Attachment_10_-_BTO__4_(North_Bend),_FY18.pdf
PDF 4 MB Posted
- Attached to
- Road Maintenance Multiple Award Task Order Contract (MATOC) Federal contract opportunity
- Solicitation number
- 1205M618R0002
About this file
Attachment 10 - BTO #4 (North Bend)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_02.pdf | ||
| Attachment_11_-_BTO__5_(Enumclaw),_FY18.pdf | ||
| Attachment_7_-_BTO__1_(Mt_Baker),_FY18.pdf | ||
| Attachment_9_-_BTO__3_(Skykomish),_FY18.pdf | ||
| Amendment_01.pdf | ||
| Attachment_8_-_BTO__2_(Darrington),_FY18.pdf | ||
| RFP_No._1205M618R0002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. 6. SOLICITATION ISSUE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
RFQ IFB RFP
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NAICS:
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8 (A)
EDWOSB
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
SOLICITATION NUMBER
1205M618R0002
Brian A. Johnson, CO (425) 783-6056 05M6 100
05M6
Same as Block 9.
Invoice Processing Platform (IPP)
238910
$14 million
USDA Forest Service Mt. Baker-Snoqualmie NF 2930 Wetmore Ave., Suite 3A Everett, WA 98201-4067
DATE
3/15/2018
4/18/2018 @ 1400
Not Rated
IPP
905905
X bajohnson03@fs.fed.us
Road Maintenance Services BTO #4 (North Bend), FY18
DOCUMENTS TO SUBMIT: Only submit pages 1-6 to the CO.
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 1 of 71 bajohnson03 Highlight bajohnson03 Highlight
B.1 SCHEDULE OF ITEMS
Item No. Description Period of
Performance
001 Blanket Task Order Funding (Ceiling) 365 Days after BTO Award
Sub-Item No. Description Estimated
Quantity Unit Unit Price Total
251 (1) Riprap Machine placed 0.5 Cubic Yds. $_______________ $_______________
251 (2) Riprap Hand placed 0.5 Square Yard $_______________ $_______________
640 (1) Install Road Closure Devices, Earth/Rock Berms from material on-site 1 Each $_______________ $_______________
803(1) Snow removal 0.5 Mile $_______________ $_______________
807 (1) Water Truck, 2,000 gall min, filled 0.5 Hour $_______________ $_______________
807(2)a Excavator, Small (40 - 50 hp) with thumb and blade 0.5 Hour $_______________ $_______________
807(2)b Excavator, Medium (90 hp) 25' min reach with thumb 0.5 Hour $_______________ $_______________
807(2)c Excavator, Large (230 hp min) 30' min arm reach with thumb 0.5 Hour $_______________ $_______________
807(3) Backhoe, Extend-a-hoe with thumb and 4 - 1 bucket 0.5 Hour $_______________ $_______________
The quantities below represent the most common quantities ordered on work orders. Actual work orders issued may list more or less than the quantity listed below.
MBS ROAD MAINTENANCE SERVICES MATOC
BTO #4 (North Bend), FY18
ROAD MAINTENANCE - SNOQUALMIE (North Bend) RANGER DISTRICT
Not To Exceed Amount
$0.00
The sum of all work orders issued under this Task Order SHALL not exceed the Not To Exceed amount listed. Performance of work in excess of the funds available or work not specified below is at the contractors risk and may not be paid. The Government may add additional funds as they come available or may solicit the MATOC contractors for a new BTO for this area.
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 2 of 71
Sub-Item No. Description Estimated
Quantity Unit Unit Price Total
807(4) Grader, 12G min equivalent 0.5 Hour $_______________ $_______________
807(5)a Crawler Tractor / Dozer, D3 min 0.5 Hour $_______________ $_______________
807(5)b Crawler Tractor / Dozer, D5 min 0.5 Hour $_______________ $_______________
807(6) Dump Truck, 10 CY min capacity 0.5 Hour $_______________ $_______________
807(7) Front End Loader 2 yard minimum 0.5 Hour $_______________ $_______________
807(10) Trailer - Min 2 axle 0.5 Hour $_______________ $_______________
807(11) 3 Axle Low Boy with Tractor and Operator 0.5 Hour $_______________ $_______________
807(12) Service Truck W / Chain Saw & Operator 0.5 Hour $_______________ $_______________
807(13) Compactor, Steel Wheel, Vibratory, 64" drum width min. 0.5 Hour $_______________ $_______________
811(1) Surface Maintenance Level 3-5 Roads 0.5 Single Lane Mile $_______________ $_______________
811(2) Surface Maintenance Level 3-5 Roads 0.5 Double Lane Mile $_______________ $_______________
811(4) Shoulder Maintenance 0.5 Road Mile $_______________ $_______________
813(1) Spot Surfacing, Forest Service Furnished from nearby Govt Pit source 0.5 Cubic Yard $_______________ $_______________
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 3 of 71
Quantity Unit Unit Price Total
813(3) Spot Surfacing, Commercial Source 0.5 Ton $_______________ $_______________
813(4) Haul - 10 CY Min 0.5 Cubic Yard Mile $_______________ $_______________
813(5) Haul - 10 CY Min 0.5 Truck Hour $_______________ $_______________
814(1) Pothole Patching, Hot Mix AR4000 Oil, 1/2" size minus aggregate 0.5 Ton $_______________ $_______________
814(6) Paved Surface Cleaning (Double Lane), Power Broom, 48" min width Self Propelled with Lights
0.5 Mile $_______________ $_______________
832(1) Load, Haul and Place Material under 3 miles one way, minimum 10 CY Dump Truck
0.5 Cubic Yard $_______________ $_______________
832(2) Load, Haul and Place Material over 3 miles one way, minimum 10 CY Dump Truck
0.5 Cubic Yard/Mile $_______________ $_______________
832(4) Haul, minimum 10 CY Dump Truck 0.5 Cubic Yard Mile $_______________ $_______________
834(1) Clean and Recondition Culverts 24 inch Diameter and under 1 Each $_______________ $_______________
834(2) Clean and Recondition Culverts over 24 inch through 48 inch Diameter 1 Each $_______________ $_______________
834(3) Clean and Recondition Culverts Over 48 Inch Diameter 1 Each $_______________ $_______________
834(4) Clean Ditches 0.5 Mile $_______________ $_______________
834(5) Clean Ditches and Drainage Structures 0.5 Mile $_______________ $_______________
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 4 of 71
Quantity Unit Unit Price Total
834(6) Clean Drainage Structures 0.5 Mile $_______________ $_______________
838(1) 838 MAINTENANCE FOR LIMITED
USE (ML 2) 0.5 Mile $_______________ $_______________
839(1) Spring Recurrent Maintenance of ML 4 and 5 Roads 0.5 Mile $_______________ $_______________
839(2) Spring Recurrent Maintenance of ML 3 Roads 0.5 Mile $_______________ $_______________
