Attachment_7_-_BTO__1_(Mt_Baker),_FY18.pdf

PDF 4 MB Posted

Attached to
Road Maintenance Multiple Award Task Order Contract (MATOC) Federal contract opportunity
Solicitation number
1205M618R0002
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Attachment 7 - BTO #1 (Mt Baker)

View the file

Other files for this federal contract opportunity

Other files attached to Road Maintenance Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
Amendment_02.pdf PDF
Attachment_9_-_BTO__3_(Skykomish),_FY18.pdf PDF
Amendment_01.pdf PDF
Attachment_11_-_BTO__5_(Enumclaw),_FY18.pdf PDF
Attachment_10_-_BTO__4_(North_Bend),_FY18.pdf PDF
Attachment_8_-_BTO__2_(Darrington),_FY18.pdf PDF
RFP_No._1205M618R0002.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. 6. SOLICITATION ISSUE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

RFQ IFB RFP

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NAICS:

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8 (A)

EDWOSB

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

SOLICITATION NUMBER

1205M618R0002

Brian A. Johnson, CO (425) 783-6056 05M6 100

05M6

Same as Block 9.

Invoice Processing Platform (IPP)

238910

$14 million

USDA Forest Service Mt. Baker-Snoqualmie NF 2930 Wetmore Ave., Suite 3A Everett, WA 98201-4067

DATE

3/15/2018

LOCAL TIME

4/18/2018 @ 1400

Not Rated

IPP

BRIAN A. JOHNSON

Road Maintenance Services BTO #1 (Mt. Baker), FY18

X bajohnson03@fs.fed.us

Note: Only submit pages 1-6 with your quotation

905892

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 1 of 68 bajohnson03 Highlight bajohnson03 Highlight bajohnson03 Highlight

B.1 SCHEDULE OF ITEMS

Item No. Description Period of

Performance End

001 Blanket Task Order Funding (Ceiling) 365 Days from BTO Award

Sub-Item No. Description Estimated

Quantity Unit Unit Price Total

251 (1) Riprap Machine placed 1 Cubic Yds. $_____________ $_____________

251 (2) Riprap Hand placed 1 Square Yard $_____________ $_____________

640 (1) Install Road Closure Devices, Earth/Rock Berms from material on-site 1 Each $_____________ $_____________

803(1) Snow removal 1 Mile $_____________ $_____________

807 (1) Water Truck, 2,000 gall min, filled 1 Hour $_____________ $_____________

807(2)a Excavator, Small (40 - 50 hp) with thumb and blade 1 Hour $_____________ $_____________

807(2)b Excavator, Medium (90 hp) 25' min reach with thumb 1 Hour $_____________ $_____________

807(2)c Excavator, Large (230 hp min) 30' min arm reach with thumb 1 Hour $_____________ $_____________

807(3) Backhoe, Extend-a-hoe with thumb and 4 - 1 bucket 1 Hour $_____________ $_____________

The sum of all work orders issued under this Task Order SHALL not exceed the Not To Exceed amount listed. Performance of work in excess of the funds available or work not specified below is at the contractors risk and may not be paid. The Government may add additional funds as they come available or may solicit the MATOC contractors for a new BTO for this area.

The quantities below represent the most common quantities ordered on work orders. Actual work orders issued may list more or less than the quantity listed below.

MBS ROAD MAINTENANCE SERVICES MATOC

BTO #1 (Mt. Baker), FY18

ROAD MAINTENANCE - MT. BAKER RANGER DISTRICT

Not To Exceed Amount

$0.00

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 2 of 68

Sub-Item No. Description Estimated

Quantity Unit Unit Price Total

807(4) Grader, 12G min equivalent 1 Hour $_____________ $_____________

807(5)a Crawler Tractor / Dozer, D3 min 1 Hour $_____________ $_____________

807(5)b Crawler Tractor / Dozer, D5 min 1 Hour $_____________ $_____________

807(6) Dump Truck, 10 CY min capacity 1 Hour $_____________ $_____________

807(7) Front End Loader 2 yard minimum 1 Hour $_____________ $_____________

807(10) Trailer - Min 2 axle 1 Hour $_____________ $_____________

807(11) 3 Axle Low Boy with Tractor and Operator 1 Hour $_____________ $_____________

807(12)a General Laborer 1 Hour $_____________ $_____________

807(12)b Service Truck W / Chain Saw & Operator 1 Hour $_____________ $_____________

807(13) Compactor, Steel Wheel, Vibratory, 64" drum width min. 1 Hour $_____________ $_____________

811(1) Surface Maintenance Level 3-5 Roads 1 Single Lane Mile $_____________ $_____________

811(2) Surface Maintenance Level 3-5 Roads 1 Double Lane Mile $_____________ $_____________

811(4) Shoulder Maintenance 1 Road Mile $_____________ $_____________

813(1) Spot Surfacing, Forest Service Furnished from nearby Govt Pit source 1 Cubic Yard $_____________ $_____________

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 3 of 68

Quantity Unit Unit Price Total

813(3) Spot Surfacing, Commercial Source 1 Ton $_____________ $_____________

813(4) Haul - 10 CY Min 1 Cubic Yard Mile $_____________ $_____________

813(5) Haul - 10 CY Min 1 Truck Hour $_____________ $_____________

814(1) Pothole Patching, Hot Mix AR4000 Oil, 1/2" size minus aggregate 1 Ton $_____________ $_____________

814(6) Paved Surface Cleaning (Double Lane), Power Broom, 48" min width Self Propelled with Lights

1 Mile $_____________ $_____________

832(1) Load, Haul and Place Material under 3 miles one way, minimum 10 CY Dump Truck

1 Cubic Yard $_____________ $_____________

832(2) Load, Haul and Place Material over 3 miles one way, minimum 10 CY Dump Truck

