12-26-004 Price Sheet -Environmental Consulting.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- Environmental: Sampling and Consulting Services
- Solicitation number
- BC-RFP-26-004
- Issued by
- Bergen County, New Jersey
About this file
This is a price sheet for a state and local contract opportunity issued by New Jersey for environmental sampling and consulting services under solicitation BC-RFP-26-004. The contract encompasses a 24-month initial period commencing on the date of award, followed by three optional 12-month renewal periods, for a potential total contract duration of 48 months. The scope of work includes asbestos-related services, indoor air quality and mold assessment, lead risk evaluation, and PCB testing. Specific services requested include abatement technical specification design, bulk and air sample analysis via multiple methodologies (PLM, TEM, and PCM) with varying turnaround times ranging from 6 hours to 5 days, project supervision and monitoring by certified asbestos safety technicians, on-site air sample collection and analysis, industrial hygienist and senior project manager consultation at both normal and evening/weekend rates, mold surface and air sampling, PCB bulk sampling, lead risk assessment, and lead dust wipe sampling.
Vendors are required to submit unit costs for each line item across all contract periods on a mandatory price sheet that includes separate tabs for the initial 24-month period and each of the three 12-month renewal options. Pricing is structured by unit cost per service, with flat-rate pricing for specification design and report preparation services and hourly rates for professional consultant services and turn-key analysis services. All pricing submissions must include vendor name, signature, and date on each tab. The solicitation requires bidders to complete all pricing tabs accordingly to ensure comprehensive cost proposals for the full potential contract duration.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID PRICESHEET
| INSTRUCTIONS |
| BC-RFP-26-004 |
| Environmental - Sampling and Consulting |
| Please note that there are multiple tabs. |
| Please complete ALL the bid tabs accordingly. |
Initial 24-Month Period
| BC-RFP-26-004 Environmental Consulting Price Sheet |
| 24-month Contract Period - Commencing on Date of Award |
| Vendor Name | mandatory - please complete |
| Vendor Signature | mandatory - please complete |
| Date | mandatory - please complete |
| Asbestos | |||
| Item# | Description | Unit | Cost |
| 1 | Abatement Technical Specification Design (Subchapter 8) Including DCA Fees, Permit Fees, Sub-code Variances, C/O as necessary | Flat Rate | |
| 1.1 | Abatement Technical Specification Design (Non-Subchapter 8) | Flate Rate | |
| 1.2 | O&M Activity Specification/Guidance | Flate Rate | |
| 2 | Bulk Sample Analysis Via PLM (6 Hour TAT) | Sample | |
| 2.1 | Bulk Sample Analysis Via PLM (24 Hour TAT) | Sample | |
| 2.2 | Bulk Sample Analysis Via PLM (2 Day TAT) | Sample | |
| 2.3 | Bulk Sample Analysis Via PLM (3 Day TAT) | Sample | |
| 2.4 | Bulk Sample Analysis Via PLM (5 Day TAT) | Sample | |
| 3 | Bulk Sample Analysis Via TEM (6 Hour TAT) | Sample | |
| 3.1 | Bulk Sample Analysis Via TEM (24 Hour TAT) | Sample | |
| 3.2 | Bulk Sample Analysis Via TEM (2 Day TAT) | Sample | |
| 3.3 | Bulk Sample Analysis Via TEM (3 Day TAT) | Sample | |
| 3.4 | Bulk Sample Analysis Via TEM (5 Day TAT) | Sample | |
