This is a Request for Proposal (RFP) issued by the City of Midland, Texas for elevator and escalator maintenance services at Midland International Air & Space Port. The City seeks a qualified contractor to provide comprehensive maintenance and repair services for two Schindler escalators and four Schindler hydraulic elevators, with equipment approximately twenty-five years old at contract inception. The RFP was released on January 13, 2026, with a pre-proposal conference scheduled for January 21, 2026 at 9:00 a.m. at 9506 La Force Blvd. Written inquiries must be submitted by January 23, 2026, and sealed proposals are due by 2:00 p.m. on January 28, 2026, to the City Secretary at Suite 330, P.O. Box 1152, Midland, Texas 79702-1153. The City intends to announce vendor interviews by a date to be determined and make a contract award by February 24, 2026. The initial contract term is three years, with renewal options for an additional three years (1-year intervals) at the City's discretion.

The contractor must provide all labor, materials, supervision, and equipment necessary for preventive and corrective maintenance, including comprehensive coverage of basic and major components for both elevators and escalators. Service requirements include scheduled cleaning, lubrication, adjustments to manufacturer specifications, same-day response to repair requests submitted by 2:00 p.m. during normal business hours, and 24/7 remote monitoring capability. The contractor must cover all required safety testing, state inspector fees, licensing, and annual pressure and relief valve checks for hydraulic equipment. The City will pay applicable premium rates for emergency service outside normal working hours. The evaluation committee will assess proposals using the following weighted criteria: Cost Analysis (25 points), Company Service Qualifications (15 points), Years in Business (15 points), Implementation Plan (10 points), Training Requirements (10 points), Organization (10 points), Two References (5 points), Project Manager (5 points), and Technical Abilities (5 points). Offerors must submit one original, two hard copies, and one soft copy (PDF or Word) of their proposal and demonstrate financial stability through audited financial statements for the three preceding years. All contractor personnel must obtain TSA Airport Security Identification Badges at $100 per employee and comply with federal criminal history record checks per 49 CFR 1542.209.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S:\Purch PDF\0ProcFldr\FY2026\26002248 Elevator- Escalator Service Airport\26002248 Request for Proposal.doc i Revise

Request for Proposals

RFP 26002248

for

Midland International Air & Space Port Elevator & Escalator Maintenance

Proposals for this requirement will be accepted until 2:00 P.M. on January 28,2026

Proposals May be Mailed or Delivered to:

City Secretary City of Midland

Suite 330

P.O. BOX 1152

Midland, Texas 79702-1153 (300 N. Loraine, Suite 330 Midland, TX 79701)

No Late Proposals Will Be Accepted

NOTICE TO PROPOSERS:

1. IMPORTANT NOTICE – IF THE CONTRACT DOCUMENTS REQUIRE WORKER’S COMPENSATION INSURANCE, PROPOSER/CONTRACTOR MUST CARRY WORKER’S COMPENSATION INSURANCE TO BE ELIGIBLE FOR THIS CONTRACT. IF YOU CANNOT PROVIDE WORKER’S COMPENSATION INSURANCE AS REQUIRED BY STATE OF TEXAS STATUTE WE RESPECTFULLY

REQUEST THAT YOU “NO BID” THIS WORK

2. COMPLIANCE. – COMPANY AGREES THAT IT SHALL COMPLY WITH TEXAS GOVERNMENT CODE SECTION 2252.908, ET SEQ., AS AMENDED. COMPANY AGREES THAT IT SHALL COMPLY WITH TEXAS LOCAL GOVERNMENT CODE SECTION 176.006, ET SEQ., AS

AMENDED.

3. PUBLIC INFORMATION. TO THE EXTENT THAT PROPOSER IS SUBMITTING A PROPOSAL FOR A CONTRACT DESCRIBED BY SECTION 552.371 OF THE TEXAS GOVERNMENT CODE, PROPOSER AGREES AS FOLLOWS IN ACCORDANCE WITH SECTION 552.372(B) OF THE TEXAS GOVERNMENT CODE: THE REQUIREMENTS OF SUBCHAPTER J, CHAPTER 552, GOVERNMENT CODE, MAY APPLY TO THIS PROPOSAL, AND THE CONTRACTOR OR VENDOR AGREES THAT THE CONTRACT CAN BE TERMINATED IF THE CONTRACTOR OR VENDOR KNOWINGLY OR INTENTIONALLY FAILS TO COMPLY WITH A REQUIREMENT OF THAT SUBCHAPTER.

See Section 1.9 for Pre-proposal Meeting Information

S:\Purch PDF\0ProcFldr\FY2026\26002248 Elevator- Escalator Service Airport\26002248 Request for Proposal.doc ii Revise

TABLE OF CONTENTS

Page SCHEDULE OF EVENTS ................................................................................................................................iii Special Terms and Conditions ........................................................................................................................... iv

1. General Information

2. Proposal Waivers:

3. Scope Of Project

4. Requirements

5. Narrative

6. Vendor Qualifications

7. Evaluation Process

8. Proposal Contents

EXECUTION OF OFFER

S:\Purch PDF\0ProcFldr\FY2026\26002248 Elevator- Escalator Service Airport\26002248 Request for Proposal.doc iii Revised: January 8, 2026

SCHEDULE OF EVENTS

RFP 26002248

For Midland International Air & Space Port Elevator & Escalator Maintenance

Event Date*

RFP Released .............................................................................................................. 01/13/2026 Cutoff Date for inquiries and clarification………………………………………….. 01/23/2026 Proposal Due Date ...................................................................................................... 01/28/2026 Notification of Vendor Interviews / Product Demonstrations .................................... To Be Determined Intended Date for Contract Award .............................................................................. 02/24/2026

*These dates are our intended schedule; however, they may be changed as necessary without further notice.

NOTE:

From the issuance date of this RFP until a Contractor(s) is selected, all verbal communication is not binding.

The City will only be bound by written comments submitted by the Purchasing Office.