1 Cubic Yard/Mile $_____________ $_____________

832(4) Haul, minimum 10 CY Dump Truck 1 Cubic Yard Mile $_____________ $_____________

834(1) Clean and Recondition Culverts 24 inch Diameter and under 1 Each $_____________ $_____________

834(2) Clean and Recondition Culverts over 24 inch through 48 inch Diameter 1 Each $_____________ $_____________

834(3) Clean and Recondition Culverts Over 48 Inch Diameter 1 Each $_____________ $_____________

834(4) Clean Ditches 1 Mile $_____________ $_____________

834(5) Clean Ditches and Drainage Structures 1 Mile $_____________ $_____________

834(6) Clean Drainage Structures 1 Mile $_____________ $_____________

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 4 of 68

Quantity Unit Unit Price Total

838(1) 838 MAINTENANCE FOR LIMITED

USE (ML 2) 2 Mile $_____________ $_____________

839(1) Spring Recurrent Maintenance of ML 4 and 5 Roads 2 Mile $_____________ $_____________

839(2) Spring Recurrent Maintenance of ML 3 Roads 2 Mile $_____________ $_____________

842(1)a Vegetation Maintenance - Level 5 Road 1 Mile $_____________ $_____________

842(1)b Vegetation Maintenance - Level 4 Road 1 Mile $_____________ $_____________

842(2) Vegetation Maintenance - Level 3 Road 1 Mile $_____________ $_____________

842(3) Vegetation Maintenance - Level 2 Road 1 Mile $_____________ $_____________

851(2)

Danger Tree Removal, Fall trees outside of roadway, Trees fell on roadway and inside clearing limits are to be removed to outside of roadway

1 Each $_____________ $_____________

851(3) Hazard or Obstruction Removal ML 3-5 Roads 1 Miles $_____________ $_____________

851(4) Hazard or Obstruction Removal ML 2 Roads 1 Miles $_____________ $_____________

861(4)

Recondition/clean traffic gate, repair by welding locking mechanism, remove graffiti, reinstall Government Furnished signs and hardware

1 Each $_____________ $_____________

872(1) Clean Sign Face, return sign by removing surfacing debris, remove graffiti 1 Each $_____________ $_____________

872(3) Recondition Sign Face Government Materials 1 Each $_____________ $_____________

872(4)

Install or Replace Post, Government furnished - Carsonite markers, 4x4 treated posts, to dimensions and depths meeting MUTCD standards

1 Each $_____________ $_____________

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 5 of 68

Quantity Unit Unit Price Total

872(8) Install or Replace Sign Government Furnished 1 Each $_____________ $_____________

872(10) Remount Sign 1 Each $_____________ $_____________

872(12) Maintain Marker 1 Each $_____________ $_____________

872(14) Replace Marker Government Furnished 1 Each $_____________ $_____________

881(3)a Equipment Moving – Tilt-bed with Road Grader 1 Miles $_____________ $_____________

881(3)b Equipment Moving – Tilt-bed with Backhoe 40 Miles $_____________ $_____________

881(3)c Equipment Moving - Tilt-bed with Excavator (all sizes) 40 Miles $_____________ $_____________

881(3)d Equipment Moving – 3 Axle Low boy Loaded with Equipment 1 Miles $_____________ $_____________

TOTAL PRICE: $_____________

B.2 PERSONNEL AUTHORIZED TO ISSUE WORK ORDERS

The following personnel are authorized to place and administer work orders under this BTO:

Jonathan Wilson, North Zone Engineering Technician, (360) 856-2623, jewilson@fs.fed.us

Work Orders can ONLY be issued for those items that are listed and pre-priced in the Schedule of Items in this BTO. Only a warranted FS Contracting Officer is authorized to modify this BTO and any items in the schedule.

Note: Work Orders will include Pay Item Numbers and Quantity of each Subitem ordered. A Work Order will be issued designating the roads to be maintained and the time frame in which the work shall be accomplished. If the contractor fails to perform the ordered work within the timeframe required, the ordered work may be deleted from the contract and performed by other means.

Name, Position, Phone and E-mail:

Brian Hindman, Civil Engineering Technician, (425) 783-6020, bhindman@fs.fed.us

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 6 of 68

SECTION C - DESCRIPTION/SPECIFICATION/WORK STATEMENT

C.1 SCOPE OF CONTRACT

a. The intent of this performance based service contract is to provide for road maintenance of National Forest System Roads on the Mt. Baker-Snoqualmie National Forest (Mt. Baker Ranger District).

b. A District map may be obtained at the district office: Mt. Baker Ranger District, 810 State Route 20, Sedro-Woolley, WA. For a complete list of roads contact Brian Hindman at bhindman@fs.fed.us.

c. The Contractor shall assume all risk, loss, damage, or expense arising out of the prosecution of the work, except as otherwise provided in the contract.

d. Locations that may be used for staging of equipment and materials are available. The government will not be held liable for contractor’s equipment and material stored in these locations.

C.2 FURNISHING OF MATERIAL

a. Unless otherwise stated in the Special Project Specifications, the contractor shall furnish all material required for performance of the contract. All material shall comply with the specifications.

b. The Contractor shall furnish and deliver the material to the site of the work in such a manner that their quality and fitness for the work is preserved.

c. The Contractor shall start work when directed within three calendar days from the date of work order.

d. Measurement and payment for contract work will be made only for those pay items included in the Schedule of Items.

e. The Contractor shall be responsible for furnishing warning devices and complying with Federal and any State or local safety standards and traffic management procedures.

C.3 COORDINATION OF CONTRACT DOCUMENTS

The specifications, drawings, and all other provisions are essential parts of the contract. They are intended to be mutually complementary. In the case of discrepancy, the following is the order of precedance: a. Drawings; b. Standard Specifications for Maintenance of Roads.