| 4 | Services of USEPA certified Asbestos Building Inspector (Normal Working Hours) | Hour | |
| 4.1 | Services of USEPA certified Asbestos Building Inspector (Evening/Weekend) | Hour | |
| 5 | Air Sample Analysis Via PCM (6 Hour TAT) | Sample | |
| 5.1 | Air Sample Analysis Via PCM (24 Hour TAT) | Sample | |
| 5.2 | Air Sample Analysis Via PCM (2 Day TAT) | Sample | |
| 5.3 | Air Sample Analysis Via PCM (3 Day TAT) | Sample | |
| 5.4 | Air Sample Analysis Via PCM (5 Day TAT) | Sample | |
| 6 | Air Sample Analysis Via TEM (6 Hour TAT) | Sample | |
| 6.1 | Air Sample Analysis Via TEM (24 Hour TAT) | Sample | |
| 6.2 | Air Sample Analysis Via TEM (2 Day TAT) | Sample | |
| 6.3 | Air Sample Analysis Via TEM (3 Day TAT) | Sample | |
| 6.4 | Air Sample Analysis Via TEM (5 Day TAT) | Sample | |
| 7 | Project Supervision/Monitoring Services by Asbestos Safety Technician (Evening/Weekend) | Hour | |
| 7.1 | Project Supervision/Monitoring Services by Asbestos Safety Technician (Normal Working Hours) | Hour | |
| 8 | On Site Air Sample Collection and Analysis Via PCM (Normal Working Hours) | Hour | |
| 8.1 | On Site Air Sample Collection and Analysis Via PCM (Evening/Weekend) | Hour | |
| 9 | Final Report Preparation | Flat Rate |
| Indoor Air Quality/Mold | |||
| Item# | Description | Unit | Cost |
| 10 | Industrial Hygenist (Normal Working Hours) | Hour | |
| 10.1 | Industrial Hygenist (Evening/Weekend | Hour | |
| 11 | Senior Project Manager (Normal Working Hours) | Hour | |
| 11.1 | Senior Project Manager (Evening/Weekend) | Hour | |
| 12 | Certified Industrial Hygenist (Normal Working Hours | Hour | |
| 12.1 | Certified Industrial Hygenist (Evening/Weekend) | Hour | |
| 13 | Mold Surface Sample (6 Hour TAT) | Sample | |
| 13.1 | Mold Surface Sample (24 Hour TAT) | Sample | |
| 13.2 | Mold Surface Sample (2 Day TAT | Sample | |
| 13.3 | Mold Surface Sample (3 Day TAT) | Sample | |
| 13.4 | Mold Surface Sample (5 Day TAT) | Sample | |
| 14 | Mold Air Sample (6 Hour TAT) | Sample | |
| 14.1 | Mold Air Sample (24 Hour TAT) | Sample | |
| 14.2 | Mold Air Sample (2 Day TAT | Sample | |
| 14.3 | Mold Air Sample (3 Day TAT) | Sample | |
| 14.4 | Mold Air Sample (5 Day TAT) | Sample | |
| 15 | PCB Bulk Sample (3 Day TAT) | Sample | |
| 15.1 | PCB Bulk Sample (Standard TAT) | Sample | |
| 16 | Lead Risk Assesor (Normal Working Hours) | Hour | |
| 16.1 | Lead Risk Assesor (Evening/Weekend) | Hour | |
| 17 | Lead Dust Wipe Sample (6 Hour TAT) | Sample | |
| 17.1 | Lead Dust Wipe Sample (24 Hour TAT) | Sample |
1st Renewal Option
| BC-RFP-26-004 Environmental Consulting Price Sheet |
| 1st - 12-Month Renewal Option |
| Vendor Name | mandatory - please complete |
| Vendor Signature | mandatory - please complete |
| Date | mandatory - please complete |
| Asbestos | |||
| Item# | Description | Unit | Cost |
| 1 | Abatement Technical Specification Design (Subchapter 8) Including DCA Fees, Permit Fees, Sub-code Variances, C/O as necessary | Flat Rate | |
| 1.1 | Abatement Technical Specification Design (Non-Subchapter 8) | Flate Rate | |
| 1.2 | O&M Activity Specification/Guidance | Flate Rate | |
| 2 | Bulk Sample Analysis Via PLM (6 Hour TAT) | Sample | |
| 2.1 | Bulk Sample Analysis Via PLM (24 Hour TAT) | Sample | |
| 2.2 | Bulk Sample Analysis Via PLM (2 Day TAT) | Sample | |
| 2.3 | Bulk Sample Analysis Via PLM (3 Day TAT) | Sample | |
| 2.4 | Bulk Sample Analysis Via PLM (5 Day TAT) | Sample | |
| 3 | Bulk Sample Analysis Via TEM (6 Hour TAT) | Sample | |