842(1)a Vegetation Maintenance - Level 5 Road 0.5 Mile $_______________ $_______________
842(1)b Vegetation Maintenance - Level 4 Road 0.5 Mile $_______________ $_______________
842(2) Vegetation Maintenance - Level 3 Road 0.5 Mile $_______________ $_______________
842(3) Vegetation Maintenance - Level 2 Road 0.5 Mile $_______________ $_______________
851(2)
Danger Tree Removal, Fall trees outside of roadway, Trees fell on roadway and inside clearing limits are to be removed to outside of roadway
1 Each $_______________ $_______________
851(3) Hazard or Obstruction Removal ML 3-5 Roads 1 Miles $_______________ $_______________
851(4) Hazard or Obstruction Removal ML 2 Roads 1 Miles $_______________ $_______________
861(4)
Recondition/clean traffic gate, repair by welding locking mechanism, remove graffiti, reinstall Government Furnished signs and hardware
1 Each $_______________ $_______________
872(1) Clean Sign Face, return sign by removing surfacing debris, remove graffiti 1 Each $_______________ $_______________
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 5 of 71
Quantity Unit Unit Price Total
872(3) Recondition Sign Face Government Materials 1 Each $_______________ $_______________
872(4)
Install or Replace Post, Government furnished - Carsonite markers, 4x4 treated posts, to dimensions and depths meeting MUTCD standards
1 Each $_______________ $_______________
872(8) Install or Replace Sign Government Furnished 1 Each $_______________ $_______________
872(10) Remount Sign 1 Each $_______________ $_______________
872(12) Maintain Marker 1 Each $_______________ $_______________
872(14) Replace Marker Government Furnished 1 Each $_______________ $_______________
881(3)a Equipment Moving – Tilt-bed with Road Grader 16 Miles $_______________ $_______________
881(3)b Equipment Moving – Tilt-bed with Backhoe 16 Miles $_______________ $_______________
881(3)c Equipment Moving - Tilt-bed with Excavator (all sizes) 16 Miles $_______________ $_______________
881(3)d Equipment Moving – 3 Axle Low boy Loaded with Equipment 1 Miles $_______________ $_______________
TOTAL PRICE: $_______________
B.2 PERSONNEL AUTHORIZED TO ISSUE WORK ORDERS
The following personnel are authorized to place and administer work orders under this BTO:
Name, Position, Phone, Email Ron Hausinger, South Zone Engineering, (425) 888-8776, rhausinger@fs.fed.us Santino Pascua, South Zone Road Manager, (425) 888-8784, spascua02@fs.fed.us
Note: Work Orders will include Pay Item Numbers and Quantity of each Subitem ordered. A Work Order will be issued designating the roads to be maintained and the time frame in which the work shall be accomplished. If the contractor fails to perform the ordered work within the timeframe required, the ordered work may be deleted from the contract and performed by other means.
Work Orders can ONLY be issued for those items that are listed and pre-priced in the Schedule of Items in this BTO. Only a warranted FS Contracting Officer is authorized to modify this BTO and any items in the schedule.
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 6 of 71
SECTION C - DESCRIPTION/SPECIFICATION/WORK STATEMENT
C.1 SCOPE OF CONTRACT
a. The intent of this performance based service contract is to provide for road maintenance of National Forest System Roads on the Mt. Baker-Snoqualmie National Forest (Snoqualmie Ranger District - North Bend Area).
b. A District map may be obtained at the district office: Snoqualmie Ranger District, 902 S.E. North Bend Way, North Bend, WA. For a complete list of roads contact Ron
Hausinger at rhausinger@fs.fed.us.
c. The Contractor shall assume all risk, loss, damage, or expense arising out of the prosecution of the work, except as otherwise provided in the contract.
d. Locations that may be used for staging of equipment and materials are available. The government will not be held liable for contractor’s equipment and material stored in these locations.
C.2 FURNISHING OF MATERIAL
a. Unless otherwise stated in the Special Project Specifications, the contractor shall furnish all material required for performance of the contract. All material shall comply with the specifications.
b. The Contractor shall furnish and deliver the material to the site of the work in such a manner that their quality and fitness for the work is preserved.
c. The Contractor shall start work when directed within three calendar days from the date of work order.
d. Measurement and payment for contract work will be made only for those pay items included in the Schedule of Items.
e. The Contractor shall be responsible for furnishing warning devices and complying with Federal and any State or local safety standards and traffic management procedures.
C.3 COORDINATION OF CONTRACT DOCUMENTS
The specifications, drawings, and all other provisions are essential parts of the contract. They are intended to be mutually complementary. In the case of discrepancy, the following is the order of precedance: a. Drawings; b. Standard Specifications for Maintenance of Roads.
C.4 TECHNICAL SPECIFICATIONS FOR MAINTENANCE OF ROAD
The specifications are numbered in the "800" series codes. Only those sections which are applicable to this contract are included. There will be gaps between the section numbers due to the fact that many sections have been purposely omitted or because certain specification sections have been reserved for possible future inclusion in the "800" series.
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 7 of 71 mailto:spascua02@fs.fed.us
C.5 APPLICABLE PUBLICATIONS AND FORMS
Publications and forms that apply to this contract. Publications and forms listed can be obtained via the Internet, ordered through the U.S. Government Printing Office, or through the Mt. Baker- Snoqualmie National Forest. Supplements or amendments to listed publications from any organizational level may be issued throughout the performance period. The Contractor shall immediately implement those changes that result in a decrease or no change in cost and notify the contracting officer in writing of such changes. Before implementing any change that will result in an increase in cost, the Contractor shall submit to the contracting officer a price proposal within 30 calendar days following receipt of the change by the Contractor.