C.4 TECHNICAL SPECIFICATIONS FOR MAINTENANCE OF ROAD

The specifications are numbered in the "800" series codes. Only those sections which are applicable to this contract are included. There will be gaps between the section numbers due to the fact that many sections have been purposely omitted or because certain specification sections have been reserved for possible future inclusion in the "800" series.

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 7 of 68 mailto:spascua02@fs.fed.us

C.5 APPLICABLE PUBLICATIONS AND FORMS

Publications and forms that apply to this contract. Publications and forms listed can be obtained via the Internet, ordered through the U.S. Government Printing Office, or through the Mt. Baker- Snoqualmie National Forest. Supplements or amendments to listed publications from any organizational level may be issued throughout the performance period. The Contractor shall immediately implement those changes that result in a decrease or no change in cost and notify the contracting officer in writing of such changes. Before implementing any change that will result in an increase in cost, the Contractor shall submit to the contracting officer a price proposal within 30 calendar days following receipt of the change by the Contractor.

Publication Publication Number or WWW Address Revision Date

Manual of Uniform Traffic Control Devices. MUTCD 2009 2009

Sign and Poster Guidelines for the Forest Service. EM-7100-15 2010

Mt. Baker-Snoqualmie National Forest Road Rules Document.

Copy of Commercial Road Rules Listing is available upon request. 1991 or as amended

Mt. Baker-Snoqualmie N.F. Programmatic Biological Assessment for North Zone Road Maintenance (2012).

A copy of the Biological Assessment is available upon request. 2012

Memorandum of Agreement between the USDA Forest Service, Region 6 and the Washington State Department of Ecology.

Copy of MOA is available upon request. 2000

Roads Maintenance Level Guide for Forest Service Roads.

San Dimas Guide for Road Maintenance Levels 0577-1205-SDTC. 2005

MEMORANDUM OF UNDERSTANDING

Between Washington State Department of Fish and Wildlife And USDA Forest Service, Pacific Northwest Region.

Copy of MOU is available upon request. 2012

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 8 of 68

SECTION F--DELIVERIES OR PERFORMANCE

F.1 AGAR 452.211-75 EFFECTIVE PERIOD OF CONTRACT (FEB 1988)

The effective period of this contract is from DATE OF AWARD through: 365 calendar days.

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 9 of 68

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at: TBD.

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 10 of 68

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 PROSECUTION OF WORK -- WORK HOUR LIMITS -- WORK ITEM LIMITS

The Contractor shall conduct activities so that interference with the public shall be kept at a minimum.

When excavation work prevents traffic flow, the Contractor is authorized to delay traffic not to exceed 30 minutes.

Any activities requiring closure to the public shall be scheduled with the CO at least 14 days in advance.

The Contractor shall shut down all equipment when there is 1 inch precipitation in a 24 hour period and/or ½ inch precipitation in 1 hour.

H.2 USE OF PREMISES

General - The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform the contract in a manner that will not interrupt or interfere with the conduct of Government business.

Camps - Before any camp or storage site is opened or operated on National Forest land or lands administered by the Government, written permission shall be obtained through the Government.

Camp is interpreted to include the campsite or trailer parking area of any employee or subcontractor working on the project. Such permission, if granted, will be without charge to the Contractor.

H.3 USE OF ROADS BY CONTRACTOR

The Contractor is authorized to use all roads under the jurisdiction of the Forest Service that are open and necessary for direct route access to the contract work sites for all activities necessary to complete this contract. This authorization is subject to the limitations described below, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

Keep existing roads open to all traffic during contract work, and maintain them in a condition that will adequately accommodate traffic. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a Written Plan for the satisfactory handling of traffic has been approved. Post Traffic Control Signs and Devices in conformance with the “Manual on Uniform Traffic Control Devices” (MUTCD). Do not proceed with work on the project until all required signs are in place and approved.

Before shutting down any operations, leave all travel ways in a condition suitable for traffic.

Unless otherwise provided, traffic delays may not exceed 30 minutes.

If the Contractor requests use of a National Forest road or road segment not listed above, the Forest Service may authorize such use if not in conflict with the current Road Rules document.

Authorization to use such additional roads may include maintenance requirements and use limitations.

The roads authorized for use will be subject to the following provisions:

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 11 of 68

(a) The current National Forest Road Use Rules Document is applicable to all commercial road users. This document is available for inspection at the office of the Forest Supervisor and shall be applicable except when modified by provisions of this contract. Copies are available upon request.

(b) Federal Regulations contained in 36 CFR 261.54 as applied to the area by an order issued under 36 CFR 261.50. These regulations authorized the Forest Service, as a sovereign act, to issue additional restrictions to those shown in the current Road Use Rules Document and will be posted on the road.

H.4 TRAFFIC CONTROL, FLAGGERS, BARRICADES, WARNING SIGNS, AND OTHER DEVICES

The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, flaggers, pilot cars, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Barricades and other obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic. Keep traffic devices current with maintenance operation and remove upon completion.

All operations and signing shall conform to the current requirements and guidelines of the Occupational Safety and Health Administration (OSHA) and the Manual of Uniform Traffic Control Devices (MUTCD).

The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points, where the new work crosses or coincides with an existing road or trail. Required signs may be mounted on portable or temporary mountings. Use standard MUTCD shapes, colors, sizes, and legends.

Mark hazards incidental to the work within or on the traveled way, shoulders, or turnouts with hazard identification markers, illuminated beacons, and other MUTCD devices to safely guide road users through the area. Mark work segments not completed on a daily basis appropriately for night travel. Obtain authorization before commencing work at night.

Advisory speed plates may be used to control traffic through the work area.

Flaggers - Provide properly equipped, trained and certified, flag person(s) where the traffic is required to stop before proceeding. Stop traffic in locations which provide width enough for passage of traffic and reasonable protection for vehicles. When flag control is used, advance warning signs are required.