S:\Purch PDF\0ProcFldr\FY2026\26002248 Elevator- Escalator Service Airport\26002248 Request for Proposal.doc iv Revised: January 8, 2026

SPECIAL TERMS AND CONDITIONS

Proposal Requirements /Terms

1. Unless otherwise called for, the number of copies specified in the RFP, shall be submitted typewritten or printed in ink. Many Requests for Proposals are in a word format that can be completed on your computer and will be noted on the cover page if available.

2. Each proposal should be placed in a separate envelope completely and properly identified with the RFP number, due time and date. Proposal must be time stamped at the appointed receipt location before the hour and date specified for the proposal receipt.

Responsibility for having the proposal properly marked and to the opening location by the specified date and time is solely the offeror’s.

All copies of the proposal may be delivered in the same box/package.

3. Any Proposal may be withdrawn in writing prior to the date and time set for receipt of proposals. Any proposals not so withdrawn shall constitute an irrevocable offer, for a minimum period as stated in the RFP following the final acceptance date, to provide the commodity or service set forth in the attached specifications, or until a selection has been made by the City.

4. Late proposals will not be accepted under any circumstances.

5. Proposal should give full firm name and address of Offeror. Failure to manually sign the proposal will disqualify it. The person signing the proposal should show title or authority to bind his/her firm in contract. Insert your Federal Employer’s Identification Number _____________________ or Sole owner should enter SSN ______-____-______.

6. Purchases made for City use are exempt from State Sales Tax and Federal Excise Tax.

Do not include tax in your proposal. Tax exemption certificates will be furnished by the City upon request.

7. Telephone proposals are not acceptable when in response to an RFP.

Conditions The City of Midland is requesting proposals with the intent of awarding a contract for the requirement contained in this RFP. However, the City is not obligated to award a contract on this solicitation and reserves the right to reject any and all proposals and award the proposal to best serve the interests of the City.

1. Offerors electing to respond to this RFP are responsible for all costs of proposal preparation. The City is not liable for any costs incurred by a offeror in response to this RFP.

2. No public disclosures or news releases pertaining to this RFP shall be made without prior written approval from purchasing.

3. In case of a tie between two or more offerors, the award will be made in accordance with preferences as outlined by statute.

4. The Offeror agrees to protect the City from claims involving infringement of patents or copyrights.

5. The Offeror hereby assigns to Purchaser, any and all claims for overcharges associated with any contract resulting from this RFP which arise under the antitrust laws of the United States 15 U.S.C.A. Section 1, et seq.

1973 and which arise under the antitrust laws of the State of Texas, Texas Business and Commercial Code Ann. Sec. 15.01, et seq. (1967).

6. No substitutions or cancellation permitted without the written approval of the City Purchasing Agent. Deliveries made pursuant to a resulting contract shall be made during normal working hours only, unless approval for late delivery has been obtained.

7. Contractor shall submit two copies of an itemized invoice to Accounts Payable, The City of Midland, Texas, P.O. Box 1152, Midland Texas 79702.

Each copy of the invoice shall reference the P.O. and the RFP numbers.

8. In the event of a conflict between the standard proposal requirements and conditions and the attached detail specification, the detail specifications shall govern.

9. Governing Law & Venue: This agreement shall be governed by and construed in accordance with the laws of the State of Texas. Venue for any disputes or lawsuits arising from the performance of this contract shall be exclusively in Midland County, Texas. The parties agree that all performance under this contract shall take place in Midland, County, Texas. The Contractor and City agree that all payments made under this contract shall take place in Midland County, Texas.

10. This obligation and undertakings of each of the parties to this contract shall be deemed to have been performed in Midland County, Texas.

S:\Purch PDF\0ProcFldr\FY2026\26002248 Elevator- Escalator Service Airport\26002248 Request for Proposal.doc 1 of 11 Revised: Ja

1. GENERAL INFORMATION

1.1. INTRODUCTION

The City of Midland (Midland International Air & Space Port) (hereinafter referred to as "the City") is pleased to invite you to submit a proposal for the elevator-escalator service at the City of Midland Airport as specified herein. Proposals submitted in response to the specifications contained herein shall comply with the following instructions and procedures.

Request for Proposal Standard Information

This Request for Proposal (RFP) is issued in accordance with City of Midland Policy, the RFP Manual and the statutes of the State of Texas. The RFP process is a procurement option allowing the award to be evaluated based on stated criteria. The RFP states the relative importance of all criteria. No other criteria, other than as outlined in the Request for Proposal, will be used.

1.2. INITIAL EVALUATION

Upon receipt, the proposal information will be disclosed only to persons participating in the evaluation or contracting process until the proposal has been reviewed and all marked trade secrets have been removed (see “Trade Secrets and Other Withheld Information” statement below). After this review, all remaining proposal materials will be available under the open records act. The proposals will be initially evaluated by the committee as being “responsive” or “non-responsive”.

1.3. DISCUSSION/NEGOTIATION

Although proposals may be accepted and a contract awarded without discussion, the City may initiate discussions should clarification or negotiation be necessary. Offerors should be prepared to send qualified personnel to Midland, Texas to discuss technical and contractual aspects of the proposal.

1.4. BEST AND FINAL OFFER

The "Best and Final Offer" is an option available to the City under the RFP process allowing one or more offerors to submit a best and final offer. Offerors may be contacted, asking that they submit their best and final offer, which must include the discussed and/or negotiated changes.

1.5. AWARD

1.5.1. If the Contract is awarded, it will be awarded to either the lowest responsible bidder, or to the bidder who provides goods or services at the best value for the City of Midland. In determining the best value for the City of Midland, the City of Midland may consider the criteria enumerated in Section 252.043 of the Texas Local Government Code.

1.6. TRADE SECRETS

1.6.1. All information received in response to this RFP will be available to the public except for:

1.6.1.1. trade secrets meeting the requirements of Texas Government Code Title 5, Chapter

552, Subchapter C, § 552.110; and

1.6.1.2. matters involving individual safety as determined by the department.

