12-26-004 Price Sheet -Environmental Consulting.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Environmental: Sampling and Consulting Services
Solicitation number
BC-RFP-26-004
Issued by
Bergen County, New Jersey

About this file

This is a price sheet for a state and local contract opportunity issued by New Jersey for environmental sampling and consulting services under solicitation BC-RFP-26-004. The contract encompasses a 24-month initial period commencing on the date of award, followed by three optional 12-month renewal periods, for a potential total contract duration of 48 months. The scope of work includes asbestos-related services, indoor air quality and mold assessment, lead risk evaluation, and PCB testing. Specific services requested include abatement technical specification design, bulk and air sample analysis via multiple methodologies (PLM, TEM, and PCM) with varying turnaround times ranging from 6 hours to 5 days, project supervision and monitoring by certified asbestos safety technicians, on-site air sample collection and analysis, industrial hygienist and senior project manager consultation at both normal and evening/weekend rates, mold surface and air sampling, PCB bulk sampling, lead risk assessment, and lead dust wipe sampling.

Vendors are required to submit unit costs for each line item across all contract periods on a mandatory price sheet that includes separate tabs for the initial 24-month period and each of the three 12-month renewal options. Pricing is structured by unit cost per service, with flat-rate pricing for specification design and report preparation services and hourly rates for professional consultant services and turn-key analysis services. All pricing submissions must include vendor name, signature, and date on each tab. The solicitation requires bidders to complete all pricing tabs accordingly to ensure comprehensive cost proposals for the full potential contract duration.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID PRICESHEET

INSTRUCTIONS
BC-RFP-26-004
Environmental - Sampling and Consulting
Please note that there are multiple tabs.
Please complete ALL the bid tabs accordingly.

Initial 24-Month Period

BC-RFP-26-004 Environmental Consulting Price Sheet
24-month Contract Period - Commencing on Date of Award
Vendor Namemandatory - please complete
Vendor Signaturemandatory - please complete
Datemandatory - please complete
Asbestos
Item#DescriptionUnitCost
1Abatement Technical Specification Design (Subchapter 8) Including DCA Fees, Permit Fees, Sub-code Variances, C/O as necessaryFlat Rate
1.1Abatement Technical Specification Design (Non-Subchapter 8)Flate Rate
1.2O&M Activity Specification/GuidanceFlate Rate
2Bulk Sample Analysis Via PLM (6 Hour TAT)Sample
2.1Bulk Sample Analysis Via PLM (24 Hour TAT)Sample
2.2Bulk Sample Analysis Via PLM (2 Day TAT)Sample
2.3Bulk Sample Analysis Via PLM (3 Day TAT)Sample
2.4Bulk Sample Analysis Via PLM (5 Day TAT)Sample
3Bulk Sample Analysis Via TEM (6 Hour TAT)Sample
3.1Bulk Sample Analysis Via TEM (24 Hour TAT)Sample
3.2Bulk Sample Analysis Via TEM (2 Day TAT)Sample
3.3Bulk Sample Analysis Via TEM (3 Day TAT)Sample
3.4Bulk Sample Analysis Via TEM (5 Day TAT)Sample
4Services of USEPA certified Asbestos Building Inspector (Normal Working Hours)Hour
4.1Services of USEPA certified Asbestos Building Inspector (Evening/Weekend)Hour
5Air Sample Analysis Via PCM (6 Hour TAT)Sample
5.1Air Sample Analysis Via PCM (24 Hour TAT)Sample
5.2Air Sample Analysis Via PCM (2 Day TAT)Sample
5.3Air Sample Analysis Via PCM (3 Day TAT)Sample
5.4Air Sample Analysis Via PCM (5 Day TAT)Sample
6Air Sample Analysis Via TEM (6 Hour TAT)Sample
6.1Air Sample Analysis Via TEM (24 Hour TAT)Sample
6.2Air Sample Analysis Via TEM (2 Day TAT)Sample
6.3Air Sample Analysis Via TEM (3 Day TAT)Sample
6.4Air Sample Analysis Via TEM (5 Day TAT)Sample
7Project Supervision/Monitoring Services by Asbestos Safety Technician (Evening/Weekend)Hour
7.1Project Supervision/Monitoring Services by Asbestos Safety Technician (Normal Working Hours)Hour
8On Site Air Sample Collection and Analysis Via PCM (Normal Working Hours)Hour
8.1On Site Air Sample Collection and Analysis Via PCM (Evening/Weekend)Hour
9Final Report PreparationFlat Rate
Indoor Air Quality/Mold
Item#DescriptionUnitCost
10Industrial Hygenist (Normal Working Hours)Hour
10.1Industrial Hygenist (Evening/WeekendHour
11Senior Project Manager (Normal Working Hours)Hour
11.1Senior Project Manager (Evening/Weekend)Hour
12Certified Industrial Hygenist (Normal Working HoursHour
12.1Certified Industrial Hygenist (Evening/Weekend)Hour
13Mold Surface Sample (6 Hour TAT)Sample
13.1Mold Surface Sample (24 Hour TAT)Sample
13.2Mold Surface Sample (2 Day TATSample
13.3Mold Surface Sample (3 Day TAT)Sample
13.4Mold Surface Sample (5 Day TAT)Sample
14Mold Air Sample (6 Hour TAT)Sample
14.1Mold Air Sample (24 Hour TAT)Sample
14.2Mold Air Sample (2 Day TATSample
14.3Mold Air Sample (3 Day TAT)Sample
14.4Mold Air Sample (5 Day TAT)Sample
15PCB Bulk Sample (3 Day TAT)Sample
15.1PCB Bulk Sample (Standard TAT)Sample
16Lead Risk Assesor (Normal Working Hours)Hour
16.1Lead Risk Assesor (Evening/Weekend)Hour
17Lead Dust Wipe Sample (6 Hour TAT)Sample
17.1Lead Dust Wipe Sample (24 Hour TAT)Sample

