This document is a Supplementary Conditions contract for a Bridge Rehabilitation project by the City of Lafayette, Colorado, involving the reconstruction of the 120th Street Bridge over Coal Creek. The project scope includes replacing the entire top slab of the bridge culvert, bridge railing, asphalt improvements, pedestrian crossing signal relocation, signage, striping, and final site stabilization. The contract has a defined term of 60 working days, with RockSol Consulting Group, Inc. serving as the Design Professional. The contractor will be responsible for utility locates, identifying subcontractors, and obtaining necessary permits.
The contract includes provisions for performance and payment bonds, insurance requirements, and specific financial terms. The contract allows for potential withdrawal of retainage if the contract price exceeds $150,000, with the contractor able to deposit acceptable securities as defined by Colorado Revised Statutes. The document outlines detailed responsibilities for the contractor, including coordination with other potential project contractors, correction periods for defective work, and specific requirements for insurance and additional insured parties. The total project is managed through the City of Lafayette's Public Works Department, located at 1290 South Public Road, Lafayette, CO 80026.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project: Bridge Rehabilitation 120th St Over Coal Creek Contractor:
Design Professional: RockSol Consulting Group, Inc.
Total Cost:
Term: 60 Working Days Acct. or P.O. #: 34-301-932100
CONSTRUCTION CONTRACT
Supplementary Conditions
Acknowledged by:
CONTRACTOR
[INSERT CONTRACTOR NAME]
By:
Printed Name:
Title:
Attest:
By:
Printed Name:
Title:
SUPPLEMENTARY CONDITIONS
ARTICLE 1
DEFINITIONS
SC-1.19. DESIGN PROFESSIONAL’s Consultant: The following individuals, firms or corporations, hereinafter “DESIGN PROFESSIONAL’s Consultants,” shall furnish services as DESIGN PROFESSIONAL’s independent professional associates or consultants with respect to the Project:
ARTICLE 2
PRELIMINARY MATTERS
SC-2.2. Copies of Documents:
☐ CITY shall furnish to CONTRACTOR ____ copies of the Contract Documents.
☒ CITY shall furnish to CONTRACTOR electronic copies of all Contract Documents.
SC-2.5.4 Utility Locates: It shall be the CONTRACTOR’S responsibility to determine the exact location of all utilities and utility service laterals for the Project. CITY shall not be considered the OWNER of any underground utility except for sanitary sewer, storm sewer, and water. CITY will not be held liable in any claims or delays caused by underground utility locations which it does not own; including extensions of Contract Times and damages.
ARTICLE 3
CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE
ARTICLE 4
AVAILABILITY OF LANDS;
SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS
SC-4.2 Subsurface and Physical Conditions:
SC-4.2.1. Reports and Drawings: The following reports of explorations and tests of subsurface conditions at or contiguous to the site have been utilized by DESIGN PROFESSIONAL in preparing the Contract Documents:
SC-4.2.2. Technical Data: The following drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site have been utilized by DESIGN PROFESSIONAL in preparing the Contract Documents:
ARTICLE 5
BONDS AND INSURANCE
SC-5.1. Performance, Payment and Other Bonds: The following Bonds shall also be required:
SC-5.2. Licensed Sureties and Insurers; Certificates of Insurance: Each surety and insurance company shall also meet the following additional requirements and qualifications:
SC-5.3.2 Additional Insureds: All insurance policies required by paragraph GC 5.3. shall include the following as additional insureds:
ARTICLE 6
CONTRACTOR’S RESPONSIBILITIES
SC-6.5. Concerning Subcontractors, Suppliers and Others: Prior to ___________, 20__, CONTRACTOR shall identify to CITY the following Subcontractors, Suppliers, or other persons or organizations:
SC-6.7. Permits:
ARTICLE 7
OTHER WORK
[If CITY contracts with others for the performance of other work on the Project at the site, include the following information:]
SC-7.2. Coordination:
SC-7.2.1 The following person, firm or corporation will have authority and responsibility for coordination of the activities among the various prime contractors:
SC-7.2.2 The specific matters to be covered by such authority and responsibility are as follows:
SC-7.2.3 The extent of such authority and responsibility is as follows:
ARTICLE 8
CITY’S RESPONSIBILITIES
8.10. If and to the extent CITY has agreed to furnish CONTRACTOR reasonable evidence that financial arrangements have been made to satisfy CITY’s obligations under the Contract Documents, CITY’s responsibility with respect thereto will be as follows:
ARTICLE 9
DESIGN PROFESSIONAL’S STATUS DURING CONSTRUCTION
SC-9.3. Project Representative: The Resident Project Representative shall have the following responsibilities, authority and limitations:
ARTICLE 10
CHANGES IN THE WORK
ARTICLE 11
CHANGE OF CONTRACT PRICE
ARTICLE 12
CHANGE OF CONTRACT TIMES
ARTICLE 13
TESTS AND INSPECTIONS;
CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK
SC-13.7. Correction Period: The correction period(s) specified in Paragraphs 13.7. of the General Conditions are amended as follows:
SC-13.7.1. The period for correction or removal and replacement of Defective Work set forth in Paragraph 13.7.1 of the General Conditions shall be __________ years after the date of Substantial Completion. All other provisions of Paragraph 13.7.1 of the General Conditions shall otherwise remain in full force in effect.
SC-13.7.3. The period for correction or removal and replacement of Defective Work that has been corrected, removed or replaced under Paragraph 13.7 of the General Conditions shall be extended for an additional period of _____________ years after such correction or removal and replacement has been satisfactorily completed. All other provisions of Paragraph 13.7.3 of the General Conditions shall otherwise remain in full force in effect.
ARTICLE 14
PAYMENTS TO CONTRACTOR AND COMPLETION
SC-14.2 Application for Progress Payment: If the Contract Price is more than $150,000, CONTRACTOR may withdraw the whole or any portion of the retainage provided for in the Contract Documents if CONTRACTOR deposits acceptable securities, as that term is defined by C.R.S. § 24-91-102(1), with CITY. The deposit of such acceptable securities, including any escrow agreement or custodian therefor and the earning of any interest thereon, shall be governed by C.R.S. §§ 24-91-105 through 108 inclusive. This provision shall not apply if a portion of the Contract Price is to be paid with federal funds.
ARTICLE 15
SUSPENSION OF WORK AND TERMINATION
ARTICLE 16
MISCELLANEOUS
CONSTRUCTION CONTRACT – SUPPLEMENTARY CONDITIONS
City of Lafayette, 1290 South Public Road, Lafayette, CO 80026; Phone: 303-665-5588 Form Approved by City Attorney October 2021 (reviewed Aug. 2022)
SC - 2
CONSTRUCTION CONTRACT – SUPPLEMENTARY CONDITIONS
City of Lafayette, 1290 South Public Road, Lafayette, CO 80026; Phone: 303-665-5588 Form Approved by City Attorney October 2021 (reviewed Aug. 2022) image1.emf
File details come from the government source that posted it. Updated .