1.6.2. In order for an offeror to claim trade secret material, the following conditions must be met. Information to be withheld must be clearly marked and separated from the rest of the proposal.

1.6.2.1. The proposal may not contain trade secret matter in the cost or price.

1.6.2.2. An affidavit from the offeror’s legal counsel attesting to and explaining the validity of

S:\Purch PDF\0ProcFldr\FY2026\26002248 Elevator- Escalator Service Airport\26002248 Request for Proposal.doc 2 of 11 Revised: Ja the trade secret claim must be attached to each proposal containing trade secrets. In addition, offerors submitting a proposal containing trade secrets must be prepared to pay all legal costs and fees associated with defending the claim for trade secret protection in the event of an open records request from another party.

1.6.3. Documents not meeting all of the requirements of (1) and (2) will be available for public inspection, including copyrighted materials.

1.7. LATE PROPOSALS

Proposals received after the time specified for receipt of proposals will be destroyed or returned at the offeror’s expense after consultation with the offeror. There are no exceptions to this deadline.

1.8. PREPARING A RESPONSE

This RFP contains the instructions governing the proposals to be submitted and a description of the mandatory requirements. To be eligible for consideration, an offeror must meet the intent of all mandatory requirements. Compliance with the intent of a mandatory requirement will be determined by the Purchasing Office. When imperative language (shall, will, must) appears in any section of the RFP, it is considered to be mandatory.

1.8.1. Offerors shall promptly notify the City of any ambiguity, inconsistency or error, which they may discover upon examination of this RFP.

1.9. PRE-PROPOSAL CONFERENCE:

A Pre-Proposal Conference will be conducted at 9506 La Force Blvd. on (date) January 21, 2026 at (time) 9:00am. Offerors may use this opportunity to notify the City of any ambiguity, inconsistency, or error, which they may discover upon examination of this RFP. All responses to questions at the Pre-Proposal Conference will be oral and in no way binding on the City.

1.10. CLARIFICATION/ INTERPRETATION

Offerors requiring clarification or interpretation of any section or sections contained in this RFP shall make a written request to the City Purchasing Agent by the deadline described in the Schedule of Events. All written correspondence must be addressed to:

The City of Midland FAX: (432) 685-0523 Office of the Purchasing Agent OR P.O. Box 1152 e-mail: purchasing@midlandtexas.gov Midland, TX 79702

1.11. FORMAT FOR INQUIRIES:

Each offeror submitting written questions must clearly address each question by reference to a specific section, page and item of this RFP. An official written answer will be provided to all questions received. Verbal responses shall not be considered binding.

1.12. INTERPRETATION:

Any interpretation, correction or change of this RFP will be made by written Addendum.

Interpretations, corrections or changes of this RFP made in any other manner will not be binding and offerors shall not rely upon such interpretations, corrections or changes.

The City of Midland Purchasing Office will issue any necessary Addenda.

A point-by-point response to all numbered sections, subsections, paragraphs, subparagraphs and appendices must be submitted by each offeror in order to be considered for selection.

1.13. PROPOSAL ORGANIZATION AND SUBMISSION

Offerors must organize proposals into sections following the format of this RFP, with tabs

S:\Purch PDF\0ProcFldr\FY2026\26002248 Elevator- Escalator Service Airport\26002248 Request for Proposal.doc 3 of 11 Revised: Ja separating each section. If no exception, explanation, or clarification is required in the offeror's response to a specific subsection, the offeror shall indicate so in the point-by-point response with the following:

“(Offeror’s Name)", understands and will comply.

Section 1.14 is optional:

1.14. OFFER PRICING

Offerors must respond to this RFP by utilizing the RFP Cost Summary. The cost summary will be used as the primary representation of each offeror’s cost, and will be used extensively during proposal evaluations. Additional information should be included as necessary to explain in detail the offeror’s cost.

Proposals should be complete to the degree that all of the information sought by this RFP is supplied in the order requested.

Section 1.15 is optional:

1.15. ALTERNATE PROPOSALS

Offerors may submit, at their option, multiple proposals, in which case each proposal shall be evaluated as a separate document.

1.16. SUBMITTING A SEALED PROPOSAL

1.16.1. Number of copies and Location:

1.16.1.1. Offerors must submit one original, 2 hard copies and one (1) soft copy (PDF or

Word) to the City Secretary. Sealed Proposals must be received by the date before the time stated on the face of the Request for Proposal Cover Page, local time. Sealed Proposals received after this time will not be accepted for consideration. Facsimile copies are not acceptable.

1.16.1.2. Please be sure to label the outermost package of the RFP whether it is an envelope, box or overnight package with the RFP number, RFP description and closing date so that it is visible when received by the City.

1.16.2. Each Offeror who submits a proposal represents that:

1.16.2.1. The proposal is based upon an understanding of the specifications and requirements described in this RFP.

1.16.2.2. Costs for developing and delivering responses to this RFP and any subsequent presentations of the proposal as requested by the City are entirely the responsibility of the offeror. The City is not liable for any expense incurred by the offerors in the preparation and presentation of their proposals.

1.16.2.3. All materials submitted in response to this RFP become the property of the City and are to be appended to any formal documentation, which would further define or expand any contractual relationship between the City and offeror resulting from this RFP process.

1.16.3. The proposals must be signed in ink by an individual authorized to legally bind the business submitting the proposal.

The 120-day period (how long will it take to evaluate and take to Council-we have had a couple that took a year!) can be changed.

1.16.4. A proposal may not be modified, withdrawn or canceled by the offeror for a 120-

S:\Purch PDF\0ProcFldr\FY2026\26002248 Elevator- Escalator Service Airport\26002248 Request for Proposal.doc 4 of 11 Revised: Ja day period following the deadline for proposal submission, or receipt of best and final offer, if required, as defined in the Schedule of Events, and offeror so agrees in submitting the proposal.