Publication Publication Number or WWW Address Revision Date
Manual of Uniform Traffic Control Devices. MUTCD 2009 2009
Sign and Poster Guidelines for the Forest Service. EM-7100-15 2010
Mt. Baker-Snoqualmie National Forest Road Rules Document.
Copy of Commercial Road Rules Listing is available upon request.
1991 or as amended
Mt. Baker-Snoqualmie N.F. Programmatic Biological Assessment for North Zone Road Maintenance (2012).
A copy of the Biological Assessment is available upon request. 2012
Memorandum of Agreement between the USDA Forest Service, Region 6 and the Washington State Department of Ecology.
Copy of MOA is available upon request. 2000
Roads Maintenance Level Guide for Forest Service Roads.
San Dimas Guide for Road Maintenance Levels 0577-1205-SDTC. 2005
MEMORANDUM OF UNDERSTANDING
Between Washington State Department of Fish and Wildlife And USDA Forest Service, Pacific Northwest Region.
Copy of MOU is available upon request. 2012
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 8 of 71
SECTION F--DELIVERIES OR PERFORMANCE
F.1 AGAR 452.211-75 EFFECTIVE PERIOD OF CONTRACT (FEB 1988)
The effective period of this contract is from DATE OF AWARD through 365 calendar days.
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 9 of 71
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at: TBD.
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 10 of 71
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 PROSECUTION OF WORK -- WORK HOUR LIMITS -- WORK ITEM LIMITS
The Contractor shall conduct activities so that interference with the public shall be kept at a minimum.
When excavation work prevents traffic flow, the Contractor is authorized to delay traffic not to exceed 30 minutes.
Any activities requiring closure to the public shall be scheduled with the CO at least 14 days in advance.
The Contractor shall shut down all equipment when there is 1 inch precipitation in a 24 hour period and/or ½ inch precipitation in 1 hour.
H.2 USE OF PREMISES
General - The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform the contract in a manner that will not interrupt or interfere with the conduct of Government business.
Camps - Before any camp or storage site is opened or operated on National Forest land or lands administered by the Government, written permission shall be obtained through the Government.
Camp is interpreted to include the campsite or trailer parking area of any employee or subcontractor working on the project. Such permission, if granted, will be without charge to the Contractor.
H.3 USE OF ROADS BY CONTRACTOR
The Contractor is authorized to use all roads under the jurisdiction of the Forest Service that are open and necessary for direct route access to the contract work sites for all activities necessary to complete this contract. This authorization is subject to the limitations described below, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
Keep existing roads open to all traffic during contract work, and maintain them in a condition that will adequately accommodate traffic. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a Written Plan for the satisfactory handling of traffic has been approved. Post Traffic Control Signs and Devices in conformance with the “Manual on Uniform Traffic Control Devices” (MUTCD). Do not proceed with work on the project until all required signs are in place and approved.
Before shutting down any operations, leave all travel ways in a condition suitable for traffic.
Unless otherwise provided, traffic delays may not exceed 30 minutes.
If the Contractor requests use of a National Forest road or road segment not listed above, the Forest Service may authorize such use if not in conflict with the current Road Rules document.
Authorization to use such additional roads may include maintenance requirements and use limitations.
The roads authorized for use will be subject to the following provisions:
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 11 of 71
(a) The current National Forest Road Use Rules Document is applicable to all commercial road users. This document is available for inspection at the office of the Forest Supervisor and shall be applicable except when modified by provisions of this contract. Copies are available upon request.
(b) Federal Regulations contained in 36 CFR 261.54 as applied to the area by an order issued under 36 CFR 261.50. These regulations authorized the Forest Service, as a sovereign act, to issue additional restrictions to those shown in the current Road Use Rules Document and will be posted on the road.
H.4 TRAFFIC CONTROL, FLAGGERS, BARRICADES, WARNING SIGNS, AND OTHER DEVICES
The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, flaggers, pilot cars, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Barricades and other obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic. Keep traffic devices current with maintenance operation and remove upon completion.
All operations and signing shall conform to the current requirements and guidelines of the Occupational Safety and Health Administration (OSHA) and the Manual of Uniform Traffic Control Devices (MUTCD).
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points, where the new work crosses or coincides with an existing road or trail. Required signs may be mounted on portable or temporary mountings. Use standard MUTCD shapes, colors, sizes, and legends.
Mark hazards incidental to the work within or on the traveled way, shoulders, or turnouts with hazard identification markers, illuminated beacons, and other MUTCD devices to safely guide road users through the area. Mark work segments not completed on a daily basis appropriately for night travel. Obtain authorization before commencing work at night.
Advisory speed plates may be used to control traffic through the work area.
Flaggers - Provide properly equipped, trained and certified, flag person(s) where the traffic is required to stop before proceeding. Stop traffic in locations which provide width enough for passage of traffic and reasonable protection for vehicles. When flag control is used, advance warning signs are required.
H.5 MOTORIZED EQUIPMENT
Use of motorized equipment other than hand-held equipment such as power saws and brush cutters will not be permitted off designated roads in the project area without approval of the Contracting Officer or as elsewhere provided herein.
H.6 EQUIPMENT REQUIREMENTS
The Contractor shall furnish equipment meeting OSHA (Occupational Safety and Health Act) requirements. When the Contractor is paid for furnishing and operating equipment on an hourly or daily basis, it shall be operated at its design speed, or the maximum speed feasible under prevailing conditions.
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 12 of 71
Equip all vehicles and machinery operating on or from the traveled way or road shoulder with flashing lights, strobes, or rotary beacons operated continuously while work is in progress. Use truck headlights at all times while operating. Backup horns are required on all self-propelled equipment in excess of 5 ½ tons gross weight.
Park vehicles and machinery not currently used in the maintenance operation off the traveled way at approved locations to minimize interference with normal use.
H.7 SPECIAL REQUIREMENTS FOR WATER DRAFTING EQUIPMENT
Water drafting equipment may be used only at water sources designated on the Vicinity Map, task order, or provided by the Contracting Officer. Such equipment shall include a screen around the intake (foot valve) with openings no larger than 1/8 - inch. An air gap or positive antisiphon device shall be provided between the water source and the vehicle being loaded if the vehicle has been used for other than water haul, if the source is a domestic potable water supply, or the water is used for tank mixing with any other materials. Materials must be readily available and appropriate measures taken to prevent petroleum products from entering the water source.