H.5 MOTORIZED EQUIPMENT

Use of motorized equipment other than hand-held equipment such as power saws and brush cutters will not be permitted off designated roads in the project area without approval of the Contracting Officer or as elsewhere provided herein.

H.6 EQUIPMENT REQUIREMENTS

The Contractor shall furnish equipment meeting OSHA (Occupational Safety and Health Act) requirements. When the Contractor is paid for furnishing and operating equipment on an hourly or daily basis, it shall be operated at its design speed, or the maximum speed feasible under prevailing conditions.

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 12 of 68

Equip all vehicles and machinery operating on or from the traveled way or road shoulder with flashing lights, strobes, or rotary beacons operated continuously while work is in progress. Use truck headlights at all times while operating. Backup horns are required on all self-propelled equipment in excess of 5 ½ tons gross weight.

Park vehicles and machinery not currently used in the maintenance operation off the traveled way at approved locations to minimize interference with normal use.

H.7 SPECIAL REQUIREMENTS FOR WATER DRAFTING EQUIPMENT

Water drafting equipment may be used only at water sources designated on the Vicinity Map, task order, or provided by the Contracting Officer. Such equipment shall include a screen around the intake (foot valve) with openings no larger than 1/8 - inch. An air gap or positive antisiphon device shall be provided between the water source and the vehicle being loaded if the vehicle has been used for other than water haul, if the source is a domestic potable water supply, or the water is used for tank mixing with any other materials. Materials must be readily available and appropriate measures taken to prevent petroleum products from entering the water source.

H.8 HAZARDOUS MATERIAL SPILL CLEAN-UP KIT

A hazardous material spill clean-up kit shall be maintained and readily available for potential use on the project at each work site. Spill clean-up kits shall contain the following items as a minimum:

• 1 case absorbent pads suitable for absorbing hydraulic fluid, engine oil, and fuel

• 1 gallon "Plug-a-Dike" or equivalent material

• A nineteen liter (five-gallon) mixing container

• 20 meters of 150 mm absorbent, floating booms for absorbing hydraulic fluid, engine oil, and fuel from a water surface

H.9 LANDSCAPE PRESERVATION AND HAZARDOUS MATERIALS

(a) The Contractor shall give attention to the effect of contract operation upon the landscape, shall take care to maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following requirements:

1. Prevention of the Landscape Defacement. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or natural features unless specifically authorized by the Government. Unless otherwise provided in the Special Project Specifications, the Contractor shall confine contract operations to within the areas designated in contract documents.

Unless otherwise provided in this contract, the Contractor shall gather rock which falls outside the roadway due to contract operations and dispose of it as directed by the Government.

2. Protection of Streams, Lakes, and Reservoirs. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes, small ponds, and reservoirs with fuels, oils, bitumen’s, dust palliatives, silt, or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the Government.

(b) The Contractor shall confine operations to within the work area limits, immediate work area, or other areas designated in the contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 13 of 68

The Contractor shall make all reasonable attempts to preserve the scenic and natural environment within and adjacent to this project.

(c) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, lakes, reservoirs, and other surface waters.

1. Wash water or waste from concrete, aggregate or other operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

2. Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.

(d) No petroleum products or other hazardous substances shall be released on or into land or rivers, streams, impoundments or other waters, or into natural or manmade channels leading thereto or therefrom. Servicing of all equipment shall be done only in the areas approved by the Contracting Officer. The Contractor shall transport off government lands all waste oil, vehicle oil filters (drained of free-flowing oil), and oily rags and shall dispose of such materials in accordance with applicable State and Federal regulations.

1. If the total on-site oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer. This plan shall include notification of appropriate state and local officials, the Contracting Officer and other appropriate agencies.

2. At all on-site work areas (including Contractor storage, transfer, fueling, mixing sites, etc., for oil, oil products or any hazardous materials), the Contractor shall take appropriate preventive measures to insure that any release of hazardous products does not enter any stream or other waters of the United States or any of the individual States and shall conform to the federal, state and local regulations. Planned spill containment locations in stream courses shall be established prior to commencement of work activities. These locations will be reviewed by the Contracting Officer or representative. When deemed appropriate, additional planned preventive measures shall be established for review by the Contracting Officer or representative.

3. The Contractor, acting independently, shall immediately take action to notify the appropriate agencies including the Contracting Officer, and to contain and clean up, without expense to the Government, all petroleum products or other hazardous substance releases which are on or in the vicinity of the project and which are caused by the Contractor's employees, directly or indirectly. The Contractor shall have the necessary materials on site to contain a spill which may occur on land or within live streams as appropriate for any potential flow conditions likely to occur. This may require absorbent pads and/or booms, or other containment devices. In the event the Government determines that additional resources beyond those of the Contractor's are required, the Contractor may be held liable for all damages and costs including, but not limited to additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and clean-

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 14 of 68 up of petroleum products or other hazardous substance releases caused by Contractor's employees or resulting from or related to construction operations.

4. The Contractor shall notify the Contracting Officer of any hazardous materials to be used on the job and shall have Material Safety Data Sheets (MSDS) for those materials available on the job.

H.10 PROTECTION OF BOTANICAL RESOURCES

Previously unknown or unlisted populations of Protected, Endangered, Threatened, or Sensitive (PETS) plant species, or potential habitat for PETS species, may be located within contract project boundaries. The modification of contract specifications may be required to protect previously unknown PETS plant populations.

(a) Government's Responsibility - The Government will identify, as they become known, locations of PETS species that the Contractor could encounter in the progress of work under this contract.

(b) Contractor's Responsibility - The Contractor shall protect these areas that contain PETS species, as directed in writing by the Government.

