Amendment_02.pdf

PDF 3 MB Posted

Attached to
Road Maintenance Multiple Award Task Order Contract (MATOC) Federal contract opportunity
Solicitation number
1205M618R0002
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Amendment 02 - Attachment 12 - TO #6 FSR 4300 Buttermilk

View the file

Other files for this federal contract opportunity

Other files attached to Road Maintenance Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
Attachment_11_-_BTO__5_(Enumclaw),_FY18.pdf PDF
Attachment_10_-_BTO__4_(North_Bend),_FY18.pdf PDF
Attachment_7_-_BTO__1_(Mt_Baker),_FY18.pdf PDF
Attachment_9_-_BTO__3_(Skykomish),_FY18.pdf PDF
Amendment_01.pdf PDF
Attachment_8_-_BTO__2_(Darrington),_FY18.pdf PDF
RFP_No._1205M618R0002.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB Control No. 2120-0595 (SF-30) FAA Template No. 11 (Reverse) (8/97)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 53

2. AMENDMENT/MODIFICATION NO. 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

3. EFFECTIVE DATE

4-6-2018 Pending

6. ISSUED BY 7. ADMINISTRATED BY (If other than Item 6)

USDA Forest Service Mt. Baker-Snoqualmie National Forest Attn: Brian A. Johnson, CO 2930 Wetmore Ave., Suite 3A Everett, WA 98201

Same as Block 6

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

1205M618R0002

9B. DATED (SEE ITEM 11)

3-15-2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

*TO BE COMPLETED BY VENDOR IF NOT COMPLETE 10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended is not extended.

NOTE: If offers are handcarried, additional time should be allowed to access the depository facility due to heightened security requirements.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Item 8 and 15, and returning 1 copies of the amendment; (b) acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hours and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required) N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO.

AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return Zero (0) copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

1. The purpose of Amendment 01 is as follows:

a. Add “Attachment 12 - TO #6 FSR 4300 Buttermilk.”

2. The response date/time for submission of all documents, including Attachment 12, remains unchanged.

3. If there are any questions contact the undersigned at (425) 783-6056 or bajohnson03@fs.fed.us.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign)

BY

(Signature of Contracting Officer) 4-6-2018 mailto:bajohnson03@fs.fed.us

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. 6. SOLICITATION ISSUE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

RFQ IFB RFP

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NAICS:

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8 (A)

EDWOSB

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

SOLICITATION NUMBER

1205M618R0002

Brian A. Johnson, CO (425) 783-6056 05M6 100

05M6

Same as Block 9.

Invoice Processing Platform (IPP)

238910

$14 million

USDA Forest Service Mt. Baker-Snoqualmie NF 2930 Wetmore Ave., Suite 3A Everett, WA 98201-4067

DATE

3/15/2018

LOCAL TIME

4/18/2018 @ 1400

Not Rated

IPP

BRIAN A. JOHNSON

FSR 4300 Buttermilk Road Maintenance Methow Valley Ranger District

Okanogan-Wenatchee National Forest Washington State

(Okanogan County)

X bajohnson03@fs.fed.us

Note: See Section L, Paragraph L.5 for required documents to submit with this quote.

Pending

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 1 of 52 bajohnson03 Highlight bajohnson03 Highlight bajohnson03 Highlight

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

FSR 4300 Buttermilk Road Maintenance Methow Valley Ranger District

Okanogan-Wenatchee National Forest Washington State

(Okanogan County)

B.1 SCHEDULE OF ITEMS

Base Items:

ITEM

NO. DESCRIPTION PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

814(1) Pothole Patching TN 15 $_________ $___________

834(5) Clean Ditches & Drainage Structures MI 2.4 $_________ $___________

842(a) Vegetation Maintenance, Normal MI 2.4 $_________ $___________

881(1) Mobilization LS 1 $_________ $___________

Total: $____________

Option 1:

ITEM

NO. DESCRIPTION PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

814(1) Pothole Patching Ton 45 $_________ $___________

Base Items Total: $_______________

Option 1 Total: $_______________

Total Price: $_______________

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 2 of 52

SECTION C - DESCRIPTION/SPECIFICATION/WORK STATEMENT

C.1 SCOPE OF CONTRACT

A. The intent of this performance based service task order is to provide for road maintenance, to include, brushing, ditch cleaning and pothole patching, of National Forest Service Road (FSR) 4300 – Buttermilk Road on the Okanogan-Wenatchee National Forest.

B. District maps may be obtained at the district office. Methow Valley Ranger District, Winthrop, WA. For additional information contact Ken Bigelow at e-mail krbigelow@fs.fed.us or telephone

(509) 664-9252.

