About this file

Photos

View the file

Other files

File Type Posted
Amendment003.pdf PDF
Amendment002.pdf PDF
20190808_Prequote_tour.docx DOCX document
SEADC_Biomass_Boiler_Utility_Info.xlsx XLSX spreadsheet
Amendment001.pdf PDF
Biomass_Stack_Detail.pdf PDF
Alaska_Ketchikan_Wiring_Diagrams.pdf PDF
12010919Q0097.pdf PDF
Wage_Determination.pdf PDF
Final_Biomas_Boiler_Drawings.pdf PDF
011-7-27_Tie-In_Schmolck_Sketch-Biomass_System.pdf PDF
Typical_Stud_Wall_Details_S3_5.pdf PDF
DiscoveryCenterSidingAttachmentDetail.pdf PDF
Bldg_LayoutPlan.pdf PDF
Hurst_Biomass_Boiler_Specs.pdf PDF
boiler_hopper_layout_drawing_hurst_2011_0216.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEADC Front Entry Corner of building with Mechanical room

Exterior enclosure houses the hopper Weather wall to be removed with double doors.

Doors to be removed located behind weather wall

Return to previous conditions as shown above.

Biomass Boiler Unit

Biomass Boiler Controls

Remove 480V transformer, associated breakers, and concrete lift

Remove to and from piping connections to the biomass boiler, as identified in mechanical tie-in plan.

Existing water heater and boiler units.

Supply and return lines to biomass boiler Auger from the hopper to the boiler

Feature wall to remain Remove sign adjacent to feature wall

Original installation of biomass boiler and hopper

Opening in back wall where boiler was brought into the building

Hopper put on rollers to slide under awning

Hopper located under awning and surrounding enclosure built afterward

File details come from the government source that posted it.