 2.1 2 2 AGG 1
13.13
17.8
6.759
13.13
6830140 RD 6830 SEC 16 0 1.111 2 2 AGG 1
6830690 RD 6830 SEC 36 0 0.6 2 2 AGG 1
6830693 RD
6830690 SEC 36 0 0.4 2 2 AGG 1
6830922 RD 6830 SEC 18 0 0.1 2 2 AGG 1
6554610 285-A
EN MTN
RD 6554
0.627
Note: Not all roads listed will receive road maintenance work during this contract.
BTO #3 (Skykomish), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 30 of 74
WD 15-5523 (Rev.-5) was first posted on www.wdol.gov on 01/16/2018
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2015-5523
Daniel W. Simms Division of | Revision No.: 5 Director Wage Determinations| Date Of Revision: 01/10/2018 Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts State: Washington
Area: Washington County of Whatcom
**Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 15.56 01012 - Accounting Clerk II 17.47 01013 - Accounting Clerk III 19.54 01020 - Administrative Assistant 25.34 01035 - Court Reporter 19.01 01041 - Customer Service Representative I 12.15 01042 - Customer Service Representative II 13.66 01043 - Customer Service Representative III…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.