H.11 CONTROL OF NOXIOUS WEEDS--CLEANING OF EQUIPMENT

To prevent the introduction and control the spread of seeds of noxious weeds onto and around National Forest land, the Contractor shall ensure all equipment moved onto National Forest land is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. When the Contractor is working in an area that has been identified as a noxious weed infestation area, the Contractor shall ensure equipment is cleaned of weed seeds prior to moving to another work area on the Forest. The Contractor shall employ whatever cleaning methods necessary, this may require a pressure hose, to ensure compliance with the terms of this provision, and shall notify the Forest Service prior to moving each piece of equipment onto National Forest land, unless otherwise agreed in writing. Notification will include identifying the location of the equipment's most recent operations.

The Contractor shall certify, in writing, compliance with the terms of this clause prior to each start-up of operations. For the purposes of this clause, "equipment" includes all motorized equipment operated off system roads, transport vehicles, and all motorized equipment used in road maintenance. Not included are log trucks, chip vans, pickup trucks, cars, or other vehicles used to daily transport personnel.

Special care shall be taken to assure removal of noxious weeds and their seed, specifically any species on the Washington State Noxious Weed Control Board website:

http://www.nwcb.wa.gov/weed_list/weed_list.htm

1. If any previously undiscovered Threatened Endangered or Sensitive vascular plants, bryophytes, lichens, or fungi are discovered, before or during project implementation, halt work until a USFS botanist is consulted and necessary mitigation measures are enacted. The list of rare plants of concern can be found on the following website:

http://www.fs.fed.us/r6/sfpnw/issssp/agency-policy/.

2. Treat known infestations before ground disturbance begins.

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 15 of 68 http://www.nwcb.wa.gov/weed_list/weed_list.htm http://www.fs.fed.us/r6/sfpnw/issssp/agency-policy/

3. For actions conducted or authorized by written permit by the Forest Service that will operate outside the limits of the road prism, require the cleaning of all heavy equipment prior to entering NFS Lands. See engineering contract specs H.12.

4. Suppliers must provide annual documentation to the USFS indicating that the following products have been examined by a qualified inspector and deemed free of State listed noxious weeds:

• Straw or other Mulch

• Gravel, Rock, or other fill

• Seeds (according to AOSA standards)

5. If weeds are present in the project area, all equipment and gear must be cleaned before leaving the project area to avoid spreading the infestation further.

6. If weeds are present in the project area, work from relatively weed-free areas into the infested area rather than vica-versa.

Revegetate all areas of bare soil exposed by project activities if there is a risk of noxious weed invasion. Native plant materials are the first choice in revegetation where timely natural regeneration of the native plant community is not likely to occur. Follow revegetation criteria and specifications for this project (see Spec. 841.06 Seed Mix)

H.12 CONTROL POINTS

The Contractor is responsible for the preservation of existing bench marks and other control points. The cost of replacing them may be charged against the Contractor and may be deducted from the payment for the work. If the Contractor finds missing controls they shall notify the Government who will replace them within two (2) days.

H.13 SUBMITTALS

The following submittals are required for this project:

Title Referenced by Contract Clause or Specification No.

Time of Government Approval After Submittal

Quality Assurance Plan Section F and Specifications 7 days

Traffic Control Plan Use of Roads by Contractor clause 7 days

Safety Plan, Including Blasting Plan, Where Applicable

Accident Prevention clause

(FAR 52.236-13) N/A

Engineered Spill Prevention Plan

Landscape Preservation and Hazardous Materials clause 2 days

Fire Plan R6-FS-6300-55 and Certification that your Fire Tools and Equipment are in full compliance with the contract requirements

R6-FS-6300-52 part 2 N/A

Progress Schedule Section F N/A

Note: For this BTO the submittals were satisfied with initial base MATOC award.

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 16 of 68

H.14 SALVAGE RIGHTS

Sign maintenance under specification SPS872F1 allows for sign post, signs replaced and applicable hardware to become property of the Contractor. No other Contractor salvage rights exist under the contract unless specifically provided elsewhere herein.

H.15 MATERIAL SOURCES

Rock and mineral soil excavated within the normal excavation shall be conserved and used as needed.

Borrow sources are identified on the plans or elsewhere herein if made available by the Government. If alternate borrow sources are needed, they must be approved in advance by the COR. Such borrow sources shall be restored to a natural appearance. Materials acquired from commercial sources shall conform to government specifications and be from acceptable certified weed free commercial sources.

H.16 FURNISHING OF MATERIALS

Unless otherwise stated in the Special Project Specifications, the Contractor shall furnish all material required for performance of the contract. All material shall comply with the specifications. The Contractor shall verify the kind and amount of work that may be necessary in furnishing the material.

H.17 STORAGE OF MATERIALS AND EQUIPMENT

Materials shall be stored to assure the preservation of their quality and fitness for work.

Approved portions of the right-of-way or other areas on Government land may be used for storage purposes. All storage sites approved by the Government shall be restored to a satisfactory condition at the Contractor's expense.

H.18 LEGAL RELATIONS AND RESPONSIBILITIES

Government's Responsibility for Utilities

1. The Government will identify the roads in the Road Listing of, known locations of underground installations other than culverts and drains the Contractor could encounter in the progress of work under the contract; electric, telephone cables, water supply pipes, and induction loops within the road right of way.

Contractor's Responsibility for Utilities

1. The Contractor will notify Washington UULC 1-800-424-5555 and the utility companies and request utilities be marked on the ground prior to excavation.

2. The Contractor will notify all utility companies or other parties affected and make arrangements for all necessary adjustments of the public or private utility fixtures, pipelines, and other appurtenances affected by work under the contract.

In the event of interruption to utility services because of accidental breakage the Contractor shall promptly notify the utility authority and shall cooperate with that authority in the

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 17 of 68 restoration of service. If damage occurs to the utilities the Contractor will be liable for damage to underground utilities.

H.19 ARCHAEOLOGICAL OR HISTORICAL SITES (AGAR 452.236-73) (FEB 1988)

If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 18 of 68

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 FAR 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)

In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.