C. The Contractor shall assume all risk, loss, damage, or expense arising out of the prosecution of the work, except as otherwise provided in the contract.

D. Locations that may be used for staging of equipment and materials are available in contract areas. The government will not be held liable for contractor’s equipment and material stored in these locations.

C.2 FURNISHING OF MATERIAL

A. Unless otherwise stated in the specifications, the contractor shall furnish all material required for performance of the task order. All material shall comply with the specifications.

B. The Contractor shall furnish and deliver the material to the site of the work in such a manner that their quality and fitness for the work is preserved.

C. Measurement and payment for contract work will be made only for those pay items included in the Schedule of Items.

D. The Contractor shall be responsible for furnishing warning devices and complying with Federal and any State or local safety standards and traffic management procedures.

C.3 COORDINATION OF CONTRACT DOCUMENTS

The specifications, drawings, and all other provisions are essential parts of the contract. They are intended to be mutually complementary. In the case of discrepancy, the following is the order of precedance (supplementing FAR 52.214-29):

a. Drawings; then

b. Standard Specifications for Maintenance of Roads.

C.4 TECHNICAL SPECIFICATIONS FOR MAINTENANCE OF ROAD

The specifications are numbered in the "800" series codes. Only those sections which are applicable to this contract are included. There will be gaps between the section numbers due to the fact that many sections have been purposely omitted or because certain specification sections have been reserved for possible future inclusion in the "800" series.

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 3 of 52 mailto:krbigelow@fs.fed.us

C.5 APPLICABLE PUBLICATIONS AND FORMS

Publications and forms that apply to this task order. Publications and forms listed can be obtained via the Internet, ordered through the U.S. Government Printing Office, or through the Mt. Baker- Snoqualmie National Forest. Supplements or amendments to listed publications from any organizational level may be issued throughout the performance period. The contractor shall immediately implement those changes that result in a decrease or no change in cost and notify the contracting officer in writing of such changes. Before implementing any change that will result in an increase in cost, the contractor shall submit to the contracting officer a price proposal within thirty (30) calendar days following receipt of the change by the Contractor.

Publication Publication Number or WWW Address Revision Date

Manual of Uniform Traffic Control Devices MUTCD 2007 2007

Sign and Poster Guidelines for the Forest Service EM-7100-15 2005

Okanogan-Wenatchee National Forest Road Rules Document

Copy of Commercial Road Rules Listing is available upon request 2010

Okanogan-Wenatchee N.F. Programmatic Biological Assessment for Low Impact Management Activities (2013-2018)

A copy of the Biological Assessment is available upon request 2013

Memorandum of Agreement between the USDA Forest Service, Region 6 and the Washington State Department of Ecology

Copy of MOA is available upon request

Roads Maintenance Level Guide for Forest Service Roads

San Dimas Guide for Road Maintenance Levels 0577-1205-SDTC 2005

MEMORANDUM OF UNDERSTANDING

Between Washington State Department of Fish and Wildlife And USDA Forest Service, Pacific Northwest Region

Copy of MOU is available upon request 2005

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 4 of 52

SECTION F--DELIVERIES OR PERFORMANCE

F.1 AGAR 452.211-75 EFFECTIVE PERIOD OF CONTRACT (FEB 1988)

The effective period of this contract is from DATE OF AWARD through August 31, 2018

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 5 of 52

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled within ten (10) calendar days after the date of task order award. The conference will be held at: TBA.

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 6 of 52

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 PROSECUTION OF WORK -- WORK HOUR LIMITS -- WORK ITEM LIMITS

The Contractor shall conduct activities so that interference with the public shall be kept at a minimum.

When patching work prevents traffic flow, the Contractor is authorized to delay traffic not to exceed sixty (60) minutes.

Any activities requiring closure to the public shall be scheduled with the CO at least fourteen (14) calendar days in advance.

The contractor shall shut down all equipment when there is 1 inch precipitation in a 24 hour period and/or ½ inch precipitation in 1 hour.

H.2 USE OF PREMISES

General - The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform the contract in a manner that will not interrupt or interfere with the conduct of Government business.

Camps - Before any camp or storage site is opened or operated on National Forest land or lands administered by the Government, written permission shall be obtained through the Government.

Camp is interpreted to include the campsite or trailer parking area of any employee or subcontractor working on the project. Such permission, if granted, will be without charge to the Contractor.