1.17. RIGHTS RESERVED

While the City has every intention to award a contract as a result of this RFP, issuance of the RFP in no way constitutes a commitment by the City of Midland to award a contract. Upon a determination, such actions would be in its best interests, the City in its sole discretion reserves the right to:

A) waive any formality;

b) cancel or terminate this RFP;

c) reject any or all proposals received in response to this document;

d) waive any undesirable, inconsequential, or inconsistent provisions of this document, which would not have significant impact on any proposal; not award, or if awarded, terminate any contract if the City determines adequate City funds are not available.

1.18. BONDING REQUIREMENTS

See Exhibit C

1.19. OFFEROR INTERVIEW / PRODUCT DEMONSTRATION

After receipt of all proposals and before the determination of the award, respondents may be required to make an oral presentation and product demonstration in Midland, Texas to clarify their response or to further define their offer. Oral presentations and product demonstrations, if requested, shall be at the offeror’s expense.

(Section 1.20 is optional based on whether or not subcontractors will be involved.)

1.20. SUBCONTRACTING

1.20.1. The successful offeror will be the Prime Contractor and shall be responsible, in total, for all work of subcontractors. All subcontractors must be listed in the proposal.

The City reserves the right to approve all subcontractors.

1.20.2. The contractor shall be responsible to the City for the acts and omissions of all subcontractors or agents and of persons directly or indirectly employed by such subcontractors, and for the acts and omissions of persons employed directly by the contractor. Further, nothing contained within this document or any contract documents created as a result of any contract awards derived from this RFP shall create any contractual relationships between any subcontractor and the City.

1.21. INSURANCE REQUIREMENTS

See Contract or Agreement

1.22. CONTRACTOR'S RESPONSIBILITIES

The successful offeror shall keep informed of, and shall comply with all applicable laws, ordinances, rules, regulations and orders of the City, County, State, Federal or public bodies having jurisdiction affecting any work to be done to provide the services required. The offeror shall provide all necessary safeguards for safety and protection, as set forth by the United States Department of Labor, Occupational Safety and Health Administration.

1.23. OFFEROR COMPETITION

The City encourages free and open competition among offerors. Whenever possible, specifications, proposal requests and conditions are designed to accomplish this objective, consistent with the necessity to satisfy the City's need to procure technically sound, cost-effective services.

The offeror's signature on a proposal in response to this RFP guarantees that the prices quoted have been established without collusion of other eligible offerors and without effort to preclude the City of Midland from obtaining the best possible price.

S:\Purch PDF\0ProcFldr\FY2026\26002248 Elevator- Escalator Service Airport\26002248 Request for Proposal.doc 5 of 11 Revised: Ja

1.24. CONTRACT PROVISIONS AND TERMS

1.24.1. Contract Execution

1.24.1.1. The City will execute a contract with the successful offeror(s). The City requires that the RFP and the terms and conditions attached to it, the offeror’s response, the best and final offer (if required), and any formal addenda to the RFP be included as part of any contract documents.

1.24.2. Terms and Conditions

Contract that will be executed by the successful offeror and the City is found in Appendix A.

1.24.3. Exceptions to Contract Terms & Conditions

Offerors should notify the City of any terms within the sample contract that either precludes them from responding to the RFP or add unnecessary cost.

1.24.4. The initial contract(s) term is for a period of three (3) years. Renewals of the contract may be made at 1-year intervals, not to exceed a total of (3) three years, at the City's option.

Section 1.15.3 is optional depending on the nature of the project.

1.24.5. Contract Extension

The offeror agrees that, through the term of the initial contract and any agreed-upon extension, the City will be entitled to any price reductions at least equal to any lower prices made available to any other customer of comparable volume.

Section 1.24.6 is optional depending on the nature of the project. The rates need to be adjusted per project.

1.24.6. Escalation

Annual pricing adjustments to contract extensions following the initial contract term, if applicable, shall not exceed seventy-five percent (75%) of the rate of increase in the cost of living as reflected in the Federal Bureau of Labor Statistics, Consumer Price Index (CPI) for all Urban Consumers (1982-84=100; through November 1991 = 137.8) or any other index which may be substituted in the future. The CPI for the latest twelve (12) month period of the contract will be the CPI base on which later adjustments are computed. Each time an adjustment is made, the earlier CPI base will be replaced by the adjusted CPI base. The percentage of adjustment to contract prices shall in no event exceed the percentage change in the index.

2. PROPOSAL WAIVERS:

2.1. WAIVER OF ATTORNEY FEES: BY SUBMITTING THIS PROPOSAL,

OFFEROR AGREES TO WAIVE AND DOES HEREBY KNOWINGLY,

CONCLUSIVELY, VOLUNTARILY AND INTENTIONALLY WAIVE ANY

CLAIM IT HAS OR MAY HAVE IN THE FUTURE AGAINST CITY

REGARDING THE AWARD OR ATTORNEY’S FEES, WHICH ARE IN ANY

WAY RELATED TO THIS PROPOSAL, OR THE CONSTRUCTION,

INTERPRETATION OR BREACH OF THIS PROPOSAL. OFFEREOR

SPECIFICALLY AGREES THAT IF OFFEROR BRINGS OR COMMENCES

ANY LEGAL ACTION OR PROCEEDING RELATED TO THIS PROPOSAL,

THE CONSTRUCTION, INTERPRETATION, VALIDITY OR BREACH OF

THIS PROPOSAL, INCLUDING, BUT NOT LIMITED TO, ANY ACTION

PURSUANT TO THE PROVISIONS OF THE TEXAS UNIFORM

DECLARATORY JUDGMENTS ACT (TEXAS CIVIL PRACTICE AND

REMEDIES CODE SECTION 37.001, ET SEQ., AS AMENDED), OR CHAPTER

S:\Purch PDF\0ProcFldr\FY2026\26002248 Elevator- Escalator Service Airport\26002248 Request for Proposal.doc 6 of 11 Revised: Ja

271 OF THE TEXAS LOCAL GOVERNMENT CODE, OFFEROR AGREES TO

ABANDON, WAIVE AND RELINQUISH ANY AND ALL RIGHTS TO THE

RECOVERY OF ATTORNEY’S FEES TO WHICH OFFEROR MIGHT

OTHERWISE BE ENTITLED.