This Statement is for Information Only:

It is not a Wage Determination

Employee Class Monetary Wage--Fringe Benefits

WG-4, Step 3 (Supervisory) WG-4, Step 2 (Non-Supervisory)

WG-2, Step 3 (Supervisory) WG-2, Step 2 (Non-Supervisory)

$22.38 (Plus Fringe) $21.53 (Plus Fringe)

$19.28 (Plus Fringe) $18.55 (Plus Fringe

Monetary Wage based on: The schedules above have been established under authority of DoD Instruction 5120.39, dated October 1, 2015, subject to the limitations contained in CPM 2017-20, dated 22 December 2017.

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 19 of 68 http://uscode.house.gov/ http://uscode.house.gov/

SECTION J

CONTRACT DOCUMENTS, EXHIBITS OR ATTACHMENTS

Attachment No. Description Total Pages

See C.1b.

District Location Map Road Listing Wage Determinations (All Counties)3A,B,C,D

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 20 of 68

Attachment 1 – District Location Map

A district map for the applicable areas may be obtained at the specific district office below:

DARRINGTON RANGER DISTRICT

Darrington Ranger District – Darrington Office 1405 Emens Avenue North Darrington, WA 98241 Telephone: (360) 436-1155

Operating Hours

Monday-Friday 8:00 am – 4:30 pm Closed for lunch 12:00 – 1:00 pm Closed federal holidays

MT. BAKER RANGER DISTRICT

810 State Route 20 Sedro-Woolley, WA 98284 Telephone: (360) 856-5700 Ext 515

Operating Hours

Monday-Friday 8:00 am – 4:30 pm

SKYKOMISH RANGER DISTRICT

74920 NE Stevens Pass Hwy P.O. Box 305 Skykomish, WA 98288 Telephone: (360) 677-2414

Operating Hours

Monday-Friday 8:00 am – 4:30 pm Closed for lunch 12:00 – 12:30 pm

SNOQUALMIE RANGER DISTRICT

North Bend Office 902 S.E. North Bend Way, Bldg. 1 North Bend, WA 98045 Telephone: (425) 888-1421

Operating Hours

Monday-Friday 8:00 am – 4:30 pm

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 21 of 68

- Road Listing -

The following is a list of primary roads that will be maintained with this contract. Not included in this list are the roads that have a Objective Maintenance level lower than 3. For a complete list of roads contact Brian Hindman at bhindman@fs.fed.us. Maintenance on roads not shown will primarily be opening and drainage, as funding allows. The objective of this contract is to provide appropriate maintenance of the Forest roads, with the following priority for maintenance 1st: user safety, 2nd: resource protection and 3rd: user comfort.

Mt. Baker District has 3 Areas of Road Sections as noted in the 3 Tables below.

MT. BAKER RANGER DISTRICT – GLACIER AREA

Rd. # NAME BEGIN_TERMINI END_TERMINI BMP EMP

OPER

M L

OBJE

M L

SURF.

TYPE LANES

3015000 RANGER STATION ST ROUTE 542 0.20 0.00 0.20 3 3 PAVED 1

3020000 DOUGLAS FIR CG ST ROUTE 542 0.50 0.00 0.50 3 3 PAVED 2

3040000 EAST CHURCH ST ROUTE 542 2.70 0.00 2.70 3 3 AGG 1

3045000 EXCELSIOR CG ST ROUTE 542 0.70 0.00 0.70 3 3 AGG 1

3065000 TWIN LAKES ST ROUTE 542 4.00 0.00 4.00 3 3 AGG 1

3065012 BOURNS POND 3065 0.30 0.00 0.30 2 2 AGG 1

3067000 SILVER FIR CG ST ROUTE 542 0.80 0.00 0.80 3 3 AGG 1

3070000 RAZOR HONE ST ROUTE 542 2.50 0.00 2.50 2 3 AGG 1

3071000 ANDERSON CREEK ST ROUTE 542 4.10 0.00 4.10 2 2 AGG 1

3075000 WHITE SALMON ST ROUTE 542 1.60 0.00 1.60 2 2 AGG 1

3090000 AUSTIN PASS ST ROUTE 542 0.30 0.00 0.30 4 4 PAVED 2

3095000 HEATHER MEADOWS ST ROUTE 542 0.50 0.00 0.50 2 2 PAVED 2

3100000 CANYON CREEK ST ROUTE 542 10.00 0.00 10.00 4 4 PAVED 1

3100000 CANYON CREEK 10.00 5.00 10.00 15.00 3 3 AGG 1

3120000 WEST CHURCH 31 3.30 0.00 3.00 2 2 AGG 1

3124000 WEST VIEW 3120 1.00 0.00 1.00 2 2 AGG 1

3140000 CANYON RIDGE 31 6.50 0.00 6.50 2 2 AGG 1

3160000 WHISTLER CREEK 31 2.00 0.00 2.00 2 2 AGG 1

3200000 HENNEGAN ST ROUTE 542 5.50 0.00 5.50 3 3 AGG 1

3300000 WELLS CREEK ST ROUTE 542 12.00 0.00 12.00 3 3 AGG 1

3400000 N F NOOKSACK 32 1.00 0.00 1.00 2 2 AGG 1

3600000 GROUSE BUTTE 39 4.00 0.00 4.00 2 2 AGG 1

3700000 DEADHORSE 39 12.80 0.00 12.80 3 3 AGG 1

3722000 BRIDGE CAMP 37 0.50 0.00 0.50 2 2 AGG 1

3800000 MIDDLE FK NOOKSACK COUNTY ROAD 12.30 0.00 12.30 3 3 AGG 1

3800023 RIDLEY CREEK 38 0.20 0.00 0.20 2 2 AGG 1

3900000 GLACIER ST ROUTE 542 1.00 0.00 1.00 5 5 PAVED 2

3900000 GLACIER 1.00 7.70 0.00 7.70 3 3 AGG 1

3910000 THOMPSON CREEK 39 2.5 0.00 1.5 3 2 AGG 1

Attachment 2 - Road Listing (Mt. Baker)

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 22 of 68 mailto:spascua02@fs.fed.us

MT. BAKER RANGER DISTRICT – BAKER LAKE – FINNEY AREA

Rd. # NAME BEGIN_TERMINI END_TERMINI BMP EMP

OPER

M L

OBJE

M L

SURF.