H.8 HAZARDOUS MATERIAL SPILL CLEAN-UP KIT
A hazardous material spill clean-up kit shall be maintained and readily available for potential use on the project at each work site. Spill clean-up kits shall contain the following items as a minimum:
• 1 case absorbent pads suitable for absorbing hydraulic fluid, engine oil, and fuel
• 1 gallon "Plug-a-Dike" or equivalent material
• A nineteen liter (five-gallon) mixing container
• 20 meters of 150 mm absorbent, floating booms for absorbing hydraulic fluid, engine oil, and fuel from a water surface
H.9 LANDSCAPE PRESERVATION AND HAZARDOUS MATERIALS
(a) The Contractor shall give attention to the effect of contract operation upon the landscape, shall take care to maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following requirements:
1. Prevention of the Landscape Defacement. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or natural features unless specifically authorized by the Government. Unless otherwise provided in the Special Project Specifications, the Contractor shall confine contract operations to within the areas designated in contract documents.
Unless otherwise provided in this contract, the Contractor shall gather rock which falls outside the roadway due to contract operations and dispose of it as directed by the Government.
2. Protection of Streams, Lakes, and Reservoirs. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes, small ponds, and reservoirs with fuels, oils, bitumen’s, dust palliatives, silt, or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the Government.
(b) The Contractor shall confine operations to within the work area limits, immediate work area, or other areas designated in the contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 13 of 71
The Contractor shall make all reasonable attempts to preserve the scenic and natural environment within and adjacent to this project.
(c) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, lakes, reservoirs, and other surface waters.
1. Wash water or waste from concrete, aggregate or other operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
2. Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.
(d) No petroleum products or other hazardous substances shall be released on or into land or rivers, streams, impoundments or other waters, or into natural or manmade channels leading thereto or therefrom. Servicing of all equipment shall be done only in the areas approved by the Contracting Officer. The Contractor shall transport off government lands all waste oil, vehicle oil filters (drained of free-flowing oil), and oily rags and shall dispose of such materials in accordance with applicable State and Federal regulations.
1. If the total on-site oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer. This plan shall include notification of appropriate state and local officials, the Contracting Officer and other appropriate agencies.
2. At all on-site work areas (including Contractor storage, transfer, fueling, mixing sites, etc., for oil, oil products or any hazardous materials), the Contractor shall take appropriate preventive measures to insure that any release of hazardous products does not enter any stream or other waters of the United States or any of the individual States and shall conform to the federal, state and local regulations. Planned spill containment locations in stream courses shall be established prior to commencement of work activities. These locations will be reviewed by the Contracting Officer or representative. When deemed appropriate, additional planned preventive measures shall be established for review by the Contracting Officer or representative.
3. The Contractor, acting independently, shall immediately take action to notify the appropriate agencies including the Contracting Officer, and to contain and clean up, without expense to the Government, all petroleum products or other hazardous substance releases which are on or in the vicinity of the project and which are caused by the Contractor's employees, directly or indirectly. The Contractor shall have the necessary materials on site to contain a spill which may occur on land or within live streams as appropriate for any potential flow conditions likely to occur. This may require absorbent pads and/or booms, or other containment devices. In the event the Government determines that additional resources beyond those of the Contractor's are required, the Contractor may be held liable for all damages and costs including, but not limited to additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and clean-
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 14 of 71 up of petroleum products or other hazardous substance releases caused by Contractor's employees or resulting from or related to construction operations.
4. The Contractor shall notify the Contracting Officer of any hazardous materials to be used on the job and shall have Material Safety Data Sheets (MSDS) for those materials available on the job.
H.10 PROTECTION OF BOTANICAL RESOURCES
Previously unknown or unlisted populations of Protected, Endangered, Threatened, or Sensitive (PETS) plant species, or potential habitat for PETS species, may be located within contract project boundaries. The modification of contract specifications may be required to protect previously unknown PETS plant populations.
(a) Government's Responsibility - The Government will identify, as they become known, locations of PETS species that the Contractor could encounter in the progress of work under this contract.
(b) Contractor's Responsibility - The Contractor shall protect these areas that contain PETS species, as directed in writing by the Government.
H.11 CONTROL OF NOXIOUS WEEDS--CLEANING OF EQUIPMENT
To prevent the introduction and control the spread of seeds of noxious weeds onto and around National Forest land, the Contractor shall ensure all equipment moved onto National Forest land is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. When the Contractor is working in an area that has been identified as a noxious weed infestation area, the Contractor shall ensure equipment is cleaned of weed seeds prior to moving to another work area on the Forest. The Contractor shall employ whatever cleaning methods necessary, this may require a pressure hose, to ensure compliance with the terms of this provision, and shall notify the Forest Service prior to moving each piece of equipment onto National Forest land, unless otherwise agreed in writing. Notification will include identifying the location of the equipment's most recent operations.
The Contractor shall certify, in writing, compliance with the terms of this clause prior to each start-up of operations. For the purposes of this clause, "equipment" includes all motorized equipment operated off system roads, transport vehicles, and all motorized equipment used in road maintenance. Not included are log trucks, chip vans, pickup trucks, cars, or other vehicles used to daily transport personnel.
Special care shall be taken to assure removal of noxious weeds and their seed, specifically any species on the Washington State Noxious Weed Control Board website:
http://www.nwcb.wa.gov/weed_list/weed_list.htm
1. If any previously undiscovered Threatened Endangered or Sensitive vascular plants, bryophytes, lichens, or fungi are discovered, before or during project implementation, halt work until a USFS botanist is consulted and necessary mitigation measures are enacted. The list of rare plants of concern can be found on the following website:
http://www.fs.fed.us/r6/sfpnw/issssp/agency-policy/.
2. Treat known infestations before ground disturbance begins.
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 15 of 71 http://www.nwcb.wa.gov/weed_list/weed_list.htm http://www.fs.fed.us/r6/sfpnw/issssp/agency-policy/
3. For actions conducted or authorized by written permit by the Forest Service that will operate outside the limits of the road prism, require the cleaning of all heavy equipment prior to entering NFS Lands. See engineering contract specs H.12.