2.2. OFFEROR AGREES THAT THIS IS THE VOLUNTARY AND INTENTIONAL

RELINQUISHMENT AND ABANDONMENT OF A PRESENTLY-EXISTING

KNOWN RIGHT. OFFEROR ACKNOWLEDGES THAT IT UNDERSTANDS

ALL TERMS AND CONDITIONS OF THIS PROPOSAL. OFFEROR FURTHER

ACKNOWLEDGES AND AGREES THAT THERE WAS AND IS NO

DISPARITY OF BARGAINING POWER BETWEEN CITY AND OFFEROR.

THIS SECTION SHALL NOT BE CONSTRUED OR INTERPRETED AS A

WAIVER OR GOVERNMENTAL IMMUNITY AND SHALL SURVIVE THE

TERMINATION OF THE CONTRACT.

2.3. OFFEROR IS RELYING ON ITS OWN JUDGMENT. OFFEROR HAD THE

OPPORTUNITY TO DISCUSS THESE PROPOSAL DOCUMENTS WITH

COMPETENT LEGAL COUNSEL PRIOR TO SUBMISSION OF THE

PROPOSAL OR EXECUTION OF THE CONTRACT.

2.4. WAIVER:

2.5. BY SUBMITTING A PROPOSAL, THE OFFEROR AGREES TO WAIVE AND

DOES HEREBY VOLUNTARILY AND INTENTIONALLY WAIVE, ABANDON

AND RELINQUISH ANY CLAIM THE OFFEROR HAS OR MAY HAVE IN THE

FUTURE AGAINST THE CITY OF MIDLAND, TEXAS, AND THE CITY’S

EMPLOYEES, AGENTS AND OFFICERS, ARISING OUT OF OR IN ANY WAY

CONNECTED WITH THE FOLLOWING:

2.5.1. THE ADMINISTRATION, EVALUATION OR RECOMMENDATION OF ANY

PROPOSAL;

2.5.2. WAIVER OR DELETION OF ANY OF THE REQUIREMENTS UNDER THE

PROPOSAL DOCUMENTS OR THE CONTRACT DOCUMENTS;

2.5.3. ACCEPTANCE OR REJECTION OF ANY PROPOSALS; OR

2.5.4. AWARD OF THE CONTRACT.

2.6. BY SUBMITTING A PROPOSAL, THE OFFEROR ACKNOWLEDGES THAT

THE OFFEROR UNDERSTANDS ALL OF THE TERMS OF THE PROPOSAL

DOCUMENTS AND CONSENTS TO THE PROPOSAL PROCESS AND THE

POSSIBILITY OF A NEGATIVE ASSESSMENT. BY SUBMITTING A

PROPOSAL, THE OFFEROR ACKNOWLEDGES AND AGREES THAT THERE

WAS AND IS NO DISPARITY OF BARGAINING POWER BETWEEN THE

OFFEROR AND THE CITY OF MIDLAND, TEXAS. THE OFFEROR AGREES

THAT THIS IS THE INTENTIONAL RELINQUISHMENT OF A PRESENTLY

EXISTING KNOWN RIGHT. BY SIGNING THE PROPOSAL AND/OR BELOW,

YOUR COMPANY AGREES TO THE ABOVE WAIVER(S).

2.7. BY SIGNING THE EXECUTION OF OFFER, YOUR COMPANY AGREES TO

THE ABOVE WAIVER(S). IF THIS FORM IS NOT SIGNED AND INCLUDED

WITH YOUR PROPOSAL DOCUMENTS YOUR PROPOSAL WILL BE

CONSIDERED NON-RESPONSIVE AND WILL BE REJECTED.

3. SCOPE OF PROJECT

The contractor shall provide all labor, material, supervision and equipment necessary to maintain the elevator and escalator at the Midland International Air & Space Port. Equipment damaged through acts of God and abuse is the City's responsibility. However, the labor to replace the equipment is the Contractor’s responsibility.

S:\Purch PDF\0ProcFldr\FY2026\26002248 Elevator- Escalator Service Airport\26002248 Request for Proposal.doc 7 of 11 Revised: Ja

4. REQUIREMENTS

The Contractor shall, at its sole expense, obtain all permits, licenses, approvals, and authorizations required for the performance of this contract; provide all required notices; pay all fees required by law; and comply fully with all applicable federal, state, and local laws, ordinances, rules, and regulations governing the performance of the work. Permit information may be obtained by contacting 685-7390.

Portions of this contract qualify for exemption under the Texas Limited Sales, Excise and Use Tax Act in accordance with Texas Tax Code, Title 2, Subtitle E, Chapter 151, Subchapter H, including Sections 151.309, 151.311, and 151.3111. Upon request, the Contractor may obtain a sales tax exemption certificate from the City of Midland through the Purchasing Office. The exemption applies to all labor performed on the project, all materials incorporated into the project, and related costs such as overhead allocation. Equipment, equipment parts, and tools purchased for use on the project but not incorporated into the work may not qualify for the exemption. The Contractor is solely responsible for determining any tax liability associated with the contract and for the payment of any such taxes. Under no circumstances shall sales or use tax be billed to the City.

The City may award a contract or purchase order to the lowest responsible bidder or to the bidder offering the best value to the City, as determined solely by the City in accordance with Section

252.043 of the Texas Local Government Code.

This service contract covers two (2) Schindler escalators and four (4) Schindler elevators located at Midland International Air & Space Port. At the beginning of the contract term, the equipment will be approximately twenty-five (25) years old and has been continuously maintained under a manufacturer’s maintenance contract since installation.

During the term of the contract, the Contractor shall, at its expense, correct defects in materials and workmanship resulting from normal wear and tear, excluding damage caused by improper use or vandalism. Elevator coverage shall include both basic and major components, including but not limited to resistors, timers, fuses, overloads, wiring, coils, door operating devices, guide shoes, rollers, traveling cables, interlocks, motors, PC boards, pump units, solid-state devices, contactors, exposed piping in the machine room and hoistway, and valve rebuilds. Escalator coverage shall include basic and major components such as step rollers, belts, controller components, brakes, brake components, escalator machines or drive units, handrails, drive chains, PC boards, sprockets, and step chains.