TYPE LANES

1010000 BAKER RIVER RS ST ROUTE 20 0.50 0.00 0.50 3 3 PAVED 1

1100000 BAKER LAKE HIGHWAY COUNTY RD 20.03 15.54 20.03 5 5 PAVED 2

1100000 BAKER LAKE HIGHWAY 20.03 26.20 20.03 26.20 4 4 AGG 1

1105000 DIKE ROAD COUNTY ROAD 1.30 0.00 1.30 3 3 AGG 1

1106000 EAST BANK COUNTY ROAD 2.10 0.00 2.10 4 4 AGG 1

1106011 DEPPRESSION LAKE 1106 1.00 0.00 1.00 3 3 AGG 1

1107000 ANDERSON 1106 9.00 0.00 9.00 3 3 AGG 1

1107022 TRAIL RIDGE 1107 1.10 0.00 1.10 3 3 AGG 1

1110000 KOMA KULSHAN COUNTY ROAD 0.20 0.00 0.20 2 2 PAVED 1

1114000 SULPHUR CRK CUTOFF COUNTY ROAD 2.00 0.00 2.00 2 2 AGG 1

1116000 SHADOW OF SENTINALS COUNTY ROAD 0.10 0.00 0.10 3 3 PAVED 1

1118000 DRY CREEK COUNTY ROAD 1.90 0.00 1.90 3 3 PAVED 2

1118012 HORSESHOE COVE CG 1118 0.40 0.00 0.40 3 3 PAVED 1

1122000 LOWER SANDY C COUNTY ROAD 2.20 0.00 2.20 2 2 AGG 1

1122011 LOWER SANDY B 1122 0.90 0.00 0.90 2 2 AGG 1

1128000 BOULDER CREEK CG COUNTY ROAD 0.50 0.00 0.50 3 3 AGG 1

1130000 MARTEN LAKE COUNTY ROAD 4.50 0.00 4.50 3 3 AGG 1

1130000 MARTEN LAKE 4.50 4.80 4.50 9.30 2 2 AGG 1

1131000 BOULDER RIDGE 1130 4.70 0.00 4.70 3 3 AGG 1

1137000 PANORAMA PT CG 11 1.00 0.00 1.00 3 3 PAVED 2

1142000 RESORT 11 1.00 0.00 1.00 3 3 PAVED 2

1144000 MOROVITZ CREEK 11 0.50 0.00 0.50 2 2 AGG 1

1144011 PARK CREEK CG 1144 0.40 0.00 0.40 3 3 AGG 1

1150000 SHANNON CRK CG 11 0.70 0.00 0.70 3 3 AGG 1

1152000 SHUKSAN CRK 11 4.00 0.00 4.00 3 3 AGG 1

1152000 SHUKSAN CRK 4.00 4.50 4.00 4.50 2 2 AGG 1

1200000 LOOMIS NOOKSACK COUNTY ROAD 3.40 0.00 3.40 4 4 AGG 1

1200000 LOOMIS NOOKSACK 3.40 10.30 3.40 10.30 3 3 AGG 1

1230000 BLUE LAKE 12 4.00 0.00 4.00 3 3 AGG 1

1260000 SISTERS MTN 12 0.80 0.00 0.80 3 3 AGG 1

1300000 SCHRIBERS MEADOW 12 5.60 0.00 5.60 3 3 AGG 1

1700000 FINNEY-CUMBERLAND COUNTY ROAD 8.00 6.00 14.00 4 4 AGG 1

1700000 FINNEY-CUMBERLAND 14.00 18.30 14.00 32.30 3 3 AGG 1

1720000 GEE POINT 17 2.10 0.00 2.10 3 3 AGG 1

1800000 SEGELSEN 17 9.10 0.00 9.10 3 3 AGG 1

3140000 CANYON RIDGE 31 6.50 0.00 6.50 2 2 AGG 1

3160000 WHISTLER CREEK 31 2.00 0.00 2.00 2 2 AGG 1

3200000 HENNEGAN ST ROUTE 542 5.50 0.00 5.50 3 3 AGG 1

3300000 WELLS CREEK ST ROUTE 542 12.00 0.00 12.00 3 3 AGG 1

3600000 GROUSE BUTTE 39 4.00 0.00 4.00 2 2 AGG 1

3700000 DEADHORSE 39 12.80 0.00 12.80 3 3 AGG 1

3800000 MIDDLE FK NOOKSACK COUNTY ROAD 12.30 0.00 12.30 3 3 AGG 1

3900000 GLACIER ST ROUTE 542 1.00 0.00 1.00 5 5 AC 2

3900000 GLACIER 1.00 7.70 0.00 7.70 3 3 AGG 1

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 23 of 68

MT. BAKER RANGER DISTRICT – CASCADE AREA

Rd. # NAME BEGIN_TERMINI END_TERMINI BMP EMP

OPER

M L

OBJE

M L

SURF.