4. Suppliers must provide annual documentation to the USFS indicating that the following products have been examined by a qualified inspector and deemed free of State listed noxious weeds:
• Straw or other Mulch
• Gravel, Rock, or other fill
• Seeds (according to AOSA standards)
5. If weeds are present in the project area, all equipment and gear must be cleaned before leaving the project area to avoid spreading the infestation further.
6. If weeds are present in the project area, work from relatively weed-free areas into the infested area rather than vica-versa.
Revegetate all areas of bare soil exposed by project activities if there is a risk of noxious weed invasion. Native plant materials are the first choice in revegetation where timely natural regeneration of the native plant community is not likely to occur. Follow revegetation criteria and specifications for this project (see Spec. 841.06 Seed Mix)
H.12 CONTROL POINTS
The Contractor is responsible for the preservation of existing bench marks and other control points. The cost of replacing them may be charged against the Contractor and may be deducted from the payment for the work. If the Contractor finds missing controls they shall notify the Government who will replace them within two (2) days.
H.13 SUBMITTALS
The following submittals are required for this project:
Title Referenced by Contract Clause or Specification No.
Time of Government Approval After Submittal
Quality Assurance Plan Section F and Specifications 7 days
Traffic Control Plan Use of Roads by Contractor clause 7 days
Safety Plan, Including Blasting Plan, Where Applicable
Accident Prevention clause
(FAR 52.236-13) N/A
Engineered Spill Prevention Plan
Landscape Preservation and Hazardous Materials clause 2 days
Fire Plan R6-FS-6300-55 and Certification that your Fire Tools and Equipment are in full compliance with the contract requirements
R6-FS-6300-52 part 2 N/A
Progress Schedule Section F N/A
Note: For this BTO the submittals were satisfied with initial base MATOC award.
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 16 of 71
H.14 SALVAGE RIGHTS
Sign maintenance under specification SPS872F1 allows for sign post, signs replaced and applicable hardware to become property of the Contractor. No other Contractor salvage rights exist under the contract unless specifically provided elsewhere herein.
H.15 MATERIAL SOURCES
Rock and mineral soil excavated within the normal excavation shall be conserved and used as needed.
Borrow sources are identified on the plans or elsewhere herein if made available by the Government. If alternate borrow sources are needed, they must be approved in advance by the COR. Such borrow sources shall be restored to a natural appearance. Materials acquired from commercial sources shall conform to government specifications and be from acceptable certified weed free commercial sources.
H.16 FURNISHING OF MATERIALS
Unless otherwise stated in the Special Project Specifications, the Contractor shall furnish all material required for performance of the contract. All material shall comply with the specifications. The Contractor shall verify the kind and amount of work that may be necessary in furnishing the material.
H.17 STORAGE OF MATERIALS AND EQUIPMENT
Materials shall be stored to assure the preservation of their quality and fitness for work.
Approved portions of the right-of-way or other areas on Government land may be used for storage purposes. All storage sites approved by the Government shall be restored to a satisfactory condition at the Contractor's expense.
H.18 LEGAL RELATIONS AND RESPONSIBILITIES
Government's Responsibility for Utilities
1. The Government will identify the roads in the Road Listing of, known locations of underground installations other than culverts and drains the Contractor could encounter in the progress of work under the contract; electric, telephone cables, water supply pipes, and induction loops within the road right of way.
Contractor's Responsibility for Utilities
1. The Contractor will notify Washington UULC 1-800-424-5555 and the utility companies and request utilities be marked on the ground prior to excavation.
2. The Contractor will notify all utility companies or other parties affected and make arrangements for all necessary adjustments of the public or private utility fixtures, pipelines, and other appurtenances affected by work under the contract.
In the event of interruption to utility services because of accidental breakage the Contractor shall promptly notify the utility authority and shall cooperate with that authority in the
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 17 of 71 restoration of service. If damage occurs to the utilities the Contractor will be liable for damage to underground utilities.
H.19 ARCHAEOLOGICAL OR HISTORICAL SITES (AGAR 452.236-73) (FEB 1988)
If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 18 of 71
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 FAR 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)
In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.
This Statement is for Information Only:
It is not a Wage Determination
Employee Class Monetary Wage--Fringe Benefits
WG-4, Step 3 (Supervisory) WG-4, Step 2 (Non-Supervisory)
WG-2, Step 3 (Supervisory) WG-2, Step 2 (Non-Supervisory)
$22.38 (Plus Fringe) $21.53 (Plus Fringe)
$19.28 (Plus Fringe) $18.55 (Plus Fringe
Monetary Wage based on: The schedules above have been established under authority of DoD Instruction 5120.39, dated October 1, 2015, subject to the limitations contained in CPM 2017-20, dated 22 December 2017.
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 19 of 71 http://uscode.house.gov/ http://uscode.house.gov/
SECTION J
CONTRACT DOCUMENTS, EXHIBITS OR ATTACHMENTS
Attachment No. Description Total Pages
See C.1b.
3A,B,C,D 44
District Location Map Road Listing Wage Determinations (All Counties)
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 20 of 71
Attachment 1 – District Location Map
A district map for the applicable areas may be obtained at the specific district office below:
DARRINGTON RANGER DISTRICT
Darrington Ranger District – Darrington Office 1405 Emens Avenue North Darrington, WA 98241 Telephone: (360) 436-1155
Operating Hours
Monday-Friday 8:00 am – 4:30 pm Closed for lunch 12:00 – 1:00 pm Closed federal holidays
MT. BAKER RANGER DISTRICT
810 State Route 20 Sedro-Woolley, WA 98284 Telephone: (360) 856-5700 Ext 515
Operating Hours
Monday-Friday 8:00 am – 4:30 pm
SKYKOMISH RANGER DISTRICT
74920 NE Stevens Pass Hwy P.O. Box 305 Skykomish, WA 98288 Telephone: (360) 677-2414
Operating Hours
Monday-Friday 8:00 am – 4:30 pm Closed for lunch 12:00 – 12:30 pm
SNOQUALMIE RANGER DISTRICT
North Bend Office 902 S.E. North Bend Way, Bldg. 1 North Bend, WA 98045 Telephone: (425) 888-1421
Operating Hours
Monday-Friday 8:00 am – 4:30 pm
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 21 of 71
Attachment 2 – Road Listing (North Bend)
- Road Listing -
The following is a list of primary roads that will be maintained with this contract. Not included in this list are the roads that have a Objective Maintenance level lower than 3. For a complete list of roads contact Ron Hausinger at rhausinger@fs.fed.us. Maintenance on roads not shown will primarily be opening and drainage, as funding allows. The objective of this contract is to provide appropriate maintenance of the Forest roads, with the following priority for maintenance 1st: user safety, 2nd: resource protection and 3rd: user comfort.