| 3.1 | Bulk Sample Analysis Via TEM (24 Hour TAT) | Sample | |
| 3.2 | Bulk Sample Analysis Via TEM (2 Day TAT) | Sample | |
| 3.3 | Bulk Sample Analysis Via TEM (3 Day TAT) | Sample | |
| 3.4 | Bulk Sample Analysis Via TEM (5 Day TAT) | Sample | |
| 4 | Services of USEPA certified Asbestos Building Inspector (Normal Working Hours) | Hour | |
| 4.1 | Services of USEPA certified Asbestos Building Inspector (Evening/Weekend) | Hour | |
| 5 | Air Sample Analysis Via PCM (6 Hour TAT) | Sample | |
| 5.1 | Air Sample Analysis Via PCM (24 Hour TAT) | Sample | |
| 5.2 | Air Sample Analysis Via PCM (2 Day TAT) | Sample | |
| 5.3 | Air Sample Analysis Via PCM (3 Day TAT) | Sample | |
| 5.4 | Air Sample Analysis Via PCM (5 Day TAT) | Sample | |
| 6 | Air Sample Analysis Via TEM (6 Hour TAT) | Sample | |
| 6.1 | Air Sample Analysis Via TEM (24 Hour TAT) | Sample | |
| 6.2 | Air Sample Analysis Via TEM (2 Day TAT) | Sample | |
| 6.3 | Air Sample Analysis Via TEM (3 Day TAT) | Sample | |
| 6.4 | Air Sample Analysis Via TEM (5 Day TAT) | Sample | |
| 7 | Project Supervision/Monitoring Services by Asbestos Safety Technician (Evening/Weekend) | Hour | |
| 7.1 | Project Supervision/Monitoring Services by Asbestos Safety Technician (Normal Working Hours) | Hour | |
| 8 | On Site Air Sample Collection and Analysis Via PCM (Normal Working Hours) | Hour | |
| 8.1 | On Site Air Sample Collection and Analysis Via PCM (Evening/Weekend) | Hour | |
| 9 | Final Report Preparation | Flat Rate |
| Indoor Air Quality/Mold | |||
| Item# | Description | Unit | Cost |
| 10 | Industrial Hygenist (Normal Working Hours) | Hour | |
| 10.1 | Industrial Hygenist (Evening/Weekend | Hour | |
| 11 | Senior Project Manager (Normal Working Hours) | Hour | |
| 11.1 | Senior Project Manager (Evening/Weekend) | Hour | |
| 12 | Certified Industrial Hygenist (Normal Working Hours | Hour | |
| 12.1 | Certified Industrial Hygenist (Evening/Weekend) | Hour | |
| 13 | Mold Surface Sample (6 Hour TAT) | Sample | |
| 13.1 | Mold Surface Sample (24 Hour TAT) | Sample | |
| 13.2 | Mold Surface Sample (2 Day TAT | Sample | |
| 13.3 | Mold Surface Sample (3 Day TAT) | Sample | |
| 13.4 | Mold Surface Sample (5 Day TAT) | Sample | |
| 14 | Mold Air Sample (6 Hour TAT) | Sample | |
| 14.1 | Mold Air Sample (24 Hour TAT) | Sample | |
| 14.2 | Mold Air Sample (2 Day TAT | Sample | |
| 14.3 | Mold Air Sample (3 Day TAT) | Sample | |
| 14.4 | Mold Air Sample (5 Day TAT) | Sample | |
| 15 | PCB Bulk Sample (3 Day TAT) | Sample | |
| 15.1 | PCB Bulk Sample (Standard TAT) | Sample | |
| 16 | Lead Risk Assesor (Normal Working Hours) | Hour | |
| 16.1 | Lead Risk Assesor (Evening/Weekend) | Hour | |
| 17 | Lead Dust Wipe Sample (6 Hour TAT) | Sample | |
| 17.1 | Lead Dust Wipe Sample (24 Hour TAT) | Sample |
2nd Renewal Option
| BC-RFP-26-004 Environmental Consulting Price Sheet |
| 2nd - 12-Month Renewal Option |
| Vendor Name | mandatory - please complete |
| Vendor Signature | mandatory - please complete |
| Date | mandatory - please complete |
| Asbestos | |||
| Item# | Description | Unit | Cost |
| 1 | Abatement Technical Specification Design (Subchapter 8) Including DCA Fees, Permit Fees, Sub-code Variances, C/O as necessary | Flat Rate | |
| 1.1 | Abatement Technical Specification Design (Non-Subchapter 8) | Flate Rate | |
| 1.2 | O&M Activity Specification/Guidance | Flate Rate | |
| 2 | Bulk Sample Analysis Via PLM (6 Hour TAT) | Sample | |