H.3 USE OF ROADS BY CONTRACTOR

The Contractor is authorized to use all roads under the jurisdiction of the Forest Service that are open and necessary for direct route access to the contract work sites for all activities necessary to complete this contract. This authorization is subject to the limitations described below, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

Keep existing roads open to all traffic during contract work, and maintain them in a condition that will adequately accommodate traffic. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a Written Plan for the satisfactory handling of traffic has been approved. Post Traffic Control Signs and Devices in conformance with the “Manual on Uniform Traffic Control Devices” (MUTCD). Do not proceed with work on the project until all required signs are in place and approved.

Before shutting down any operations, leave all travel ways in a condition suitable for traffic.

Unless otherwise provided, traffic delays may not exceed thirty (30) minutes.

If the Contractor requests use of a National Forest road or road segment not listed above, the Forest Service may authorize such use if not in conflict with the current Road Rules document.

Authorization to use such additional roads may include maintenance requirements and use limitations.

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 7 of 52

The roads authorized for use will be subject to the following provisions:

(a) The current National Forest Road Use Rules Document is applicable to all commercial road users. This document is available for inspection at the office of the Forest Supervisor and shall be applicable except when modified by provisions of this contract. Copies are available upon request.

(b) Federal Regulations contained in 36 CFR 261.54 as applied to the area by an order issued under 36 CFR 261.50. These regulations authorized the Forest Service, as a sovereign act, to issue additional restrictions to those shown in the current Road Use Rules Document and will be posted on the road.

H.4 TRAFFIC CONTROL, FLAGGERS, BARRICADES, WARNING SIGNS, AND OTHER DEVICES

The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, flaggers, pilot cars, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Barricades and other obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic. Keep traffic devices current with maintenance operation and remove upon completion.

All operations and signing shall conform to the current requirements and guidelines of the Occupational Safety and Health Administration (OSHA) and the Manual of Uniform Traffic Control Devices (MUTCD).

The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points, where the new work crosses or coincides with an existing road or trail. Required signs may be mounted on portable or temporary mountings. Use standard MUTCD shapes, colors, sizes, and legends.

Mark hazards incidental to the work within or on the traveled way, shoulders, or turnouts with hazard identification markers, illuminated beacons, and other MUTCD devices to safely guide road users through the area. Mark work segments not completed on a daily basis appropriately for night travel.

Obtain authorization before commencing work at night.

Advisory speed plates may be used to control traffic through the work area.

Flaggers - Provide properly equipped, trained and certified, flag person(s) where the traffic is required to stop before proceeding. Stop traffic in locations which provide width enough for passage of traffic and reasonable protection for vehicles. When flag control is used, advance warning signs are required.

H.5 MOTORIZED EQUIPMENT

Use of motorized equipment, other than hand-held equipment such as power saws and brush cutters, will not be permitted off of designated roads in the project area without approval of the Contracting Officer or as elsewhere provided herein.

H.6 EQUIPMENT REQUIREMENTS

The Contractor shall furnish equipment meeting OSHA (Occupational Safety and Health Act) requirements. When the Contractor is paid for furnishing and operating equipment on an hourly or daily basis, it shall be operated at its design speed, or the maximum speed feasible under prevailing conditions.

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 8 of 52

Equip all vehicles and machinery operating on or from the traveled way or road shoulder with flashing lights, strobes, or rotary beacons operated continuously while work is in progress. Use truck headlights at all times while operating. Backup horns are required on all self-propelled equipment in excess of 5 ½ tons gross weight.

Park vehicles and machinery not currently used in the maintenance operation off the traveled way at approved locations to minimize interference with normal use.

H.7 SPECIAL REQUIREMENTS FOR WATER DRAFTING EQUIPMENT

Water drafting equipment may be used only at water sources designated on the Vicinity Map, task order, or provided by the Contracting Officer. Such equipment shall include aa approved fish screen around the intake (foot valve) with openings no larger than 3/32” x 1/16”. An air gap or positive antisiphon device shall be provided between the water source and the vehicle being loaded if the vehicle has been used for other than water haul, if the source is a domestic potable water supply, or the water is used for tank mixing with any other materials. Materials must be readily available and appropriate measures taken to prevent petroleum products from entering the water source.

H.8 HAZARDOUS MATERIAL SPILL CLEAN-UP KIT

A hazardous material spill clean-up kit shall be maintained and readily available for potential use on the project at each work site. Spill clean-up kits shall contain the following items as a minimum:

• 1 case absorbent pads suitable for absorbing hydraulic fluid, engine oil, and fuel;

• 1 gallon "Plug-a-Dike" or equivalent material;

• A nineteen liter (five-gallon) mixing container; and

• 20 meters of 150 mm absorbent, floating booms for absorbing hydraulic fluid, engine oil, and fuel from a water surface.