SNOQUALMIE RANGER DISTRICT – NORTH BEND AREA ROADS
ID NAME BEGIN_TERMINI END_TERMINI BMP EMP OPER
ML
OBJ
ML
SURFACE
TYPE LANES
4832000 ROCKY RUN I-90 INTERCHANGE RD 4832142 0.00 0.95 5 5 PCC 2
4832000 ROCKY RUN I-90 INTERCHANGE RD 4832142 0.95 1.99 5 4 PCC 2
4832000 ROCKY RUN I-90 INTERCHANGE RD 4832142 1.99 2.43 5 4 PCC 1
9000050
NORTH BEND
RANGER STATION OLD HWY 90 SEC 10 0.00 0.14 5 5 BST 2
9000219
LK KEECHELUS
BOAT RAMP OLD HWY 90
SEC 22-BOAT
RAMP 0.00 1.70 5 5 BST 2
9000220
JOHN WAYNE
TRAILHEAD RD 9000219 SEC 22 0.00 0.10 5 5 BST 2
9000410 SNOQ. PASS VIS OLD HWY 90 SEC 04 0.00 0.10 5 5 PCC 2
9032000
BANDERA
AIRSTRIP I-90 INTERCHANGE SEC 16 0.00 0.20 5 4 BST 2
9034000 LOOKOUT POINT I-90 INTERCHANGE SEC 14 0.00 0.10 5 5 BST 1
9034000 LOOKOUT POINT I-90 INTERCHANGE SEC 14 0.10 0.36 5 5 BST 1
9035000 ASAHEL CURTIS I-90 INTERCHANGE SEC 13 0.00 0.40 5 5 BST 1
9041000
PACIFIC CREST
TRAILHEAD RD 9040000
HORSE
ACCESS
RAMPS 0.00 0.18 5 5 BST 1
5800000 DENNY CREEK I-90 EXIT
RD 9040 SNOQ
PASS 2.00 5.10 4 5 BST 2
5810000 DENNY CREEK CG RD 5800000 SEC 08 0.00 0.55 4 4 BST 1
9035000 ASAHEL CURTIS I-90 INTERCHANGE SEC 13 0.40 0.80 4 4 BST 1
9035000 ASAHEL CURTIS I-90 INTERCHANGE SEC 13 0.80 0.88 4 4 BST 1
9050000
SNOQUALMIE
PASS/YELLOWSTO
NE RD I-90 INTERCHANGE SEC 09 0.00 0.25 4 4 BST 2
9050000
SNOQUALMIE
PASS/YELLOWSTO
NE RD I-90 INTERCHANGE SEC 09 0.25 0.74 4 4 BST 2
4832142
GOLD CREEK
POND RD RD 4832000
GOLD CREEK
POND 0.00 0.42 3 5 AGG 1
4832142
GOLD CREEK
POND RD RD 4832000
GOLD CREEK
POND 0.42 0.66 3 5 AC 1
5000000 CEDAR MAINLINE COUNTY ROAD RD 54
18.8
23.6
5 3 3 AGG 1
5000710 RD 50 SEC 34 0.00 0.20 3 2 AGG 1
5000710 RD 50 SEC 34 0.20 0.40 3 2 AGG 1
5060000 CEDAR #560 RD 5070000 RD 5000000 1.00 1.50 3 2 AGG 1
5060000 CEDAR #560 RD 5070000 RD 5000000 1.50 8.20 3 2 AGG 1
5060120 CEDAR #675.1 RD 5060000 SEC 26 0.10 0.70 3 D AGG 1
5060124 RD 5060120 SEC 26 0.00 0.20 3 D AGG 1
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 22 of 71 mailto:rhausinger@fs.fed.us
SNOQUALMIE RANGER DISTRICT – NORTH BEND AREA ROADS
ID NAME BEGIN_TERMINI END_TERMINI BMP EMP OPER
ML
OBJ
ML
SURFACE
TYPE LANES
5060130 RD 5060000 SEC 35 0.00 0.10 3 D AGG 1
5060140 RD 5060000 SEC 36 0.00 0.10 3 D AGG 1
5060160 RD 5060000 SEC 36 0.00 0.51 3 2 AGG 1
5060160 RD 5060000 SEC 36 0.51 1.30 3 D AGG 1
5060210 RD 5060120 SEC 26 0.00 0.40 3 D AGG 1
5060212 RD 5060210 SEC 26 0.00 0.20 3 D AGG 1
5060214 RD 5060210 SEC 36 0.00 0.30 3 D AGG 1
5060610 SPUR 633 RD 5060000 SEC 36 0.00 0.30 3 2 AGG 1
5060610 SPUR 633 RD 5060000 SEC 36 0.30 1.30 3 D AGG 1
5060612 RD 5060610 SEC 36 0.00 0.20 3 D AGG 1
5060620 RD 5060610 SEC 36 0.00 0.20 3 D AGG 1
5060710 SPUR 630 RD 5060000 SEC 30 0.90 1.20 3 1 AGG 1
5060810 SPUR 620 RD 5060000 SEC 32 0.50 0.51 3 D AGG 1
5062000 ROOSTER COMB RD 5060000 SEC 08 0.00 2.00 3 3 AGG 1
5062000 ROOSTER COMB RD 5060000 SEC 08 2.00 3.90 3 2 AGG 1
5062000 ROOSTER COMB RD 5060000 SEC 08 3.90 5.88 3 2 AGG 1
5062110 RD 5062000 SEC 02 0.00 0.20 3 2 AGG 1
5062110 RD 5062000 SEC 02 0.20 1.26 3 2 AGG 1
5062210 SMAY EAST RD 5062000 W LINE SEC 3 0.00 0.80 3 1 AGG 1
5063110 SPUR 717 RD 5063000 SEC 13 0.00 0.55 3 2 AGG 1
5063110 SPUR 717 RD 5063000 SEC 13 0.55 2.85 3 D AGG 1
5063210 LO BALD RD 5063000 SEC 12 0.00 0.20 3 D AGG 1
5063220 RD 5063000 SEC 02 0.00 0.60 3 D AGG 1