1st Renewal Option

BC-RFP-26-004 Environmental Consulting Price Sheet
1st - 12-Month Renewal Option
Vendor Namemandatory - please complete
Vendor Signaturemandatory - please complete
Datemandatory - please complete
Asbestos
Item#DescriptionUnitCost
1Abatement Technical Specification Design (Subchapter 8) Including DCA Fees, Permit Fees, Sub-code Variances, C/O as necessaryFlat Rate
1.1Abatement Technical Specification Design (Non-Subchapter 8)Flate Rate
1.2O&M Activity Specification/GuidanceFlate Rate
2Bulk Sample Analysis Via PLM (6 Hour TAT)Sample
2.1Bulk Sample Analysis Via PLM (24 Hour TAT)Sample
2.2Bulk Sample Analysis Via PLM (2 Day TAT)Sample
2.3Bulk Sample Analysis Via PLM (3 Day TAT)Sample
2.4Bulk Sample Analysis Via PLM (5 Day TAT)Sample
3Bulk Sample Analysis Via TEM (6 Hour TAT)Sample
3.1Bulk Sample Analysis Via TEM (24 Hour TAT)Sample
3.2Bulk Sample Analysis Via TEM (2 Day TAT)Sample
3.3Bulk Sample Analysis Via TEM (3 Day TAT)Sample
3.4Bulk Sample Analysis Via TEM (5 Day TAT)Sample
4Services of USEPA certified Asbestos Building Inspector (Normal Working Hours)Hour
4.1Services of USEPA certified Asbestos Building Inspector (Evening/Weekend)Hour
5Air Sample Analysis Via PCM (6 Hour TAT)Sample
5.1Air Sample Analysis Via PCM (24 Hour TAT)Sample
5.2Air Sample Analysis Via PCM (2 Day TAT)Sample
5.3Air Sample Analysis Via PCM (3 Day TAT)Sample
5.4Air Sample Analysis Via PCM (5 Day TAT)Sample
6Air Sample Analysis Via TEM (6 Hour TAT)Sample
6.1Air Sample Analysis Via TEM (24 Hour TAT)Sample
6.2Air Sample Analysis Via TEM (2 Day TAT)Sample
6.3Air Sample Analysis Via TEM (3 Day TAT)Sample
6.4Air Sample Analysis Via TEM (5 Day TAT)Sample
7Project Supervision/Monitoring Services by Asbestos Safety Technician (Evening/Weekend)Hour
7.1Project Supervision/Monitoring Services by Asbestos Safety Technician (Normal Working Hours)Hour
8On Site Air Sample Collection and Analysis Via PCM (Normal Working Hours)Hour
8.1On Site Air Sample Collection and Analysis Via PCM (Evening/Weekend)Hour
9Final Report PreparationFlat Rate
Indoor Air Quality/Mold
Item#DescriptionUnitCost
10Industrial Hygenist (Normal Working Hours)Hour
10.1Industrial Hygenist (Evening/WeekendHour
11Senior Project Manager (Normal Working Hours)Hour
11.1Senior Project Manager (Evening/Weekend)Hour
12Certified Industrial Hygenist (Normal Working HoursHour
12.1Certified Industrial Hygenist (Evening/Weekend)Hour
13Mold Surface Sample (6 Hour TAT)Sample
13.1Mold Surface Sample (24 Hour TAT)Sample
13.2Mold Surface Sample (2 Day TATSample
13.3Mold Surface Sample (3 Day TAT)Sample
13.4Mold Surface Sample (5 Day TAT)Sample
14Mold Air Sample (6 Hour TAT)Sample
14.1Mold Air Sample (24 Hour TAT)Sample
14.2Mold Air Sample (2 Day TATSample
14.3Mold Air Sample (3 Day TAT)Sample
14.4Mold Air Sample (5 Day TAT)Sample
15PCB Bulk Sample (3 Day TAT)Sample
15.1PCB Bulk Sample (Standard TAT)Sample
16Lead Risk Assesor (Normal Working Hours)Hour
16.1Lead Risk Assesor (Evening/Weekend)Hour
17Lead Dust Wipe Sample (6 Hour TAT)Sample
17.1Lead Dust Wipe Sample (24 Hour TAT)Sample