H.9 LANDSCAPE PRESERVATION AND HAZARDOUS MATERIALS

(a) The Contractor shall give attention to the effect of contract operation upon the landscape, shall take care to maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following requirements:

1. Prevention of the Landscape Defacement. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or natural features unless specifically authorized by the Government. Unless otherwise provided in the Special Project Specifications, the Contractor shall confine contract operations to within the areas designated in contract documents.

Unless otherwise provided in this contract, the Contractor shall gather rock which falls outside the roadway due to contract operations and dispose of it as directed by the Government.

2. Protection of Streams, Lakes, and Reservoirs. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes, small ponds, and reservoirs with fuels, oils, bitumen’s, dust palliatives, silt, or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the Government.

(b) The Contractor shall confine operations to within the work area limits, immediate work area, or other areas designated in the contract documents, and prevent the depositing of rocks, TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 9 of 52 excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.

The Contractor shall make all reasonable attempts to preserve the scenic and natural environment within and adjacent to this project.

(c) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, lakes, reservoirs, and other surface waters.

1. Wash water or waste from concrete, aggregate or other operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

2. Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.

(d) No petroleum products or other hazardous substances shall be released on or into land or rivers, streams, impoundments or other waters, or into natural or manmade channels leading thereto or therefrom. Servicing of all equipment shall be done only in the areas approved by the Contracting Officer. The Contractor shall transport off government lands all waste oil, vehicle oil filters (drained of free-flowing oil), and oily rags and shall dispose of such materials in accordance with applicable State and Federal regulations.

1. If the total on-site oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer. This plan shall include notification of appropriate state and local officials, the Contracting Officer and other appropriate agencies.

2. At all on-site work areas (including Contractor storage, transfer, fueling, mixing sites, etc., for oil, oil products or any hazardous materials), the Contractor shall take appropriate preventive measures to insure that any release of hazardous products does not enter any stream or other waters of the United States or any of the individual States and shall conform to the federal, state and local regulations. Planned spill containment locations in stream courses shall be established prior to commencement of work activities. These locations will be reviewed by the Contracting Officer or representative. When deemed appropriate, additional planned preventive measures shall be established for review by the Contracting Officer or representative.

3. The Contractor, acting independently, shall immediately take action to notify the appropriate agencies including the Contracting Officer, and to contain and clean up, without expense to the Government, all petroleum products or other hazardous substance releases which are on or in the vicinity of the project and which are caused by the Contractor's employees, directly or indirectly. The Contractor shall have the necessary materials on site to contain a spill which may occur on land or within live streams as appropriate for any potential flow conditions likely to occur. This may require absorbent pads and/or booms, or other containment devices. In the event the Government determines that additional resources beyond those of the Contractor's are required, the Contractor may be held liable for all damages and costs including, TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 10 of 52 but not limited to additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and clean-up of petroleum products or other hazardous substance releases caused by Contractor's employees or resulting from or related to construction operations.

4. The Contractor shall notify the Contracting Officer of any hazardous materials to be used on the job and shall have Material Safety Data Sheets (MSDS) for those materials available on the job.

H.10 PROTECTION OF BOTANICAL RESOURCES

Previously unknown or unlisted populations of Protected, Endangered, Threatened, or Sensitive (PETS) plant species, or potential habitat for PETS species, may be located within contract project boundaries. The modification of contract specifications may be required to protect previously unknown PETS plant populations.

(a) Government's Responsibility - The Government will identify, as they become known, locations of PETS species that the Contractor could encounter in the progress of work under this contract.

(b) Contractor's Responsibility - The Contractor shall protect these areas that contain PETS species, as directed in writing by the Government.

H.11 CONTROL OF NOXIOUS WEEDS--CLEANING OF EQUIPMENT

To prevent the introduction and control the spread of seeds of noxious weeds onto and around National Forest land, the Contractor shall ensure all equipment moved onto National Forest land is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. When the Contractor is working in an area that has been identified as a noxious weed infestation area, the Contractor shall ensure equipment is cleaned of weed seeds prior to moving to another work area on the Forest. The Contractor shall employ whatever cleaning methods necessary, this may require a pressure hose, to ensure compliance with the terms of this provision, and shall notify the Forest Service prior to moving each piece of equipment onto National Forest land, unless otherwise agreed in writing. Notification will include identifying the location of the equipment's most recent operations.

The Contractor shall certify, in writing, compliance with the terms of this clause prior to each start-up of operations. For the purposes of this clause, "equipment" includes all motorized equipment operated off system roads, transport vehicles, and all motorized equipment used in road maintenance. Not included are log trucks, chip vans, pickup trucks, cars, or other vehicles used to daily transport personnel.

