Amendment003.pdf

PDF 258 KB Posted

Attached to
Southeast Alaska Discovery Center (SEADC) Biomass Boiler Removal and Wall Reconstruction
Solicitation number
12010919Q0097
Issued by

View the file

Other files

File Type Posted
Amendment002.pdf PDF
20190808_Prequote_tour.docx DOCX document
SEADC_Biomass_Boiler_Utility_Info.xlsx XLSX spreadsheet
Amendment001.pdf PDF
Biomass_Stack_Detail.pdf PDF
Alaska_Ketchikan_Wiring_Diagrams.pdf PDF
12010919Q0097.pdf PDF
Wage_Determination.pdf PDF
Photos.pdf PDF
Final_Biomas_Boiler_Drawings.pdf PDF
011-7-27_Tie-In_Schmolck_Sketch-Biomass_System.pdf PDF
Typical_Stud_Wall_Details_S3_5.pdf PDF
DiscoveryCenterSidingAttachmentDetail.pdf PDF
Bldg_LayoutPlan.pdf PDF
Hurst_Biomass_Boiler_Specs.pdf PDF
boiler_hopper_layout_drawing_hurst_2011_0216.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12010919Q0097 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

JUNEAU AK 99802

709 WEST 9TH STREET

ALASKA REGIONAL OFFICE

08/15/20190003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/30/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEADC Biomass Boiler Removal and Wall Reconstruction

The purpose of this Amendment is to include in Section B. a Contract Line Item Number to cover Mobilization. Accordingly, Section B. is now removed in entirety, and replaced with the Section B. as attached to this Modification.

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

12010919Q0097 – SEADC Boiler Removal and Wall Reconstruction

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

Contract Line Items (CLINs):

Item # Schedule of Supplies/Services Method of Measurement

Quantity Unit Unit Price Amount

1 Item 1: Boiler Removal and Wall Reconstruction Activities 1-1 Remove Hurst Wood Fired Boiler and all associated appurtenances

LSQ 1 LS $ $

1-2 Remove Weather Wall and Exterior Double Doors

LSQ 1 LS $ $

1-3 Exterior Storage Enclosure Work LSQ 1 LS $ $ 1-4 Mobilization LSQ 1 LS $ $

Total Price Item(s) 1: $

LSQ – Lump Sum Quantity; LS – Lump Sum

Additional Terms:

1) Quoters must submit prices for all Items in the Schedule of Items above.

2) Disclosure of the Magnitude of Construction Projects:

Between $25,000 and $100,000.

3) Payment for bond premiums in accordance with (IAW) Federal Acquisition Regulation ((FAR) 48 CFR Chapter 1) Clause

52.232-5 Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Mobilization.

4) Payment will be made IAW Section G.2. only for those Items listed on the Schedule of Items above.

SF30.pdf
Section B

File details come from the government source that posted it.