| 2.1 | Bulk Sample Analysis Via PLM (24 Hour TAT) | Sample | |
| 2.2 | Bulk Sample Analysis Via PLM (2 Day TAT) | Sample | |
| 2.3 | Bulk Sample Analysis Via PLM (3 Day TAT) | Sample | |
| 2.4 | Bulk Sample Analysis Via PLM (5 Day TAT) | Sample | |
| 3 | Bulk Sample Analysis Via TEM (6 Hour TAT) | Sample | |
| 3.1 | Bulk Sample Analysis Via TEM (24 Hour TAT) | Sample | |
| 3.2 | Bulk Sample Analysis Via TEM (2 Day TAT) | Sample | |
| 3.3 | Bulk Sample Analysis Via TEM (3 Day TAT) | Sample | |
| 3.4 | Bulk Sample Analysis Via TEM (5 Day TAT) | Sample | |
| 4 | Services of USEPA certified Asbestos Building Inspector (Normal Working Hours) | Hour | |
| 4.1 | Services of USEPA certified Asbestos Building Inspector (Evening/Weekend) | Hour | |
| 5 | Air Sample Analysis Via PCM (6 Hour TAT) | Sample | |
| 5.1 | Air Sample Analysis Via PCM (24 Hour TAT) | Sample | |
| 5.2 | Air Sample Analysis Via PCM (2 Day TAT) | Sample | |
| 5.3 | Air Sample Analysis Via PCM (3 Day TAT) | Sample | |
| 5.4 | Air Sample Analysis Via PCM (5 Day TAT) | Sample | |
| 6 | Air Sample Analysis Via TEM (6 Hour TAT) | Sample | |
| 6.1 | Air Sample Analysis Via TEM (24 Hour TAT) | Sample | |
| 6.2 | Air Sample Analysis Via TEM (2 Day TAT) | Sample | |
| 6.3 | Air Sample Analysis Via TEM (3 Day TAT) | Sample | |
| 6.4 | Air Sample Analysis Via TEM (5 Day TAT) | Sample | |
| 7 | Project Supervision/Monitoring Services by Asbestos Safety Technician (Evening/Weekend) | Hour | |
| 7.1 | Project Supervision/Monitoring Services by Asbestos Safety Technician (Normal Working Hours) | Hour | |
| 8 | On Site Air Sample Collection and Analysis Via PCM (Normal Working Hours) | Hour | |
| 8.1 | On Site Air Sample Collection and Analysis Via PCM (Evening/Weekend) | Hour | |
| 9 | Final Report Preparation | Flat Rate |
| Indoor Air Quality/Mold | |||
| Item# | Description | Unit | Cost |
| 10 | Industrial Hygenist (Normal Working Hours) | Hour | |
| 10.1 | Industrial Hygenist (Evening/Weekend | Hour | |
| 11 | Senior Project Manager (Normal Working Hours) | Hour | |
| 11.1 | Senior Project Manager (Evening/Weekend) | Hour | |
| 12 | Certified Industrial Hygenist (Normal Working Hours | Hour | |
| 12.1 | Certified Industrial Hygenist (Evening/Weekend) | Hour | |
| 13 | Mold Surface Sample (6 Hour TAT) | Sample | |
| 13.1 | Mold Surface Sample (24 Hour TAT) | Sample | |
| 13.2 | Mold Surface Sample (2 Day TAT | Sample | |
| 13.3 | Mold Surface Sample (3 Day TAT) | Sample | |
| 13.4 | Mold Surface Sample (5 Day TAT) | Sample | |
| 14 | Mold Air Sample (6 Hour TAT) | Sample | |
| 14.1 | Mold Air Sample (24 Hour TAT) | Sample | |
| 14.2 | Mold Air Sample (2 Day TAT | Sample | |
| 14.3 | Mold Air Sample (3 Day TAT) | Sample | |
| 14.4 | Mold Air Sample (5 Day TAT) | Sample | |
| 15 | PCB Bulk Sample (3 Day TAT) | Sample | |
| 15.1 | PCB Bulk Sample (Standard TAT) | Sample | |
| 16 | Lead Risk Assesor (Normal Working Hours) | Hour | |
| 16.1 | Lead Risk Assesor (Evening/Weekend) | Hour | |
| 17 | Lead Dust Wipe Sample (6 Hour TAT) | Sample | |
| 17.1 | Lead Dust Wipe Sample (24 Hour TAT) | Sample |
3rd Renewal Option
| BC-RFP-26-004 Environmental Consulting Price Sheet |
| 3rd - 12-Month Renewal Option |
| Vendor Name | mandatory - please complete |
| Vendor Signature | mandatory - please complete |
| Date | mandatory - please complete |
| Asbestos | |||
| Item# | Description | Unit | Cost |