TYPE LANES

1030000 SAUK MTN ST ROUTE 20 7.40 0.00 7.40 3 3 AGG 1

103600 SAUK LO 1030 0.50 0.00 0.50 3 3 AGG 1

105000 DIOBSUD CREEK ST ROUTE 20 5.50 0.00 5.50 3 2 AGG 1

106000 BACON CREEK ST ROUTE 20 4.50 0.00 4.50 2 2 AGG 1

140000 JACKMAN ST ROUTE 20 9.70 0.00 9.70 3 2 AGG 1

142000 THUNDER LAKES 14 3.00 0.00 3.0 3 2 AGG 1

1530000 MARBLE C G 15 1.00 0.00 1.00 3 3 AGG 1

1540000 SIBLEY CREEK 15 4.90 0.00 4.90 3 2 AGG 1

1550000 IRENE CREEK 15 7.10 0.00 7.10 3 2 AGG 1

1570000 FOUND CREEK 15 2.10 0.00 2.10 3 2 AGG 1

1600000 ILLABOT ST ROUTE 530 20.50 0.00 20.50 3 2 AGG 1

1610000 WEST BOUNDRY 16 8.60 0.00 8.60 3 2 AGG 1

1620000 ILLABOT PEAK 16 5.00 0.00 5.00 3 3 AGG 1

1620012 UPPER HILT 1620 0.50 0.00 0.50 2 2 AGG 1

3124000 WEST VIEW 3120 1.00 0.00 1.00 2 2 AGG 1

3140000 CANYON RIDGE 31 6.50 0.00 6.50 2 2 AGG 1

3160000 WHISTLER CREEK 31 2.00 0.00 2.00 2 2 AGG 1

3200000 HENNEGAN ST ROUTE 542 5.50 0.00 5.50 3 3 AGG 1

3300000 WELLS CREEK ST ROUTE 542 12.00 0.00 12.00 3 3 AGG 1

3600000 GROUSE BUTTE 39 4.00 0.00 4.00 2 2 AGG 1

3700000 DEADHORSE 39 12.80 0.00 12.80 3 3 AGG 1

3800000 MIDDLE FK NOOKSACK COUNTY ROAD 12.30 0.00 12.30 3 3 AGG 1

3900000 GLACIER ST ROUTE 542 1.00 0.00 1.00 5 5 PAVED 2

3900000 GLACIER 1.00 7.70 0.00 7.70 3 3 AGG 1

3910000 THOMPSON CREEK 39 2.5 0.00 2.5 3 2 AGG 1

Note: Not all roads listed will receive road maintenance work during this contract.

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 24 of 68

WD 15-5523 (Rev.-5) was first posted on www.wdol.gov on 01/16/2018

REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary of Labor | WAGE AND HOUR DIVISION

| WASHINGTON D.C. 20210

| Wage Determination No.: 2015-5523

Daniel W. Simms Division of | Revision No.: 5 Director Wage Determinations| Date Of Revision: 01/10/2018 Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts State: Washington

Area: Washington County of Whatcom

**Fringe Benefits Required Follow the Occupational Listing**

OCCUPATION CODE - TITLE FOOTNOTE RATE

01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 15.56 01012 - Accounting Clerk II 17.47 01013 - Accounting Clerk III 19.54 01020 - Administrative Assistant 25.34 01035 - Court Reporter 19.01 01041 - Customer Service Representative I 12.15 01042 - Customer Service Representative II 13.66 01043 - Customer Service Representative III 14.90 01051 - Data Entry Operator I 15.84 01052 - Data Entry Operator II 17.28 01060 - Dispatcher, Motor Vehicle 23.21 01070 - Document Preparation Clerk 13.87 01090 - Duplicating Machine Operator 13.87 01111 - General Clerk I 13.56 01112 - General Clerk II 14.80 01113 - General Clerk III 16.82 01120 - Housing Referral Assistant 21.81 01141 - Messenger Courier 13.25 01191 - Order Clerk I 16.02 01192 - Order Clerk II 17.48 01261 - Personnel Assistant (Employment) I 16.87 01262 - Personnel Assistant (Employment) II 18.88 01263 - Personnel Assistant (Employment) III 21.05 01270 - Production Control Clerk 21.23 01290 - Rental Clerk 16.18 01300 - Scheduler, Maintenance 17.49 01311 - Secretary I 17.49 01312 - Secretary II 19.57 01313 - Secretary III 21.81

Attachment 3A - Wage Determination (Whatcom County) Note: (see the applicable county's wage determination)

BTO #1 (Mt. Baker), RFP No 1205M618R0002 MBS Road Maintenance MATOC (FY18) Page 25 of 68 bajohnson03 Highlight bajohnson03 Highlight

01320 - Service Order Dispatcher 20.72 01410 - Supply Technician 25.34 01420 - Survey Worker 19.01 01460 - Switchboard Operator/Receptionist 14.47 01531 - Travel Clerk I 14.84 01532 - Travel Clerk II 15.95 01533 - Travel Clerk III 17.09 01611 - Word Processor I 17.01 01612 - Word Processor II 19.09 01613 - Word Processor III 21.35 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer, Fiberglass 23.34 05010 - Automotive Electrician 22.06 05040 - Automotive Glass Installer 21.36 05070 - Automotive Worker 21.36 05110 - Mobile Equipment Servicer 19.93 05130 - Motor Equipment Metal Mechanic 22.82 05160 - Motor Equipment Metal Worker 21.36 05190 - Motor Vehicle Mechanic 22.78 05220 - Motor Vehicle Mechanic Helper 19.20 05250 - Motor Vehicle Upholstery Worker 20.65 05280 - Motor Vehicle Wrecker 21.36 05310 - Painter, Automotive 22.06 05340 - Radiator Repair Specialist 21.36 05370 - Tire Repairer 16.61 05400 - Transmission Repair Specialist 22.82 07000 - Food Preparation And Service Occupations 07010 - Baker 15.16 07041 - Cook I 15.81 07042 - Cook II 17.67 07070 - Dishwasher 10.81 07130 - Food Service Worker 11.65 07210 - Meat Cutter 21.24 07260 - Waiter/Waitress 13.40 09000 - Furniture Maintenance And Repair…