5066000 RD 5060000 SEC 04 0.00 2.26 3 2 AGG 1
5066000 RD 5060000 SEC 04 2.26 2.88 3 2 AGG 1
5066110 RD 5066000 SEC 32 0.00 0.30 3 2 AGG 1
5066110 RD 5066000 SEC 32 0.30 0.40 3 D AGG 1
5066310 604-A RD 5066000 SEC 07 0.00 0.20 3 2 AGG 1
5066310 604-A RD 5066000 SEC 07 0.20 1.47 3 D AGG 1
5066710 SPUR 608 RD 5066000 SEC 32 0.20 0.30 3 D AGG 1
5066810 SPUR 602 RD 5066000 SEC 08 0.00 0.34 3 2 AGG 1
5066810 SPUR 602 RD 5066000 SEC 08 0.34 0.60 3 D AGG 1
5078000
UPPER SNOW
CREEK RD 5000000 SEC 19 0.00 3.78 3 3 AGG 1
5078000
UPPER SNOW
CREEK RD 5000000 SEC 19 3.78 5.07 3 3 AGG 1
5080000 DANDY PASS RD 5000000 N LINE SEC 28 0.00 3.21 3 2 AGG 1
5200000 TACOMA PASS RD 5400000
RD 4100000
CABIN CR 0.00 0.69 3 3 AGG 1
5200000 TACOMA PASS RD 5400000
RD 4100000
CABIN CR 0.94
11.1
5 3 3 AGG 1
5200112 RD 5200110 SEC 26 0.00 0.60 3 D AGG 1
5200210 RD 5200000 E LINE SEC 34 0.00 0.28 3 1 AGG 1
5200210 RD 5200000 E LINE SEC 34 0.28 1.08 3 D AGG 1
5210000 INTAKE CREEK
RD 5200000 (SEC
21)
RD 5200000
(SEC 26) 0.00 7.60 3 3 AGG 1
5210000 INTAKE CREEK
RD 5200000 (SEC
21)
RD 5200000
(SEC 26) 7.60
11.3
9 3 3 AGG 1
5210110 RD 5210000 RD 5250000 0.00 0.60 3 D AGG 1
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 23 of 71
ML
OBJ
ML
SURFACE
TYPE LANES
5210140 RD 5210000 SEC 26 0.00 0.10 3 D AGG 1
5210145 RD 5210000 SEC 26 0.00 0.70 3 D AGG 1
5210150 RD 5210000 SEC 26 0.00 0.40 3 D AGG 1
5210152 RD 5210150 SEC 26 0.00 0.10 3 D AGG 1
5210154 RD 5210150 SEC 26 0.00 0.20 3 D AGG 1
5210410 RD 5210000 RD 5250000 0.00 0.50 3 2 AGG 1
5210510 RD 5210000 SEC 26 0.00 0.20 3 D AGG 1
5210610 RD 5210000 SEC 24 0.00 0.30 3 D AGG 1
5220000 INTAKE CREEK RD 5200000
SW LINE SEC
35 0.00 2.64 3 2 AGG 1
5220110 RD 5220000 SEC 34 0.00 0.77 3 2 AGG 1
5220110 RD 5220000 SEC 34 0.77 0.87 3 1 AGG 1
5220310 RD 5220000
NW CORNER
SEC 02 0.00 0.34 3 2 AGG 1
5230000 PIONEER CR. RD 5200000 E LINE SEC 36 0.00 2.35 3 2 AGG 1
5250000 LONGWORTH CR
RD 52 (N LINE
SEC21) SEC 13 0.00 1.90 3 3 AGG 1
5250000 LONGWORTH CR
RD 52 (N LINE
SEC21) SEC 13 1.90 4.50 3 2 AGG 1
5250000 LONGWORTH CR
RD 52 (N LINE
SEC21) SEC 13 4.50 5.14 3 2 AGG 1
5250000 LONGWORTH CR
RD 52 (N LINE
SEC21) SEC 13 6.64 7.20 3 2 AGG 1
5400000
STAMPEDE
PASS/GREEN
RIVER RD STAMPEDE PASS PALMER JCT 0.00 1.72 3 3 AGG 1
5400000
STAMPEDE
PASS/GREEN
RIVER RD STAMPEDE PASS PALMER JCT 1.72 9.10 3 3 AGG 1
5400000
STAMPEDE
PASS/GREEN
RIVER RD STAMPEDE PASS PALMER JCT 9.10
11.2
5 3 3 AGG 1
5400000
STAMPEDE
PASS/GREEN
RIVER RD STAMPEDE PASS PALMER JCT
11.2
18.2
1 3 3 AGG 1
5400675 CREST RD 5400000 N LINE SEC 35 0.00 0.40 3 1 AGG 1
5400677 RD 5400675 SEC 35 0.00 0.40 3 1 AGG 1
5403000
LIZARD
LAKE/BORUP RD 5400000 0.00 1.06 3 3 AGG 1
5403000
LIZARD
LAKE/BORUP RD 5400000 1.06 4.66 3 3 AGG 1
5403000
LIZARD
LAKE/BORUP RD 5400000 4.66 9.34 3 3 AGG 1
5403000
LIZARD
LAKE/BORUP RD 5400000 9.34
10.0
9 3 3 AGG 1
5403210 LINE RD 5403205 S LINE SEC 02 0.00 1.59 3 2 AGG 1
5403310 TRACK RD 5403000 0.00 0.11 3 D AGG 1
5405000 BORUP RD 5403000 RD 5250 0.00 2.56 3 3 AGG 1
5415000 LAST CHANCE RD 5400000 0.00 0.97 3 1 AGG 1
5500000 TINKHAM I-90 WEST I-90 EAST 0.00 4.70 3 5 AGG 1
5500000 TINKHAM I-90 WEST I-90 EAST 4.70 6.60 3 5 AGG 1
5500101
MCCLELLEN BUTTE
TRAILHEAD RD 5500000 SEC 07 0.00 0.26 3 3 AGG 1
5500411 SOUTHFORK THIN RD 5500000 SEC 16 0.00 0.04 3 3 AGG 1