The Contractor shall provide cleaning on a scheduled maintenance basis, including removal of debris related to the Contractor’s work in the machine room, car top, and pit areas; lubrication;

adjustments to manufacturer-recommended tolerances; and the repair or replacement of broken or malfunctioning parts. A detailed maintenance schedule specific to the Airport equipment and its usage shall be included as part of the proposal.

All required safety testing shall be the responsibility of the Contractor, including state inspector witnessing fees, inspections, licensing, and testing of equipment. These fees shall be included in the proposal. Hydraulic equipment shall receive an annual pressure and relief valve check, and escalators shall undergo an annual safety switch test. If applicable, remote monitoring of equipment is desired, with 24/7 monitoring and toll-free communication with the City to schedule required service.

The Contractor shall utilize only qualified, properly trained personnel to service the equipment.

Midland International Air & Space Port operates 24 hours per day, seven days per week;

however, most service calls are expected to be handled during normal working hours. Repair requests made by the City by 2:00 p.m. shall receive same-day response during normal operating

S:\Purch PDF\0ProcFldr\FY2026\26002248 Elevator- Escalator Service Airport\26002248 Request for Proposal.doc 8 of 11 Revised: Ja hours, while requests made after that time may be addressed the next working day. If the Contractor’s regular Airport personnel are unavailable, the Contractor shall provide replacement personnel at no additional cost to the City. Prompt callback coverage is required, and the Contractor shall provide contact information for both non-emergency and emergency service calls.

For emergency service requiring response on weekends, holidays, or outside normal working hours, the City will pay applicable premium rates, including travel time and expenses. The Contractor shall clearly state normal operating hours and provide hourly rates for weekends, after-hours service, and holidays.

Any exclusions from coverage shall be clearly identified in the proposal.

All matters related to the hiring, supervision, training, compensation, and discharge of the Contractor’s employees are the sole responsibility of the Contractor. The City reserves the right to require removal of any employee deemed unacceptable, with replacement by a properly qualified individual. Contractor employees shall perform all work in a careful, efficient, and professional manner consistent with the highest industry standards, particularly when interacting with the public, airport staff, and aircraft operations.

Due to security requirements at the Airport, the Contractor shall execute an Airport Security Agreement and ensure that all employees obtain Airport Security Identification Badges. Each employee shall undergo a Criminal History Records Check in accordance with TSA regulations (49 CFR §1542.209), with a $100 application fee per individual covering background checks, fingerprinting, and badge issuance. Employees convicted of disqualifying offenses shall not be permitted to work at the Airport. Approved employees must complete mandatory Airport Security Training prior to badge issuance. The Contractor shall promptly report employee terminations or lost, stolen, or destroyed badges, return badges for terminated employees within ten (10) days, and comply with all assessed replacement or non-return fees. All personnel must be able to comprehend and communicate in English.

The Contractor shall comply with all applicable laws and directives of the Director of Airports.

Upon written notice of non-compliance by any employee, the Contractor shall take appropriate corrective action, including removal from Airport work if necessary. The Contractor shall maintain and promptly update written records of all employees assigned to the contract.

All Contractor employees must be legally authorized to work in the United States. Verification of legal status is required, and background checks with the appropriate federal agencies are strongly recommended.

Employees shall wear clean, neat, and professional uniforms approved by the Director of Airports, including long pants, appropriate footwear, and company-branded headwear only.

Shirts shall remain buttoned and tucked in at all times; shorts and unapproved attire are prohibited.

Subcontracting shall not be permitted without prior written approval from the Director of Airports. All subcontractors and their employees shall comply with the same requirements applicable to the Contractor, including insurance, security, and personnel standards.

5. NARRATIVE

Proposals will be evaluated heavily based on the projected yearly cost to the City, encompassing all necessary expenses for the operation, maintenance, and any additional services required.

Vendors must provide a detailed breakdown of all annual costs associated with their proposed

S:\Purch PDF\0ProcFldr\FY2026\26002248 Elevator- Escalator Service Airport\26002248 Request for Proposal.doc 9 of 11 Revised: Ja solution.

6. VENDOR QUALIFICATIONS

6.1. INFORMATION VERIFICATION

The City may make such investigations as deemed necessary to determine the ability of the offeror to supply the products and perform the services specified.

6.2. RIGHT TO REJECT

The City reserves the right to reject any proposal if the evidence submitted by, or investigation of, the offeror fails to satisfy the City that offeror is properly qualified to carry out the obligations of the contract.

6.3. VENDOR CAPABILITIES

In determining the capabilities of an offeror to perform the services specified herein, the following informational requirements must be met by the offeror and will be weighed by the City. (Note: Each item must be thoroughly addressed. Taking exception to any requirements listed in this Section may disqualify the proposal):

6.3.1. References

6.3.1.1. Offeror shall provide a minimum of two references that are using services of the type proposed in this RFP. The references should fall within the categories identified below. At a minimum, the offeror shall provide the company name, the location where the services were provided, contact person(s), customer telephone number, a complete description of the service type, and dates the services were provided. The City reserves the right to use any information or additional references deemed necessary to establish the ability of the offerors to perform the conditions of the contract. Negative references may be grounds for proposal disqualification.

6.3.1.2. These references should include City government and universities where the offeror, preferably within the last five years, has successfully completed elevator service to an airport.

6.3.2. Vendor Stability

6.3.2.1. Offerors shall demonstrate their financial stability to supply, install and support the services specified.

6.3.2.2. Provide financial statements, preferably audited, for the three consecutive years immediately preceding the issuance of this RFP.

6.3.2.3. Provide copies of any quarterly financial statements that have been prepared since the end of the period reported by your most recent annual report.

6.3.2.4. Offerors shall specify how long the company submitting the proposal has been in business (doing similar projects) _______________________________.

