12-Sample Task Order Pricing Sheet.xlsx

XLSX spreadsheet 85 KB Posted

Attached to
RFP - Maintenance, Repair, and Modernization Services of Vertical Transportation Equipment for Harris County
Solicitation number
25/0044
Issued by
Harris County, Texas

About this file

The document is a Task Order Pricing Sheet for a vertical transportation equipment project for Harris County, Texas, potentially covering maintenance, repair, and modernization services. The pricing sheet provides a comprehensive line-item breakdown for various elevator-related components and services, including design work, demolition, landing systems, controllers, fixtures, electrical work, door operators, cab interiors, hoistway doors, jack assemblies, and associated documentation such as shop drawings, manuals, and electrical designs. The contract appears to be structured for a one-year term beginning on or about August 1, 2025, with potential renewal options.

The pricing sheet is a detailed template for contractors to itemize costs, with separate columns for materials and labor costs across multiple line items. The document allows for alternate line items and requires contractors to break down substantial costs with subcontractor quotes. The pricing structure includes provisions for equipment rentals, warranty, overhead, profit, and bonding. While no specific pricing amounts are filled in, the sheet is designed to capture a comprehensive cost breakdown for vertical transportation equipment services, suggesting a competitive bidding process for Harris County's maintenance and modernization needs.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CONTRACTOR PRICING SHEET
Task Order Projects
Contractor Name:
Line Item*QuanityUnitMaterials**Labor**Line Item Total Cost
Per Unit CostSubtotal CostPer Unit CostSubtotal Cost
Design Work$0.00$0.00$0.00
Demolition$0.00$0.00$0.00
Landing System$0.00$0.00$0.00
Controller$0.00$0.00$0.00
Fixtures$0.00$0.00$0.00
Electrical$0.00$0.00$0.00
Door Operator/Hardware$0.00$0.00$0.00
Cutting & Patching$0.00$0.00$0.00
Cab Interior$0.00$0.00$0.00
Hoistway Doors$0.00$0.00$0.00
Pump Unit$0.00$0.00$0.00
New Jack Assembly$0.00$0.00$0.00
Shop Drawings$0.00$0.00$0.00
Manuals$0.00$0.00$0.00
Electrical Designs$0.00$0.00$0.00
As-Built Wiring Diagrams$0.00$0.00$0.00
Training at site$0.00$0.00$0.00
Accessories$0.00$0.00$0.00
QuanityUnitPer Unit CostLine Item Cost
Equipment Rentals0
WarrantyMO0
PercentageTotal Applied to
Overhead$0.00
Profit$0.00
Bond$0.00
Total Project Cost$0.00$0.00$0.00
Notes
*Alternate Line Items may be proposed depending on project specifications. Please identify all major equipment, major labor, subcontractor work, and deliverables as individual line items in your pricing breakdown
**All Line Items need to be broken down between Labor and Material Costs. Except for non-labor/non-material line items as broken out by the subheader.
***All line items with substantial amounts should be broken down on further pricing sheets or accompanied with the subcontractor's quotes.

File details come from the government source that posted it. Updated .