Special care shall be taken to assure removal of noxious weeds and their seed, specifically any species on the Washington State Noxious Weed Control Board website:

http://www.nwcb.wa.gov/weed_list/weed_list.htm

1. If any previously undiscovered Threatened Endangered or Sensitive vascular plants, bryophytes, lichens, or fungi are discovered, before or during project implementation, halt work until a USFS botanist is consulted and necessary mitigation measures are enacted. The list of rare plants of concern can be found on the following website:

http://www.fs.fed.us/r6/sfpnw/issssp/agency-policy/.

2. Treat known infestations before ground disturbance begins.

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 11 of 52 http://www.nwcb.wa.gov/weed_list/weed_list.htm http://www.fs.fed.us/r6/sfpnw/issssp/agency-policy/

3. For actions conducted or authorized by written permit by the Forest Service that will operate outside the limits of the road prism, require the cleaning of all heavy equipment prior to entering NFS Lands. See engineering contract specs H.12.

4. Suppliers must provide annual documentation to the USFS indicating that the following products have been examined by a qualified inspector and deemed free of State listed noxious weeds:

• Straw or other Mulch

• Gravel, Rock, or other fill

• Seeds (according to AOSA standards)

5. If weeds are present in the project area, all equipment and gear must be cleaned before leaving the project area to avoid spreading the infestation further.

6. If weeds are present in the project area, work from relatively weed-free areas into the infested area rather than vica-versa.

Revegetate all areas of bare soil exposed by project activities if there is a risk of noxious weed invasion. Native plant materials are the first choice in revegetation where timely natural regeneration of the native plant community is not likely to occur. Follow revegetation criteria and specifications for this project (see Spec. 841.06 Seed Mix).

H.12 CONTROL POINTS

The Contractor is responsible for the preservation of existing bench marks and other control points. The cost of replacing them may be charged against the Contractor and may be deducted from the payment for the work. If the Contractor finds missing controls they shall notify the Government who will replace them within two (2) days.

H.13 SUBMITTALS

The following submittals are required for this project:

Title Referenced by Contract Clause or Specification No.

Time of Government Approval After Submittal

Quality Assurance Plan Section F and specifications 7 days

Traffic Control Plan Use of Roads by Contractor clause 7 days

Safety Plan, including Blasting Plan where applicable

Accident Prevention clause

(FAR 52.236-13) N/A

Engineered Spill Prevention Plan

Landscape Preservation and Hazardous Materials clause 2 days

Fire Plan R6-FS-6300-55 and Certification that your Fire Tools and Equipment are in full compliance with the contract requirements

R6-FS-6300-52 part 2 N/A

Planned Progress Schedule Section F Submit with Quote

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 12 of 52

H.14 SALVAGE RIGHTS

No Contractor salvage rights exist under the contract unless specifically provided elsewhere herein.

H.15 MATERIAL SOURCES

Rock and mineral soil excavated within the normal excavation shall be conserved and used as needed.

Borrow sources are identified on the plans or elsewhere herein if made available by the Government. If alternate borrow sources are needed, they must be approved in advance by the COR. Such borrow sources shall be restored to a natural appearance. Materials acquired from commercial sources shall conform to government specifications and be from acceptable certified weed free commercial sources.

H.16 FURNISHING OF MATERIALS

Unless otherwise stated in the Special Project Specifications, the Contractor shall furnish all material required for performance of the contract. All material shall comply with the specifications. The Contractor shall verify the kind and amount of work that may be necessary in furnishing the material.

H.17 STORAGE OF MATERIALS AND EQUIPMENT

Materials shall be stored to assure the preservation of their quality and fitness for work.

Approved portions of the right-of-way or other areas on Government land may be used for storage purposes. All storage sites approved by the Government shall be restored to a satisfactory condition at the Contractor's expense.

H.18 LEGAL RELATIONS AND RESPONSIBILITIES

Government's Responsibility for Utilities

1. The Government will identify the roads in the Road Listing of, known locations of underground installations other than culverts and drains the Contractor could encounter in the progress of work under the contract; electric, telephone cables, water supply pipes, and induction loops within the road right of way.

Contractor's Responsibility for Utilities

1. The Contractor will notify Washington UULC 1-800-424-5555 and the utility companies and request utilities be marked on the ground prior to excavation.

2. The Contractor will notify all utility companies or other parties affected and make arrangements for all necessary adjustments of the public or private utility fixtures, pipelines, and other appurtenances affected by work under the contract.