2nd Renewal Option

BC-RFP-26-004 Environmental Consulting Price Sheet
2nd - 12-Month Renewal Option
Vendor Namemandatory - please complete
Vendor Signaturemandatory - please complete
Datemandatory - please complete
Asbestos
Item#DescriptionUnitCost
1Abatement Technical Specification Design (Subchapter 8) Including DCA Fees, Permit Fees, Sub-code Variances, C/O as necessaryFlat Rate
1.1Abatement Technical Specification Design (Non-Subchapter 8)Flate Rate
1.2O&M Activity Specification/GuidanceFlate Rate
2Bulk Sample Analysis Via PLM (6 Hour TAT)Sample
2.1Bulk Sample Analysis Via PLM (24 Hour TAT)Sample
2.2Bulk Sample Analysis Via PLM (2 Day TAT)Sample
2.3Bulk Sample Analysis Via PLM (3 Day TAT)Sample
2.4Bulk Sample Analysis Via PLM (5 Day TAT)Sample
3Bulk Sample Analysis Via TEM (6 Hour TAT)Sample
3.1Bulk Sample Analysis Via TEM (24 Hour TAT)Sample
3.2Bulk Sample Analysis Via TEM (2 Day TAT)Sample
3.3Bulk Sample Analysis Via TEM (3 Day TAT)Sample
3.4Bulk Sample Analysis Via TEM (5 Day TAT)Sample
4Services of USEPA certified Asbestos Building Inspector (Normal Working Hours)Hour
4.1Services of USEPA certified Asbestos Building Inspector (Evening/Weekend)Hour
5Air Sample Analysis Via PCM (6 Hour TAT)Sample
5.1Air Sample Analysis Via PCM (24 Hour TAT)Sample
5.2Air Sample Analysis Via PCM (2 Day TAT)Sample
5.3Air Sample Analysis Via PCM (3 Day TAT)Sample
5.4Air Sample Analysis Via PCM (5 Day TAT)Sample
6Air Sample Analysis Via TEM (6 Hour TAT)Sample
6.1Air Sample Analysis Via TEM (24 Hour TAT)Sample
6.2Air Sample Analysis Via TEM (2 Day TAT)Sample
6.3Air Sample Analysis Via TEM (3 Day TAT)Sample
6.4Air Sample Analysis Via TEM (5 Day TAT)Sample
7Project Supervision/Monitoring Services by Asbestos Safety Technician (Evening/Weekend)Hour
7.1Project Supervision/Monitoring Services by Asbestos Safety Technician (Normal Working Hours)Hour
8On Site Air Sample Collection and Analysis Via PCM (Normal Working Hours)Hour
8.1On Site Air Sample Collection and Analysis Via PCM (Evening/Weekend)Hour
9Final Report PreparationFlat Rate
Indoor Air Quality/Mold
Item#DescriptionUnitCost
10Industrial Hygenist (Normal Working Hours)Hour
10.1Industrial Hygenist (Evening/WeekendHour
11Senior Project Manager (Normal Working Hours)Hour
11.1Senior Project Manager (Evening/Weekend)Hour
12Certified Industrial Hygenist (Normal Working HoursHour
12.1Certified Industrial Hygenist (Evening/Weekend)Hour
13Mold Surface Sample (6 Hour TAT)Sample
13.1Mold Surface Sample (24 Hour TAT)Sample
13.2Mold Surface Sample (2 Day TATSample
13.3Mold Surface Sample (3 Day TAT)Sample
13.4Mold Surface Sample (5 Day TAT)Sample
14Mold Air Sample (6 Hour TAT)Sample
14.1Mold Air Sample (24 Hour TAT)Sample
14.2Mold Air Sample (2 Day TATSample
14.3Mold Air Sample (3 Day TAT)Sample
14.4Mold Air Sample (5 Day TAT)Sample
15PCB Bulk Sample (3 Day TAT)Sample
15.1PCB Bulk Sample (Standard TAT)Sample
16Lead Risk Assesor (Normal Working Hours)Hour
16.1Lead Risk Assesor (Evening/Weekend)Hour
17Lead Dust Wipe Sample (6 Hour TAT)Sample
17.1Lead Dust Wipe Sample (24 Hour TAT)Sample

