Photos.pdf
PDF 952 KB Posted
- Attached to
- Southeast Alaska Discovery Center (SEADC) Biomass Boiler Removal and Wall Reconstruction
- Solicitation number
- 12010919Q0097
About this file
Photos
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment003.pdf | ||
| Amendment002.pdf | ||
| 20190808_Prequote_tour.docx | DOCX document | |
| SEADC_Biomass_Boiler_Utility_Info.xlsx | XLSX spreadsheet | |
| Amendment001.pdf | ||
| Biomass_Stack_Detail.pdf | ||
| Alaska_Ketchikan_Wiring_Diagrams.pdf | ||
| 12010919Q0097.pdf | ||
| Wage_Determination.pdf | ||
| Final_Biomas_Boiler_Drawings.pdf | ||
| 011-7-27_Tie-In_Schmolck_Sketch-Biomass_System.pdf | ||
| Typical_Stud_Wall_Details_S3_5.pdf | ||
| DiscoveryCenterSidingAttachmentDetail.pdf | ||
| Bldg_LayoutPlan.pdf | ||
| Hurst_Biomass_Boiler_Specs.pdf | ||
| boiler_hopper_layout_drawing_hurst_2011_0216.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEADC Front Entry Corner of building with Mechanical room
Exterior enclosure houses the hopper Weather wall to be removed with double doors.
Doors to be removed located behind weather wall
Return to previous conditions as shown above.
Biomass Boiler Unit
Biomass Boiler Controls
Remove 480V transformer, associated breakers, and concrete lift
Remove to and from piping connections to the biomass boiler, as identified in mechanical tie-in plan.
Existing water heater and boiler units.
Supply and return lines to biomass boiler Auger from the hopper to the boiler
Feature wall to remain Remove sign adjacent to feature wall
Original installation of biomass boiler and hopper
Opening in back wall where boiler was brought into the building
Hopper put on rollers to slide under awning
Hopper located under awning and surrounding enclosure built afterward
File details come from the government source that posted it.