5500421 SOUTHFORK THIN RD 5500000 SEC 15 0.00 0.40 3 3 AGG 1
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 24 of 71
ML
OBJ
ML
SURFACE
TYPE LANES
5500431 SOUTHFORK THIN RD 5500000 SEC 15 0.00 0.03 3 3 AGG 1
5500441 SOUTHFORK THIN RD 5500000 SEC 15 0.00 0.05 3 3 AGG 1
5500451 SOUTHFORK THIN RD 5500000 SEC 15 0.00 0.05 3 3 AGG 1
5500461 SOUTHFORK THIN RD 5500000 SEC 15 0.00 0.05 3 3 AGG 1
5501000
TINKHAM
CAMPGROUND RD 5500000 SEC 08 0.00 0.72 3 4 BST 1
5510000 HANSEN CREEK RD 5500000
RD
5510710/CRWS
GATE 0.00 5.60 3 3 AGG 1
5510120 HUMPBACK RD 5510000 N LINE SEC 22 0.00 0.50 3 2 AGG 1
5510410 CARTER RD 5510000 S LINE SEC 21 0.00 1.83 3 2 AGG 1
5510430 RIDGE 21 RD 5510410 SEC 22 0.00 0.42 3 2 AGG 1
5510710 RD 5510000 N LINE SEC 28 0.00 0.75 3 2 AGG 1
5590000
ANNETTE LAKE
TRAILHEAD RD 5500000 E LINE SEC 13 0.00 0.40 3 5 AGG 1
5600000
MIDDLE
FORK/GOLDMEYER JCT SEC 13 SEC 21 8.24 8.50 3 4 AGG 1
5600000
MIDDLE
FORK/GOLDMEYER JCT SEC 13 SEC 21 8.50
12.1
8 3 4 AGG 1
5600000
MIDDLE
FORK/GOLDMEYER JCT SEC 13 SEC 21
12.1
12.4
0 3 4 AGG 1
5600310 CAMP BROWN RD 5600000 SEC 21 0.00 0.13 3 3 AGG 1
5600800
DINGFORD FALLS
TRAILHEAD RD 5600000 TRAILHEAD 0.00 0.02 3 3 AGG 1
5640000 QUARTZ CREEK RD 5600000 SEC 07 0.00 0.40 3 3 AGG 1
5700000 CO. RD.
JCT W/ERNIE'S
GROVE SEC 25
22.0
25.9
4 3 3 AGG 1
5700120
BARE MTN
TRAILHEAD RD 5700000 0.00 0.01 3 3 AGG 1
5700210
DEVIL'S CANYON
TRAILHEAD RD 5700000
SEC 27
TRAILHEAD 0.00 0.30 3 D AGG 1
5710000 CALLIGAN LAKE RD 5700000 SEC 34
11.0
11.2
1 3 D AGG 1
5730000
NORTH FORK
ROAD RD 5700000 SEC 03 0.00 4.12 3 3 AGG 1
5730104 RD 5730000 SEC 07 0.00 0.60 3 2 AGG 1
5740000
PROSPECTORS
LOW RD 5700000 SEC 18 0.00 1.20 3 2 AGG 1
5740110 RD 5740000 SEC 17 0.00 0.20 3 D AGG 1
5830000
FRANKLIN FALLS
TRAILHEAD RD 5800000 SEC 05 0.00 0.30 3 4 AGG 1
5830010
SUMMERHOME
ROAD RD 5830000 SEC 05 0.00 0.15 3 3 AGG 1
6200410 DRY CREEK RD 6200000 N LINE SEC 08 0.00 1.50 3 D AGG 1
6250000 RD 6200000 SEC 32 5.50 7.00 3 2 AGG 1
7012000 DIVIDE RIDGE RD 7010000 E LINE SEC 25 3.33 3.58 3 1 AGG 1
7012000 DIVIDE RIDGE RD 7010000 E LINE SEC 25 3.58 3.63 3 1 AGG 1
7012000 DIVIDE RIDGE RD 7010000 E LINE SEC 25 3.63 6.54 3 1 AGG 1
7012000 DIVIDE RIDGE RD 7010000 E LINE SEC 25 8.00 8.31 3 1 AGG 1
7012535 RD 7012000 SEC 33 0.00 0.45 3 2 AGG 1
7012535 RD 7012000 SEC 33 0.45 1.35 3 1 AGG 1
7030000
HIMES/TWIN
CAMP/WHISTLER
CREEK RD 7000000 RD 7030510 5.15 5.19 3 3 AGG 1
7030000
HIMES/TWIN
CAMP/WHISTLER RD 7000000 RD 7030510 5.19 5.78 3 3 AGG 1
BTO #4 (North Bend), RFP No. 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 25 of 71
ML
OBJ
ML
SURFACE
TYPE LANES
CREEK
7030000
HIMES/TWIN
CAMP/WHISTLER
CREEK RD 7000000 RD 7030510 5.78 6.51 3 3 AGG 1
7030510 RD 7030000
SEC 01
TRAILHEAD 0.00 0.60 3 3 AGG 1
7030510 RD 7030000
SEC 01
TRAILHEAD 0.60 0.73 3 3 AGG 1
7034000 SAWMILL RIDGE RD 7030000 SEC 33 0.00 4.60 3 2 AGG 1
7035000
SAWMILL RIDGE
SPUR RD 7034000 SEC 35 0.00 1.17 3 2 AGG 1
7035110
RD 7035000-SE COR
N CENTER
SEC 33 0.00 0.98 3 2 AGG 1
7035210 RD 7035000 SEC 33 0.00 0.98 3 2 AGG 1
7036000 GREEN DIVIDE RD 7030000 RD 5200000 2.35 3.69 3 2 AGG 1
7036000 GREEN DIVIDE RD 7030000 RD 5200000 4.96 7.69 3 2 AGG 1
7036000 GREEN DIVIDE RD 7030000 RD 5200000 8.42
10.0
5 3 2 AGG 1
7036310 FALLS TS RD 7036000 SEC 16 0.00 0.93 3 1 AGG 1
9020000 GARCIA
I-90…