3rd Renewal Option

BC-RFP-26-004 Environmental Consulting Price Sheet
3rd - 12-Month Renewal Option
Vendor Namemandatory - please complete
Vendor Signaturemandatory - please complete
Datemandatory - please complete
Asbestos
Item#DescriptionUnitCost
1Abatement Technical Specification Design (Subchapter 8) Including DCA Fees, Permit Fees, Sub-code Variances, C/O as necessaryFlat Rate
1.1Abatement Technical Specification Design (Non-Subchapter 8)Flate Rate
1.2O&M Activity Specification/GuidanceFlate Rate
2Bulk Sample Analysis Via PLM (6 Hour TAT)Sample
2.1Bulk Sample Analysis Via PLM (24 Hour TAT)Sample
2.2Bulk Sample Analysis Via PLM (2 Day TAT)Sample
2.3Bulk Sample Analysis Via PLM (3 Day TAT)Sample
2.4Bulk Sample Analysis Via PLM (5 Day TAT)Sample
3Bulk Sample Analysis Via TEM (6 Hour TAT)Sample
3.1Bulk Sample Analysis Via TEM (24 Hour TAT)Sample
3.2Bulk Sample Analysis Via TEM (2 Day TAT)Sample
3.3Bulk Sample Analysis Via TEM (3 Day TAT)Sample
3.4Bulk Sample Analysis Via TEM (5 Day TAT)Sample
4Services of USEPA certified Asbestos Building Inspector (Normal Working Hours)Hour
4.1Services of USEPA certified Asbestos Building Inspector (Evening/Weekend)Hour
5Air Sample Analysis Via PCM (6 Hour TAT)Sample
5.1Air Sample Analysis Via PCM (24 Hour TAT)Sample
5.2Air Sample Analysis Via PCM (2 Day TAT)Sample
5.3Air Sample Analysis Via PCM (3 Day TAT)Sample
5.4Air Sample Analysis Via PCM (5 Day TAT)Sample
6Air Sample Analysis Via TEM (6 Hour TAT)Sample
6.1Air Sample Analysis Via TEM (24 Hour TAT)Sample
6.2Air Sample Analysis Via TEM (2 Day TAT)Sample
6.3Air Sample Analysis Via TEM (3 Day TAT)Sample
6.4Air Sample Analysis Via TEM (5 Day TAT)Sample
7Project Supervision/Monitoring Services by Asbestos Safety Technician (Evening/Weekend)Hour
7.1Project Supervision/Monitoring Services by Asbestos Safety Technician (Normal Working Hours)Hour
8On Site Air Sample Collection and Analysis Via PCM (Normal Working Hours)Hour
8.1On Site Air Sample Collection and Analysis Via PCM (Evening/Weekend)Hour
9Final Report PreparationFlat Rate
Indoor Air Quality/Mold
Item#DescriptionUnitCost
10Industrial Hygenist (Normal Working Hours)Hour
10.1Industrial Hygenist (Evening/WeekendHour
11Senior Project Manager (Normal Working Hours)Hour
11.1Senior Project Manager (Evening/Weekend)Hour
12Certified Industrial Hygenist (Normal Working HoursHour
12.1Certified Industrial Hygenist (Evening/Weekend)Hour
13Mold Surface Sample (6 Hour TAT)Sample
13.1Mold Surface Sample (24 Hour TAT)Sample
13.2Mold Surface Sample (2 Day TATSample
13.3Mold Surface Sample (3 Day TAT)Sample
13.4Mold Surface Sample (5 Day TAT)Sample
14Mold Air Sample (6 Hour TAT)Sample
14.1Mold Air Sample (24 Hour TAT)Sample
14.2Mold Air Sample (2 Day TATSample
14.3Mold Air Sample (3 Day TAT)Sample
14.4Mold Air Sample (5 Day TAT)Sample
15PCB Bulk Sample (3 Day TAT)Sample
15.1PCB Bulk Sample (Standard TAT)Sample
16Lead Risk Assesor (Normal Working Hours)Hour
16.1Lead Risk Assesor (Evening/Weekend)Hour
17Lead Dust Wipe Sample (6 Hour TAT)Sample
17.1Lead Dust Wipe Sample (24 Hour TAT)Sample

File details come from the government source that posted it. Updated .