In the event of interruption to utility services because of accidental breakage the Contractor shall promptly notify the utility authority and shall cooperate with that authority in the restoration of service. If damage occurs to the utilities the Contractor will be liable for damage to underground utilities.

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 13 of 52

H.19 ARCHAEOLOGICAL OR HISTORICAL SITES (AGAR 452.236-73) (FEB 1988)

If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 14 of 52

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 FAR 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 1989)

In compliance with the Service Contract Act of 1965, as amended, and the regulations of the Secretary of Labor (29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.

This Statement is for Information Only:

It Is Not A Wage Determination.

Employee Class Monetary Wage--Fringe Benefits

WG-4 $17.92 plus fringes WG-2 $15.43 plus fringes

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 15 of 52

SECTION J -- CONTRACT DOCUMENTS, EXHIBITS OR ATTACHMENTS

J.1 LIST OF ATTACHMENTS

Attachment No. Description Pages

1 Project Map 1

2 Specification List 1

3 Project Specifications and Drawings

4 Fire Protection and Suppression 5

5 Wage Determination

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 16 of 52

PRO

JECT VICIN

ITY M

AP

Attachment 1 - Project Map

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 17 of 52

SECIFICATIONS FOR ROAD MAINTENANCE

SPECIFICATION LIST

Spec. No. Description Latest Rev. Date

800F-1 Definitions and Abbreviations 03/2006 801 Quantity Measurement Terms 02/2006 814F-1 Asphalt Surface Maintenance 10/2010 834F-1 Road Way Drainage System Maintenance 03/2007 842F-1 Cutting Roadway Vegetation 02/2002 881F-1 Mobilization/Equipment 02/2007

TYPICAL DETAILS/DRAWINGS

Drawing No. Description

834-1F1 Drainage Structure Maintenance (Detail) 834-2F1 Cleaning of Ditch Relief, Catch Basin & Transition (Detail) 834-3F1 Ditch Maintenance/culvert slide (Detail) 834-4F1 Culvert Cleaning/brushing (Detail) 834-5F1 Ditch Maintenance (Detail)

Attachment 2 - Specification List

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 18 of 52

Section 800F-1 Definitions and Abbreviations 03/2006

800.1 Definitions

Wherever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:

1. Agreed or Approved - Official agreement or approval by use of a written document issued by the Government. Agreements also require signature of Contractor's Representative and are dated.

2. Base course - The layer or layers of material placed on a subbase or a subgrade to support a surface course. (See Illustration of Road Maintenance Terms.)

3. Berm - A curb or dike that controls roadway runoff water, or delineates traffic direction.

4. Broad based dip - A shallow ditch placed across the roadbed to remove water from the roadbed surface that can be driven across by high clearance vehicles; usually placed diagonal to the centerline.

5. Catch Basin. The area immediately adjacent to inlet invert of the culvert.

6. Channel. A natural waterway leading into or away from a culvert or bridge.

7. Cross ditch. A shallow ditch placed across the roadbed to remove water from the roadbed surface that can be driven across by full-size pickups or other high clearance vehicles; usually placed diagonal to the centerline.

8. Culvert. Any structure that provides a passageway, drain, or waterway under a road or embankment.

9. Lead-off ditch. A ditch used to remove water from roadside drainage ditches, the roadway, cattleguards, or drainage structures such as culverts and drainage dips.

10. Ditch. A relatively long narrow excavation placed to collect or disperse water.

11. Drainage dip. A drainage structure that was previously constructed within the roadbed surface to form a uniform depression that allows routine passage of vehicles while diverting water from the traveled way.

12. Drainage ditch. A ditch located parallel to and abutting the roadbed.

13. Drainage structure. A term identifying manufactured devices placed to control water movements.

14. Drawings. Illustrations showing details of required work.

15. Equipment. All machinery, operating supplies and tools necessary for the proper performance and acceptable completion of the work.

16. Excess Material. Material from the roadway in excess to that needed for maintenance of roadway.

17. Foreslope. The slope of the ditch section nearest to the traveled way.

18. Grade. The vertical alignment of the top surface of the road.

19. Highway Vehicles. Vehicles such as, passenger cars and high clearance vehicles.

20. High Clearance Vehicles. Vehicles such as, pickups, 4x4s, and log trucks.

21. Hydrologic Function. Physical properties of the occurrence and movement of surface and subsurface water flows that intersects and crosses transportation systems.

Attachment 3 - Project Specifications and Drawings

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 19 of 52

22. Materials. Any substances specified for use in the performance of the work.

23. Measurement. The process of identifying the dimensions, quantity, or capacity of an item..

24. Nominal Dimensions or Weights. The numerical values shown on the drawings or in the specifications as measurements for the work.