| 1 | Abatement Technical Specification Design (Subchapter 8) Including DCA Fees, Permit Fees, Sub-code Variances, C/O as necessary | Flat Rate | |
| 1.1 | Abatement Technical Specification Design (Non-Subchapter 8) | Flate Rate | |
| 1.2 | O&M Activity Specification/Guidance | Flate Rate | |
| 2 | Bulk Sample Analysis Via PLM (6 Hour TAT) | Sample | |
| 2.1 | Bulk Sample Analysis Via PLM (24 Hour TAT) | Sample | |
| 2.2 | Bulk Sample Analysis Via PLM (2 Day TAT) | Sample | |
| 2.3 | Bulk Sample Analysis Via PLM (3 Day TAT) | Sample | |
| 2.4 | Bulk Sample Analysis Via PLM (5 Day TAT) | Sample | |
| 3 | Bulk Sample Analysis Via TEM (6 Hour TAT) | Sample | |
| 3.1 | Bulk Sample Analysis Via TEM (24 Hour TAT) | Sample | |
| 3.2 | Bulk Sample Analysis Via TEM (2 Day TAT) | Sample | |
| 3.3 | Bulk Sample Analysis Via TEM (3 Day TAT) | Sample | |
| 3.4 | Bulk Sample Analysis Via TEM (5 Day TAT) | Sample | |
| 4 | Services of USEPA certified Asbestos Building Inspector (Normal Working Hours) | Hour | |
| 4.1 | Services of USEPA certified Asbestos Building Inspector (Evening/Weekend) | Hour | |
| 5 | Air Sample Analysis Via PCM (6 Hour TAT) | Sample | |
| 5.1 | Air Sample Analysis Via PCM (24 Hour TAT) | Sample | |
| 5.2 | Air Sample Analysis Via PCM (2 Day TAT) | Sample | |
| 5.3 | Air Sample Analysis Via PCM (3 Day TAT) | Sample | |
| 5.4 | Air Sample Analysis Via PCM (5 Day TAT) | Sample | |
| 6 | Air Sample Analysis Via TEM (6 Hour TAT) | Sample | |
| 6.1 | Air Sample Analysis Via TEM (24 Hour TAT) | Sample | |
| 6.2 | Air Sample Analysis Via TEM (2 Day TAT) | Sample | |
| 6.3 | Air Sample Analysis Via TEM (3 Day TAT) | Sample | |
| 6.4 | Air Sample Analysis Via TEM (5 Day TAT) | Sample | |
| 7 | Project Supervision/Monitoring Services by Asbestos Safety Technician (Evening/Weekend) | Hour | |
| 7.1 | Project Supervision/Monitoring Services by Asbestos Safety Technician (Normal Working Hours) | Hour | |
| 8 | On Site Air Sample Collection and Analysis Via PCM (Normal Working Hours) | Hour | |
| 8.1 | On Site Air Sample Collection and Analysis Via PCM (Evening/Weekend) | Hour | |
| 9 | Final Report Preparation | Flat Rate |
| Indoor Air Quality/Mold | |||
| Item# | Description | Unit | Cost |
| 10 | Industrial Hygenist (Normal Working Hours) | Hour | |
| 10.1 | Industrial Hygenist (Evening/Weekend | Hour | |
| 11 | Senior Project Manager (Normal Working Hours) | Hour | |
| 11.1 | Senior Project Manager (Evening/Weekend) | Hour | |
| 12 | Certified Industrial Hygenist (Normal Working Hours | Hour | |
| 12.1 | Certified Industrial Hygenist (Evening/Weekend) | Hour | |
| 13 | Mold Surface Sample (6 Hour TAT) | Sample | |
| 13.1 | Mold Surface Sample (24 Hour TAT) | Sample | |
| 13.2 | Mold Surface Sample (2 Day TAT | Sample | |
| 13.3 | Mold Surface Sample (3 Day TAT) | Sample | |
| 13.4 | Mold Surface Sample (5 Day TAT) | Sample | |
| 14 | Mold Air Sample (6 Hour TAT) | Sample | |
| 14.1 | Mold Air Sample (24 Hour TAT) | Sample | |
| 14.2 | Mold Air Sample (2 Day TAT | Sample | |
| 14.3 | Mold Air Sample (3 Day TAT) | Sample | |
| 14.4 | Mold Air Sample (5 Day TAT) | Sample | |
| 15 | PCB Bulk Sample (3 Day TAT) | Sample | |
| 15.1 | PCB Bulk Sample (Standard TAT) | Sample | |
| 16 | Lead Risk Assesor (Normal Working Hours) | Hour | |
| 16.1 | Lead Risk Assesor (Evening/Weekend) | Hour | |
| 17 | Lead Dust Wipe Sample (6 Hour TAT) | Sample | |
| 17.1 | Lead Dust Wipe Sample (24 Hour TAT) | Sample |
File details come from the government source that posted it. Updated .