7. EVALUATION PROCESS

7.1. EVALUATION PROCEDURE

7.1.1. Committee Actions

7.1.1.1. The evaluation committee will separate proposals into “responsive” and “non-responsive” proposals. Non-responsive proposals will be eliminated from further consideration.

7.1.1.2. The evaluation committee will evaluate the remaining proposals and determine whether to award the contract to the best proposal or to seek a best and final offer before awarding a contract. Selection and award will be based on the offeror’s proposal and other items outlined in this RFP.

S:\Purch PDF\0ProcFldr\FY2026\26002248 Elevator- Escalator Service Airport\26002248 Request for Proposal.doc 10 of 11 Revised: Ja

7.1.1.3. Responses must be complete and address all the criteria listed. Information or materials presented by offerors outside the formal response or subsequent “best and final offer,” if requested, will not be considered and will have no bearing on any award.

7.2. EVALUATION CRITERIA

The evaluation committee will review and evaluate the offers according to the following criteria:

7.2.1. Company Service Qualifications- 15

7.2.2. Two references- 5

7.2.3. Years in business- 15

7.2.4. Project Manager- 5

7.2.5. Implementation Plan- 10

7.2.6. Training Requirements- 10

7.2.7. Organization- 10

7.2.8. Technical Abilities- 5

7.2.9. Cost Analysis- 25

8. PROPOSAL CONTENTS

The following items constitute the RFP submittal in response to the request herein:

8.1. THE RFP

8.2. THE COST SUMMARY OR PROPOSAL FORM

8.3. REQUESTED ATTACHMENTS

8.3.1. References

8.3.2. Resumes

8.3.3. Business Plan

8.3.4. Financial Information

8.3.5. Signed Execution of Offer

9. TEXAS PUBLIC INFORMATION ACT

Notwithstanding any other provisions, this request for proposals, along with any associated contract, is subject to the Texas Public Information Act.

Request for Proposals
RFP 26002248
for
Proposals for this requirement will be accepted until 2:00 P.M. on January 28,2026
Proposals May be Mailed or Delivered to:
City Secretary
City of Midland
Suite 330
P.O. BOX 1152
Midland, Texas 79702-1153
(300 N. Loraine, Suite 330 Midland, TX 79701)
No Late Proposals Will Be Accepted
See Section 1.9 for Pre-proposal Meeting Information
TABLE OF CONTENTS
SCHEDULE OF EVENTS
Special Terms and Conditions
1. General Information
1.1. Introduction
1.2. Initial Evaluation
1.3. Discussion/Negotiation
1.4. Best and Final Offer
1.5. Award
1.5.1. If the Contract is awarded, it will be awarded to either the lowest responsible bidder, or to the bidder who provides goods or services at the best value for the City of Midland. In determining the best value for the City of Midland, the City o...
1.6. Trade Secrets
1.6.1. All information received in response to this RFP will be available to the public except for:
1.6.1.1. trade secrets meeting the requirements of Texas Government Code Title 5, Chapter 552, Subchapter C, § 552.110; and
1.6.1.2. matters involving individual safety as determined by the department.
1.6.2. In order for an offeror to claim trade secret material, the following conditions must be met. Information to be withheld must be clearly marked and separated from the rest of the proposal.
1.6.2.1. The proposal may not contain trade secret matter in the cost or price.
1.6.2.2. An affidavit from the offeror’s legal counsel attesting to and explaining the validity of the trade secret claim must be attached to each proposal containing trade secrets. In addition, offerors submitting a proposal containing trade secrets ...

1.6.3. Documents not meeting all of the requirements of (1) and (2) will be available for public inspection, including copyrighted materials.