25. Original Contract Quantities. Those estimated quantities shown in the Schedule of Items as awarded.

26. Patching. Minor repairs.

27. Paved Surface or Pavement. Denotes asphalt, concrete, or other stabilized materials excluding natural aggregates. Dust palliative treatments are not considered as pavement.

28. Right-of-Way. A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private Lands), or (2) real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

29. Roadbed. The portion of a road between the intersection of the subgrade and side slopes, excluding that portion of the ditch below the subgrade.

30. Road Listing. A preliminary listing of road locations and any established work priorities.

31. Road Maintenance Levels. As used in this Contract - OBJECTIVE MAINT LEVEL: The maintenance level to be assigned at a future date considering future road management objectives, traffic needs, budget constraints, and environmental concerns.

OPER MAINT LEVEL: The Maintenance level currently assigned to the road considering today's needs, road condition, budget constraints and environmental concerns; in other words it defines the level to which the road is currently being maintained.

Maintenance Level 4 & 5: Roads with a moderate to high degree of user comfort and convenience. These roads receive maintenance on a routine basis, normally with brushing done yearly or biyearly.

Maintenance Level 3: Roads maintained for use by a prudent driver in a passenger car.

These roads generally receive maintenance on a routine basis, usually getting brushed every 3 to 4 years.

Maintenance Level 2: Roads maintained for use by high clearance vehicles. These roads generally receive only drainage related maintenance on a routine basic, and usually getting relegated to the lowest priority for brushing. Many have become mostly brushed in.

Maintenance Level 1: Assigned to intermittent service roads during time they are closed to vehicular traffic.

D – Decommission: Assigned to roads that have been or are to be decommissioned.

C - Convert Use: Convert use of the facility to another use such as a trail.

32. Schedule of Items. A schedule in the contract that contains a listing and description of maintenance items, quantities, units of measure, methods of measurement, unit price, and amount.

33. Shoulder. The portion of the roadway continuous to the traveled way for accommodation of stopped vehicles, emergency use, and lateral support of travel way structure.

34. Slough or Slide. Material deposited on the roadway that may need to be repositioned or removed.

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 20 of 52

35. Slump. A localized portion of the roadbed that has slipped, or otherwise become lower than the adjacent roadbed, and constitutes a hazard to traffic.

36. Standard Specifications. Specifications for all divisions of work.

37. Subgrade. Top surface of roadbed upon which the pavement structure, shoulders, and curbs are constructed.

38. Traveled Way. The portion of the roadway designated for the movement of vehicles, exclusive of shoulders but including turnouts and curve widening.

39. Turnouts. A short auxiliary lane on a one-lane road provided for passage of meeting vehicles.

40. Unit of Measure. The unit and fractions of units shown in the Schedule of Items.

41. Unsuitable Material. Material removed during maintenance, which must be disposed of in designated locations. Includes material with substantial amounts of vegetation or other objectionable material.

42. Waterbar. A deeper type cross ditch, which is not intended for standard passenger vehicles.

43. Work Schedule. The Contractor's current schedule for work progression.

Abbreviations

Whenever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows: (Reference to a specific standard or specification shall mean the latest addition or amendment thereto in effect on date of Invitation for Bids.)

AASHTO – American Association of State Highway and Transportation Officials.

ASTM – American Society for Testing and Materials.

EPA – Environmental Protection Agency.

FAR – Federal Acquisition Regulation System.

FED SPEC – Federal Specifications.

FP-03 – Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects.

FSSS- Forest Service Supplemental Specifications

MSHA – Mine Safety Health Administration.

MUTCD – Manual of Uniform Traffic Control Devices.

NBS – National Bureau of Standards.

OSHA – Occupational Safety and Health Act.

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 21 of 52

Illustration of Road Maintenance Terms.

R ig ht of

W ay

R oa ds id e R oa ds id e

C le ar in g W id th

R oa dw ay

C le ar in g Li m it

X Y

G ro un d

Li ne

Tr av el ed

W ay C L

B er m S ur fa ce C ou rs e B as e

C ou rs e

Fi ll

S lo pe

B ac k S lo pe

D ra in ag e D itc h

G ro un d

Li ne

S ub gr ad e

R oa d B ed

S ha pe s an d di m en si on s w ill va ry to fi t l oc al c on di tio ns

S ee d ra w in gs fo r t yp ic al s ec tio ns

X a nd Y d en ot e cl ea rin g ou ts id e of ro ad w ay

N ot e:

Right - of - Way Line

Right - of - Way Line

Clearing Limit

Shoulder

Shoulder

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 22 of 52

Section 801 Quantity Measurement Terms

02/2006

1. U.S. Customary Units of measure are used in conjunction with these specifications.

2. The methods of measurement and computation will be those necessary to accurately determine the quantities of materials furnished and work performed.

