11952 Exhibit E Task Perf Checklists.pdf

PDF 129 KB Posted

Attached to
Janitorial Services and Snow Removal - Brothers Oasis Rest Area
Solicitation number
S-73000-00011952
Issued by
Baker County, Oregon

About this file

This document is an Exhibit E - Task Summary and Checklists for a janitorial services contract between the Ohio Department of Transportation (ODOT) and a contractor. It outlines the daily, weekly, monthly, and bi-annual janitorial tasks required for building maintenance, including restroom cleaning, exterior area maintenance, and snow/ice removal. The contractor is responsible for completing the checklists and leaving them for ODOT's on-site coordinator to review and approve. The contract requires the contractor to provide all necessary supplies and equipment to perform the specified janitorial services.

The contract does not include any pricing terms, set-asides, or information about the current incumbent or funding sources. The document focuses solely on the detailed scope of work and performance standards for the janitorial services to be provided under the contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT E

TASK SUMMARY AND CHECKLISTS

DAILY JANITORIAL SERVICE – TASK SUMMARY AND CHECKLIST

INSTRUCTIONS TO CONTRACTOR: Contractor will be responsible for supplying and completing this checklist every day that service is provided under the Contract. Check off each Task completed. Fill-in the date, time in, time out and sign in the appropriate space at the bottom of the page. Leave the checklist in a location specified by the On-Site Coordinator.

INSTRUCTIONS TO ODOT ON-SITE COORDINATOR: Check-off whether the Tasks performed meet the requirements of the Performance Standards. For any task that does not meet requirements, provide comments at the bottom of the page. Date, sign and send to the Contract Administrator.

TASKS COMPLETED

(Contractor)

APPROVED

(ODOT)

YES NO

DAILY SERVICES – (Monday, Wednesday and Friday) Restrooms Sweep and Wet Mop Floors Clean and Disinfect Counter Surfaces Clean and Disinfect Door Handles Clean and Disinfect Paper Dispensers Clean and Disinfect Walls, Partitions, and Doors Clean and Disinfect Sinks Clean and Disinfect Toilets, Toilet Seats, Urinals and Exposed Plumbing Clean Mirrors Clean, Disinfect and Refill Soap Dispensers Empty, Clean and Disinfect Trash and Sanitary Receptacles Replace Trash Liners and Sanitary Bags Refill Toilet Tissue, Seat Covers, Paper Towels, Sanitary Disposal Bags Verify there are Backup Supplies of Can Liners, Paper Towels, Hand Soap, Toilet Tissue, Toilet Seat Covers, Sanitary Disposal Bags, and Urinal Blocks

Building Security Building Security Check Contractor: Time In Time Out

Date:

Signature:

ODOT:

Work Reviewed and Approved (Check One): YES NO

Date:

Signature:

ODOT Communication:

Janitorial Communication:

WEEKLY JANITORIAL SERVICE –TASK SUMMARY AND CHECKLIST

INSTRUCTIONS TO CONTRACTOR: Contractor will be responsible for supplying and completing this checklist every day that service is provided under the Contract. Check off each Task completed. Fill-in the date, time in, time out and sign in the appropriate space at the bottom of the page. Leave the checklist in a location specified by the On-Site Coordinator.

INSTRUCTIONS TO ODOT ON-SITE COORDINATOR: Check-off whether the Tasks performed meet the requirements of the Performance Standards. For any task that does not meet requirements, provide comments at the bottom of the page. Date, sign and send to the Contract Administrator.

TASKS COMPLETED

(Contractor)

APPROVED

(ODOT)

YES NO

WEEKLY SERVICE – (Friday) Restrooms Dust Building Surfaces, Ceilings, Walls, Corners, and Light Fixtures Exterior Building Areas Dust Building Surfaces, Ceilings, Walls, Corners, and Light Fixtures Sweep Exterior Entrances Remove Cobwebs and Debris Empty Trash Receptacles Empty Ash Receptacles | Sand Urns Remove Trash and Debris Clean Picnic Tables, Seats, etc.

Pick Up All Loose Trash, Butts and Debris from Grounds and Landscaping Remove Weeds From Around Buildings, Sidewalks, Curbs, and Picnic Tables Contractor: Time In Time Out

Date:

Signature:

ODOT:

Work Reviewed and Approved (Check One): YES NO

Date:

Signature:

MONTHLY JANITORIAL SERVICE – TASK SUMMARY AND CHECKLIST

INSTRUCTIONS TO CONTRACTOR: Contractor will be responsible for supplying and completing this checklist every day that service is provided under the Contract. Check off each Task completed. Fill-in the date, time in, time out and sign in the appropriate space at the bottom of the page. Leave the checklist in a location specified by the On-Site Coordinator.

INSTRUCTIONS TO ODOT ON-SITE COORDINATOR: Check-off whether the Tasks performed meet the requirements of the Performance Standards. For any task that does not meet requirements, provide comments at the bottom of the page. Date, sign and send to the Contract Administrator.

TASKS COMPLETED

(Contractor)

APPROVED

(ODOT)

YES NO

MONTHLY SERVICES

Restrooms Replace Urinal Blocks Exterior/Interior Areas Check/Replace Lamps/Fluorescent Tubes Contractor: Time In Time Out

Date:

Signature:

ODOT:

Work Reviewed and Approved (Check One): YES NO

Date:

Signature:

JANITORIAL SERVICE – TASK SUMMARY AND CHECKLIST

2-TIMES PER YEAR (March & August)

INSTRUCTIONS TO CONTRACTOR: Contractor will be responsible for supplying and completing this checklist every day that service is provided under the Contract. Check off each Task completed. Fill-in the date, time in, time out and sign in the appropriate space at the bottom of the page. Leave the checklist in a location specified by the On-Site Coordinator.

INSTRUCTIONS TO ODOT ON-SITE COORDINATOR: Check-off whether the Tasks performed meet the requirements of the Performance Standards. For any task that does not meet requirements, provide comments at the bottom of the page. Date, sign and send to the Contract Administrator.

TASKS COMPLETED

(Contractor)

APPROVED

(ODOT)

YES NO

PERIODIC SERVICES

2-TIMES PER YEAR (March and August) Restrooms Clean Restroom Ceiling Vents and Light Fixtures

Wet Scrub and Seal Floors Contractor: Time In Time Out

Date:

Signature:

ODOT:

Work Reviewed and Approved (Check One): YES NO

Date:

Signature:

WINTER TIME SERVICES – SNOW AND ICE REMOVAL – TASK SUMMARY AND CHECKLIST

INSTRUCTIONS TO CONTRACTOR: Contractor will be responsible for supplying and completing this checklist every day that service is provided under the Contract. Check off each Task completed. Fill-in the date, time in, time out and sign in the appropriate space at the bottom of the page. Leave the checklist in a location specified by the On-Site Coordinator.

INSTRUCTIONS TO ODOT ON-SITE COORDINATOR: Check-off whether the Tasks performed meet the requirements of the Performance Standards. For any task that does not meet requirements, provide comments at the bottom of the page. Date, sign and send to the Contract Administrator.

TASKS COMPLETED

(Contractor)

APPROVED

(ODOT)

YES NO

WINTER TIME SERVICES

Snow and Ice Removal (Mon-Fri with an accumulation over 2-inches) Exterior and Interior Areas Removal of Snow and Ice from Walkways and Interior Surfaces (Refer to Section 3)

Contractor: Time In Time Out

Date:

Signature:

ODOT:

Work Reviewed and Approved (Check One): YES NO

Date:

Signature:

File details come from the government source that posted it. Updated .