1.7. Late Proposals
1.8. Preparing a Response
1.8.1. Offerors shall promptly notify the City of any ambiguity, inconsistency or error, which they may discover upon examination of this RFP.
1.9. Pre-proposal Conference:
1.10. Clarification/ Interpretation
1.11. Format for inquiries:
1.12. Interpretation:
1.13. Proposal Organization and Submission
1.14. Offer Pricing
1.15. Alternate Proposals
1.16. Submitting a Sealed Proposal
1.16.1. Number of copies and Location:
1.16.1.1. Offerors must submit one original, 2 hard copies and one (1) soft copy (PDF or Word) to the City Secretary. Sealed Proposals must be received by the date before the time stated on the face of the Request for Proposal Cover Page, local time. ...
1.16.1.2. Please be sure to label the outermost package of the RFP whether it is an envelope, box or overnight package with the RFP number, RFP description and closing date so that it is visible when received by the City.
1.16.2. Each Offeror who submits a proposal represents that:
1.16.2.1. The proposal is based upon an understanding of the specifications and requirements described in this RFP.
1.16.2.2. Costs for developing and delivering responses to this RFP and any subsequent presentations of the proposal as requested by the City are entirely the responsibility of the offeror. The City is not liable for any expense incurred by the offero...
1.16.2.3. All materials submitted in response to this RFP become the property of the City and are to be appended to any formal documentation, which would further define or expand any contractual relationship between the City and offeror resulting from...
1.16.3. The proposals must be signed in ink by an individual authorized to legally bind the business submitting the proposal.
1.16.4. A proposal may not be modified, withdrawn or canceled by the offeror for a 120-day period following the deadline for proposal submission, or receipt of best and final offer, if required, as defined in the Schedule of Events, and offeror so agr...
1.17. Rights Reserved
1.18. Bonding Requirements
1.19. Offeror Interview / Product Demonstration
1.20. Subcontracting
1.20.1. The successful offeror will be the Prime Contractor and shall be responsible, in total, for all work of subcontractors. All subcontractors must be listed in the proposal. The City reserves the right to approve all subcontractors.
1.20.2. The contractor shall be responsible to the City for the acts and omissions of all subcontractors or agents and of persons directly or indirectly employed by such subcontractors, and for the acts and omissions of persons employed directly by th...
1.21. Insurance requirements
1.22. Contractor's Responsibilities
1.23. Offeror Competition
1.24. Contract Provisions and Terms
1.24.1. Contract Execution
1.24.1.1. The City will execute a contract with the successful offeror(s). The City requires that the RFP and the terms and conditions attached to it, the offeror’s response, the best and final offer (if required), and any formal addenda to the RFP be...
1.24.2. Terms and Conditions
1.24.3. Exceptions to Contract Terms & Conditions
1.24.4. The initial contract(s) term is for a period of three (3) years. Renewals of the contract may be made at 1-year intervals, not to exceed a total of (3) three years, at the City's option.
1.24.5. Contract Extension
1.24.6. Escalation
2. Proposal Waivers:
2.1. Waiver of Attorney Fees: BY SUBMITTING THIS PROPOSAL, OFFEROR AGREES TO WAIVE AND DOES HEREBY KNOWINGLY, CONCLUSIVELY, VOLUNTARILY AND INTENTIONALLY WAIVE ANY CLAIM IT HAS OR MAY HAVE IN THE FUTURE AGAINST CITY REGARDING THE AWARD OR ATTORNEY’S ...
2.2. Offeror AGREES THAT THIS IS THE VOLUNTARY AND INTENTIONAL RELINQUISHMENT AND ABANDONMENT OF A PRESENTLY-EXISTING KNOWN RIGHT. OFFEROR ACKNOWLEDGES THAT IT UNDERSTANDS ALL TERMS AND CONDITIONS OF THIS PROPOSAL. OFFEROR FURTHER ACKNOWLEDGES AND AGR...
2.3. OFFEROR IS RELYING ON ITS OWN JUDGMENT. OFFEROR HAD THE OPPORTUNITY TO DISCUSS THESE PROPOSAL DOCUMENTS WITH COMPETENT LEGAL COUNSEL PRIOR TO SUBMISSION OF THE PROPOSAL OR EXECUTION OF THE CONTRACT.
2.4. WAIVER:
2.5. BY SUBMITTING A PROPOSAL, THE OFFEROR AGREES TO WAIVE AND DOES HEREBY VOLUNTARILY AND INTENTIONALLY WAIVE, ABANDON AND RELINQUISH ANY CLAIM THE OFFEROR HAS OR MAY HAVE IN THE FUTURE AGAINST THE CITY OF MIDLAND, TEXAS, AND THE CITY’S EMPLOYEES, AG...
2.5.1. THE ADMINISTRATION, EVALUATION OR RECOMMENDATION OF ANY PROPOSAL;
2.5.2. WAIVER OR DELETION OF ANY OF THE REQUIREMENTS UNDER THE PROPOSAL DOCUMENTS OR THE CONTRACT DOCUMENTS;
2.5.3. ACCEPTANCE OR REJECTION OF ANY PROPOSALS; OR
2.5.4. AWARD OF THE CONTRACT.
2.6. BY SUBMITTING A PROPOSAL, THE OFFEROR ACKNOWLEDGES THAT THE OFFEROR UNDERSTANDS ALL OF THE TERMS OF THE PROPOSAL DOCUMENTS AND CONSENTS TO THE PROPOSAL PROCESS AND THE POSSIBILITY OF A NEGATIVE ASSESSMENT. BY SUBMITTING A PROPOSAL, THE OFFEROR AC...
2.7. BY SIGNING THE EXECUTION OF OFFER, YOUR COMPANY AGREES TO THE ABOVE WAIVER(S). IF THIS FORM IS NOT SIGNED AND INCLUDED WITH YOUR PROPOSAL DOCUMENTS YOUR PROPOSAL WILL BE CONSIDERED NON-RESPONSIVE AND WILL BE REJECTED.
3. Scope Of Project
4. Requirements
5. NarrAtive
6. Vendor Qualifications
6.1. Information Verification
6.2. Right to reject
6.3. Vendor Capabilities
6.3.1. References
6.3.1.1. Offeror shall provide a minimum of two references that are using services of the type proposed in this RFP. The references should fall within the categories identified below. At a minimum, the offeror shall provide the company name, the locat...
6.3.1.2. These references should include City government and universities where the offeror, preferably within the last five years, has successfully completed elevator service to an airport.
6.3.2. Vendor Stability
6.3.2.1. Offerors shall demonstrate their financial stability to supply, install and support the services specified.
6.3.2.2. Provide financial statements, preferably audited, for the three consecutive years immediately preceding the issuance of this RFP.
6.3.2.3. Provide copies of any quarterly financial statements that have been prepared since the end of the period reported by your most recent annual report.
6.3.2.4. Offerors shall specify how long the company submitting the proposal has been in business (doing similar projects) _______________________________.
7. Evaluation Process
7.1. Evaluation Procedure
7.1.1. Committee Actions
7.1.1.1. The evaluation committee will separate proposals into “responsive” and “non-responsive” proposals. Non-responsive proposals will be eliminated from further consideration.
7.1.1.2. The evaluation committee will evaluate the remaining proposals and determine whether to award the contract to the best proposal or to seek a best and final offer before awarding a contract. Selection and award will be based on the offeror’s p...
7.1.1.3. Responses must be complete and address all the criteria listed. Information or materials presented by offerors outside the formal response or subsequent “best and final offer,” if requested, will not be considered and will have no bearing on ...
7.2. Evaluation Criteria
7.2.1. Company Service Qualifications- 15
7.2.2. Two references- 5
7.2.3. Years in business- 15
7.2.4. Project Manager- 5
7.2.5. Implementation Plan- 10
7.2.6. Training Requirements- 10
7.2.7. Organization- 10
7.2.8. Technical Abilities- 5
7.2.9. Cost Analysis- 25
8. Proposal Contents
8.1. The RFP
8.2. The Cost Summary or Proposal Form
8.3. Requested attachments
8.3.1. References
8.3.2. Resumes
8.3.3. Business Plan
8.3.4. Financial Information
8.3.5. Signed Execution of Offer
9. TEXAS PUBLIC INFORMATION ACT
EXECUTION OF OFFER

File details come from the government source that posted it. Updated .