3. All items, which are measured by the feet, will be measured parallel to its longitudinal centerline, unless otherwise shown on the drawings.

4. A station when used as a definition of term or measurement will be one hundred feet, or a precise location along a survey line.

5. Miles will, in the absence of known distances from existing plans or surveys, be determined by the Government using a calibrated survey odometer or equal substitute operated on the traveled way at or parallel to road centerline.

6. The term "ton" means 2000 pounds. Trucks used to haul material measured by truck weight shall be weighed empty at least once daily, and each truck shall bear a plainly legible identification mark.

Weigh tickets furnished by the Contractor from certified scales will be used to determine weight measurements.

7. Materials measured by the cubic yard in the hauling vehicle shall be measured therein at the point of delivery. Vehicles may be of any size or type, provided that the box is of such shape that the actual volume may be readily and accurately determined.

8. Measurement by the acre will use the length and width treated. Measurement of width will approximate significant slope breaks, but will not include minor deviations along the slopes. The measured slope distance for the length will multiply width treated and converted to a standard 10,000 square yard or acreage value of the surface area treated.

9. Measure square yard with horizontal longitudinal and traverse measurements.

10. The term "lump sum" when used in the Schedule of Items means the complete unit as required by or described in the contract.

11. Measurement will be made of each item or unit of work, as shown in the Schedule of Items, completed and accepted in accordance with the contract provisions, specifications, and drawings.

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 23 of 52

814 ASPHALT SURFACE MAINTENANCE

814.01 Service Required

Repair and cleaning of pavement surfaces.

814.02 Performance Standard

This work is complete when the pavement is clean and free of cracks, potholes, and surface irregularities.

Follow industry standards as outlined in the Asphalt Institute Manual Series Number 16.

814.03 Location of Work

As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.

814.04 Measurement

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

A. Single Lane Roads: The work activity will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one-tenth (0.1) mile.

B. Double Lane Roads: The work activity will be measured along the centerline of the roadway. Measurement will be to the nearest one-tenth (0.1) mile.

C. Road Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.

D. Ton: Material measured by the ton shall be verified by certified weight tickets.

E. Linear Foot: Work activity by the linear foot will be measured using standard survey methods rounded to the nearest one (1) foot.

814.05 Payment

A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 814 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.

Pay Item Pay Unit

814(1) Pothole Patching Ton 814(2) Skin Patching Ton 814(3) Crack Sealing Linear Foot 814(4) Crack Sealing Mile 814(5) Paved Surface Cleaning (Single Lane) Mile 814(6) Paved Surface Cleaning (Double Lane) Mile 814(7) Paved Surface Cleaning Each

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 24 of 52

814.05 Acceptable Quality Levels

Description Major Minor Allowable Defects Required Action Defect Defect Major Minor Major Minor

Pothole Patching

Finished elevation does not match adjoining segments by more than 1/4 inch

N/A 0 X per unit Rework N/A

Patched material does not properly adhere to adjacent surfaces

N/A 0 N/A Rework N/A

Area to be patched is not properly prepared

N/A 0 N/A Rework N/A

Skin Patching

Finished skin patch does not make smooth transition with adjoining pavement.

N/A 0 N/A Rework N/A

Patched material does not properly adhere to adjacent surfaces

N/A 0 N/A Rework N/A

Area to be patched is not properly prepared

N/A 0 N/A Rework N/A

Crack Sealing

Crack Sealant does not completely fill the cracks greater than 1/4 inch

Crack Sealant does not completely fill the cracks 1/4 inch or less

0 X per unit Rework Accept

Crack sealant does not properly adhere to adjacent surfaces

N/A 0 N/A Rework N/A

Area to be sealed is not properly prepared

N/A 0 N/A Rework N/A

TO #6 (Oka-Wen), RFP No 1205M618R0002 FSR 4300 Buttermilk Road Road Maintenance Page 25 of 52

Description Major Minor Allowable Defects Required Action Defect Defect Major Minor Major Minor

Surface Cleaning

More than 5% of surface is not cleaned as specified

Less than 5% of surface is not cleaned as specified

0 X per unit Rework

Accept but may reduce payment.

Asphalt Quality

Product and gradation does not meet Specifications and is not suitable for job.

Product and gradation does not meet Specifications but is otherwise suitable for job.

0 X per unit Reject and replace

Accept but may reduce payment.

Work Area Management

Not following approved safety…